General Construction Inspector December 2017 Contract Administration – Project Documentation 19-1 Unit 19 Project Documentation Unit 19 Topics Daily Reports Public Records Region Assurance Specialist (RAS) Role Quarterly Release of Retainage CPS – How to Request Access

Upload: doanquynh

Post on 24-Sep-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

General Construction Inspector December 2017

Contract Administration – Project Documentation 19-1

Unit 19Project Documentation

Unit 19 Topics

Daily Reports Public Records Region Assurance

Specialist (RAS) Role Quarterly Release of

Retainage CPS – How to Request

Access

Page 2: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

General Construction Inspector December 2017

Contract Administration – Project Documentation 19-2

Daily Reports

General Daily Progress Reports– What should be documented– Why they are important– Public Record implications

Accident Investigation and Reporting– What to do, and why

Construction Manual, Chapter 12A

General Daily Progress ReportForm 734-3474, Page 1

Project InformationWeatherPersonnel/EquipmentWork DescriptionTraffic ControlEquipmentEffects on Work

Page 3: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

General Construction Inspector December 2017

Contract Administration – Project Documentation 19-3

General Daily Progress ReportForm 734-3474, Page 2

Materials rejectedProject visitorsRemarks

General Daily Progress ReportForm 734-3474, Page 3

Pictures!

Pictures!

Pictures!

Page 4: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

General Construction Inspector December 2017

Contract Administration – Project Documentation 19-4

General Daily Progress Reports

Your reports are Public Record.

Be factual Be concise Be relevant

Appropriate pictures are also nice.

What should be Documented?

Refer to 12A-2 of the Construction Manual

Generally track the progress of the Work– What got accomplished?– Are there positive or negative schedule impacts?– Any disagreements or disputes– Workmanship problems– Relevant conversations with the Contractor– Accidents or damage

Page 5: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

General Construction Inspector December 2017

Contract Administration – Project Documentation 19-5

What should NOT be documented?

Personal opinions…even if they are positive

Irrelevant information

General Daily Progress Reports

Four years from now you should be able to answer a few questions.

Page 6: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

General Construction Inspector December 2017

Contract Administration – Project Documentation 19-6

General Daily Progress Reports

When, exactly, did the earthwork begin?

What caused the delay?

Who was involved in the conversation?

Did the Contractor follow their schedule?

Was the corrective work completed? When?

Was the superintendent present and in control of the work?

How much work was completed that day?

Public Records

Public Record:…any writing that contains information relating to the conduct of the public’s business…prepared, owned, used or retained by a public body regardless of physical form or characteristics.

ORS 192.410(4)(a)

Page 7: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

General Construction Inspector December 2017

Contract Administration – Project Documentation 19-7

Public Records

Writing:…handwriting, typewriting, printing, photographing and every means of recording, including letters, words, pictures, sounds, or symbols, or combination thereof, and all papers, maps, files, facsimiles or electronic recordings.

ORS 192.410(6)

Public Records

Don’t create documents that you wouldn’t want in the newspaper

– Including e-mails, letters, text messages, inappropriate photos, etc.

– Keep it professional– No personal opinions

Page 8: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

General Construction Inspector December 2017

Contract Administration – Project Documentation 19-8

How long should documents be kept?

Contract Administration Documents– Includes: e-mail, paper files, electronic files– Must be kept 20 years after final payment– Structures, such as bridges, require longer retention

times

The Region Assurance Specialists (RAS)

Their role in helping to assure documentation compliance

16

Page 9: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

General Construction Inspector December 2017

Contract Administration – Project Documentation 19-9

Used to record Non-Field Tested Materials ONLY

Example: Test Summary A-Sheet

Page 10: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

19-10

Page 11: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

CO

NT

RA

CT

NO

.

OF

PR

EP

AR

ED

BY

DA

TE

740

LS10

075

0FT

43.5

760

LS10

077

0LS

100

780

LS10

0

FL

TQ

QI

EO

13/

31/1

71

xx

x27

823#

23/

31/1

71

x3

3/27

/17

1x

43/

6/17

F414

00-3

2417

-000

299

x5

3/6/

17F4

1400

-324

17-0

0030

0x

63/

6/17

F414

00-3

2417

-000

301

x7

12/1

4/16

xx

84/

11/2

017

94/

27/1

71

100%

104/

27/1

71

x10

0%11

4/27

/17

1x

100%

125/

8/17

1x

xx

100%

137/

18/2

017

14 15 16 17 18 19 2073

4-19

02A

(8-2

010)

http

://w

ww

.ore

gon.

gov/

OD

OT/

HW

Y/C

ON

STR

UC

TIO

N/H

wyC

onst

Form

s1.s

htm

l

Cas

cade

Stl

Reb

ar#8

Ht=

SE

1610

4450

Bek

o, A

tlas

Tube

, Nuc

or, V

ikin

g, G

alv

RA

S R

evie

w

Cas

cade

Stl

Reb

ar#5

Ht1

0017

, #4H

t008

117

EX

PLA

NA

TIO

NS

AN

D N

ON

CO

MP

LIA

NC

EM

ATE

RIA

LS D

ES

CR

IPTI

ON

INC

OR

PO

RA

TED

QU

AN

TITI

ES

Nuc

orB

estF

itt G

aske

t, M

SD

SO

DO

T D

on T

horto

n ta

gIn

Ste

el W

eld

Wire

InS

teel

Wel

d W

ireIn

Ste

el W

eld

Wire

Adv

anta

ge P

reca

st, T

he M

arvi

n G

roup

RA

S R

evie

w

copy

REINF CONCRETE BOX CULVERTS

WINGWALLS AND APRONS

STRUCTURE 22490 EXCAVATION

GRANULAR WALL BACKFILL

CULVERT PROTECTION BARS

100

100

NFT

MG

Jun

e 20

162/

16/2

017

LINE

DATE OFSAMPLE, TEST,OR INSPECTION

FIR REPORT NO.

DATA SHEET NO.OR MATERIALS LAB."I" REPORT NO.

INSPECTION/LAB REPORT NO.

TEST RESULTS CERTIFICATE

QUALITY COMPLIANCECERTIFICATE

"Q" WITH MATERIALS"I" REPORT NO.

EQUIPMENT LISTSAND DRAWINGS

CERTIFICATE OFMATERIALS ORIGIN

3/4 INCH PLATE

FIN

AL

QU

AN

TITY

OR

99W

: Lak

e S

loug

h B

ridge

Rep

lace

men

t 0

1W

Ad

date

9/8

/201

6

730

740

750

760

770

780

730

LS

PR

OJE

CT

NA

ME

ITE

M N

UM

BE

RS

AN

D D

ES

CR

IPTI

ON

SIT

EM

NO

.U

NIT

OR

IGIN

AL

QU

AN

TITY

TE

ST

SU

MM

AR

Y F

OR

N

ON

-FIE

LD

TE

ST

ED

MA

TE

RIA

LS

(A

)S

HE

ET

1493

6

19-11

Page 12: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

19-12

Page 13: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

Oreg

on D

epar

tmen

t of T

rans

porta

tion

TES

T S

UM

MA

RY

(B) -

QA

(FIE

LD T

ES

TED

MA

TER

IALS

)C

ON

TRA

CT

NO

.S

HE

ET

RE

VIE

WE

RS

AN

D D

ATE

SIT

EM

NO

DE

SC

RIP

TIO

NU

NIT

OR

IGIN

AL

FIN

AL

QU

AN

TITY

QU

AN

TITY

Lum

p 1.

00

TES

TIN

G B

YTE

ST

ME

THO

D A

ND

FR

EQ

UE

NC

YQ

UA

NTI

TIE

S

105

/21/

1441

593-

4614

-116

2X

SE

E B

ID IT

EM

#11

80

205

/21/

14X

XS

EE

BID

ITE

M #

1180

305

/21/

14X

XS

EE

BID

ITE

M #

1180

405

/21/

14X

XS

EE

BID

ITE

M #

1180

505

/22/

14X

XS

EE

BID

ITE

M #

1180

605

/22/

14X

XS

EE

BID

ITE

M #

1180

706

/19/

1414

-172

3X

XS

EE

BID

ITE

M #

1180

807

/31/

1414

-233

4X

X

9 1010

/01/

14X

XX

X

1110

/01/

14X

XX

XP

AS

S

1210

/16/

14X

XX

X

13 1410

/27/

14X

XX

X

1510

/29/

14X

XX

X

1611

/26/

14X

XX

X

1712

/15/

14X

XX

X

18 1905

/29/

14X

X

2002

/05/

15X

X

US

101:

23R

D S

T - 3

5TH

ST

(LIN

CO

LN C

ITY)

SEC

TIO

NC

1465

41

AL

L T

ES

T D

AT

A

1210

RET

AIN

ING

WAL

L C

AST-

IN-P

LAC

E C

ON

CR

ETE

SEM

I-GR

AVIT

Y C

ANTI

LEVE

RW

OR

K P

HA

SE

LINE

DATE OFSAMPLE, TEST,OR INSPECTION

REPORT NO.

DATA SHEET NO.

LAB REPORT NO.

QUALITY CONTROL BY CONTRACTOR

REGION - QUALITY VERIFICATION

REGION - INDEPENDENT ASSURANCE

CONTRACTOR - INDEPENDENT ASSURANCE (SPLIT SAMPLE)

COMPLIANCE TESTS

SOURCE MATERIAL (QUALIFYING)

COMMERCIAL SOURCE MEMO

Email\Letter\Fax

MIX DESIGN

RANDOM NUMBERS

VISUAL

STAT SPEC

CONCRETE TICKET

CONCRETE WKST

STRENGTH

INSPECTOR REPORT

GRADATION WKST

OTHER

IN COMPLIANCE INCORPORATED

NON-COMPLIANCE INCORPORATED

EXPL

ANAT

ION

S AN

D

NO

N-C

OM

PLIA

NC

E

LCR

M 4

000S

T

WA

LL F

TG

Wal

l

8-5-

14 B

RE

NT

HE

YN

E R

AS

RE

VIE

W

10-2

7-14

BR

EN

T H

EY

NE

RA

S R

EV

IEW

Den

sity

Wal

l Foo

ting

Wal

l Foo

ting

Wal

l L

Wal

l L

T99

Cur

ve (S

ee B

id It

em #

1350

)

2/2/

15 B

RE

NT

HE

YN

E R

AS

RE

VIE

W

AGG

R. P

RO

D

MIX

PR

OD

UCT

ION

DEN

SITY

OTH

ER

734-

1902

-BQ

A(8

-99)

19-13

Page 14: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

19-14

Page 15: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

General Construction Inspector December 2017

Contract Administration – Project Documentation 19-15

The Goals for the Region Assurance Specialist (RAS)

Provide early, timely project documentation reviews in theProject Managers office

Review the organization and documentation process

Provide technical help to inspectors and ContractAdministration Specialist

Valued resource to ODOT, Local Agency and ConsultantProject Managers

Documentation Review Report (DRR)Form 734-1903

List of comments, missing items or deficiencies

Distributed to Contract Administration Specialist,APM or PM

Page 16: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

19-16

Page 17: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

CO

NT

RA

CT

Last

on

File

:

C14

936

Last

on

File

:

KE

Y%

Pro

ject

Co

mp

lete

1856

55

2.9

%

EA

CO

N03

612

Dat

e:

□7

/17

/17

L0

07

0□

7/1

7/1

7L

01

20

□7

/17

/17

L0

22

0□

4/1

0/1

7L

04

60

□4

/10

/17

L0

72

0□

7/1

7/1

7L

05

80

□7

/17

/17

L0

85

0□

7/1

7/1

7L

40

04

B□ □ □

7/1

7/1

7L

02

50

□7

/18

/17

L0

60

0□

7/1

8/1

7L

06

50

□7

/18

/17

L0

65

0□ □ □

4/1

1/1

7L

03

90

□7

/18

/17

L0

41

0□

7/1

8/1

7L

04

40

□7

/18

/17

L0

62

0□

4/1

1/1

7L

07

10

□7

/18

/17

L0

78

0□

7/1

8/1

7L

08

50

□7

/18

/17

L0

88

0□ □ □ □

RE

GIO

N A

SS

UR

AN

CE

SP

EC

IALI

ST

SIG

NA

TUR

E

□N

ote

: A

fter S

econ

d N

otifi

catio

n is

issu

ed, a

ny o

utst

andi

ng D

RR

item

s w

ill be

list

ed o

n th

e C

ompl

etio

n S

trate

gy a

nd A

ctio

n P

lan.

The

Pro

ject

doc

umen

tatio

n re

view

s w

ill tra

nsiti

on fr

om q

uarte

rly to

30

day

frequ

ency

.

I R

EC

OM

ME

ND

AC

CE

PT

AN

CE

OF

TH

E D

OC

UM

EN

TA

TIO

NP

RO

JEC

T M

AN

AG

ER

SIG

NA

TUR

E

D

ATE

DA

TE

□ □

Agg

rega

te B

ase:

Nee

d ne

w c

omm

erci

al s

ourc

e m

emo

for m

ater

ial f

rom

sou

rce

#20-

232-

3□

Leve

l 3 1

/2 In

ch A

CP

: Nee

d qu

ality

doc

umen

ts□

Gra

nula

r Wal

l Bac

kfill

: Nee

d Q

C te

st re

sults

for m

ater

ial o

r CC

O c

hang

ing

grad

atio

n re

quire

men

t□

Gra

nula

r Wal

l Bac

kfill

: Nee

d Q

C te

st re

sults

for m

ater

ial o

r CC

O c

hang

ing

grad

atio

n re

quire

men

t□

Loos

e R

ipra

p, C

lass

50,

Nee

d FI

R to

vis

ually

acc

ept m

ater

ial

□G

ener

al S

truct

ural

Con

cret

e, C

lass

330

0: N

eed

QC

28

day

com

pres

sive

stre

ngth

resu

lts fo

r con

cret

e pl

aced

on

6/15

/201

7□

Gen

eral

Exc

avat

ion:

Nee

d te

st re

sults

for s

ubgr

ade

test

s or

FIR

ver

ifyin

g su

bgra

de s

tabi

lized

36 In

ch S

ubgr

ade

Sta

biliz

atio

n: N

eed

FIR

to u

pdat

e qu

antit

y of

sta

biliz

atio

n□□

Fie

ld T

es

ted

Ma

teri

als

30 In

ch P

reca

st P

rest

ress

ed S

labs

: Nee

d O

DO

T In

spec

tion

Rep

ort

□30

Inch

Pre

cast

Pre

stre

ssed

Sla

bs: N

eed

curr

ent l

abor

ator

y re

port

for t

ie ro

ds a

nd b

olt a

ssem

blie

s□

Ero

sion

Con

trol:

Nee

d w

eekl

y E

rosi

on a

nd S

edim

ent C

ontro

l Mon

itorin

g re

ports

for M

ay, J

une,

and

Jul

y□

Rei

nfor

cem

ent:

Nee

d C

MO

for m

echa

nica

l spl

ices

□□Q

ua

lity

Agg

rega

te B

ase:

Not

e 2

& 3

: Nee

d w

eigh

mem

os fo

r agg

rega

te p

lace

d or

CC

O m

odify

ing

mea

sure

men

t of m

ater

ial

□Te

mpo

rary

Sho

ulde

r Agg

rega

te: N

ote

1: N

eed

copi

es o

f wei

gh m

emos

for m

ater

ial p

lace

d□

Gra

nula

r Stru

ctur

e B

ackf

ill: N

eed

CC

O to

adj

ust l

ump

sum

bid

item

for q

uant

ity c

hang

e□

Furn

ish

PP

16

x 0.

5 S

teel

Pile

s: P

ile le

ngth

qua

ntity

tota

ls 2

25.2

4 fe

et (2

25 fe

et p

aid)

Flag

gers

: Nee

d co

st ju

stifi

catio

n fo

r bid

item

ove

rrun

□18

" Cul

vert

Pip

e: N

ote

1 &

2 -

Leng

th s

houl

d be

repo

rted

to th

e ne

ares

t 0.1

foot

Tem

pora

ry C

oncr

ete

Bar

rier:

Not

e 1

- Lay

ing

leng

th o

f bar

rier i

s 12

.58

feet

; pay

men

t is

for 9

.85

barr

iers

, sho

uld

pay

for a

ll ba

rrie

rs u

sed

□Te

mpo

rary

Con

cret

e B

arrie

r: N

ote

1 - L

ayin

g le

ngth

of b

arrie

r is

12.5

8 fe

et; p

aym

ent i

s fo

r 9.8

5 ba

rrie

rs, s

houl

d pa

y fo

r all

barr

iers

use

d□

ES

TA

BL

ISH

ME

NT

E

ND

DA

TE

RA

S

CO

NC

UR

Th

is d

oc

um

en

t re

pla

ce

s a

ll p

rio

r D

RR

s o

r C

om

ple

tio

n S

tra

teg

y a

nd

Ac

tio

n P

lan

s.

Qu

anti

ty□

DA

TE

NO

TE

DB

Y R

AS

PR

IOR

ITY

H-H

igh

M-M

ediu

mL-

Low

BID

IT

EM

N

UM

BE

R

Item

nam

e, c

omm

ents

, unr

esol

ved

quan

tity/

qual

ity d

etai

ls, e

xcep

tions

to th

e Fi

nal M

ater

ials

Cer

tific

atio

n, fo

rm 7

34-1

979

and

met

hod

of re

solu

tion.

AS

SIG

NE

DT

O (i

nitia

ls):

Afte

r 2nd

Not

e

PM

R

es

olv

ed

(in

itial

s)

LO

CA

L A

GE

NC

Y/C

ON

SU

LT

AN

TD

AY

S P

AS

T2N

D N

OT

ES

TE

EL

ES

CA

LA

TIO

NP

RE

PA

RE

D B

Y (

RA

S)

OD

OT

Con

tract

or O

pted

:1/

24/2

017

Jim

Dol

l

PR

OJE

CT

NA

ME

(S

EC

TIO

N)

CO

MP

LE

TIO

N D

AT

ET

RA

FF

IC R

EP

OR

TS

C

UR

RE

NT

6/29

/201

7P

LA

NT

E

ST

AB

LIS

HM

EN

T

PA

GE

DO

CU

ME

NT

AT

ION

RE

VIE

W R

EP

OR

T (

DR

R)

1O

F1

RE

VIE

W #

2R

EV

IEW

DA

TE

7/17

/201

7

% U

SE

D

AS

PH

AL

T E

SC

AL

AT

ION

390

167.

543

%

PR

OJE

CT

MA

NA

GE

R2n

d N

OT

ED

AT

EF

UE

L E

SC

AL

AT

ION

TR

AIN

ING

BI

QU

AN

TIT

YH

RS

to

DA

TE

OR

99W

: Lak

e S

loug

h B

ridge

Rep

lace

men

t Sec

tion

11/1

5/20

17E

RO

SIO

N R

EP

OR

TS

C

UR

RE

NT

4/30

/201

7

Yes

No

Yes

Yes

Yes

Yes

No

No

No

Elig

ible

Pay

Ite

ms

NoNo

No

Yes

Yes

Yes

No

734

-190

3 (0

4-20

15)

19-17

Page 18: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

19-18

Page 19: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

General Construction Inspector December 2017

Contract Administration – Project Documentation 19-19

Documentation Review Report (DRR)

All items should be addressed or resolved prior to thenext RAS review

Final DRR signatures of Project Manager and RAS– Quantities are considered to be FINAL– No Changes will be made at Final Acceptance unless

discovery of gross errors or lump sum items not paidat 100%

Quarterly Release of Retainage

Section 00195.50(d)

Page 20: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

General Construction Inspector December 2017

Contract Administration – Project Documentation 19-20

00195.50(d) – Quarterly Release of Retainage

Release of the amounts retained will only be consideredfor Pay Items that have been satisfactorily completed.

A Pay Item will be considered satisfactorily completedonly if all of the Work for the Pay Item is complete and allcontractual requirements pertaining to the Pay Item andWork have been satisfied.

Beginning with the fourth month after First Notificationand every third month thereafter, the agency will releaseretainage for satisfactorily completed Pay Items.

Contract Payment System

Page 21: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

General Construction Inspector December 2017

Contract Administration – Project Documentation 19-21

Contract Payment System Access (CPS)

Internal ODOT Users

Contact the Contract Administration Unit– Provide user name– User authority– Responsible contracts

Contract Payment System Access (CPS)

External Users (Local Agencies & Consultants)

Contact the Contract Administration Unit– Request a pin– Return request user name (e-mail address), user

authority, responsible contracts

Page 22: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

General Construction Inspector December 2017

Contract Administration – Project Documentation 19-22

The Contract Payment System Retainage Tool & Reports

Contact:

James SealyODOT Contract Payments Specialist

[email protected]

Key Inspection Points

General Dailies are a necessary evil and the mostimportant document

A good picture is worth a thousand words

Region Assurance Specialist is a resource

Address items noted on Document Review Report

Stay organized by writing paynotes and keep up with yourdocumentation. Don’t wait until the end of the month!!!!

Page 23: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

General Construction Inspector December 2017

Contract Administration – Project Documentation 19-23

Unit 19 Review

Daily Reports

Public Records

Region Assurance Specialist (RAS) Role

Quarterly Release of Retainage

CPS – How to Request Access

Page 24: m19 ca project doc - oregon.gov · Specialist (RAS) Role Quarterly Release of Retainage CPS –How to Request Access. General Construction Inspector December 2017 ... 1210 RETAINING

19-24