m Ùkj izns'k y ksd fuekz.k fohkkx in d e xchapter-2 saharanpur moradabad rampur lucknow...

17
1- - OFFICE ORDER 1 2- - EXTRA CONDITIONS FOR LABOUR WORK ONLY 2 3- - IMPORTANT INSTRUCTIONS 3-5 4- 1 MATERIAL 6-19 5- 2 LABOUR 20-21 6- 3 CARTAGE 22-25 7- 4 EARTH WORK 26 8- 5 CONCRETE WORK 27-28 9- 6 BRICK WORK 29 10- 7 DAMP PROOF COARSE 30 11- 8 ANTI TERMITE TREATMENT 31 12- 9 WOOD WORK 32-34 13- 10 MILD STEEL & IRON WORK 35-37 14- 11 ROOF WORK 38 15- 12 CEILING AND LINING 39-41 16- 13 PLASTER & POINTING 42-43 17- 14 FLOORING 44-46 18- 15 PAINTING & DISTEMPERING 47-49 19- 16 WHITE WASHING & COLOUR WASHING 50 20- 17 DEMOLITION & DISMANTLING 51-52 mÙkj izns'k yksd fuekZ.k foHkkx INDEX Sl. No. Chapter Description Page No.

Upload: others

Post on 24-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

1- - OFFICE ORDER 1

2- - EXTRA CONDITIONS FOR LABOUR WORK ONLY 2

3- - IMPORTANT INSTRUCTIONS 3-5

4- 1 MATERIAL 6-19

5- 2 LABOUR 20-21

6- 3 CARTAGE 22-25

7- 4 EARTH WORK 26

8- 5 CONCRETE WORK 27-28

9- 6 BRICK WORK 29

10- 7 DAMP PROOF COARSE 30

11- 8 ANTI TERMITE TREATMENT 31

12- 9 WOOD WORK 32-34

13- 10 MILD STEEL & IRON WORK 35-37

14- 11 ROOF WORK 38

15- 12 CEILING AND LINING 39-41

16- 13 PLASTER & POINTING 42-43

17- 14 FLOORING 44-46

18- 15 PAINTING & DISTEMPERING 47-49

19- 16 WHITE WASHING & COLOUR WASHING 50

20- 17 DEMOLITION & DISMANTLING 51-52

mÙkj izns'k yksd fuekZ.k foHkkx

INDEXSl.

No.Chapter Description Page No.

Page 2: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

CHAPTER-2

Saharanpur Moradabad Rampur LucknowSitapur-

KheriUnnao Gonda Basti Gorakhpur Deoria Meerut

Bulandshah

rAligarh Agra Mainpuri Kanpur Etawah

Kannauj-

Farukhabad

Faizabad-

Ambedkar

Nagar

Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra

Saharanpur

/Shamli

/Muzaffar nagar

Moradabad

/Amroha

/Sambhal

Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/

RaibareliSitapur /Kheri Unnao /Hardoi

Gonda

/BalrampurBarabanki

Bahraich

/Shrawasti

Basti

/Santkabir

Nagar

/Siddharth

Nagar

Gorakhpur

/Maharajganj

Deoria

/Kushinagar

Meerut

/Baghpat

Bulandshahr/G

autam Budh

Nagar

/Ghaziabad

/Hapur

Aligarh

/Hathrash

/Etah

/Kashganj

Agra /MathuraMainpuri/

Firozabad

Kanpur

Nagar/Kanpur

Dehat

Etawah/AuriyaKannauj/Faruk

habad

Faizabad/Amb

edkar NagarSultanpur Amethi

Azamgarh

/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur

Allahabad

/Kaushambi

Pratapgarh

/Fatehpur

Varanasi

/Ghazipur

/Chandauli

Mirzapur

/BhadoiSonebhadra

06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018

S.No.SCH.

P.W.D

ITEM NO

NBODescription of the Work

P.W.D SPEC.

NO.Unit

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

1- Mistri Per Day - 440.00 440.00 380.00 360.00 380.00

2(a)- Mason (for floor & Tiles Work) Per Day 450.00 - - 380.00 350.00 380.00

2(b)- Mason (for other works) Per Day 400.00 400.00 400.00 350.00 340.00 350.00

3(a)- Carpenter (for skilled/furniture work) Per Day - 400.00 400.00 380.00 350.00 380.00

3(b)- Carpenter (for other work) Per Day 400.00 380.00 380.00 350.00 330.00 350.00

4- Black Smith Per Day 370.00 380.00 380.00 350.00 330.00 350.00

5- Hammer Man Per Day 325.00 330.00 330.00 260.00 245.00 260.00

6- Fitter Per Day 400.00 300.00 300.00 320.00 300.00 320.00

7- Welder Per Day - 300.00 300.00 350.00 320.00 350.00

8(a)- Painter (for Polishing Work) Per Day - 400.00 400.00 380.00 360.00 380.00

8(b)- Painter (for Painting work) Per Day 400.00 370.00 370.00 290.00 290.00 290.00

9- Plumber (with kit) Per Day 425.00 360.00 360.00 350.00 330.00 350.00

10- Helper to Plumber Per Day - - - - - -

11- Mate Per Day 330.00 300.00 300.00 270.00 250.00 270.00

12- Mazdoor / Beldar / Chawkidar / Helper / Cleaner/Coolies Per Day 325.00 260.00 260.00 260.00 225.00 260.00

13- Bhisti with Mashak Per Day 300.00 280.00 280.00 290.00 260.00 260.00

14- White Washer Per Day 330.00 350.00 350.00 270.00 250.00 270.00

15- Beldar for bitumen/tar work Per Day 330.00 280.00 280.00 270.00 240.00 270.00

16- Glazier Per Day 330.00 280.00 280.00 320.00 300.00 320.00

17- Floor cutting machine with operator but without grinding stone Per Day - 600.00 600.00 530.00 550.00 530.00

18- Tractor with trolley including P.O.L. & Driver Per Day 900.00 1300.00 1300.00 1300.00 1200.00 1300.00

19(a)- Road Roller Without P.O.L. & Driver Per Day - - - - - -

19(b)- Road Roller With P.O.L. & Driver etc Per Day - - - 2000.00 1850.00 2000.00

20- Rivetter Per Day - 300.00 300.00 350.00 320.00 350.00

21-Jeep / Car / Truck / Tipper / Roller Driver, Pump / Mixol / Generator

Operator, Electrician / Wire manPer Day - 320.00 320.00 280.00 270.00 280.00

22- Ameen/Tracer Per Day 370.00 300.00 300.00 270.00 270.00 270.00

23- Surveyor/Draftman Per Day - 370.00 370.00 - 270.00 -

24- Tractor with Water Tanker with cost of water Including P.O.L. and Driver. Per Day 2000.00 - - 1300.00 1200.00 1300.00

25- Mixol Machine Complete in all respect (without P.O.L.) Per Day - - - 1100.00 - 1100.00

26-C.C. Mixer with Hopper, One Cement bag Capacity, with POL and

Operator Complete in all respectPer Day - - - 2200.00 3000.00 2200.00

27-Water Tanker with Sprinkler 6000 Litre or above cap.

With POL/Driver including filling of water etc. completePer Day - - - - 1200.00 -

28- J.C.B. (Joint Cutter Bucket) Including P.O.L. and Driver Per Hour 950.00 800.00 800.00 - - -

29- Vibrator (Surface/Pin with Operator and POL Per Day - - - - - -

30- Armed Guard from security agency. Per Day - - - - - -

31- Five door commercial vehicle with driver. Owing taxi permit without fuel. Per Day 700.00 800.00 750.00 750.00 750.00 750.00

-

-

-

-

-

-

300.00

385.00

-

-

-

-

-

-

-

-

-

-

300.00

265.00

300.00

350.00

-

285.00

330.00

375.00

-

410.00

380.00

480.00

480.00

420.00

-

435.00

450.00

-

-

-

-

-

-

300.00

385.00

-

-

-

-

-

-

-

-

-

-

300.00

265.00

300.00

350.00

-

285.00

330.00

375.00

-

410.00

380.00

480.00

480.00

420.00

-

435.00

450.00

UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.

Labour Rate

Name of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda

01.01.2018 24.04.2018

Name of Districts

S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017

Page 3: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

CHAPTER-4

Saharanpur Moradabad Rampur LucknowSitapur-

KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah

Kannauj-

Farukhabad

Faizabad-

Ambedkar

Nagar

Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra

Saharanpur

/Shamli /Muzaffar

nagar

Moradabad

/Amroha

/Sambhal

Rampur

/BijnorBareilly Shahjahanpur Budaun Pilibhit

Lucknow/

Raibareli

Sitapur

/Kheri

Unnao

/Hardoi

Gonda

/BalrampurBarabanki

Bahraich

/Shrawasti

Basti

/Santkabir

Nagar

/Siddharth

Nagar

Gorakhpur

/Maharajganj

Deoria

/Kushinagar

Meerut

/Baghpat

Bulandshahr/Gauta

m Budh Nagar

/Ghaziabad /Hapur

Aligarh

/Hathrash

/Etah

/Kashganj

Agra

/Mathura

Mainpuri/

Firozabad

Kanpur

Nagar/Kanpur

Dehat

Etawah/AuriyaKannauj/Farukh

abad

Faizabad/Ambe

dkar NagarSultanpur Amethi

Azamgarh

/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur

Allahabad

/Kaushambi

Pratapgarh

/Fatehpur

Varanasi

/Ghazipur

/Chandauli

Mirzapur

/BhadoiSonebhadra

06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018

S.No.SCH.

P.W.D

ITEM NO

NBODescription of the Work

P.W.D SPEC.

NO.Unit

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

1 251

Excavation in foundations in ordinary soil (Loam clay or

sand) including lift upto 1.5 m. (5 fts.) and lead upto 30m.

(100 fts.) & including filling, watering and ramming of

excavated earth into the trenches or into the space

between the building and the sides of foundation trenches

or into the plinth and removal and disposal of surplus

earth as directed by the Engineer-incharges upto a

distance of 30 m. (100 fts.) from the foundation trenches.

4.11 Cum. 82.00 90.00 90.00 110.00 105.00 110.00 110.00 110.00 120.00 115.00 82.00 95.00 125.00 130.00 125.00 110.00 110.00 105.00 110.00 105.00 105.00

175.00

(With

Royalty)

- 110.00 105.00 110.00

3 252

Same as in item No. 251 above but excavation in soil

mixed with Moorum, shingle. Kankar etc. requiring the use

of special T&P. such as piclaxes, sabbals etc.

4.13 Cum. 86.00 95.00 95.00 130.00 125.00 130.00 130.00 130.00 130.00 125.00 86.00 90.00 130.00 135.00 135.00 130.00 128.00 125.00 130.00 125.00 125.00

195.00

(With

Royalty)

- 130.00 125.00 130.00

4 253 4.13

Earthwork in cutting or in embarkment In ordinary soil,

excavation to be in the form of regular pits not exceeding

1/2 metre (20") in depth and earthwork in embankment to

be in 20 cm. (8") layers, including ramming & dressing the

surface to required levels and slopes and also including

1.5 metre (5 fts) lifts and 30 m. (100") lead. The earth

from cutting to be used in making embankment or to be

deposited as spoil banks within 30 metres (100 ft.)

distance as directed by the Engineer-in-charge.

4.3 Cum. 72.00 90.00 90.00 95.00 90.00 95.00 95.00 95.00 100.00 90.00 72.00 90.00 140.00 145.00 90.00 95.00 95.00 95.00 95.00 90.00 90.00 - 95.00 80.00 90.00

5 254 4.13

Add to items 251-253 for every additional 30 m. (100 fts.)

lead or part of 30 m. (100 fts.) or for every additional 1.5

m. (5 fts.) lift or part of 1.5 m. (5 fts.).

4.3 Cum. 11.50 12.00 12.00 17.00 15.00 17.00 17.00 16.00 16.00 14.00 11.50 15.00 15.00 15.00 13.00 17.00 17.00 17.00 17.00 17.00 17.00 22.00 - 17.00 14.00 16.00

6 255 4.24

Sand filling in plinth excluding supply of necessary

quantity of sand from a distance not exceeding 8 km. (5

miles) from the site of work and including watering,

ramming, dressing etc. rate to include cost of all

materials, labour and T & P etc.required for proper

completion of the work (Labour only).

4.4 Cum. 380.00 480.00 480.00

75.00

(Labour

only)

72.00

(Labour

only)

75.00

(Labour

only)

75.00

(Labour

only)

870.00 870.00 860.00 380.00 460.00

60.00

(Labour

only)

60.00

(Labour

only)

65.00

(Labour

only)

75.00

(Labour

only)

75.00

(Labour

only)

75.00

(Labour

only)

75.00

(Labour

only)

- -

1647.0

0 (With

Royalty

)

1808.0

0 (With

Royalty

)

1879.0

0 (With

Royalty

)

- - 630.00

60.00

(Labour

only)

650.00

7 256Same as in item no. 251 above but excavation in soil

mixed with gravel and boulder. 4.4 Cum. - - - 150.00 140.00 150.00 150.00 - - - - - - - - - - - 150.00 - - - - - 4.15 -

8 257

As in item 251 above but excavation in black cotton soil in

Bundelkhand area requiring use of special tools and

plants such as pick axes and sabbal etc.4.4 Cum. - - - 123.00 - 123.00 123.00 - - - - - - - - - - - 123.00 - -

180.00

(With

Royalty)

- - - -

9 258 Extra rate for quantities of work executed under- - -

(a) In or under water and or liquid mud.

Cum.Add 25% of above

item- -

Add 20% of

above item-

Add 20% of

above item

Add 20% of

above item

Add 20% of

above item

Add 20% of

above item

Add 20% of

above item

Add 25% of

above item- - - - - - -

Add 20% of

above item- - - - - - -

10 (b) In or under foul position.

Cum.Add 25% of above

item- -

Add 25% of

above item-

Add 25% of

above item

Add 25% of

above item

Add 25% of

above item

Add 25% of

above item

Add 25% of

above item

Add 25% of

above item- - - - - - -

Add 25% of

above item- - - - - - -

11 259

Cleaning jungla including uprooting of rank vegetations

grass, bush, wood trees and saplings of girth upto 30 cm.

measured at a height of 1 metre above ground level &

removal of rubbish upto a distance of 50 metres out side

the periphery of area cleared.

Sqm. 2.60 2.75 2.75 4.50 3.60 4.50 4.50 - 3.00 3.00 2.60 3.10 4.00 4.00 4.50 4.50 4.50 4.50 4.50 - - 5.00 - 3.60 - `-

Add 20% of above item

Add 25% of above item

3.50

Add 20% of above item

Add 25% of above item

4.00

126.00

142.00

28.30

35.40

5.40

112.00

146.00

Add 20% of above item

Add 20% of above item

5.00

Add 20% of above item

Add 20% of above item

4.50

140.00 (with Royalty)

140.00 (with Royalty)

Add 20% of above item

Add 20% of above item

4.50

Name of Circle

Name of Districts

S.O.R. Effective Date

UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.

EARTH WORK

140.00 (with Royalty) 83.00 90.00

01.06.2018 16.10.2017 24.04.201801.01.201815.12.2017

140.00 (with Royalty) 112.00 110.00

15.12.2017

110.00

120.00

15.00

Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda

1000.00

120.00

160.00 (with Royalty)

180.00 (with Royalty)

20.00

750.00 (with Royalty)

112.00

13.00

65.00 (Labour only)

128.00170.00 (with Royalty)

160.00 (with Royalty)

180.00 (with Royalty)

20.00

750.00 (with Royalty)

170.00 (with Royalty)

139.00

161.00

20.40

172.00

140.00

162.00

20.00

85.00

(Labour only)

178.00

95.00

Page 4: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

CHAPTER-5

Saharanpur Moradabad Rampur LucknowSitapur-

KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah

Kannauj-

Farukhabad

Faizabad-

Ambedkar

Nagar

Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra

Saharanpur

/Shamli

/Muzaffar nagar

Moradabad

/Amroha

/Sambhal

Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/

RaibareliSitapur /Kheri Unnao /Hardoi

Gonda

/BalrampurBarabanki

Bahraich

/Shrawasti

Basti

/Santkabir

Nagar

/Siddharth

Nagar

Gorakhpur

/Maharajganj

Deoria

/Kushinagar

Meerut

/Baghpat

Bulandshahr/Ga

utam Budh

Nagar

/Ghaziabad

/Hapur

Aligarh

/Hathrash

/Etah

/Kashganj

Agra /MathuraMainpuri/

Firozabad

Kanpur

Nagar/Kanpur

Dehat

Etawah/AuriyaKannauj/Faruk

habad

Faizabad/Amb

edkar NagarSultanpur Amethi

Azamgarh

/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur

Allahabad

/Kaushambi

Pratapgarh

/Fatehpur

Varanasi

/Ghazipur

/Chandauli

Mirzapur

/BhadoiSonebhadra

06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018

S.No.SCH.

P.W.D

ITEM

NO NBODescription of the Work

P.W.D

SPEC.

NO.

UnitOver All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

1 273

Providing and laying Cement concrete 1:6:12( 1

cement ; 6 fine sand : 12 graded brick aggregate

40 mm.nominal size) including supply of all

materials,labour and T & P etc.required for proper

completion of the work and curing complete,also

including cost of formwork in foundation & floors.

Cum. 2600.00 2900.00 2900.00 2750.00 2700.00 2750.00 3000.00 3745.00 3745.00 3200.00 3160.00 3160.00 2600.00 2900.00 3650.00 3700.00 3675.00 2800.00 2840.00 2950.00 2750.00 2750.00 2750.00 4928.00 6084.00 7078.00 3800.00 3600.00 3500.00 3600.00 2370.00 3450.00 3200.00 3000.00 3100.00

2 274As in item (273) above, but in the proportion of

10:5:1. Cum. 2750.00 3050.00 3050.00 2850.00 2750.00 2850.00 3100.00 3950.00 3950.00 3550.00 3380.00 3380.00 2750.00 3050.00 3850.00 3900.00 3850.00 2960.00 3000.00 3150.00 2850.00 2850.00 2850.00 5105.00 6256.00 7260.00 - - - - 2545.00 3250.00 3350.00 3200.00 3250.00

3 275As in item (273) above, but in the proportion of

8:4:1. Cum. 2850.00 3200.00 3200.00 2950.00 2800.00 2950.00 3300.00 4100.00 4100.00 3650.00 3625.00 3625.00 2850.00 3200.00 4250.00 4300.00 4090.00 3000.00 3200.00 2975.00 2950.00 2950.00 2950.00 5222.00 6374.00 7377.00 - - - - 2415.00 3500.00 3575.00 3300.00 3350.00

4 279(a)

Providing and laying Cement concrete 1:2:4 (1

cement : 2coarse sand : 4 graded stone ballast 40

mm. nominal size) including supply of all materials.

labour and T&P etc. required for proper

completion of the work and curing complete, also

including cost of formwork in foundation and floors.

Cum. - 6100.00 6100.00 6900.00 7280.00 7280.00 6900.00 5910.00 5700.00 5910.00 6300.00 7400.00 8260.00 6500.00 6450.00 6450.00 5750.00 5800.00 6090.00 5830.00 5200.00 5850.00 5910.00 5910.00 5910.00 5560.00 4773.00 5625.00 5200.00 5000.00 4900.00 5000.00 5300.00 5610.00 5800.00 5200.00 -

5 279(b)

Providing and laying Cement concrete 1:2:4 (1

cement : 2coarse sand : 4 graded stone ballast 20

mm. nominal size) including supply of all materials.

labour and T&P etc. required for proper

completion of the work and curing complete, also

including cost of formwork in foundation and floors.

Cum. 5050.00 6200.00 6200.00 6950.00 7330.00 7330.00 6950.00 6000.00 5600.00 6000.00 6800.00 7900.00 8770.00 6550.00 6510.00 6510.00 5050.00 6250.00 6300.00 6350.00 6090.00 6100.00 5500.00 6500.00 6000.00 6000.00 6000.00 - - - 5700.00 5500.00 5400.00 5500.00 6115.00 5820.00 6600.00 - 5250.00

6 280 Same at item 279(a) above but in 6:3:1 Cum. 4300.00 - - 6300.00 6680.00 6680.00 6300.00 5600.00 5500.00 5600.00 6300.00 6800.00 7675.00 6100.00 5950.00 5950.00 4300.00 5400.00 4850.00 4900.00 5350.00 5200.00 5700.00 5250.00 5600.00 5600.00 5200.00 5009.00 4205.00 5076.00 4600.00 4400.00 4300.00 4400.00 4650.00 4900.00 5200.00 4700.00 4750.00

7 281 Same at item 279(a) above but in 8:4:1 Cum. 4100.00 5200.00 5200.00 6270.00 6700.00 6700.00 6270.00 5410.00 5450.00 5410.00 6100.00 6400.00 7350.00 5500.00 5425.00 5425.00 4100.00 5200.00 5050.00 5100.00 5150.00 4800.00 5400.00 4900.00 5410.00 5410.00 4800.00 4799.00 3974.00 4869.00 4400.00 4200.00 4100.00 4200.00 4490.00 4750.00 4900.00 4350.00 4400.00

8 282

Cost cement concrete door sills, chaukhats

boundry posts, shelves and similar small work with

cement, approved coarse sand and 2 cm. (3/4")

gauge approved stone ballast in the proportion of

1:2:4, excluding supply of reinforcement and its

binding but including its fixing and binding the

same with 24 B.W.G.G.I. binding wire, and

including the cost of binding wire, moulds and all

other materials, labour and T & P etc. required for

proper completion of the work.

Cum. 5450.00 6700.00 6700.00 8150.00 8500.00 8500.00 8150.00 7215.00 7800.00 7215.00 7200.00 8830.00 9750.00 7500.00 7500.00 7500.00 5450.00 6700.00 6550.00 6600.00 6500.00 6800.00 7300.00 7250.00 7215.00 7215.00 7150.00 7185.00 6328.00 7120.00 6400.00 6200.00 6100.00 6200.00 7100.00 7850.00 7600.00 7400.00 6600.00

9 283

R.C.C. work with cement approved coarse sand

and 2 cm. (3/4") gauge approved stone ballast in

the proportion of 1:2:4 in lintels of doors and

windows excluding supply of reinforcement and its

binding but including its fixing and binding the

same with 24 B.W.G.G.I. binding wire and

including necessary centering and shuttering etc.

and also including supply of all materials, labour

and T & P etc. required for proper completion of

the work. Binding wire cost being included in the

item.

Cum. 5670.00 6950.00 6950.00 7800.00 8150.00 8150.00 7800.00 7250.00 8600.00 7250.00 7800.00 8274.00 9420.00 7725.00 7725.00 7725.00 5670.00 7000.00 7050.00 7100.00 7150.00 6600.00 7100.00 6750.00 7250.00 7250.00 7250.00 7133.00 6242.00 7065.00 6600.00 6400.00 6300.00 6400.00 6840.00 7800.00 7700.00 7400.00 6550.00

10 283(a) Same as Item No. 283 above but 1:1.5:3 Cum. - 7100.00 7100.00 8200.00 8550.00 8550.00 8200.00 - - - 7900.00 7900.00 7550.00 - - - - - - - - 7747.00 6812.00 7676.00 6200.00 6000.00 5900.00 6000.00 6450.00 8100.00 - - -

11 284 As in item 283 above, but for slabs. Cum. 6050.00 7250.00 7250.00 8580.00 8900.00 8900.00 8580.00 7375.00 9030.00 7375.00 8000.00 8575.00 9720.00 8325.00 8325.00 8325.00 6050.00 7300.00 7600.00 7700.00 7750.00 6850.00 7500.00 6850.00 7375.00 7375.00 7375.00 7525.00 6585.00 7454.00 6800.00 6600.00 6500.00 6600.00 7640.00 8300.00 8300.00 7800.00 6800.00

12 284(a) Same as Item No. 284 above but 1:1.5:3 Cum. 6600.00 7650.00 7650.00 8900.00 9150.00 9150.00 8900.00 - - - 8790.00 8790.00 8790.00 6600.00 7700.00 8250.00 8350.00 8200.00 - 7600.00 6850.00 7400.00 8100.00 8100.00 - - - - - - - 8060.00 8600.00 8500.00 8400.00 7500.00

13 285As in item 283 above but the lighter beams i.e.

having spans upto 6 meters.Cum. 6350.00 7700.00 7700.00 9050.00 9400.00 9400.00 9050.00 7400.00 9050.00 7400.00 8200.00 8760.00 9900.00 8850.00 8850.00 8850.00 6350.00 7500.00 8650.00 8250.00 8400.00 6850.00 7700.00 6900.00 8300.00 7400.00 7400.00 7760.00 6791.00 7687.00 7000.00 6800.00 6700.00 6800.00 - - 8800.00 8000.00 7100.00

14 286As in item 283 above but the heavier beams/i.e.

having spans upto 6 metrs (20').Cum. 6450.00 7900.00 7900.00 9620.00 9850.00 9850.00 9620.00 7480.00 9070.00 7480.00 8800.00 8880.00 10100.00 9050.00 9050.00 9050.00 6450.00 7700.00 8900.00 8500.00 8710.00 6950.00 7800.00 7000.00 9200.00 7480.00 7480.00 8702.00 7615.00 8619.00 7200.00 7000.00 6900.00 7000.00 - - 9100.00 8400.00 7250.00

15 287

As in item 283 above but in R.C.C raft foundation

and footing with 4 cm. (1-1/2") gauge approved

stone ballast.

Cum. 5100.00 6300.00 6300.00 7380.00 7750.00 7750.00 7380.00 6100.00 - 6100.00 6700.00 7700.00 8560.00 7180.00 7180.00 7180.00 5100.00 6250.00 6600.00 6200.00 6200.00 6100.00 6650.00 6200.00 6100.00 6100.00 6100.00 6859.00 5899.00 6938.00 5700.00 5500.00 5400.00 5500.00 5700.00 - 6555.00 5800.00 5500.00

16 288

As in item 283 above but in R.C.C T Beam and

slab roofs and R.C.C columns. Rate as in item no.

(283) above.

Cum. 6000.00 7700.00 7700.00 9170.00 9500.00 9500.00 9170.00 7425.00 9050.00 7425.00 8100.00 8785.00 9920.00 8950.00 8950.00 8950.00 6000.00 7500.00 8650.00 8250.00 8400.00 7000.00 7700.00 7200.00 7425.00 7425.00 8702.00 7615.00 8619.00 7700.00 7500.00 7400.00 7500.00 - - 8700.00 8200.00 7100.00

17 289As in item no. 283 but on R. C. C. columns in 1 : 1-

1/2 : 3.Rate as in item No.288 above.Cum. 6870.00 8000.00 8000.00 9575.00 9945.00 9945.00 9575.00 7950.00 9500.00 7950.00 8500.00 9750.00 10750.00 9550.00 9550.00 9550.00 6870.00 8000.00 8700.00 8700.00 8800.00 7700.00 8300.00 7800.00 7950.00 7950.00 9316.00 8185.00 9230.00 7600.00 7400.00 7300.00 7400.00 - - 8900.00 8500.00 7700.00

18 Remark

10% extra rate will

be given for minor

repair in Govt.

Buildingbe.g.

Inspection House /

Circuit House /

Pooled Houses &

PWD Office Building

etc.

8000.00 - - - - - -

295.00

- - - - - - - - - -

9400.00 8800.00

3130.00

01.06.2018

3300.00

3500.00

Name of Districts

S.O.R. Effective Date 15.12.2017 15.12.2017

3130.00

3300.00

3500.00

Sultanpur-Amethi Jhansi Banda

01.01.2018 24.04.201816.10.2017

3340.00

3545.00

3745.00

UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.

CONCRETE WORK

Name of Circle Bareilly Budaun-Pilibhit Barabanki

6480.00

6885.00

5655.00

5160.00

7590.00

7370.00

8500.00

9000.00

-

-

8250.00

8750.00

8950.00

9750.00

6530.00

Page 5: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

CHAPTER-6

Moradabad Rampur LucknowSitapur-

KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Aligarh Agra Mainpuri Kanpur Etawah

Kannauj-

Farukhabad

Faizabad-

Ambedkar

Nagar

Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra

Moradabad

/Amroha

/Sambhal

Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/

RaibareliSitapur /Kheri Unnao /Hardoi

Gonda

/BalrampurBarabanki

Bahraich

/Shrawasti

Basti

/Santkabir

Nagar

/Siddharth

Nagar

Gorakhpur

/Maharajganj

Deoria

/Kushinagar

Meerut

/Baghpat

Bulandshahr

/Hapur

Gautam Budh

Nagar

/Ghaziabad

Aligarh

/Hathrash

/Etah

/Kashganj

Agra /MathuraMainpuri/

Firozabad

Kanpur

Nagar/Kanpur

Dehat

Etawah/AuriyaKannauj/Faruk

habad

Faizabad/Amb

edkar NagarSultanpur Amethi

Azamgarh

/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur

Allahabad

/Kaushambi

Pratapgarh

/Fatehpur

Varanasi

/Ghazipur

/Chandauli

Mirzapur

/BhadoiSonebhadra

06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018

Rate

Meerut/Bagpat klin

bricks

Rate

Saharanpur/M.Nag

ar/shamali with

flysh bricks

S.No.SCH.

P.W.D

ITEM NO

NBODescription of the Work

P.W.D SPEC.

NO.Unit

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

1 303 First Class brick work in 1 : 6 cement and fine sand

of 1.25 F.M. mortar in foundation and plinth including

supply of all materials, labour and T & P etc. required

for proper completion of the work.

6.1.1 Cum. 3500.00 3400.00 3900.00 3900.00 4700.00 4770.00 4770.00 4700.00 3300.00 3250.00 4350.00 3800.00 4800.00 4800.00 4450.00 3500.00 3930.00 3950.00 4250.00 4500.00 4400.00 4100.00 4090.00 4300.00 4350.00 3300.00 3300.00 5003.00 5524.00 6002.00 5200.00 5100.00 5300.00 5100.00 4100.00 5300.00 3802.00 4400.00 4450.00

2 304 As in item no. 303 above, but in 1 : 5 cement and

fine sand of 1.25 F.M. mortar. 6.1.3 Cum. 3600.00 3500.00 - - - - - - 3700.00 3275.00 4400.00 3900.00 4885.00 4885.00 4550.00 3600.00 4030.00 4050.00 - 4300.00 4200.00 - 4350.00 4400.00 - 3700.00 5069.00 5590.00 6068.00 5300.00 5200.00 5400.00 5200.00 4180.00 5400.00 4220.00 4500.00 4600.00

3 305(a) As in item no. 303 above, but in 1 : 4 cement and

fine sand of 1.25 F.M. mortar. 6.1.3 Cum. 3800.00 3700.00 4050.00 4050.00 - - - - 3750.00 3500.00 4470.00 3950.00 4970.00 4970.00 4650.00 3800.00 4130.00 4150.00 4450.00 4570.00 - 4250.00 4200.00 4400.00 4470.00 3750.00 3750.00 5135.00 5656.00 6136.00 5400.00 5300.00 5500.00 5300.00 4260.00 5500.00 4300.00 4600.00 4650.00

4 305(b) As in item 303 above but in 1 : 4 cement and coarse

sand mortar. 6.1.3 Cum. 4000.00 3900.00 4650.00 4650.00 4880.00 4960.00 4960.00 4880.00 4050.00 3350.00 4920.00 4400.00 5520.00 5160.00 4550.00 4550.00 4000.00 4430.00 4450.00 4550.00 4700.00 4430.00 4500.00 4450.00 4700.00 4920.00 4050.00 4050.00 - - - - - 5700.00 - - -

5 306 As in item no. 303 above, but in 1 : 3 cement and

fine sand of 1.25 F.M. mortar. 6.1.5 Cum. 3950.00 3850.00 - - - - 3900.00 - 4650.00 4300.00 5100.00 5100.00 4890.00 3950.00 4280.00 4300.00 - 4750.00 4500.00 4430.00 4600.00 4650.00 3900.00 3900.00 5334.00 5855.00 6333.00 5500.00 5400.00 5600.00 5400.00 4420.00 5750.00 4500.00 5000.00 5100.00

6 307 As in item no. 303 above but in 1 : 3 cement and

coarse sand mortar. 6.1.5 Cum. 4140.00 4040.00 4800.00 4800.00 5070.00 5150.00 5150.00 5070.00 4250.00 3900.00 5100.00 4700.00 5400.00 5770.00 5160.00 5060.00 5100.00 4140.00 4575.00 4600.00 4800.00 4950.00 5100.00 4750.00 4700.00 4700.00 5100.00 4250.00 4250.00 5348.00 5869.00 6344.00 5550.00 5450.00 5650.00 5450.00 4500.00 6150.00 4800.00 5200.00 5200.00

7 308 First Class brick work in mud mortar in foundation

and plinth including supply of all materials, labour

and T & P etc. required for proper completion of the

work.

Cum. - - 2700.00 2700.00 - - - - 3150.00 2800.00 3100.00 3250.00 4130.00 4130.00 - - 3550.00 3450.00 - - - 4185.00 4763.00 5106.00 4300.00 4200.00 4400.00 4200.00 - - - -

8 309 6.19 As in item (303) to (307) above, but in the super-

structure including necessary cutting and moulding

of bricks as required and also including honey comb

brick, work thickness of wall not to be less than 1½

brick thick. Add for extra labour to above items.

6.1.6 Cum. 200.00 200.00 240.00 240.00 300.00 300.00 300.00 300.00 365.00 600.00 365.00 249.00 320.00 320.00 250.00 250.00 200.00 280.00 280.00 360.00 250.00 250.00 250.00 250.00 365.00 210.00 210.00 276.00 276.00 276.00 240.00 240.00 240.00 240.00 285.00 - 250.00 200.00 220.00

9 310 As in item (309) above, but for wall of one brick thick.

Add for extra labour.Cum. 180.00 180.00 230.00 230.00 290.00 290.00 290.00 290.00 250.00 550.00 250.00 210.00 270.00 270.00 230.00 230.00 230.00 180.00 260.00 260.00 350.00 - - - 230.00 - 250.00 210.00 210.00 260.00 260.00 260.00 220.00 220.00 220.00 220.00 270.00 - 225.00 200.00 210.00

10 310(a) As in item (309) above, but for wall of half brick

(4½") thick. Add for extra labour over item no. 310. Cum. 220.00 220.00 300.00 300.00 430.00 430.00 430.00 430.00 125.00 280.00 125.00 105.00 140.00 140.00 195.00 195.00 195.00 220.00 300.00 300.00 500.00 510.00 260.00 125.00 120.00 125.00 125.00 95.00 95.00 390.00 390.00 390.00 290.00 290.00 290.00 290.00 135.00 - 112.00 100.00 150.00

11 310(b) As in item (309) above, but wall upto 3" thick. Add

for extra labour. Extra labour over item no.

310 (a).

Cum. - - 450.00 450.00 630.00 630.00 630.00 630.00 170.00 390.00 170.00 145.00 190.00 190.00 250.00 230.00 230.00 540.00 550.00 240.00 - 170.00 - 170.00 125.00 125.00 572.00 572.00 572.00 400.00 400.00 400.00 400.00 175.00 - 160.00 150.00 160.00

12 314 First class brick work in arches including shuttering

and centering add to items (301 to 307). Extra

labour, centering and shuttering required.Cum. - - 730.00 730.00 730.00 730.00 585.00 540.00 585.00 585.00 675.00 675.00 700.00 700.00 - - - 650.00 - 585.00 - 784.00 784.00 784.00 550.00 550.00 550.00 550.00 - - 670.00 - -

13 315 As in item 314 above, but in jack arches, including

shuttering & centering add to item 301 to 307. Extra

labour, centering and shuttering required.Cum. - - 810.00 810.00 810.00 810.00 650.00 625.00 650.00 650.00 720.00 720.00 800.00 800.00 - - - 740.00 - 650.00 - 848.00 848.00 848.00 - - - - - - 790.00 - -

14 316 As in item 314 above, but in well steining with

ordinary bricks, add to item 301 to 307. Extra cost of

labour, centering and shuttering etc.

Cum. - - 950.00 950.00 950.00 950.00 825.00 725.00 825.00 825.00 840.00 840.00 820.00 820.00 - - - 850.00 - 825.00 - 1011.00 1011.00 1011.00 - - - - - - 820.00 - -

15 317 As in item 316 above, but in well steining but with

specially moulded bricks. Add to item 316. Extra

labour required for workmanship and handling.

Cum. - - 300.00 300.00 300.00 300.00 275.00 200.00 275.00 232.00 300.00 300.00 270.00 270.00 - - - 250.00 - 275.00 - 292.00 292.00 292.00 - - - - - - 250.00 - -

16 Remark 10% extra rate will

be given for minor

repair in Govt.

Buildingbe.g.

Inspection House /

Circuit House /

Pooled Houses &

PWD Office

Building etc.

24.04.2018

Name of Districts

15.12.2017 15.12.2017 01.06.2018 16.10.2017

Sultanpur-AmethiBulandshahr

03.11.2017

Saharanpur

01.01.2018

Jhansi Banda

S.O.R. Effective Date

Saharanpur

/Shamli /Muzaffar nagar

UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.

BRICK WORK

Name of Circle Bareilly Budaun-Pilibhit Barabanki

5050.00

-

5150.00

5450.00

-

5750.00

720.00

825.00

225.00

-

245.00

215.00

115.00

145.00

620.00

Page 6: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

CHAPTER-7

Saharanpur Moradabad Rampur LucknowSitapur-

KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah

Kannauj-

Farukhabad

Faizabad-

Ambedkar

Nagar

Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra

Saharanpur

/Shamli

/Muzaffar

nagar

Moradabad

/Amroha

/Sambhal

Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/

RaibareliSitapur /Kheri Unnao /Hardoi

Gonda

/BalrampurBarabanki

Bahraich

/Shrawasti

Basti

/Santkabir

Nagar

/Siddharth

Nagar

Gorakhpur

/Maharajganj

Deoria

/Kushinagar

Meerut

/Baghpat

Bulandshahr/Gauta

m Budh Nagar

/Ghaziabad /Hapur

Aligarh

/Hathrash

/Etah

/Kashganj

Agra /MathuraMainpuri/

Firozabad

Kanpur

Nagar/Kanpur

Dehat

Etawah/AuriyaKannauj/Faruk

habad

Faizabad/Amb

edkar NagarSultanpur Amethi

Azamgarh

/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur

Allahabad

/Kaushambi

Pratapgarh

/Fatehpur

Varanasi

/Ghazipur

/Chandauli

Mirzapur

/BhadoiSonebhadra

06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018

S.No.SCH.

P.W.D

ITEM NO

NBODescription of the Work

P.W.D SPEC.

NO.Unit

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

1 360

2 cm. (3/4") thick damp proof course with cement

and approved coarse sand 1:2 with and including

water proofing materials as ordered by the Engineer-

in charge in the proportion as specified by the

manufacturers including supply of all material, labour

and T&P etc., required for proper completion of the

work including proper curing and shuttering as

necessary.

Sqm. 200.00 200.00 200.00 200.00 200.00 200.00 195.00 200.00 210.00 200.00 200.00 200.00 200.00 200.00 255.00 - 245.00 170.00 170.00 175.00 200.00 200.00 200.00 173.00 169.00 177.00 160.00 150.00 150.00 155.00 190.00 220.00 200.00 - -

2 361

As in item (360) above but 2.5 cm. (1") thick and of

cement concrete consisting of one part cement 1½

parts approved coarse sand and 3 parts approved

13mm(1½) graded stone grit and including water

proofing materials as ordered by the Engineer-in-

charge in the proportion as specified by the

manufacturers.

Sqm. 275.00 280.00 280.00 290.00 245.00 290.00 290.00 350.00 380.00 280.00 282.00 285.00 275.00 300.00 360.00 260.00 300.00 285.00 300.00 - 290.00 290.00 290.00 284.00 266.00 280.00 240.00 230.00 220.00 230.00 285.00 320.00 290.00 - -

3 Remark

S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018

UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.

DAMP PROOF COARSE

Name of Circle Bareilly Budaun-Pilibhit

Name of Districts

Barabanki Sultanpur-Amethi Jhansi Banda

01.01.2018

195.00

16.10.2017

290.00

225.00

350.00

225.00

350.00

24.04.2018

Page 7: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

CHAPTER-8

UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.

CHAPTER-8

Saharanpur Moradabad Rampur LucknowSitapur-

KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah

Kannauj-

Farukhabad

Faizabad-

Ambedkar

Nagar

Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra

Saharanpur

/Shamli /Muzaffar

Moradabad

/Amroha

/Sambhal

Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/

RaibareliSitapur /Kheri Unnao /Hardoi

Gonda

/BalrampurBarabanki

Bahraich

/Shrawasti

Basti

/Santkabir

Nagar

/Siddharth

Gorakhpur

/Maharajganj

Deoria

/Kushinagar

Meerut

/Baghpat

Bulandshahr/Ga

utam Budh

Nagar

/Ghaziabad

Aligarh

/Hathrash

/Etah

/Kashganj

Agra /MathuraMainpuri/

Firozabad

Kanpur

Nagar/Kanpur

Dehat

Etawah/AuriyaKannauj/Faruk

habad

Faizabad/Amb

edkar NagarSultanpur Amethi

Azamgarh

/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur

Allahabad

/Kaushambi

Pratapgarh

/Fatehpur

Varanasi

/Ghazipur

/Chandauli

Mirzapur

/BhadoiSonebhadra

ANTI TERMITE TREATMENT

Name of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda

Name of Districtsnagar

/Sambhal /Siddharth

Nagar

/Ghaziabad

/Hapur/Kashganj

Dehat /Chandauli

06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018

S.No.SCH.

P.W.D

ITEM NO

NBODescription of the Work

P.W.D

SPEC. NO.Unit

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

1- Providing and injecting chemical emulsion

24.04.2018S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017 01.01.2018

1- Providing and injecting chemical emulsion

of preconsfructional antitermite treatment

and creating a chemical barrier and under

and around the column pits wall trenches

basement, excavation top surface of plinth

filling, junction of wall and floor, along thefilling, junction of wall and floor, along the

external perimeter of binding expansion

joints, surrounding of pipes and conduit

etc. complete (plinth area of the building at

ground floor only shall be measured as per

I.S. 6313 (part 111981) Aldine emulsifableI.S. 6313 (part 111981) Aldine emulsifable

concentrator any other approved material

such as Hepthachior of chlordane will be

used. The rate of application of chemical

emulsion shall be as follows:-

1- Treatment of Masonary & Foundation 51- Treatment of Masonary & Foundation 5

liter per Sq.M.

2- Back fill in immediate contact with

foundation 7.5 litre per Sq,M.

3- Treatment of top surface of plinth filling

5 litre per Sq.M.5 litre per Sq.M.

4- Treatment of soil external perimeter of

building 7.50 litre per Sq.M.

5- Treatment of soil apron along external

perimeter 5 litre per Sq.M.

150.00 100.00 100.00 100.00 - 132.00210.00 - 190.00 -- - - - -- - -125.00

125.00- -

150.00115.00 125.00 190.00280.00 190.00125.00 --Sq.M. 115.00

6- Treatment junction of wall and the floor

7.5 litre/sqm.

2 Remark

Page 8: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

CHAPTER-9

Saharanpur Moradabad Rampur LucknowSitapur-

KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah

Kannauj-

Farukhabad

Faizabad-

Ambedkar

Nagar

Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra

Saharanpur

/Shamli /Muzaffar

nagar

Moradabad

/Amroha

/Sambhal

Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/

RaibareliSitapur /Kheri Unnao /Hardoi

Gonda

/BalrampurBarabanki

Bahraich

/Shrawasti

Basti /Santkabir

Nagar

/Siddharth

Nagar

Gorakhpur

/Maharajganj

Deoria

/Kushinagar

Meerut

/Baghpat

Bulandshahr/Gau

tam Budh Nagar

/Ghaziabad

/Hapur

Aligarh /Hathrash

/Etah /KashganjAgra /Mathura

Mainpuri/

Firozabad

Kanpur

Nagar/Kanpur

Dehat

Etawah/AuriyaKannauj/Faruk

habad

Faizabad/Amb

edkar NagarSultanpur Amethi

Azamgarh

/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur

Allahabad

/Kaushambi

Pratapgarh

/Fatehpur

Varanasi

/Ghazipur

/Chandauli

Mirzapur

/BhadoiSonebhadra

06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018

S.No.SCH.

P.W.D

ITEM

NO

NBO

Description of the WorkP.W.D SPEC.

NO.Unit

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

1- 401

C.P. Taek wood wrought framed and fixed

including simple mouldings, straight works as in

Chaukhats, including supply of all materials,

labour and T&P etc. required for proper

completion of work.

Cu.M. 83500.00 90000.00 90000.00 - - - 83500.00 90000.00 110000.00 - 100000.00 - - - - - 101544 101544 101544 - - - - 127600 - - - -

2- 402 As in Item no.-401 but for Sheesam wood Cu.M. 51800.00 52000.00 52000.00 - - - 51800.00 52000.00 71000.00 - 55000.00 - - - - - 44996 44996 44996 - - - - - - - -

3- 403 As in Item no.-401 but for Indian Sal wood Cu.M. 48000.00 54000.00 54000.00 - - - 48000.00 54000.00 81000.00 - 60000.00 - - - - - 55468 55468 55468 - - - - 78120 - - - -

4- 409

Supply and fixing of 4.5cm (1.3/4") thick C.P.

Teak wood part panelled & part glazed door

and window shutters including supply of

wooden cleats and stops and including fixing

and adjustment of hinses, bolts, locks, handles,

springs and/or other fitting but excluding their

supply and including painting with two coats of

Black Japan on all iron fittings if necessary &

including fixing the glass panes with putty &

brad. Glass to be 4mm thick. Fitting with

necessary screws to be supplied departmently.

Sq.M. 3600.00 - - - - - 4575.00 3600.00 4500.00 4800.00 - 5000.00 - - - - - 5014 5014 5014 - - - - 5500 - - - -

5- 410

Additional cost for fixing glass panes with C.P.

Teak wood beading and felt as directed by

Engineer-in-charge instead of putty and brad

including cost of all materials, labour and T&P

etc. required for proper completion of work.

Sq.M. 530.00 - - - - - 480.00 530.00 320.00 - 305.00 - - - - - 203 203 203 - - - - 192 - - -

6- 411 As in Item no.-409 above but fully panelled Sq.M. 4550.00 - - - - - 4800.00 4550.00 5000.00 - 5600.00 - - - - - 5513 5513 5513 - - - - 6590 - - -

7- 412 As in Item no.-409 above but fully glazed Sq.M. 3500.00 - - - - - 3800.00 3500.00 4000.00 - 4900.00 - - - - - 4620 4620 4620 - - - - 5500 - - -

8- 413 As in Item no.-409 above but 3.8cm thick Sq.M. 3980.00 - - - - - 3980.00 4700.00 - 4100.00 - - - - - - - - - 5400 - - -

9- 414 As in Item no.-411 above but 3.8cm thick Sq.M. 3790.00 - - - - - 3790.00 - 4350.00 - - - - - - - - - 6280 - - -

10- 415 As in Item no.-412 above but 3.8cm thick Sq.M. 3260.00 - - - - - 3260.00 3900.00 - 4100.00 - - - - - - - - - 5100 - - - -

11- 422As in Item no.-409 above but 3.8cm thick

Sheesam woodSq.M. 2740.00 - - - - - 2740.00 3250.00 - 3350.00 - - - - - - - - - 3700 - - - -

12- 423As in Item no.-411 above but 3.8cm thick

Sheesam woodSq.M. 2740.00 - - - - - 2740.00 3350.00 - 3650.00 - - - - - - - - - 3700 - - - -

13- 424As in Item no.-412 above but 3.8cm thick

Sheesam woodSq.M. 2640.00 - - - - - 2640.00 3200.00 - 3350.00 - - - - - - - - - 3700 - - - -

14- 450

Supply and fixing of 4cm (3/2") thick C.P. Teak

wood door and window shutters with panels of

heavy quality galvanized iron wire gauge

2.5mm or 2mm or 1.5mm (1/10 or 1/12 or 1/6

inch) mesh or any other size with necessary

beading including supply and fixing of wooden

cleats and stops and including fixing and

adjustment of hinses, bolts, locks, handles,

springs and/or other fitting but excluding their

supply and including painting with two coats of

Black Japan on all iron fittings if necessary.

Fitting with necessary screws to be supplied

departmently.

Sq.M. 3020.00 - - - - - 3020.00 3300.00 - 3600.00 - - - - - 3994 3994 3994 - - - - 4700 - - - -

15- 451 As in Item no.-450 above but in Sheesam wood Sq.M. 2640.00 - - - - - 2100.00 2640.00 2400.00 - 1800.00 - - - - - 2282 2282 2282 3490 - - -

16- 455

Supply and fixing galvanized mosquitos proof

heavy quality iron wire gauge or expended

metal heavy quality over windows and including

supply of C.P. Teakwood batten 8cmX1cm

(3"X3/8")/flat iron 25mmX4mm and including

supply of necessary screws all materials,

labour, T&P etc. required for proper completion

of work.

Sq.M. 630.00 - - - - - 630.00 700.00 690.00 - 700.00 - 600.00 - - - 728 728 728 620 620 620 620 590 - - -

17- 456As in Item no.-455 above but with Sheesam

wood battensSq.M. 600.00 - - - - - 600.00 600.00 580.00 - 490.00 - - - - - 488 488 488 - - - -

18- 457As in Item no.-455 above but with Indian Sal

wood battensSq.M. 490.00 - - - - - 490.00 650.00 520.00 - 500.00 - - - - - 533 533 533 - - - - - - - - -

19- 470

Supply and fixing of flush doors, commercial

quality conforming of I.S. 2202 part-1 (1983)

including fixing of wooden cleats and stoppers

and including fixing and adjustment of hinges,

bolts, locks, handles, springs, fitting with

necessary screws to be supplied departmentally

- - - - - - - - - - - - - - - - - - -

(A) 32mm thick Sq.M. 1300.00 1350.00 1350.00 - - - 1430.00 1400.00 1400.00 1620.00 1600.00 1480.00 1480.00 1500.00 1430.00 1470.00 1470.00 2264 - 1400.00 - -

(B) 35mm thick Sq.M. 1490.00 1400.00 1400.00 - - - 1495.00 1420.00 1420.00 1600.00 - 1700.00 1510.00 1510.00 1600.00 1495.00 1560.00 1560.00 1900 1900 1900 1900 - 1420.00 - -

(C) 40mm thick Sq.M. - 1450.00 1450.00 - - - 1560.00 1530.00 1530.00 1830.00 1800.00 1630.00 1630.00 1630.00 1560.00 1640.00 1640.00 2000 2000 2000 2000 - 1530.00 - -

(D) For double leaf shutters add extra in over all

rates.Sq.M. 200.00 120.00 120.00 - - - 104.00 110.00 110.00 160.00 165.00 135.00 85.00 85.00 85.00 104.00 104.00 104.00 - - - - - - 110.00 - -

20- 473

Approximate cost of ISI marked oxidized iron

fitting with screws for doors & windows etc. (for

estimating purpose only)

Sq.M. 380.00 - - - - - - 420.00 - 180.00 - - - 850 850 850 850 209 - - - -

21- 474As in Item no.-473 but Aluminium fittings ISI

markedSq.M. 440.00 - - - - - 500.00 530.00 - 225.00 - - - - - - - 308 - - - -

22- Remark

-

-

1430.00

1495.00

1560.00

104.00

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.

WOOD WORK

Name of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda

01.01.2018 24.04.2018

Name of Districts

S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017

89033.00

-

81970.00

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

1400.00

1420.00

1530.00

110.00

-

-

1400.00

1420.00

1530.00

110.00

89033.00

-

81970.00

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Page 9: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

CHAPTER- 10

Saharanpur Moradabad Rampur LucknowSitapur-

KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah

Kannauj-

Farukhabad

Faizabad-

Ambedkar

Nagar

Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra

Saharanpur

/Shamli

/Muzaffar nagar

Moradabad

/Amroha

/Sambhal

Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/

RaibareliSitapur /Kheri Unnao /Hardoi

Gonda

/BalrampurBarabanki

Bahraich

/Shrawasti

Basti /Santkabir

Nagar

/Siddharth

Nagar

Gorakhpur

/Maharajganj

Deoria

/Kushinagar

Meerut

/Baghpat

Bulandshahr/Gau

tam Budh Nagar

/Ghaziabad

/Hapur

Aligarh

/Hathrash

/Etah

/Kashganj

Agra /MathuraMainpuri/

Firozabad

Kanpur

Nagar/Kanpur

Dehat

Etawah/AuriyaKannauj/Faruk

habad

Faizabad/Amb

edkar NagarSultanpur Amethi

Azamgarh

/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur

Allahabad

/Kaushambi

Pratapgarh

/Fatehpur

Varanasi

/Ghazipur

/Chandauli

Mirzapur

/BhadoiSonebhadra

06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018

S.No.SCH.

P.W.D

ITEM

NO

NBO

Description of the WorkP.W.D SPEC.

NO.Unit

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

1 501 Rolled steel joists fixed in position excluding cost of

joists which will be supplied free at site but including

all labour in handling and hoisting and including hire

etc. of necessary T&P.

- - - - - - - - - - - - - - - - - - 6000.00 - -

(a) Light section, i.e. not exceeding 300 kg. (6cwt.) in

weight and upto 7.5 metre (24ft.) in height. Qtl.- - - 900.00 630.00 900.00 830.00 1050.00 1050.00 - - - - - 756.00 756.00 756.00 - - - - - - - -

2 (b) Same as above but heavy section, i.e. exceeding

300 kg. (6 cwt.) in weight and upto 7.5 metre (24') in

height. Qtl.

- - - 1300.00 950.00 1300.00 1270.00 1610.00 1610.00 - - - - - 1156.00 1156.00 1156.00 - - - - - - - -

3 (c) Add to item 501(a) and 501(b) for heights beyond 7.5

metres (24ft.). Qtl.- - - 450 390 450 480 690 690 - - - - - 659.00 659.00 659.00 - - - - - - - -

4 502 Mild steel or iron work of small sizes and sections

such as holding down bolts, hold fasts, tie, rods,

gratings etc., (when not included in an over all rates)

wrought to required form, including supply of steel,

bolts, nuts and wastage etc and their fixing required

for proper completion of the work.

Qtl.

5200.00 5500.00 5500.00 5600.00 5390.00 5600.00 6000.00 7640.00 7640.00 5600.00 4900.00 4900.00 5200.00 5600.00

anlysis as

per

current

market

rate

5800.00 5700.00 5450.00 5560.00 5560 9252.00 9252.00 9252.00 5600 5600 5600 5600 5800 5700.00 5500.00 6600.00 6600.00

5 503 Mild steel or iron work in heavy sizes such as

trusses; builts up gates, door frames, record racks,

roof work, gates etc., wrought to required form

including drilling holes, rivetting or welding where

necessary and also including supply of steel, bolts,

nuts etc. & their fixing required for proper

completion of the work. 10.22 Qtl.

6000.00 6000.00 6000.00 5850.00 5820.00 5850.00 6250.00 8625.00 8625.00 5850.00 5050.00 5050.00 6000.00 6450.00

anlysis as

per

current

market

rate

2200.00

(Labour

only)

5900.00 5850.00 5810.00 5810.00 9958.00 9958.00 9958.00 5900.00 5900.00 5900.00 5900.00 5922.00 5950.00 6300.00 7000.00 6200.00

6 504 Mild steel or iron in plain work shch as reinforced

concrete or reinforced brick work (when not included

in over all rates) wrought to required shape as

necessary including bending for proper completion of

the work and including supply of all steel and

wastage & over lapping & hooks. 10.31 Qtl.

5600.00 5600.00 5600.00 5400.00 5140.00 5400.00 5900.00 7360.00 7360.00 5400.00 4700.00 4700.00 5600.00 5600.00

anlysis as

per

current

market

rate

5500.00 5400.00 5400.00 4850.00 4850.00 5666.00 5666.00 5666.00 5600.00 5600.00 5600.00 5600.00 5356.00 5800.00 5320.00 6422.00 5200.00

7 Remark

-

-

-

6960.00

7560.00

5750.00

UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.

MILD STEEL AND IRON WORK

Name of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda

Name of Districts

S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017

-

-

5650.00

5720.00

01.01.2018 24.04.2018

Analy

sis

By A

s P

er

Curr

ent

Mark

et

rate

s

Analy

sis

By A

s P

er

Curr

ent

Mark

et

rate

s

Analy

sis

By A

s P

er

Curr

ent

Mark

et

rate

s

-

5600.00

-

-

-

-

5650.00

5720.00

5600.00

-

-

Page 10: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

CHAPTER- 11

Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur EtawahKannauj-

Farukhabad

Faizabad-

Ambedkar

Nagar

Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra

Saharanpur

/Shamli

/Muzaffar nagar

Moradabad

/Amroha

/Sambhal

Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/

RaibareliSitapur /Kheri Unnao /Hardoi

Gonda

/BalrampurBarabanki

Bahraich

/Shrawasti

Basti /Santkabir

Nagar /Siddharth

Nagar

Gorakhpur

/MaharajganjDeoria /Kushinagar Meerut /Baghpat

Bulandshahr/Gauta

m Budh Nagar

/Ghaziabad /Hapur

Aligarh /Hathrash

/Etah /KashganjAgra /Mathura

Mainpuri/

Firozabad

Kanpur

Nagar/Kanpur

Dehat

Etawah/AuriyaKannauj/Faruk

habad

Faizabad/Amb

edkar NagarSultanpur Amethi

Azamgarh

/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur

Allahabad

/Kaushambi

Pratapgarh

/Fatehpur

Varanasi

/Ghazipur

/Chandauli

Mirzapur

/BhadoiSonebhadra

06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018

S.No.SCH.

P.W.D

ITEM

NO NBODescription of the Work

P.W.D

SPEC.

NO.

UnitOver All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

1- 15.72 Painting top roofs with bitumen of approved quality @ 1.70 Kg. Per

Sq.M. impregnated with a cost of coarse sand @ 0.60 Cu.M. per 100

Sq.M. including cleaning the slab surface with a piece of cloth lately

soaked in kerosene oil complete.

Sq.M. 0.00 - - 75.00 - 130.00 130.00 116.00 116.00 116.00 - - - - - -

2- 538 Supply and laying complete 4cm (1-1/2") thick insulation layer of

sand and clay over jack arch, reinforced brick or reinforced cement

concrete roof.

11.9 Sq.M. 20.00 25.00 25.00 - 35.00 - 36.00 20.00 30.00 - 30.00 - 30.00 - - 18.50 18.50 20.00 20.00 20.00 20.00 24.00 - - -

3-i 539 Making expansion and contraction joint in terraced roof lip type,

including supply of necessary quantity of filler, tarfelt, brick tile all

material labour, tool and plants etc required for proper completion of

the work.

11.10 R.M. - 115.00 115.00 - 230.00 - 220.00 480.00 500.00 135.00 100.00 100.00 100.00 - 93.50 93.50 84.20 84.20 84.20 70.00 70.00 70.00 70.00 78.00 - 135.00 - -

3-ii 540 As in Item (539) above but parapet type. 11.11 R.M. - 380.00 380.00 - 780.00 - 840.00 - 475.00 470.00 470.00 465.00 - 414.00 414.00 449.00 449.00 449.00 600.00 600.00 600.00 600.00 370.00 - 625.00 - -

3-iii 543Screening overleaky roof with bitumen @ 1/2 kg per Sq.M. including

sweating, cleaning the roof with brush, heating of the paint upto the

required temperature pouring it on the surface spreading necessary

qty. of approved coarse sand @ 0.30 Cu.M. per 100 Sq.M. (1 cft per

100 sft) and including supply of all material, labour and tool and

plants etc. required proper completion of work.

11.12 Sq.M. 38.00 40.00 40.00 - - - 38.00 38.00 38.00 40.00 - 60.00 - 16.00 - - - 60.00 60.00 60.00 60.00 21.00 - - - -

1- 544

&

545

Supplying and laying one layer of tarfelt or any other equivalent

approved material at the junction of wall and roof or at any place as

per direction of E/IC including necessary over lap giving one coat of

approved mastic paint below the tarfelt and including supply of all

material labour and tools and plants etc. required for proper

completion of work fixed as per standard.

11.13 Sq.M. 210.00 220.00 220.00 - 240.00 - 350.00 185.00 185.00 210.00 260.00 - 260.00 260.00 260.00 260.00 - 195.00 195.00 247.00 247.00 247.00 120.00 120.00 120.00 120.00 137.00 - - - -

5- 5.7.16Providing and filling in position bitumen mixfiller of proportion 80kg of

hot bitumen, 1kg of cement and 0.25 Cu.M. of coarse sand in

expansion joints in width upto 2.5 cm, depth upto 15cm. Excluding

cost of materials but including cost of fuel.

R.M. - 210.00 210.00 - - 27.00 30.00 - - - - 14.95 14.95 20.20 20.20 20.20 - - - -

6- New

Providing and laying "brick coba" 12mm thick laid with M-150 class

brick bat coba 7.50cm thick with gap of 15mm to each other, over

20mm thick base of cement mortar 1:4 cement and coarse sand

mixed with water proofing compound spreding cement slurry mixed

with acrelic cement concrete water proofing compound filled gaps of

coba & top of coba mortar mixed with water proofing compound in

1:4 cement and coarse sand mortar finished smooth & top mashed

false square 30cmX30cm and side wall parapet shall be mono tythic

plaster wall upto 30cm higher and junction and corner shall be

rounded by brick ballast cement and coarse sand masonary coba

with top finished plaster mixed with acetic water proofing compound

@ 2% by weight & including S/o all material, labour, T&P etc

complete for proper completion of work.

Sq.M. 865.00 950.00 950.00 - - - 1100.00 1100.00 865.00 900.00 850.00 850.00 900.00 - - - - 838.00 838.00 974.00 974.00 974.00 750.00 750.00 750.00 750.00 - - - -

7- Remark

16.20

920.00

-

20.25

100.00

440.00

-

216.00

UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.

ROOF WORK

Name of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda

Name of Districts

S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017 01.01.2018 24.04.2018

-

-

-

-

-

-

-

-

38.00

185.00

-

1100.00

38.00

185.00

-

1100.00

Page 11: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

CHAPTER- 12

SaharanpurMoradab

adRampur Lucknow

Sitapur-

KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah

Kannauj-

Farukhabad

Faizabad-

Ambedkar

Nagar

Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra

Saharanpur

/Shamli

/Muzaffar

nagar

Moradabad

/Amroha

/Sambhal

Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/

RaibareliSitapur /Kheri Unnao /Hardoi

Gonda

/BalrampurBarabanki

Bahraich

/Shrawasti

Basti

/Santkabir

Nagar

/Siddharth

Nagar

Gorakhpur

/Maharajganj

Deoria

/Kushinagar

Meerut

/Baghpat

Bulandshahr/Gaut

am Budh Nagar

/Ghaziabad

/Hapur

Aligarh

/Hathrash

/Etah

/Kashganj

Agra /MathuraMainpuri/

Firozabad

Kanpur

Nagar/Kanpur

Dehat

Etawah/AuriyaKannauj/Faruk

habad

Faizabad/Amb

edkar NagarSultanpur Amethi

Azamgarh

/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur

Allahabad

/Kaushambi

Pratapgarh

/Fatehpur

Varanasi

/Ghazipur

/Chandauli

Mirzapur

/BhadoiSonebhadra

06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018

S.No.SCH.

P.W.D

ITEM NO

NBODescription of the Work

P.W.D

SPEC. NO.Unit

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

1 16.7Providing and fixing 6mm thick fibre hard board sheet lining

with but jointing and nails (Frame work and cover fillets to

be measured and paid for separately)

Sq.M. 0.00 200.00 200.00 - - 520.00 225.00 - 225.00 - - 186.00 186.00 206.00 206.00 206.00 170.00 170.00 170.00 170.00 185.00 - - - -

2 16.9(a) Providing and fixing veneered particle board 12mm thick

lining with but jointing and nails (Frame work and cover

filets to be measured and paid for separately)

Sq.M. - 410.00 410.00 - - 620.00 625.00 500.00 - 600.00 - - 409.00 409.00 582.00 582.00 582.00 500.00 500.00 500.00 500.00 490.00 - - - -

(b) 20mm thick particle board. Sq.M. - 480.00 480.00 - - 670.00 675.00 575.00 - 620.00 - - 470.00 470.00 655.00 655.00 655.00 600.00 600.00 600.00 600.00 650.00 - - - -

3 16.10 Providing and decorative type veneered particle board

12mm thick lining with but jointing and nails (Frame work

be paid separately)

Sq.M. - 450.00 450.00 - - 625.00 625.00 525.00 - 600.00 - - 431.00 431.00 582.00 582.00 582.00 500.00 500.00 500.00 500.00 490.00 - - - -

4 16.13 Providing and fixing 12mm thick plywood lining with but

jointing and nails (Frame work and cover fillets to be

measured and paid for separately)

Sq.M. - 350.00 350.00 - - 970.00 975.00 400.00 - 400.00 - - 346.00 346.00 424.00 424.00 424.00 410.00 - - - -

5 16.35 Providing and fixing 12mm thick plaster of Paris (Gypsum

anhydrous) ceiling tiles upto height of 5 meters upto floor

level over wooden frame and rendered smooth with plaster

of Paris. (Frame work to be measured and paid for

separately.)

Sq.M. - 475.00 375.00 - - 520.00 525.00 500.00 - 600.00 - - 466.00 466.00 582.00 582.00 582.00 500.00 500.00 500.00 500.00 490.00 - - - -

6(a)

Perforated ceiling tiles : Providing and fixing in position

teak wood perforated particle board ceiling tiles bonded

with B.W.P. type Phenol formaldehyde synthetic rains tile in

size 60x60x12mm over kali wood timber frame of 50x30mm

section and suspended from the roof with the help of flat

iron hangers of size 20x44mm on under side leaving and

expansion gap of 6mm and with provision for providing

necessary fighting fixtures including three coats of flat oil

paint of approved quality and shade and a coat of pink

primer/copal varnish of the side facing the roof as per

direction given by Engineer-In-Charge.

Sq.M. - 1070.00 1070.00 - - 990.00 1000.00 1100.00 - 1300.00 - - 1086.00 1086.00 1454.00 1454.00 1454.00 1350.00 1350.00 1350.00 1350.00 - - - -

6(b) Same as above but with decorative ceiling tiles. Sq.M. - 1100.00 1100.00 - - 1030.00 1050.00 1250.00 - 1350.00 - - 1104.00 1104.00 1485.00 1485.00 1485.00 1400.00 1400.00 1400.00 1400.00 - - - -

7(a)Wooden Partition: Providing and fixing in position 38mm

thick single skin partition with fibre of particle board frame

of 900x 400mm section of 75x38m mind fixing (Panelled

type) 19mm thick teak wood particle board bounded with

phenol formaldehyde synthetic resin both face commercial

confirming to ISI specification no. 3097-1980 as per

drawing complete with painting/French polish/wax polish or

as per direction given by Engineer In Charge.

Sq.M. - 1830.00 1830.00 - - 1320.00 1325.00 1325.00 - 1400.00 - - 1795.00 1795.00 1576.00 1576.00 1576.00 - - - -

7(b) Same as in Item No. 7(a) above but with 19mm thick teak

wood particle board laminated on both faces.Sq.M. - 2060.00 2060.00 - - 2540.00 2550.00 2500.00 - - - - 1848.00 1848.00 2606.00 2606.00 2606.00 - - - -

8(a)Providing and fixing in position double skin wooden partition

with fiber or particle board frame of 900 x 1200mm

rectangular of section 50 x 38mm covered with 12mm thick

teak wood particle board commercial quality of both face

duly painted two coats of high gloss synthetic enamel paint

over on priming complete.

Sq.M. - 1740.00 1740.00 - - 2240.00 2250.00 2200.00 - 2000.00 - - 1680.00 1680.00 2242.00 2242.00 2242.00 - - - -

8(b)Same as in Item No. 8(a) above but covering with 12mm

thick teak wood particle board laminated on both faces.Sq.M. - 1900.00 1900.00 - - 2440.00 2450.00 2400.00 - 2050.00 - - 1852.00 1852.00 2303.00 2303.00 2303.00 - - - -

9(a) Wall Paneling : Providing and fixing in position wall panels

of plain teak wood particle board 12mm thick bonded with

B.W.P. type Phenol formaldehyde synthetic resin tiles kali

wood frame and provision for providing switch board

fixtures etc. as per drawing complete with polishing and

fining with Fremg wax polish as per direction given by

Engineer-In-Charge.

Sq.M. - 1150.00 1150.00 - - 1530.00 1530.00 1450.00 - 1300.00 - - 1210.00 1210.00 1454.00 1454.00 1454.00 - - - -

9(b) Same as in Item No. 9(a) above but with one side

laminated instead of plain board.Sq.M. - 1670.00 1670.00 - - 2040.00 2050.00 1950.00 - 1750.00 - - 1728.00 1728.00 2000.00 2000.00 2000.00 - - - -

10(a) NewSupply and fixing of anodized aluminium door having 2mm

thick aluminium section excluding coating and average

coating of 20 microns fully glazed made of aluminium door

tube size 83.5x44.65 m as vertical member and

1140x44.45 mm size tube in bottom and horizontal member

door chaukhat should be of aluminium tublar vertical with

two openable shutter, the rate will include cost of material

fixtures 4mm glass handles locks screw necessary bending

and excluding cost of floor spring if required for proper

completion of the work as per direction of Engineer-In-

Charge.

Sq.M. - 3800.00 3800.00 - - - 4000.00 - - - - 4213.00 4213.00 - - - -

10(b) New Same as Item No. 10(a) but with 5mm thick plain glass

complete.Sq.M. - 3920.00 2920.00 - - - 4050.00 - - - - 4381.00 4381.00 - - - -

11 New Same as Item No. 10(a) above but for fixed glazing Sq.M. - 3550.00 3550.00 - - - 3750.00 - - - - 4032.00 4032.00 - - - -

551 Supply and fixing of 2.5Cm. Thick deodar wood plains,

ceiling Including supply of beading 2.5Cm. X 4Cm. (1" x 1

½") of deodar wood over joints but excluding cost of ceiling

joints if and when necessary but Including cost of material,

labour & T&P etc. required for proper completion of the

work.

Sq.M. - - - - - 1530.00 1550.00 1500.00 - - - - - - - - -

552 Same as Item No. 551 above but of C.P. teak wood. Sq.M. - - - - - 3050.00 3050.00 3025.00 - - - - - - - - -

553 As per Item No. 551 above but kail or cheer wood. Sq.M. - - - - - 720.00 725.00 650.00 - - - - - - - - -

554Supply and fixing A.C. Plain sheet ceiling includng beading

2.5cm x 4cm (1"x1½") of deodar wood, screws, bold and all

material, labour, T&P etc. complete, excluding cost of

ceiling joints if any required for proper completion of work.

Sq.M. - - - - - 370.00 375.00 375.00 - - - - - - - - -

-

-

-

1272.00

1815.00

4430.00

4610.00

4240.00

-

1140.00

1160.00

1890.00

1942.00

1765.00

1950.00

196.00

430.00

495.00

494.00

364.00

490.00

UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.

CEILING AND LINING

Name of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda

Name of Districts

S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017 01.01.2018 24.04.2018

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Page 12: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

CHAPTER- 13

SaharanpurMoradaba

dRampur Lucknow

Sitapur-

KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah

Kannauj-

Farukhabad

Faizabad-

Ambedkar

Nagar

Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra

Saharanpur

/Shamli

/Muzaffar nagar

Moradabad

/Amroha

/Sambhal

Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/

RaibareliSitapur /Kheri Unnao /Hardoi

Gonda

/BalrampurBarabanki

Bahraich

/Shrawasti

Basti

/Santkabir

Nagar

/Siddharth

Nagar

Gorakhpur

/Maharajganj

Deoria

/Kushinagar

Meerut

/Baghpat

Bulandshahr/Gau

tam Budh Nagar

/Ghaziabad

/Hapur

Aligarh

/Hathrash

/Etah

/Kashganj

Agra /MathuraMainpuri/

Firozabad

Kanpur

Nagar/Kanpur

Dehat

Etawah/AuriyaKannauj/Faruk

habad

Faizabad/Amb

edkar NagarSultanpur Amethi

Azamgarh

/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur

Allahabad

/Kaushambi

Pratapgarh

/Fatehpur

Varanasi

/Ghazipur

/Chandauli

Mirzapur

/BhadoiSonebhadra

06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018

S.No.SCH.

P.W.D

ITEM NO

NBODescription of the Work

P.W.D SPEC.

NO.Unit

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

1 17.5812mm Cement plaster in single coat of fair side

of single of half brick wall for interior plastering

upto floor two level including internal rounded

angles chamfers, and/or rounded angles not

exceeding 80mm. In girth and finished even

and smooth No. extra for mixing any additive.

(I) 1cement : 3 coarse sand Sq.M. 160.00 170.00 170.00 185.00 190.00 190.00 185.00 160.00 142.00 160.00 170.00 190.00 200.00 155.00 155.00 155.00 160.00 175.00 165.00 170.00 160.00 160.00 165.00 162.00 160.00 160.00 160.00 171.00 167.00 175.00 145.00 140.00 145.00 140.00 149.00 145.00 157.00 154.00 150.00

(II) 1 cement : 4 fine sand Sq.M. 140.00 140.00 140.00 150.00 150.00 150.00 150.00 130.00 110.00 130.00 123.00 155.00 155.00 125.00 125.00 125.00 140.00 150.00 135.00 140.00 140.00 130.00 135.00 135.00 130.00 130.00 130.00 144.00 140.00 148.00 135.00 130.00 135.00 130.00 140.00 125.00 129.00 128.00 125.00

(III) 1 cement : 6 fine sand Sq.M. 125.00 130.00 130.00 135.00 135.00 135.00 135.00 120.00 100.00 120.00 111.00 145.00 145.00 118.00 118.00 118.00 125.00 140.00 120.00 125.00 125.00 120.00 110.00 125.00 120.00 120.00 120.00 130.00 126.00 134.00 105.00 100.00 105.00 100.00 117.00 115.00 118.00 112.00 110.00

2 17.59 15mm Cement plaster in single coat on rough

side of single or half brick wall for interior

plastering upto floor to level including internal

rounded angles chamfers, and rounded angles

not exceeding 80mm. In girth and finished even

and smooth.

(I) 1cement : 3 coarse sand Sq.M. - - - - - - - - - - 175.00 180.00 175.00 175.00 - 180.00 - - 214.00 209.00 219.00 - - - -

(II) 1 cement : 4 fine sand Sq.M. - - - - - - - - - - 140.00 150.00 155.00 148.00 - 150.00 - - 180.00 175.00 185.00 - - - -

(III) 1 cement : 6 fine sand Sq.M. - - - - - - - - - - 130.00 135.00 140.00 134.00 - 135.00 - - 163.00 158.00 168.00 - - - -

3 17.63 20mm cement plaster in two coats backing cost

17mm and finishing coat 3mm thick of neat

cement and marble dust in ratio 5:1 on rough

side of single or half brick interior plastering

upto floor to level including internal rounded

angles.

(I) 1cement : 3 coarse sand Sq.M. 230.00 200.00 200.00 - - - - - - - 165.00 260.00 275.00 250.00 205.00 210.00 210.00 - - - - 194.00 185.00

(II) 1 cement : 4 fine sand Sq.M. - - - - - - - - - - 220.00 - 215.00 165.00 - 170.00 - - - - - -

4 17.91 Extra items 17.58 &17.59 for plastering on

ceilings and soffits of stairs upto floor two level

instead of plastering in walls.

Sq.M. 14.00 14.00 14.00 17.00 17.00 17.00 17.00 15.00 12.00 15.00 - 20.00 16.00 - 15.30 15.00 15.00 - 17.00 - -

5 598 Making grooves 10 to 12mm wide x 8mm deep

in plaster of the wall or in ceiling vertically or

horizontally as required.

R.M. - - - - - - - - - - 27.00 25.00 30.00 - - - - - 26.00 22.00 22.00

6 Making drip course in sunshade or FACIA as

per direction as Engineer-In-Charge including

supply of all material, labour etc. required for

proper completion of work.

R.M. 19.00 25.00 25.00 - - - - - - - 10.00 17.00 - - - - -

7 17.116 Pointing on brick work with cement mortar 1:3

(1Cement : 3 Coarse Sand)- - -

(A) Flush pointing Sq.M. - - - - - - - - - - 68.00 70.00 105.00 110.00 105.00 139.00 - 139.00 - - - - - -

(B) Ruled pointing Sq.M. - - - - - - - - - - 115.00 120.00 115.00 149.00 - 149.00 - - - - - -

8 17.120Pointing on brick work on edge floor with

cement mortar 1:2 (1cement :2 coarse sand)

(A) Flush pointing Sq.M. 111.00 - - - - - - - - - 140.00 145.00 140.00 170.00 170.00 180.00 150.00 - 187.00 142.20 141.20 - 130.00 124.00 120.00

(B) Ruled pointing Sq.M. - - - - - - - - - - 150.00 155.00 150.00 190.00 - 200.00 - - - - - -

9 Pointing on brick work on edge cement mortar

1:4 (1Cement : 4 Coarse Sane)

(A) Flush pointing Sq.M. - - - - - - - - - - 100.00 110.00 105.00 134.00 - 134.00 - - - - - -

(B) Ruled pointing Sq.M. - - - - - - - - - - 110.00 115.00 110.00 125.00 - 125.00 - - - - - -

10 6mm Cement plaster in 1:3 cement and coarse

sand plastering on ceiling.Sq.M. - - - - - - - - - 130.00 115.00 - - - - - - - - -

-

-

-

-

-

-

-

-

-

-

-

-

-

11.00

156.00

139.00

111.00

-

CPWD-13.16

UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.

PLASTER & POINTING

Name of Circle Bareilly Budaun-Pilibhit

Name of Districts

S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017 01.01.2018 24.04.2018

Barabanki Sultanpur-Amethi Jhansi Banda

Page 13: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

CHAPTER- 14

SaharanpurMoradaba

dRampur Lucknow

Sitapur-

KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Aligarh Agra Mainpuri Kanpur Etawah

Kannauj-

Farukhabad

Faizabad-

Ambedkar

Nagar

Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra

Saharanpur

/Shamli

/Muzaffar nagar

Moradabad

/Amroha

/Sambhal

Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/

RaibareliSitapur /Kheri Unnao /Hardoi

Gonda

/BalrampurBarabanki

Bahraich

/Shrawasti

Basti

/Santkabir

Nagar

/Siddharth

Nagar

Gorakhpur

/Maharajganj

Deoria

/Kushinagar

Meerut

/Baghpat

Bulandshahr/H

apur

Gautam Budh

Nagar

/Ghaziabad

Aligarh

/Hathrash

/Etah

/Kashganj

Agra /MathuraMainpuri/

Firozabad

Kanpur

Nagar/Kanpur

Dehat

Etawah/AuriyaKannauj/Faruk

habad

Faizabad/Amb

edkar NagarSultanpur Amethi

Azamgarh

/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur

Allahabad

/Kaushambi

Pratapgarh

/Fatehpur

Varanasi

/Ghazipur

/Chandauli

Mirzapur

/BhadoiSonebhadra

06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018

S.No.SCH.

P.W.D

ITEM

NO

NBO

Description of the WorkP.W.D

SPEC. NO.Unit

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

1- 14.1 40mm thick marble chips flooring rubbed

and polished to granolithic finish, under

layer 32mm thick cement concrete 1:2:4

(1cement :2coarse sand: 4 12.5 graded

stone aggregates) 12.5mm top layer

8mm thick white or black marble chips of

required size from 1mm to 4mm nominal

sizes laid in cement marbles powder

mixed 3:1 (3cement :1marble powder by

weight) in proportion of 4:7 (4 cement

marble powder mix :7marble chip by

volume) including fixing if glass strips,

including cost of pigments & polish

excluding cost of glass strip.

- 730.00

A- With ordinary cement in top layer Sq.M. - - - - - - 730.00 - 600.00 550.00 - 550.00 - - - - - 730.00 720.00

B- With white cement on top layer Sq.M. - - - - - - 810.00 - 635.00 - - - - - - - - 965.00 950.00

2- Same in as Item 14.1 above but under

layer 25mm thick

A- With ordinary cement in top layer Sq.M. - - - - - - 710.00 840.00 920.00 920.00 - 610.00 475.00 - 475.00 - - 594.00 564.00 505.00 - - - - -

B- With white cement in top layer Sq.M. - - - - - - 900.00 980.00 980.00 - 620.00 - - - - - - - - - -

3- 625 14.3 20mm thick marble chips skirting or dado

rubbed and polished to granolithic finish,

under layer 14mm thick cement concrete

1:3 (1cement : 3coarse) and top layer

6mm thick white black or white and black

or gray or mixed marble chips of size

from smallest to 4mm nominal size laid in

cement marble powder mix 3:2 (3cement

portlant) : 1 marble power mixed 3:1

(3cement (Portland) : 1 marble powder by

weight in proportion of 4:7 (4 cement

marble power mix : 7 marble chops by

volume) as specified or directed by

Engineer-In-Charge and polished with

French mason polished for other

approved polish in including curing, hire

charges of cutting machine cost of all

material for proper completion of work.

(A) With ordinary Portland cement 14.9.1 Sq.M. - - - - - - 660.00 575.00 - 475.00 - - 750.00 - - 667.00 633.00 567.00 - - - 650.00 640.00

(B) With white cement Sq.M. - - - - - - 760.00 625.00 - 500.00 - - 800.00 - - 788.00 748.00 670.00 - - - 700.00 700.00

4- 14.69 Cement concrete flooring 1:2:4 (1 cement

: 2 coarse sand : 4 graded stone of size

12.5mm nominal size) laid in one layer

finished with floating coat of neat cement

(25mm thick floor)

Sq.M. 220.00 220.00 220.00 255.00 290.00 255.00 530.00 575.00 625.00 535.00 534.00 534.00 480.00 540.00 540.00 250.00 255.00 250.00 240.00 - 240.00 - - 230.00 219.00 196.00 240.00 220.00 200.00 220.00 280.00 - 235.00 223.00 220.00

5- 665 14.71 Cement concrete flooring 1:2:4 (1 cement

: 2 coarse sand : 4 graded stone of size

20mm nominal size) laid in one layer

finished with floating coat of neat cement

(40mm thick floor)

Sq.M. 288.00 330.00 330.00 380.00 790.00 380.00 360.00 350.00 325.00 - 125.00 - - 333.00 317.00 283.00 290.00 270.00 250.00 270.00 414.00 300.00 300.00

6- 612 Brick on an edge floor with class-150

brick laid in cement mortar consisting of

one part of cement and 6 part fine sand

of fineness modules 1.25 and pointed

with cement mortar 1:2 over 8cm thick

base concrete (pointing and base

concrete to be paid separately) including

supply of all material, labour and tools

and plants etc. required for completion of

the work.

Sq.M. - - - - 520.00 - 410.00 425.00 540.00 550.00 500.00 515.00 - 520.00 - 890.00 890.00 521.00 495.00 443.00 - - - - -

7- 617 Same as Item No. 612 but bricks laid flat Sq.M. - - - - 625.00 - 285.00 300.00 440.00 450.00 400.00 350.00 - 400.00 - - 339.00 322.00 289.00 -

8- 615 Brick on edge floor with Class- 150 brick

laid dry joints sand fillied Including

preparation of base to proper slope and

its ramming supply of all material, labour,

T&P etc. required for proper completion

of work.

Sq.M. 390.00 400.00 400.00 415.00 385.00 415.00 470.00 450.00 470.00 450.00 470.00 - 415.00 415.00 424.00 403.00 361.00 350.00 510.00 435.00 475.00

9- 619 Same as Item No. 615 but brick laid flat Sq.M. 270.00 300.00 300.00 - 255.00 - 345.00 360.00 - 350.00 - - 300.00 280.00 320.00

10- 628 Supply of fixing 6mm (1/4") thick china

white glazed tile in flooring or dado laid

with 1:3 cement and approved coarse

sand mortar finished with white cement

jointed and polishing complete including

supply of all materials, labour for proper

completion of the work.

Sq.M. 865.00 900.00 900.00 - 775.00 - 950.00 950.00 950.00 665.00 900.00 900.00 890.00 1200.00 1200.00 1200.00 - 722.00 722.00 909.00 864.00 773.00 1140.00 1100.00 1060.00 1100.00 1075.00 - 1010.00 1070.00 1060.00

11- 14.36 (a) P/L 20mm white albetta stone (super

quality) flooring over 25mm thick base of

cement mortar 1:4 (1 cement : 4 coarse

sand) laid and jointed with white cement

slurry including rubbing and polishing

complete.

Sq.M. - - - - - - - 1800.00 - 1750.00 - - 2100.00 2100.00 2000.00 1900.00 1700.00 - - - - -

12 14.43(b) Providing and Laying 30mm white kota

stone flooring over 20mm thick base of

cement mortar 1:4 (1 cement : 4 coarse

sand) laid over jointed with grey cement

slurry mixed with pigment to match the

shade of slab including rubbing and

polishing complete.

Sq.M. - - - - - - - 1100.00 - - - - - 890.00 - - 1200.00 1320.00 1350.00

13 Kota stone slab 20mm thick in risers of

steps, skirting dado and pillars laid on

10mm thick cement mortar 1:3 (1 cement

: 3 coarse sand) jointed with grey cement

slurry mixed with pigment to match the

shade of the slab including rubbing and

polishing complete.

Sq.M. - 900.00 900.00 - - - 850.00 650.00 850.00 - 900.00 - - 890.00 90.00 910.00 860.00 780.00 - - 1100.00 1170.00 1160.00

14 20mm thick marble tiles in risers of steps

skirting dado wall and pillars laid on

10mm thick cement mortar 1:3 (1 cement

: 3 coarse sand) jointed with gray cement

slurry mixed with pigment to match the

shade of slab including rubbing and

polishing complete.

Sq.M. - - - - - - - 1575.00 - - - - - 1756.00 - - - - -

15 631 Providing and fixing glass strips of 4mm

thick in joints of floor and skirting at the

time fo laying Including labour, T&P etc.

complete in all respect.

(a) 2.2 cm depth RM 12.00 18.00 18.00 - - - 16.00 16.00 12.00 17.00 17.00 16.00 15.00 15.00 - - - - - 15.00 15.00 15.00 15.00 - - 25.00 18.00 18.00

(b) 3.5 cm depth RM 15.00 19.00 19.00 - - - 17.00 17.00 15.00 18.00 18.00 18.00 16.00 16.00 - - - - - 18.00 18.00 18.00 18.00 - - 28.00 23.00 23.00

(c) 2.2 cm depth & 5mm thickness RM 15.00 19.00 19.00 - - - 17.00 17.00 15.00 18.00 18.00 18.00 16.00 16.00 - - - - - 18.00 18.00 18.00 18.00 14.20 - - - -

(d) 3.5 cm depth & 5mm thickness RM 17.00 20.00 20.00 - - - 19.00 19.00 17.00 20.00 20.00 22.00 20.00 19.00 - - - - - 21.00 21.00 21.00 21.00 16.00 - - - -

16 14.18 Precast terrazzo tiles 20mm thick with

white, black or white and black marble

chip of sizes upto 6mm laid in floors,

treads of steps and landing on bed of

25mm average thickness of cement

mortar 1:3 (cement : coarse sand) joined

with neat cement slurry mixed with

pigment to match the shade of tile

including rubbing an polishing complete

with precast tiles of

-

(a) Grey Sq.M. - - - - - - - 700.00 - - - - - - - - 920.00 900.00

(b) Coloured with white cement. Sq.M. - - - - - - - 760.00 - - - - - - - - - -

17 14.66 15mm cement concrete topping 1:2 (1

cement : 2 aggregate of size 4.75mm and

below by volume) laid over and finished

monolithic with structure slab.

Sq.M. - - - - - - 170.00 155.00 175.00 - 175.00 - - - - - - -

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

685.00

-

2419.00

1058.00

-

2020.00

-

-

1028.00

-

481.00

-

831.00

-

-

-

-

-

Bulandshahr

UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.

FLOORING

Name of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda

01.01.2018 24.04.2018

Name of Districts

S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017

-

-

-

-

-

-

-

-

230.00

335.00

-

-

500.00

435.00

990.00

-

-

-

-

16.00

17.00

17.00

19.00

-

-

-

-

-

-

-

-

-

230.00

335.00

-

-

500.00

435.00

990.00

-

-

-

-

16.00

17.00

17.00

19.00

-

-

-

Page 14: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

SaharanpurMoradaba

dRampur Lucknow

Sitapur-

KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Aligarh Agra Mainpuri Kanpur Etawah

Kannauj-

Farukhabad

Faizabad-

Ambedkar

Nagar

Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra

Saharanpur

/Shamli

/Muzaffar nagar

Moradabad

/Amroha

/Sambhal

Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/

RaibareliSitapur /Kheri Unnao /Hardoi

Gonda

/BalrampurBarabanki

Bahraich

/Shrawasti

Basti

/Santkabir

Nagar

/Siddharth

Nagar

Gorakhpur

/Maharajganj

Deoria

/Kushinagar

Meerut

/Baghpat

Bulandshahr/H

apur

Gautam Budh

Nagar

/Ghaziabad

Aligarh

/Hathrash

/Etah

/Kashganj

Agra /MathuraMainpuri/

Firozabad

Kanpur

Nagar/Kanpur

Dehat

Etawah/AuriyaKannauj/Faruk

habad

Faizabad/Amb

edkar NagarSultanpur Amethi

Azamgarh

/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur

Allahabad

/Kaushambi

Pratapgarh

/Fatehpur

Varanasi

/Ghazipur

/Chandauli

Mirzapur

/BhadoiSonebhadra

06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018

S.No.SCH.

P.W.D

ITEM

NO

NBO

Description of the WorkP.W.D

SPEC. NO.Unit

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

BulandshahrName of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda

01.01.2018 24.04.2018

Name of Districts

S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017

18 14.67 Same as item 14.66 but by monolithic

with base concrete including fixing of

glass strip as direction by Engineer-In-

Charge.

Sq.M. - - - - - - 185.00 160.00 200.00 - 200.00 - - - - - - -

19 Providing and laying vitrified floor tiles in

different size (thickness to be specified by

the manufactorer) with water absorption

less than 0.08% and conforming to IS :

15622, of approved make in all colour

and shades, laid on 20mm thick cement

mortat 1:4 (1cement : 4coarse sand)

including grouting the joints with white

cement and matching pigments etc.

complete size of tile 600X600mm

Sq.M. - 1350.00 1350.00 - 1240.00 - 1031.00 1200.00 1250.00 1750.00 - - 1400.00 - - - 1380.00 1150.00 1150.00 1140.00

20 Providing and fixing 18 mm thick Granite

(gang saw cut), mirror polished,

premoulded and prepolished, machine

cut for kitchen platforms, vanity counters,

window sills, facias and similar locations,

of required size, approved shade, colour

and texture laid over 20 mm thick base

cement mortar 1:4 (1 cement : 4 coarse

sand), joints treated with white cement,

mixed with matching pigment, epoxy

touch ups, including rubbing, curing,

moulding and polishing to edges to give

high gloss finish etc. complete at all

levels. (Slab area upto 0.50 Sq.M.)

Sq.M. - - - - - - - 3000.00 - - - - - - - - - -

21 Providing and fixing 18 mm thick Granite

(gang saw cut) mirror polished,

premoulded and prepolished, machine

cut for kitchen platforms, vanity counters,

window sills, facias and similar locations,

of required size, approved shade, colour

and texture laid over 20 mm thick base

cement mortar 1:4 (1 cement : 4 coarse

sand), joints treated with white cement,

mixed with matching pigment, epoxy

touch ups, including rubbing, curing,

moulding and polishing to edges to give

high gloss finish etc. complete at all

levels. (Slab area above 0.50 Sq.M.)

Sq.M. - - - - 1776.00 - 3150.00 4200.00 - 4050.00 - - - - - - -

-

-

-

-

-

-

-

-

CPWD-

8.2.2.1

CPWD-

8.2.2.2

-

1031.00

1871.00

1776.00

1871.00

1776.00

-

1031.00

Page 15: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

CHAPTER- 15

Saharanpur Moradabad Rampur LucknowSitapur-

KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah

Kannauj-

Farukhabad

Faizabad-

Ambedkar

Nagar

Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra

Saharanpur

/Shamli

/Muzaffar nagar

Moradabad

/Amroha

/Sambhal

Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/

RaibareliSitapur /Kheri Unnao /Hardoi

Gonda

/BalrampurBarabanki

Bahraich

/Shrawasti

Basti

/Santkabir

Nagar

/Siddharth

Nagar

Gorakhpur

/Maharajganj

Deoria

/Kushinagar

Meerut

/Baghpat

Bulandshahr/Gau

tam Budh Nagar

/Ghaziabad

/Hapur

Aligarh

/Hathrash

/Etah

/Kashganj

Agra /MathuraMainpuri/

Firozabad

Kanpur

Nagar/Kanpur

Dehat

Etawah/AuriyaKannauj/Faruk

habad

Faizabad/Amb

edkar NagarSultanpur Amethi

Azamgarh

/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur

Allahabad

/Kaushambi

Pratapgarh

/Fatehpur

Varanasi

/Ghazipur

/Chandauli

Mirzapur

/BhadoiSonebhadra

06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018

S.No.SCH.

P.W.D

D.S.R. ITEM

NO.Description of the Work

P.W.D

SPEC. NO.Unit

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

1 641 - Painting or vanishing on iron works in small areas or new wood work with

one coat of ready mixed priming paint & one coat of approved superior

quality ready mixed paint of clear synthetic varnish including supply of all

materials, labour and T & P etc. required for proper completion of work.

Paint to be used should confirm to the I.S.I. No.103 1950

Sqm. 58.00 - - 65.00 65.00 65.00 58.00 64.00 64.00 65.00 - 58.00 55.00 - 24.50 30.00 59.00 65.00 59.00 65.00 65.00 65.00 66.00 64.00 61.00 59.50 62.00

2 642 - Same as in item 641 above but for every coat after 1st

coat. Details of cost

for 650 sft. AreaSqm. 24.00 - - 30.50 21.00 30.50 28.50 32.00 32.00 30.50 - 24.00 25.00 - 32.00 32.00 27.00 30.50 27.00 30.50 30.50 30.50 33.00 31.50 30.50 26.00 28.00

3 643 - As in item no.642 above but for every coat on previously painted old wood

or steel work.Sqm. 33.00 - - 42.00 34.00 42.00 39.00 44.00 44.00 40.00 - 33.00 35.00 - 35.00 37.00 37.00 42.00 37.00 42.00 42.00 42.00 52.00 43.00 40.50 34.50 36.00

4 644 - Painting roofs or other iron work in large area with one coat of ready mixed

priming paint with one coat of approved paint ( ANTISOL) including supply

of all materials, labour & T & P etc required for proper completion of the

work. Paint to be used should confirm. I.S.I No.103-1950. Cost for area of

650 sft.

Sqm. 52.00 - - 48.00 64.00 48.00 46.00 50.00 50.00 48.00 - 52.00 50.00 - 40.00 42.00 55.00 48.00 55.00 48.00 48.00 48.00 - 51.00 52.00 44.00 50.00

5 645 - As in item no.644 above but every coat after the first coat. Sqm. 15.00 - - 21.00 20.00 21.00 25.00 24.00 24.00 21.00 - 15.00 20.00 - 23.00 23.00 26.00 21.00 26.00 21.00 21.00 21.00 - 14.00 22.00 19.50 21.00

6 646 - As in item no.645 above but for every coat on previously painted old

surface.Sqm. 18.00 - - 32.00 28.00 32.00 40.00 35.00 35.00 32.00 - 18.00 25.00 - 30.00 30.00 40.00 32.00 40.00 32.00 32.00 32.00 - 21.00 32.00 27.00 30.00

7 649 - One priming coat & one coat oil distemper on new work including supply of

all materials, labour and T& P etc. required for proper completion of the

work.

Sqm. 45.00 50.00 50.00 57.00 60.00 57.00 65.00 66.00 66.00 48.00 48.00 48.00 45.00 47.00 48.00 48.00 47.00 50.00 57.00 50.00 57.00 57.00 57.00 64.00 52.00 60.00 38.50 42.50

8 650 - As in item no.649 above but for every coat after the first coat Sqm. 21.00 22.00 22.00 22.00 27.00 22.00 28.00 25.00 25.00 22.00 22.00 22.00 21.00 18.00 21.00 21.00 22.00 23.00 22.00 23.00 22.00 22.00 22.00 - 29.00 22.00 19.50 20.00

9 651 - As in item no.650 above but for every coat on previously old distempered

surface.Sqm. 24.00 25.00 25.00 27.00 29.00 27.00 35.00 30.00 30.00 33.00 27.00 27.00 24.00 23.00 - - - 28.00 27.00 28.00 27.00 27.00 27.00 36.00 21.00 27.50 33.50 33.50

10 652 - One coat hot coaltar on new surface including supply of all materials,

labour and T & P etc required for proper completion of the work.Sqm. 11.00 13.00 13.00 17.00 17.00 17.00 13.50 19.00 19.00 19.00 14.00 14.00 11.00 15.00 16.00 16.00 16.00 16.00 17.00 16.00 17.00 17.00 17.00 20.00 - 17.00 16.50 19.00

11 653 - One coat hot coaltar but every coat after 1st

coat previously painted surface

including supply of all materials, labour and T & P etc required for proper

completion of the work.

Sqm. 8.50 9.00 9.00 12.00 12.50 12.00 9.00 13.00 13.00 14.00 9.00 9.00 8.50 10.00 11.00 11.00 11.00 12.00 12.00 12.00 12.00 12.00 12.00 14.00 - 12.00 12.00 12.00

12 654 - One coat solignum or other approved preservative on new wood. Including

supply of all material, labour and T&P etc required for proper completion of

the work.

Sqm. 24.00 25.00 25.00 29.00 29.50 29.00 30.00 32.00 32.00 - 27.00 24.00 28.00 26.00 26.00 25.00 26.00 29.00 25.00 29.00 29.00 29.00 - - 25.00 - -

13 655 - As in item no 654 above but for every coat after first coat on previously

treated surfaceSqm. 10.00 15.00 15.00 22.00 24.50 22.00 25.00 26.00 26.00 - 22.00 10.00 12.00 22.00 22.00 21.00 22.00 22.00 21.00 22.00 23.00 23.00 - - 21.00 - -

14 656 - Oiling wood work with double boiled linseed oil including supply of all

materials, labour & T & P etc. required for proper completion of the work.

Details for an area of 700 sft.

Sqm. 13.00 12.00 12.00 13.00 14.50 13.00 50.00 17.00 17.00 11.00 11.00 11.00 13.00 15.00 12.00 12.00 12.00 13.00 13.00 13.00 13.00 13.00 13.00 - - 13.00 10.00 10.50

15 657 - Removing paint or varnish with paint remover or caustic soda, including

supply of all materials, labour and T & P etc. required completion of works. Sqm. 15.00 20.00 20.00 45.50 47.00 45.50 43.00 46.00 46.00 34.00 29.00 29.00 15.00 18.00 15.00 15.00 15.00 16.00 45.50 48.00 45.50 45.50 45.50 - - 45.00 38.00 38.50

16 658 - Wax polishing new wood work with approved ready made wax polish or

approved French polish after rubbing down with sand paper including

supply of all materials, labour and T & P etc. required for proper completion

of the work.

Sqm. 48.00 50.00 50.00 57.00 57.00 57.00 53.00 57.00 57.00 42.00 42.00 42.00 48.00 52.00 59.00 59.00 55.00 55.00 57.00 53.50 57.00 57.00 57.00 60.00 - 56.00 38.00 38.50

17 659 - As in item no. 658 above but repolishing wood work already wax or French

polished with approved really made wax polish or approved French polish

including supply of all materials, labour and T & P etc. required for proper

completion of the work

Sqm. 28.00 25.00 25.00 29.00 29.00 29.00 27.00 28.00 28.00 24.00 22.00 22.00 28.00 28.00 30.00 30.00 28.00 28.00 29.00 27.50 29.00 29.00 29.00 30.00 - 27.00 21.50 21.80

18 660 - Finishing walls with water proof cement paint of approved make and quality

on new work with two coats to give an even shade. Including supply of all

material labour and T & P etc required for proper completion of the work. Sqm. 48.00 48.00 48.00 51.00 51.00 51.00 48.00 54.00 54.00 45.00 45.00 45.00 48.00 42.00 55.00 55.00 55.00 51.00 51.00 51.00 51.00 51.00 51.00 54.00 49.00 51.00 45.00 40.00

19 661 - Same as in item no 660 but for each coat of water proof cement paint after

the first two coats to give an even shade.Sqm. 19.00 18.00 18.00 17.50 21.00 17.50 17.50 20.00 20.00 17.50 17.00 17.00 19.00 15.00 25.50 25.50 25.00 18.00 17.50 19.00 17.50 17.50 17.50 21.00 18.00 17.50 15.00 15.00

20 662 - Finishing walls with one coat of water proof cement paint of approved

quality on previously old treated surface with this paint to give an even

shade including supply of all material labour and T & P etc required for

proper completion of the work.

Sqm. 28.00 26.00 26.00 28.50 29.00 28.50 27.00 30.00 30.00 28.50 26.00 26.00 28.00 25.00 35.00 35.00 35.00 29.00 28.50 29.00 28.50 28.50 28.50 35.00 29.00 30.00 27.50 27.20

21 13.43.1 Applying one coat of water thinnable cement primer of approved brand and

manufacture on wall surface:Sqm. - - - 31.00 - 31.00 31.00 31.00 31.00 - - - - - - - - 31.00 - 31.00 - - - - - - -

22 13.46.1 Finishing walls with Acrylic Smooth exterior paint of required shade :New

work

(Two or more coat applied @ 1.67 ltr/10 sqm over and including priming

coat of exterior primer applied @ 2.20 kg/10 sqm) (ace Adv.,walmasta)

Asian, berger

Sqm. - - - 86.00 - 86.00 86.00 86.00 86.00 - - - - - - - - 86.00 109.00 86.00 - - - - - - -

23 13.47.1 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone

additives of required shade:New work (Two or more coats applied @ 1.43

ltr/ 10 sqm over and including priming coat of exterior primer applied @

2.20 kg/ 10 sqm) (apex Ultima, weather coat All guard) asian , berger

Sqm. - - - 110.00 - 110.00 110.00 110.00 110.00 90.00 - - - - - - - - 110.00 - 110.00 - - - - - 84.00 84.00

24 13.60.1 Wall painting with plastic emulsion paint of approved brand and

manufacture to give an even shade : Two or more coats on new work (Ist

quality (Royal,Silk) Asian/Berger )

Sqm. - - - 95.00 - 95.00 95.00 95.00 95.00 80.00 - - - - - 67.00 85.00 - 95.00 - 95.00 - - - 125.00 - 71.00 71.00

25 14.66.1 Finishing walls with Acrylic Smooth exterior paint of required shade :

Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement

paint surface (ace Adv.,walmasta) Asian, berger

Sqm. - - - 52.00 - 52.00 52.00 52.00 52.00 - - - - - - - - 52.00 - 52.00 - - - - - - -

26 14.66.2 Finishing walls with Acrylic Smooth exterior paint of required shade :

Old work (Old work (One or more coat applied @ 0.90 ltr/10 sqm). on

existing cement paint surface (ace Adv.,walmasta) Asian, berger

Sqm. - - - 35.00 - 35.00 35.00 35.00 35.00 - - - - - - - - 35.00 - 35.00 - - - - - - -

27 14.67.1 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone

additives of required shade Old work (Two or more coats applied @ 1.43

ltr/ 10 sqm) over existing cement paint surface (apex Ultima, weather coat

All guard) asian , berger

Sqm. - - - 77.00 - 77.00 77.00 77.00 77.00 - - - - - - - - 77.00 - 77.00 - - - - - - -

28 14.67.2 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone

additives of required shade Old work Old work (one or more coats applied

@ 0.83 ltr/10 sqm). over existing cement paint surface (apex Ultima,

weather coat All guard) asian , berger

Sqm. - - - 50.00 - 50.00 50.00 50.00 50.00 - - - - - - - - 50.00 - 50.00 - - - - - - -

29

14.53.1

Wall painting with plastic emulsion paint of approved brand and

manufacture to give an even shade:One or more coats on old work

(Royal,Silk) Asian/Berger

Sqm. - - - 60.00 - 60.00 60.00 60.00 60.00 - - - - - 95.00 - - 60.00 - 60.00 - - 65.00 - - - -

30 13.80 Providing and applying white cement based putty of average thickness 1

mm,

of approved brand and manufacturer, over the plastered wall surface to

prepare

the surface even and smooth complete.

Sqm. 57.00 52.00 52.00 35.00 - 83.50 83.50 83.50 83.50 - - 57.00 60.00 - - - - 83.50 - 83.50 - - - - - - -

-

-

-

115.00

80.00

-

-

-

-

-

30.00

50.00

25.00

45.00

18.00

28.00

-

60.00

28.00

30.00

50.00

20.00

11.00

24.00

20.00

11.00

-

-

-

-

-

-

51.30

18.80

30.00

-

-

-

35.00

26.30

11.90

37.50

53.80

26.30

32.50

45.00

23.10

26.90

18.10

12.50

63.80

24.00

50.00

22.00

24.00

16.00

29.40

40.00

50.00

23.10

-

-

-

-

-

-

17.10

28.20

-

-

-

-

22.15

13.10

45.30

52.40

26.20

48.30

45.30

21.15

25.20

16.10

11.10

29.20

59.40

28.20

38.30

47.30

22.15

32.20

24.04.2018S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017 01.01.2018

UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.

PAINTING & DISTEMPERING

Name of Circle Bareilly Budaun-Pilibhit

Name of Districts

Barabanki Sultanpur-Amethi Jhansi Banda

-

-

-

-

-

-

53.00

24.00

26.00

14.00

10.00

27.00

22.00

10.00

22.00

20.00

26.00

45.00

18.00

25.00

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

53.00

24.00

26.00

14.00

10.00

27.00

22.00

10.00

22.00

20.00

26.00

45.00

18.00

25.00

-

-

-

-

-

-

-

-

-

-

Page 16: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

CHAPTER- 16

Saharanpur Moradabad Rampur LucknowSitapur-

KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah

Kannauj-

Farukhabad

Faizabad-

Ambedkar

Nagar

Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra

Saharanpur

/Shamli

/Muzaffar nagar

Moradabad

/Amroha

/Sambhal

Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/

RaibareliSitapur /Kheri Unnao /Hardoi

Gonda

/BalrampurBarabanki

Bahraich

/Shrawasti

Basti

/Santkabir

Nagar

/Siddharth

Nagar

Gorakhpur

/Maharajganj

Deoria

/Kushinagar

Meerut

/Baghpat

Bulandshahr/Gaut

am Budh Nagar

/Ghaziabad /Hapur

Aligarh

/Hathrash

/Etah

/Kashganj

Agra /MathuraMainpuri/

Firozabad

Kanpur

Nagar/Kanpur

Dehat

Etawah/AuriyaKannauj/Faruk

habad

Faizabad/Amb

edkar NagarSultanpur Amethi

Azamgarh

/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur

Allahabad

/Kaushambi

Pratapgarh

/Fatehpur

Varanasi

/Ghazipur

/Chandauli

Mirzapur

/BhadoiSonebhadra

06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018

S.No.SCH.

P.W.D

ITEM NO

NBODescription of the Work

P.W.D SPEC.

NO.Unit

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

1 671 White washing one coat including supply of all

materials, labour and T & P etc required for proper

completion of the work.

Sqm.

7.00 8.00 8.00 5.50 6.00 5.50

5.5 6.5 6.5 6.5 7 8 7 6.00 8.00 8.00 5.50 8.00 5.50 5.50

5.50 6.00 -

6.70 6.00 6.00

2 672 As in item 671 above but two coats. Sqm. 11.00 12.00 12.00 8.50 8.90 8.50 8.5 9.5 9.5 9.5 11 12 12 9.00 7.00 8.50 8.50 8.50 8.50 8.50 8.50 9.00 - 10.50 8.00 8.00

3 673 As in item 671 above but 3 coats white washing 2

coats as per item 672

Sqm.14.00 15.00 15.00 12.00 7.70 12.00

12 12.5 12.5 12.5 14 15 17.5 4.00 4.00 9.50 12.00 9.50 12.00 12.0012.00 12.40 -

13.50 10.00 10.00

4 674 Colour washing one coat, using approved colouring

materials of buff, blue, grey or brown shade, including

supply of all materials, labour and T & P etc. required

for proper completion of the work.

Sqm.

9.00 10.00 10.00 9.00 8.00 9.00

9 10.5 10.5 10.5 9 10 9 9.00 7.00 9.50 9.00 9.20 9.00 9.00

9.00 10.00 -

9.50 9.00 9.00

5 675 As in item 674 above but 2 coats. Sqm. 17.00 17.00 17.00 16.00 13.50 16.00 16 17 17 17 17 18 18 17.00 16.00 17.00 16.00 17.00 16.00 16.00 16.00 15.00 - 16.00 12.50 12.50

6 676 As in item 674 above but using approved colouring

materials of pink, green or yellow shades.

Sqm.13.00 15.00 15.00 12.00 11.50 12.00

12 12 12 12 13 14 -- -

11.00 12.00 11.00 12.00 12.0012.00 - -

11.50 10.00 10.00

7 677 As in item 676 above but two coats Sqm. 15.00 18.00 18.00 21.50 21.50 21.50 21.5 21.5 19 19 15 16 - - - 19.00 21.50 19.00 21.50 21.50 21.50 - - 20.00 14.00 14.00

8 678 As in item 676 above but colour washing with copper

or iron sulphate one coat

Sqm.12.00 - - 14.00 14.00 14.00

14 15 - - 12 13 -- -

14.00 14.00 14.00 14.00 14.0014.00 - -

13.00 11.00 11.00

9 679 As in item 678 above but two coats. Sqm. 17.00 - - 26.50 26.50 26.50 26.5 26.5 - - 17 18 - - - 24.00 26.50 24.00 26.50 26.50 26.50 - - 23.00 16.50 16.50

10 680 Cement washing including supply of all materials,

labour and T & P. etc required for proper completion

of work.

Sqm.

14.00 15.00 15.00 7.50 7.60 7.50

7.5 8.5 8.5 8.5 14 15 -

- -

8.00 7.50 8.00 7.50 7.50

7.50 8.00 -

8.50 6.50 6.50

11 681 One priming coat and one coat of dry distemper on

new work including supply of all materials labour and

T & P etc. required for proper completion of work.

Sqm.

34.00 32.00 32.00 26.50 26.50 26.50

26.5 26.5 30 30 34 35 45 45.00 45.00 27.00 26.50 28.00 26.50 26.50

26.50 35.00 -

26.00 21.00 21.00

12 682 As in item 681 above but for each coat of distemper

after the first coat

Sqm.24.00 20.00 20.00 17.50 18.00 17.50

17.5 17.5 17 17 24 25 26 26.00 24.00 17.00 17.00 17.00 17.50 17.5017.50 20.00 -

15.00 12.00 12.00

18.00

13.00

18.00

9.00

28.00

16.00

5.00

7.00

9.00

9.00

13.00

11.00

22.50

15.20

26.80

8.00

19.00

19.60

25.10

7.55

25.10

17.00

5.10

9.40

13.80

9.40

17.40

12.30

43

25

5.05

8.55

11.55

9.05

16.10

12.10

20.10

14.10

18

-

-

-

-

9

16.00

33.00

19.00

10.00

13.00

16.00

13.00

18.00

16.00

21.00

-

-

21.00

-

-

24.04.2018

9

12.5

14.5

10

16.00

33.00

19.00

10.00

13.00

16.00

13.00

18.00

16.00

S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017 01.01.2018

UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.

WHITE WASHING & COLOUR WASHING

Name of Circle Bareilly Budaun-Pilibhit

Name of Districts

Barabanki Sultanpur-Amethi Jhansi Banda

Page 17: m Ùkj izns'k y ksd fuekZ.k foHkkx IN D E XCHAPTER-2 Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshah r Aligarh Agra Mainpuri

CHAPTER- 17

UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.

CHAPTER- 17

Saharanpur Moradabad Rampur LucknowSitapur-

KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah

Kannauj-

Farukhabad

Faizabad-

Ambedkar

Nagar

Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra

Saharanpur

/Shamli

/Muzaffar

Moradabad

/Amroha

/Sambhal

Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/

RaibareliSitapur /Kheri Unnao /Hardoi

Gonda

/BalrampurBarabanki

Bahraich

/Shrawasti

Basti

/Santkabir

Nagar

/Siddharth

Gorakhpur

/Maharajganj

Deoria

/Kushinagar

Meerut

/Baghpat

Bulandshahr/Ga

utam Budh

Nagar

/Ghaziabad

Aligarh

/Hathrash

/Etah

/Kashganj

Agra /MathuraMainpuri/

Firozabad

Kanpur

Nagar/Kanpur

Dehat

Etawah/AuriyaKannauj/Faruk

habad

Faizabad/Amb

edkar NagarSultanpur Amethi

Azamgarh

/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur

Allahabad

/Kaushambi

Pratapgarh

/Fatehpur

Varanasi

/Ghazipur

/Chandauli

Mirzapur

/BhadoiSonebhadraName of Districts

DEMOLITION & DISMANTLING

Name of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda

nagar

/Siddharth

Nagar

/Ghaziabad

/Hapur/Kashganj

06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018

S.No.SCH.

P.W.D

ITEM NO

NBODescription of the Work

P.W.D

SPEC. NO.Unit

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

Over All

Rate

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

1 691 Dismantling sundried brick work including stacking of Cum

Over All RateOver All Rate

01.01.2018 24.04.2018S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017

1 691 Dismantling sundried brick work including stacking of

dismantled materials as directed by the Engineer-in-

Charge with in a distance of 60 metres ¼200ft.)

Cum

57.00 68.00 68.00 75.00 65.00 75.00 65.00 75.00 77.00 77.00 57.00 70.00 90.00 87.00 70.00 70.00 75.00 70.00 75.00 75.00 75.00 - 38.00 65.00 47.00 47.00

2 692 Dismantling brick work or stone work in lime or cement

mortar and including stacking of materials as directed

by the Engineer-in- Charge with in a distance of 60

metres ¼200 ft.)

Cum

316.00 350.00 350.00 400.00 350.00 400.00 348.00 400.00 400.00 400.00 316.00 400.00 500.00 474.00 350.00 380.00 400.00 380.00 400.00 400.00 400.00 400.00 190.00 350.00 250.00 250.00

3 693 As in item 692 above but in mud-mortar. Cum 158.00 160.00 160.00 200.00 180.00 200.00 174.00 180.00 180.00 180.00 158.00 180.00 250.00 237.00 200.00 190.00 200.00 190.00 200.00 200.00 200.00 - 130.00 160.00 125.00 125.00

-

320.00

160.00

73.00

352.00

194.00

64.00

338.00

169.00

77.00

400.00

190.00

77.00

400.00

190.00

-

410.00

-3 693 As in item 692 above but in mud-mortar. Cum 158.00 160.00 160.00 200.00 180.00 200.00 174.00 180.00 180.00 180.00 158.00 180.00 250.00 237.00 200.00 190.00 200.00 190.00 200.00 200.00 200.00 - 130.00 160.00 125.00 125.00

4 694 Dismantling reinforced cement concrete or reinforced

brick work, including stacking of dismantled materials

as directed by the Engineer-in-Charge with in a

distance of 60 metres ¼200 ft.)

Cum

575.00 750.00 750.00 900.00 750.00 900.00 770.00 850.00 850.00 850.00 575.00 800.00 980.00 1000.00 900.00 800.00 900.00 800.00 900.00 900.00 900.00 800.00 422.00 700.00 540.00 540.00

5 695 Dismantling jack arched or wooden beam & bargas

roofs, including beams & roof concrete & including

stacking of dismantled materials as directed by the

Sqm.

96.00 100.00 100.00 121.00 110.00 121.00 106.00 190.00 105.00 105.00 96.00 110.00 120.00 120.00 100.00 123.00 121.00 123.00 210.00 121.00 121.00 - 82.00 95.00 76.00 76.00

160.00

700.00

320.00

194.00

877.00

352.00

169.00

740.00

190.00-

190.00

850.00

105.00105.00

190.00

850.00

-

900.00

stacking of dismantled materials as directed by the

Engineer-in- charge with in a distance of 60 metres

¼200ft.)

96.00 100.00 100.00 121.00 110.00 121.00 106.00 190.00 105.00 105.00 96.00 110.00 120.00 120.00 100.00 123.00 121.00 123.00 210.00 121.00 121.00 - 82.00 95.00 76.00 76.00

6 696 As in item 695 above but only roof concrete. Cum 240.00 260.00 260.00 300.00 270.00 300.00 260.00 260.00 260.00 260.00 240.00 300.00 350.00 350.00 300.00 290.00 300.00 290.00 300.00 300.00 300.00 - 200.00 250.00 187.50 187.50

7 697 Dismantling cement concrete or brick or granolithic

floors, including base concrete and including stacking of

dismantled materials as directed by the Engineer-in-

Sqm.

38.00 42.00 42.00 45.00 40.00 45.00 39.00 42.00 42.00 42.00 38.00 45.00 70.00 50.00 45.00 44.00 45.00 44.00 45.00 45.00 45.00 45.00 23.00 37.00 28.50 28.5035.00

320.00

240.00

44.00

352.00

292.00

39.00

190.00

260.00

-

-

-

105.00

260.00

42.00

105.00

260.00

42.00

charge with in a distance of 60 metres ¼200ft½

8 698 As in item 697 above but floors to be stone flagged or

tiled floor.

Sqm.48.00 - - 60.00 55.00 30.00 53.00 60.00 - - 48.00 60.00 65.00 65.00 60.00 58.00 60.00 58.00 60.00 60.00 60.00 - 34.00 52.00 38.50 38.50

9 699 Dismantled single tiled roof, any kind, including purlin

and battens & including sacking of dismantled materials

as directed by the Engineer-in-charge with in a distance

Sqm.

- - - 65.00 59.00 65.00 56.50 65.00 - - - - 70.00 70.00 65.00 62.00 65.00 62.00 65.00 65.00 65.00 39.00 55.00 41.50 41.50

45.00

50.00

59.00

64.00

53.00

57.00

-

--

--

-as directed by the Engineer-in-charge with in a distance

of 60 metre ¼200ft.)

10 700 As in item 699 above but double tiled roof Sqm. - - - 110.00 72.00 110.00 96.70 110.00 - - - - 110.00 110.00 90.00 105.00 110.00 105.00 110.00 110.00 110.00 - 64.00 95.00 70.00 70.00

11 701 Dismantling corrugated iron roof walls and partitions

including purlin battens and vertical supports and

including stacking of materials as directed by the

Engineer-in-Charge with in a distance of 60 metres

¼200ft.)

Sqm.

33.00 38.00 38.00 35.00 32.50 35.00 26.50 34.00 34.00 34.00 33.00 40.00 40.00 40.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 - 25.00 32.00 24.50 24.50

90.00

30.00

108.00

38.00

97.00

33.00-

--

42.0042.00

-

¼200ft.)

12 702 Dismantling or girders, trusses & other steel work

including stacking of dismantled materials as directed

by Engineer-in-charge with in a distance of 60 metre

¼200ft.)

Qtl.

960.00 1000.00 1000.00 1400.00 1150.00 1400.00 1250.00 - 1035.00 1035.00 960.00 1200.00 1200.00 1250.00 850.00 1175.00 1400.00 1200.00 1400.00 1400.00 1400.00 - 785.00 110.00 825.50 825.50

13 703 Dismantling doors & windows, chowkhats with hold fast

& including stacking of dismantled materials as directed

by the Engineer-in-charge with in a distance of 60 m

Sqm.

48.00 50.00 50.00 55.00 69.00 55.00 49.00 - 55.00 55.00 48.00 50.00 65.00 65.00 55.00 55.00 55.00 55.00 55.00 55.00 55.00 60.00 34.00 50.00 38.00 40.0035.00

1100.00

58.00

1250.00

52.00

1100.00-

60.00

850.00

60.00

850.00

60.00by the Engineer-in-charge with in a distance of 60 m

¼200ft.)

48.00 50.00 50.00 55.00 69.00 55.00 49.00 - 55.00 55.00 48.00 50.00 65.00 65.00 55.00 55.00 55.00 55.00 55.00 55.00 55.00 60.00 34.00 50.00 38.00 40.00

14 704 Dismantling doors and windows leaves, including

stacking of material as directed by the Engineer-in-

charge with in a distance of 60 metre ¼200 ft.)

Sqm.

24.00 25.00 25.00 27.00 24.50 27.00 24.50 - 27.00 27.00 24.00 35.00 40.00 29.00 50.00 25.00 27.00 24.00 27.00 27.00 27.00 25.00 15.00 25.00 18.50 19.00

15 705 Dismantling doors and windows including chowkhats

but excluding holdfasts & including stacking of material

Sqm.

48.00 50.00 50.00 53.00 47.00 53.00 47.00 - 54.00 54.00 48.00 60.00 65.00 65.00 45.00 50.00 53.00 49.50 53.00 53.00 53.00 - 30.00 48.00 34.50 36.50

35.00

20.00

45.00

58.00

31.00

57.00

52.00

25.00

49.00

60.00

-

-54.00

60.00

30.00

60.00

30.00

54.00but excluding holdfasts & including stacking of material

as directed by the Engineer- in- charge wit in a

distance of 60m (200 ft.)

48.00 50.00 50.00 53.00 47.00 53.00 47.00 - 54.00 54.00 48.00 60.00 65.00 65.00 45.00 50.00 53.00 49.50 53.00 53.00 53.00 - 30.00 48.00 34.50 36.50

16 706 Dismantling existing plaster including disposal of refuse

as directed by the Engineer-in-charge with in a distance

of 60 metre ¼200ft.)

Sqm.

24.00 25.00 25.00 32.00 28.50 32.00 28.00 - 28.00 28.00 24.00 30.00 35.00 34.00 30.00 30.00 32.00 31.00 32.00 32.00 32.00 30.00 14.00 27.00 20.50 22.50

17 707 Racking out joints of brick work in cement or lime

mortar to a depth of 1 cm ¼3/8”½ including disposal of

Sqm.

19.00 20.00 20.00 22.00 21.20 22.00 19.50 - 23.00 23.00 19.00 22.00 25.00 25.00 20.00 22.00 22.00 22.00 22.00 22.00 22.00 - 12.00 22.00 14.50 16.00

45.00

26.00

18.00

57.00

31.00

22.00

49.00

27.00

20.00-

-

33.00

54.00

28.00

24.0024.00

54.00

28.00

mortar to a depth of 1 cm ¼3/8”½ including disposal of

refuse as directed by the Engineer-in-charge with in a

distance of 60 m(200 ft.)

19.00 20.00 20.00 22.00 21.20 22.00 19.50 - 23.00 23.00 19.00 22.00 25.00 25.00 20.00 22.00 22.00 22.00 22.00 22.00 22.00 - 12.00 22.00 14.50 16.00

18 708 Scraping old white or colour wash including disposal of

refuse as directed by the Engineer-in-charge with in a

distance of 60 metres ¼200ft½

Sqm.

9.00 7.00 7.00 10.00 8.50 10.00 8.50 - 8.00 8.00 9.00 10.00 10.00 11.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 8.00 5.00 8.50 6.50 6.80

18.00

8.00

22.00

10.00

20.00

8.05

-

10.00

24.00

8.00

24.00

8.00