Gu5095.3
Project Plan
The System
Deliverables
Future
-
8/10/2019 Lrig Alsb Terrywood
4/23
Gu5095.4
The Numbers Challenge
0
n
2n
3n
4n
5n
6n
Year
Compounds
Tested
1997 1998 1999 2000 2001 2002 2003 2004 2005
-
8/10/2019 Lrig Alsb Terrywood
5/23
Gu5095.5
best return oninvestmentstability
less time per hit
Faster
-
8/10/2019 Lrig Alsb Terrywood
6/23
Gu5095.6
Return on Investment
Aggregated
Cost($ millions)
Year
0
1997 1998 1999 2000 2001 2002 2003 2004 2005
2
4
6
8
10
12
14
ALSB
Manual+ staff increase
16
0
-
8/10/2019 Lrig Alsb Terrywood
7/23
Gu5095.7
FAT -Factory Acceptance Test
Milestones
PINT - Pfizer Integration
SAT - Site Acceptance Test
-
8/10/2019 Lrig Alsb Terrywood
8/23
Gu5095.8
Factory Acceptance Test
-
8/10/2019 Lrig Alsb Terrywood
9/23
Gu5095.9
FAT -Factory Acceptance Test
Milestones
SAT - Site Acceptance Test
PINT - Pfizer Integration
-
8/10/2019 Lrig Alsb Terrywood
10/23
Gu5095.10
Site Acceptance Test
Administrator Form Operation Functionality of all GUI forms that allow the
administrator to set orders.
Administrator Transactions Testing of all sample withdrawal, replacement
and replenishment capabilities described in the
specification.
Daughter Plate Orders Ensure the system delivers all permissible
variations of daughter plate format.
Access Procedures The various elements within the ALSB must be
accessible, but only when the system is in a safe
condition.
Replenishment of Consumable Items Demonstration that al l consumable storage
modules are accessible, operable and give
suitable alerts when running low.
Alarm Conditions and Recovery from Failure Simulation of a wide range of hardware, software
and service failures, to demonstrate that the
equipment fails safe and the system is
recoverable.
Performance Testing Does the system delivers its output within the
time frames specified.
Administrator Form Operation Functionality of all GUI forms that allow the administrator to setorders.
Administrator Transactions Testing of all sample withdrawal, replacement and replenishmentcapabilities described in the specification.
Daughter Plate Orders Ensure the system delivers all permissible variations of daughterplate format.
Access Procedures The various elements within the ALSB must be accessible, but onlywhen the system is in a safe condition.
Replenishment of Demonstration that all consumable storage modules are accessible,Consumable Items operable and give suitable alerts when running low.
Alarms and Recovery Simulation of a wide range of hardware, software and service from
Failure failures, to demonstrate that the equipment fails safe and the system is recoverable.
Performance Testing Does the system delivers its output within the time frames specified.
-
8/10/2019 Lrig Alsb Terrywood
11/23
Gu5095.11
FAT -Factory Acceptance Test
Milestones
SAT - Site Acceptance Test
PINT - Pfizer Integration
-
8/10/2019 Lrig Alsb Terrywood
12/23
Gu5095.12
Pfizer Integration Testing
-
8/10/2019 Lrig Alsb Terrywood
13/23
Gu5095.13
Legacy Sample Transfer
Plate Based Tube Based
+ Tube I.d.
+ Tube Septum
+ Volume
-
8/10/2019 Lrig Alsb Terrywood
14/23
Gu5095.14
Cold Store
Defrost Station
Conveyor System
Liquid
Handling
Cells
The Technical Solution
Customers
600 plates/24hrs
OR
6000 single/24hrs
Robot arm
Robotic Carousel
Key
Robotic SampleProcessor
up to 1000+
assay plates/24hrs
-
8/10/2019 Lrig Alsb Terrywood
15/23
Gu5095.15
Cold
Store
Gantry
Robotics
-
8/10/2019 Lrig Alsb Terrywood
16/23
Gu5095.16
Defrost Oven Feeder Robot
-
8/10/2019 Lrig Alsb Terrywood
17/23
Gu5095.17
Liquid Handling Cell
-
8/10/2019 Lrig Alsb Terrywood
18/23
Gu5095.18
Then ...
-
8/10/2019 Lrig Alsb Terrywood
19/23
Gu5095.19
.. Now
-
8/10/2019 Lrig Alsb Terrywood
20/23
Gu5095.20
Lessons Learnt
Marketing
Buy - inEnhancements
2onot 1o
-
8/10/2019 Lrig Alsb Terrywood
21/23
Project buy-in
-
8/10/2019 Lrig Alsb Terrywood
22/23
Cold Store Cold Store Extension
Defrost Station
Conveyor System
Conveyor System Extension
AdvancedRSPs
Future development
Total Automation System
Customers
LiquidHandling
Cells
-
8/10/2019 Lrig Alsb Terrywood