lunch time connections – bell textron · 5/26/2020  · long term path for future vertical lift 4...

8
LUNCH TIME CONNECTIONS – BELL TEXTRON 26 May 2020 © 2020 Bell Textron Inc.

Upload: others

Post on 09-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LUNCH TIME CONNECTIONS – BELL TEXTRON · 5/26/2020  · Long Term Path for Future Vertical Lift 4 Future Attack Reconnaissance Aircraft (FARA) Future Long -Range Assault Aircraft

LUNCH TIME CONNECTIONS –BELL TEXTRON26 May 2020

© 2020 Bell Textron Inc.

Page 2: LUNCH TIME CONNECTIONS – BELL TEXTRON · 5/26/2020  · Long Term Path for Future Vertical Lift 4 Future Attack Reconnaissance Aircraft (FARA) Future Long -Range Assault Aircraft

Bell’s Mission

407GXi 412EPI

AH-1Z Bell Boeing MV-22

Bell Boeing CV-22

Bell Boeing CMV-22UH-1Y

V-280 VALOR V-247 VIGILANT

525

429

BELL NEXUS BELL APT

2

© 2020 Bell Textron Inc.

Page 3: LUNCH TIME CONNECTIONS – BELL TEXTRON · 5/26/2020  · Long Term Path for Future Vertical Lift 4 Future Attack Reconnaissance Aircraft (FARA) Future Long -Range Assault Aircraft

Current and Future Bell Products

505 407GXi 412EPI

AH-1Z Bell Boeing MV-22

Bell Boeing CV-22

Bell Boeing CMV-22UH-1Y

V-280 VALOR

525429

BELL NEXUS360 INVICTUS

3

BELL APT

© 2020 Bell Textron Inc.

Page 4: LUNCH TIME CONNECTIONS – BELL TEXTRON · 5/26/2020  · Long Term Path for Future Vertical Lift 4 Future Attack Reconnaissance Aircraft (FARA) Future Long -Range Assault Aircraft

1 2 4 53

Capability Sets

Long Term Path for Future Vertical Lift 4

Future Attack Reconnaissance Aircraft (FARA) Future Long-Range

Assault Aircraft (FLRAA)

Attack Assault

© 2020 Bell Textron Inc.

Page 5: LUNCH TIME CONNECTIONS – BELL TEXTRON · 5/26/2020  · Long Term Path for Future Vertical Lift 4 Future Attack Reconnaissance Aircraft (FARA) Future Long -Range Assault Aircraft

Key Commodity Areas 5

Casting & Forgings Bearings / Elastomers

Conveyances (Hydraulic Tubes and Hoses)Electrical Harnesses & Circuit Assembly

Raw MaterialsFuel Cells & System Components

HosesActuators

Additive ManufacturingHigh Speed Machining / Manufacturing

Composite MachiningCommunication Equipment

Kitting SuppliersOutside Process (CAD Plate, Bonding, Anodize

Chromic Acid, Passivation)

© 2020 Bell Textron Inc.

Page 6: LUNCH TIME CONNECTIONS – BELL TEXTRON · 5/26/2020  · Long Term Path for Future Vertical Lift 4 Future Attack Reconnaissance Aircraft (FARA) Future Long -Range Assault Aircraft

Tell Us About Your Company 6

BellFlight.com/suppliers

© 2020 Bell Textron Inc.

Page 7: LUNCH TIME CONNECTIONS – BELL TEXTRON · 5/26/2020  · Long Term Path for Future Vertical Lift 4 Future Attack Reconnaissance Aircraft (FARA) Future Long -Range Assault Aircraft

Future of Supply Chain 7

Logistical Insight

Enterprise VisibilityInfrastructure & Architecture

Future Enterprise Readiness

Digital Foundation Integration

Centralized Control Station

© 2020 Bell Textron Inc.

Page 8: LUNCH TIME CONNECTIONS – BELL TEXTRON · 5/26/2020  · Long Term Path for Future Vertical Lift 4 Future Attack Reconnaissance Aircraft (FARA) Future Long -Range Assault Aircraft

Contact Slide - Speakers 8

George KaszynskiManager, Strategic Sourcing – V280 (Valor)

[email protected]

Mercedes JohnsonManager, Strategic Sourcing – 360 (Invictus)

[email protected]

© 2020 Bell Textron Inc.