1 SCRRA PTC UPDATE TECHNOLOGY ON THE RAILROAD Leonard Transportation Center May 13, 2011 Joe Zerzan Project Manager Metrolink PTC

Upload: ltc-csusb

Post on 09-Jul-2015

713 views

Category:

Business


0 download

TRANSCRIPT

Page 1: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

1

SCRRA PTC UPDATE

TECHNOLOGY ON THE RAILROAD

Leonard Transportation Center

May 13, 2011

Joe Zerzan

Project Manager

Metrolink PTC

Page 2: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

2

Summary of Metrolink’s Key Characteristics

• Property acquired from freight railroads 1990-1994

• 7 Routes, 55 Stations, 45,000 average daily riders

• 350 Route Miles

• 149 - Weekday Revenue Trains

• 500 - Daily Train Movements – Metrolink (revenue

& non-revenue) Amtrak, and freight (UP and BNSF)

Page 3: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

3

Southern California Rail Network

Page 4: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

4

LA REGION - FIRST IN THE NATION PTC - 2012

Page 5: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

5

Metrolink’s Train Control and Signal System

• Over 165 Wayside to Train PTC Radio locations

• 5 County Southern California communication network

– Commercial telecommunication lease lines

– Metrolink owned fiber, copper cable, wireless antennas

– Voice & data transmissions

– Microwave

• No longer supported computer aided train dispatching system is being replaced

• 350 grade crossings – CWTD for train detection

Page 6: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

6

• THE RAIL SAFETY IMPROVEMENT ACT BECAME LAW ON OCTOBER 6, 2008

– Prevent Train to Train Collisions

– Prevent Overspeed Derailments

– Prevent Movement of a Train through a Switch left in the “Wrong” Position

– Prevent Incursions into Roadway Work Zones

Page 7: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

7

WHAT IS PTC ?

• Positive Train Control is a predictive collision avoidance system that provides a warning to train operators and then intervenes and stops a train before a collision or other hazardous train movement can occur.

• The primary purpose is to prevent incidents caused by single-point human failures by proactively stopping the train.

Page 8: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

8

PTC SYSTEM COMPONENTS

Computer-Aided

Dispatching

Back Office

Server (BOS)

Signal

Status

5. EIC

Page 9: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

9

LA Basin PTC Characteristics

• BNSF/UPRR/Amtrak/Coaster Interoperability

• Dense mixed passenger and freight territories

• Numerous inter-railroad movements

• Complex multiple main tracks

• Very high use of wireless communication systems

Page 10: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

10

LA Basin PTC Characteristics

• Numerous grade crossings

• Steep mountain grades

• Complex passenger terminals

• Main Track commuter turnback movements

• Up to 75 trains at a time in the region on all railroads

Page 11: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

11

SCRRA PTC – PROJECT UPDATE

• Fitness for Use and RF Coverage Studies are underway

• 3 PTC Equipped Hy-Rails are preparing to ship

Page 12: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

12

SCRRA PTC – PROJECT UPDATE

• Coverage in rugged canyons is a challenge

• Coverage in 7000 fttunnels is a challenge

Page 13: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

13

SCRRA PTC – PROJECT UPDATE

• Backhaul improvements in support of PTCo Hybrid design of leased fiber and packet-digital microwave

o Bid advertisement scheduled for June 2011

Page 14: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

14

SCRRA PTC – PROJECT UPDATE

• Radio Design is being coordinated as a regional network

• PTC 220 LLC, BNSF, UPRR and SCRRA are working together on sharing infrastructure

• SCRRA is acquiring Spectrum for PTC usage

• A data throughput study is underway to aid in determination of cell sizes

Page 15: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

15

SCRRA PTC – PROJECT UPDATE

On-Site surveys of existing equipment allowed for early order of long lead items

Page 16: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

16

SCRRA PTC – PROJECT UPDATEA small yard was constructed near L.A. Union Station to outfit the rolling stock – installation begins July of 2011

Page 17: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

17

SCRRA PTC – PROJECT UPDATE

• Two new simulators will be provided:– Half-car replica simulator of Rotem Cab Car

– Desktop simulator of MP36 Locomotive

• Upgrade existing F59 simulator to enable PTC training

• Simulators to be temporarilyhoused at Union Station

• Will ultimately reside at the Train Control & Operations Support Facility (TCSOF)

Page 18: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

18

SCRRA PTC – PROJECT UPDATE

• The initial SCRRA PTC will be the ITC Rung 1

solution I - ETMS

• Future Enhancements may include:

– Real time train location

– Predictive train arrival and departure information

– Advanced grade crossing starts

– Grade crossing inhibits and crossing restarts

– Grade crossing to train health status

Page 19: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

19

SCRRA PTC PROJECT - SCHEDULE

2011 WORK EFFORT

Page 20: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

20

PASSENGER SAFETY

The new rolling stock features the latest in energy absorption crash management design and construction

Page 21: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

21

SAFETY FOR THE PUBLICGRADE

CROSSINGS

ARE ANOTHER AREA WHERE SIGNIFICANT

SAFETY IMPROVEMENT

IS

ONGOING

Page 22: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

22

SAFETY FOR PEDESTRIANS

Pedestrian treatments are

included in grade crossing warning system upgrades

Page 23: LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011, Joe Zerzan

23

SCRRA – USING

TECHNOLOGY FOR SAFETY

AND EFFICIENCY

QUESTIONS

?