m2035-2013 public meetings mar2013
TRANSCRIPT
-
7/29/2019 M2035-2013 Public Meetings Mar2013
1/16
Mobility 2035 2013 Amendment
Public Meetings
March 11, 2013 Fort Worth
March 12, 2013 RichardsonMarch 13, 2013 Arlington
Chad Edwards, Program Manager
North Central Texas Council of Governments
-
7/29/2019 M2035-2013 Public Meetings Mar2013
2/16
What is Mobility 2035 2013 Amendment?
Representsa Blueprint for aMultimodal Transportation
System
Responds to Goals
Identifies Policies,
Programs, and Projects for
Continued Development
Guides Expenditures ofFederal and State Funds
Mobility Quality of Life
SystemSustainability
Implementation
GOALS
2
-
7/29/2019 M2035-2013 Public Meetings Mar2013
3/16
Metropolitan Transportation Plan
Major Policy Objectives
Needs Exceed Available Revenue
Cant Build Our Way Out of Congestion
Maximize Existing System
Use Sustainable Development Strategies to:
Reduce demand on transportation system
Provide multimodal options
Emphasis on Environmental Aspects and Quality of LifeIssues of Programs and Projects
Invest Strategically in Infrastructure
3
-
7/29/2019 M2035-2013 Public Meetings Mar2013
4/16
*Estimated RTC approval date
**Based on current 4-year update cycle requirement with the expiration of Mobility 2035 and 2011 Transportation Conformity
MTP Amendment Schedule
Metropolitan
Transportation PlanRTC Approval
(Conformity Approval)
Type of Update
Mobility 2035March 2011
(June 2011)
New Plan
New 2035 Demographics/New MPA
Boundary; Consider New Projects and
Financial Scenarios; Subject to
Financial Constraint
Mobility 2035
2013 Amendment
April 2013*
(July 2013)
AmendmentSame Demographics as Mobility 2035;
Refine Projects Already in Plan; Add
Projects to Financially Constrained
Portion that Generates Revenue; New
Air Quality Conformity Requirements
Mobility 2040March 2015*(June 2015)**
New Plan
New 2040 Demographics; All ProjectScopes Evaluated; New Financial
Constraint Analysis
4
-
7/29/2019 M2035-2013 Public Meetings Mar2013
5/16
Purpose of Amendment
Transportation Improvement Program (TIP)
New 2013-2016 TIP
Transportation Conformity (Air Quality)
Designation of Wise County as nonattainment for ozone
MOVES emissions modelAdjustment for conformity analysis years
Metropolitan Transportation Plan (MTP)
Update staging and phasing of projects
Take advantage of recent funding opportunities
5
-
7/29/2019 M2035-2013 Public Meetings Mar2013
6/16
Major Amended Roadway Projects (DRAFT)
Project From To Description
SH 114 SH 121 Loop 12Move project from deferred to recommended status(part of SH 183 project)
Loop 12 SH 183 IH 35EMove project from deferred to recommended status
(part of SH 183 project)
SH 170 IH 35W US 287Downgrade toll road section to arterial roadway
(toll bridge at railroad tracks)SH 121 SRT SH 114 Add managed lane connections
Blacklands
Toll RoadIH 30 SH 78
Add 4-lane toll road in Hunt County
(privately funded)
IH 635 US 75 IH 30 Move project from deferred to recommended status
SH 161 SH 183
Belt Line
Rd Modify cross section to include managed lanes
IH 35E US 67 IH 20 Move project from deferred to recommended status
IH 30 SH 161 Cooper St Modify cross section for additional managed lane
6
-
7/29/2019 M2035-2013 Public Meetings Mar2013
7/16
7
-
7/29/2019 M2035-2013 Public Meetings Mar2013
8/16
Major Amended Roadway Projects (DRAFT)Staging/Phasing*
Project From To DescriptionSH 183 SH 161 IH 35E Modify staging/phasing
IH 35E US 380 IH 635 Modify staging/phasing
Horseshoe Project IH 30 IH 35E Modify staging/phasing
SH 360 Camp Wisdom US 287 Modify staging/phasing
SRT Dallas CountyLine
US 75 Modify staging/phasing
PGBT IH 35E SH 78 Modify staging/phasing
PGBT IH 30 IH 20 Modify staging/phasing
DNTCollin County
LineUS 380 Modify staging/phasing
US 67 Bypass US 67 SH 174 Modify staging/phasing
*Staging/phasing modifications do not affect the ultimate planned recommendations
8
-
7/29/2019 M2035-2013 Public Meetings Mar2013
9/16
9
*Staging/phasing
modifications do not
affect the ultimate
plannedrecommendations
*
-
7/29/2019 M2035-2013 Public Meetings Mar2013
10/161010
-
7/29/2019 M2035-2013 Public Meetings Mar2013
11/16
Major Amended Transit Projects (DRAFT)
Project From To Description
TEX RailSW Fort
Worth
DFW
Airport
Modify two station locations at
Northside and Medical District
Cotton BeltDFW
AirportPlano
Modify station location at North Lake
and add Shiloh and McPhearson
East/West CommuterRail and High Speed
Rail Corridor
FortWorth
Dallas
Modify alignment from UPRR to IH 30
and reduce number of station locationsfrom 12 to 3
(Fort Worth, DFW Airport, Dallas)
Dallas StreetcarUnion
Station
Bishop Arts
District
Extend current route south along Beckley
Ave to Davis St
10
-
7/29/2019 M2035-2013 Public Meetings Mar2013
12/16
12
-
7/29/2019 M2035-2013 Public Meetings Mar2013
13/16
Financial Constraint
Plan cost/revenue increase from $101.1 B to $103.5 B
Staging/phasing changes have no impact on project
configuration in 2035
Projects added to the MTP come with funding
11
-
7/29/2019 M2035-2013 Public Meetings Mar2013
14/16
MaximizeExistin
gSystem
StrategicInfrastructure
Investment
$27.3
$4.8
$3.9
$18.9
$46.2
Mobility 2035 Expenditures (Actual $, billions) $101.1
Freeways/Tollways and ArterialsAdditional Vehicle Capacity
HOV/Managed LanesIncrease Auto Occupancy
Rail and BusInduce Switch to Transit
Growth, Development, andLand Use Strategies
More Efficient Land Use & Transportation Balance
Management and Operations Improve Efficiency & Remove Trips from System
Traffic Signals and Bicycle & Pedestrian Improvements
Infrastructure Maintenance Maintain & Operate Existing Facilities
Bridge Replacements
$48.6
$27.3
$4.8
$3.9
$18.9
Financial Constraint Comparison
Mobility 2035 2013 Amendment Expenditures (Actual $, billions) $103.5
12
-
7/29/2019 M2035-2013 Public Meetings Mar2013
15/16
Schedule
Task Name Due Date
RTC (Information Item) January 10, 2013Network Modification, Coding and Model Runs January 14, 2013
STTC (Information Item) January 25, 2013
February Public Meetings Week of February 11
RTC (Information Item) February 14, 2013
STTC (Information Item) February 22, 2013Conformity Model Runs February 28, 2013
Completed DRAFT Document Due March 11, 2013
March Public Meetings Week of March 11
RTC (Information Item) March 14, 2013
STTC (Action Item) March 22, 2013
RTC (Action Item) April 11, 2013
Air Quality Conformity Consultation Process Starts April 11, 2013
FHWA Approval of Conformity Expected July 19, 2013
15
-
7/29/2019 M2035-2013 Public Meetings Mar2013
16/16
For More Information
Chad Edwards
Program Manager817-608-2358
Dan Lamers
Senior Program Manager817-695-9263
To find out more about Mobility 2035 and the Air Quality Conformity Analysis,
visit us at: www.nctcog.org/mobility2035
or e-mail comments and questions to: [email protected]
16
mailto:[email protected]:[email protected]://www.nctcog.org/mobility2035mailto:[email protected]:[email protected]://www.nctcog.org/mobility2035mailto:[email protected]:[email protected]