CONTENTS
Sl. No. Subject Page No.
1. Introduction 1
2. Jharkhand at a Glance 2
3. Activities 3
4. Training, Seminars, VDP & Cluster Development Programme 4-5
5. Economic & Statistical Investigation 5
6. Assistance To D.I.C./A.I.A.D.A. 6
7. Assistance to SC/ST/Women/Weaker Section/Total trainees 7
8. Other Activities Undertaken by the Institute 9
9 Significant Work Undertaken by the Institute During the Year 2013-14 10
10. Details of Revenue Earned 11
11. Training Programme Target & Achievement 2013 – 14 (In %) 12
12. Annexure – I (Bar Code)
13
13. Annexure – II (Bar Code)
14
14. Annexure – III (One day Sensitization Programme on IPR)
15-17
15. Annexure – IV (National Level Vendor Development Programme)
18-23
16. Annexure – V (State Level Vendor Development Programme – 3 Nos.)
24-29
17. Annexure – VI (Activities under CLUSTER DEVELOPMENT PROGRAMME)
30-31
B Annual Report 2013-14
MSME-Development Institute, Ranchi
1
MSME-Development Institute, Ranchi
Annual Report 2013 –14
1. Introduction : MSME-Development Institute, Ranchi along with its Branch Institute at Dhanbad is catering to the development and promotional requirements of Micro Small & Medium Enterprises (MSME) in the state of Jharkhand. The Jharkhand State was carved out of erstwhile Bihar. This 28th State of the union came into existence on 15th November 2000. From administrative point of view Ranchi is the State Capital. The details of Divisions comprising of various districts are given hereunder as per Census of India 2011 :
ANNUAL REPORT FOR THE YEAR 2013-14
2 Annual Report 2013-14
MSME-Development Institute, Ranchi
2. Jharkhand at a Glance :
‘JHARKHAND INDUSTRIAL POLICY, 2012 has been formulated and
launched. Apex Committee has also been constituted to look into industrial
sickness. To cater to the needs of sick units and to avoid further sickness of the
industrial units, Jharkhand Rehabilitation Scheme, 2003 has also been
launched. Micro & Small Enterprises Facilitation Council has also started
functioning to deal with cases pertaining to interest on delayed payment. Even
medium & large industries are being taken proper care of by the Deptt. of
Industries, Govt. of Jharkhand. To make the environment congenial for
industrial development, efforts are being made to implement ‘SINGLE
WINDOW SCHEME’, where the entire facility to launch an industrial
enterprise will be dealt with under a single roof. The State Govt. in its JIP-2001
had envisaged the concept of ‘UDYOG BANDHU’, who would be the
coordinator of various Govt. departments to facilitate smooth, functioning of
‘Single Window System’. Facelifts are being undertaken at Industrial
Estates/Areas all over the State to give boost to existing as well as new units.
Continuation of such efforts would ensure that there will be no reason why
Jharkhand would not stand at par with other industrially developed states of
the Nation. Currently, there are as many as 26 mega industries, 106 large and
medium Industries and 18,109 micro and small industries operative in the State
with an approximate investment of Rs 28,424.06 crore and about 63,000 people
thus far got employment in these industries.
3 Annual Report 2013-14
MSME-Development Institute, Ranchi
3. Activities : 3.1 Sale of Publications :
Sales of priced publication, Project Profiles
: Sale of printed project profiles has been withdrawn.
3.2 Consultancy Services Rendered:
The existing and prospective entrepreneurs were given assistance, as given hereunder:
Sl. No.
Type of
Assistance
At Unit Premises
Total At MSMEDI Total Gr. Total
2013-2014 2013-2014
Ranchi Dhanbad Ranchi Dhanbad
a. Technical 40 25 65 67 39 106 171 b. Managerial 10 07 17 12 62 74 91
c. Economics & Statistic
85 80 165 90 86 176 341
d. Others 560 576 1136 621 565 1186 2322
e. Assistance to start new Industries.
941 809 1750 1680 1522 3202 4952
TOTAL 1636 1497 3133 2470 2274 4744 7877
4 Annual Report 2013-14
MSME-Development Institute, Ranchi
4. Trainings And Seminars Conducted During 2013-14:
A. This Institute conducted the following programmes:
a) Under Core Programme Target a one day programme on BAR CODE was orgnised by
this Institute on 19th July; 2013 at the Lions Club, Ranchi for the benefit of MSMEs
The Programme was attended by 44 participants. Report enclosed at Annexure – I.
b) Under Core Programme Target a one day programme on BAR CODE was orgnised by
BR. Institute, Dhanbad, in association with District Flour Mill Association on 27th
May; 2013 at IMT Hall,Br. Institute,Dhanbad for the benefit of MSMEs The
Programme was attended by 30 participants. Report enclosed at Annexure-II
c) Intensive Motivational Campaign: 82 Nos. Motivational Campaigns were conducted
and a total no. of 4952 persons were motivated to take-up self employment. Reports
already forwarded to DC (MSME) along with MPR.
d) This Institute organized 111 Nos. of ESDP, EDP, MDP, on various subjects like Beauty
Therapy, Motor Binding, Mobile Repairing, Garment Cutting & Stitching, MS Office &
Tally, Computer Hardware & Networking, Plumbing, Automobile Repairing, Food
Processing, DTP, Video Shooting, Retail Business Management, Marketing
Management, Basic Welding,BasicCNC lathe Machining Turning & Fitting,Electrical
Gadgets, etc. wherein 2727 persons were imparted training.
B. Other Seminars :
a. Under NMCP ,a one day Awareness programme on Intellectual Property Right
was conducted on 16th july; 2013 for the benefit of Entrepreneurs at Hotel Capitol
Hill, Ranchi in association with CII. In this programme research scholars, officers
from Centre/ State Govt., NGOs, Consultants/Consultancy Organizations
addressed the participants. Total 70 entrepreneurs participated in the programme.
Report is enclosed at Annexure- III.
b. Packaging for Export: Target was not assigned during 2013-14.
c. Product Certification: Target was not assigned during 2013-14.
5 Annual Report 2013-14
MSME-Development Institute, Ranchi
5. Vendor Development Programme :
During 2013-14, this Institute was assigned a total Target of 10 Nos. of SVDPs and 2
Nos of NVDPs.Total 10 Nos. of VDPs was organized by this Institute. There was a
shortfall of one each in NVDP and SVDP.
Sl. No.
Name of Programme
Target No. of VDPs Conducted
No. of units Participated
Amount Realised (Expenditure)
1. NVDP 02 01 85 1,80,000/-
2. SVDP 10 09 346 1,68,000/-
Total 12 10 431 3,48,000/-
A) One National level VDP was organized at GOPAL MAIDAN,Jamshedpur in
collaboration with CII from 11TH to 14TH JAN;2014.Report enclosed in ANNEXURE-
IV(A-F)
B) The State level VDP was organized at places like ,Ranchi , Jamshedpur, Ramgarh,
Bokaro , Dhanbad, Gumla.
6. Cluster Development Programme :
a) Under Cluster Development Programme various activities were undertaken and those
are detailed in Annexure- V-V(A)
7. Economic And Statistical Investigation:
Although the Institute is facing acute Paucity of Staff in E.I./P.I. Section, it undertook
extensive activities, besides coordinating the work of entire Institute. A brief
description of activities is tabled below :
Sl No
Name of the Activity 2013-2014 Remarks Target Achievement
1. District Industrial Potential Survey 3 3 All districts of Jharkhnd were covered last year.
Updation of State Profile 01 01 Jharkhand
2. Collection of Statistics :
a. Monthly Production Return Work was not assigned.
b. P.I. 2% units on Quarterly basis. Work was not assigned.
c. WPI Work has not been assigned.
6 Annual Report 2013-14
MSME-Development Institute, Ranchi
8. Assistance To D.I.C. / A.I.A.D.A.
There are 12 DICs, which cater to the needs of all the 24 districts of the State. They
are being provided all possible assistance by the Institute as per their requirements. The
assistance provided to different DICs, are detailed below:
i. No. of visit to DICs : 42 nos. ii. Task-force meeting attended : 08 nos. iii. Assistance to PMEGP
Beneficiaries : Project profiles on various activities were
provided to 680 unemployed youths free of cost.
9. Assistance To I.A.D.As. :
There are 3 Industrial Area Development Authorities in the State of Jharkhand viz.
Adityapur Industrial Area Development Authority (AIADA); Ranchi Industrial Area
Development (RIADA) & Bokaro Industrial Area Development Authority (BIADA).
The assistance provided to I.A.D.As. is detailed below :
9.1 Project Clearance Committee Meetings attended - 04
9.2 Sub PLC Meeting attended - 02
9.3 Project Appraisal: 38 Nos. of Projects Reports were appraised by the Institute to
enable the Project Clearance Committee to take suitable decision on allotment of land
in Industrial Estate. Through Project Appraisal a revenue of Rs. 3,90,061/- was
earned.
9.4. Joint Capacity Assessment: Capacity assessment of 91 Nos. of units was carried out
jointly by MSME-DI and the representatives of the respective IADAs and DICs. A
total revenue of Rs2,75,000/- was earned.
9.5 NSIC Single Point Registration for 154 Micro & Small Enterprises was carried out and
a reveue amounting to Rs.5,65,000/- was earned.
9.6. Bokaro Industrial Area Development Authority was advised by the Institute to take
up Cluster of Engineering Fabrication Units at BIADA for further development under
the Small Industry Cluster Development Programme of MSME-DO. Full details of the
scheme were furnished to them. The Director of the Institute also participated in the
meeting taken by the Managing Director, BIADA and shared his views with the
entrepreneurs present in the meeting.
7 Annual Report 2013-14
MSME-Development Institute, Ranchi
9.7 The DICs issued 2362 Nos. of E.M.Part- II Registration to the MSEs as per details
given hereunder up to FEB; 2014 during 2013-14:-
Sl. No.
Type of Industry Number Remarks
1. MICRO 2296 2. SMALL 65 3. MEDIUM 1 TOTAL 2362
10. Assistance To SC/ST/Women/Weaker Section
This Institute has been making concerted efforts to uplift SC / ST / Women / Weaker
Section Entrepreneurs, by way of providing technical assistance / E.S.D.P. Courses /
E.D.P. Course / M.D.P. Courses / Motivational Campaigns etc. During the training
courses the number of SC / ST / Women / Weaker Section Entrepreneurs trained, are
detailed below:
Name of the Programme
SC ST Male Female Male Female
ESDP 284 201 539 259 EDP 95 83 239 148 MDP 67 22 159 86 IMC 737 1007 1014 996 Total 1183 1313 1951 1489
0200400600800100012001400160018002000
SC ST
1183
1951
1313
1489
MALEFEMALE
8 Annual Report 2013-14
MSME-Development Institute, Ranchi
10.1 Total Number of Trainees, those attended various programmes.
Name of the Programme
SC ST OBC Min Others Total
M F M F M F M F M F M F
ESDP 284 201 539 259 45 75 21 41 44 70 939 646 EDP 95 83 239 148 47 30 15 8 51 28 447 297 MDP 67 22 159 86 14 06 10 4 24 13 274 131 IMC 737 1007 1014 966 399 271 80 101 188 189 2418 2534 Total 1183 1313 1951 1459 505 382 126 154 307 300 4078 3608
0
500
1000
1500
2000
2500
3000
ESDP EDP MDP IMC
939
447274
2418
646
297131
2534
Male
Female
9 Annual Report 2013-14
MSME-Development Institute, Ranchi
11. Other Activities Undertaken By the Institute :
11.1 The cultivable area of Jharkhand is well endowed with fertile land for cultivation of
fruits and vegetables. Although much emphasis has not been initiated for the
cultivation of fruits, tremendous effort has been put to cultivation of vegetables. It
would not be an exaggeration to say that whole of Jharkhand is very rich in vegetable
production and launching food-based units in Jharkhand would bring increasing
returns to the masses in general. On the initiative of the Ministry of Food Processing,
Govt. of India Govt. of Jharkhand has allotted land for development of Food based
industries at Gatelsud Industrial Area, Gatelsud, Ranchi.
11.2. On request of M.D., RIADA, Ranchi 38 nos. of Project Appraisal of various units was
carried out as per requirement of Project Clearance Committee (PCC) and a revenue
of Rs 3,90,061/- was realized towards appraisal fee.
11.3 During the year under report a total of 154 nos. of technical reports pertaining to
various units were given NSIC for Single Point Registration Scheme and revenue
amounting to Rs.5, 65,263/- was earned.
11.4 During the year under report this Institute prepared 04 nos. of new and 12 nos. of
updated Project Profiles:
A. LIST OF NEW PROJECT PROFILES : 1. Ceramic Tiles (Decorated). 2. Steel Fabrication.
B. LIST OF UPDATED PROJECT PROFILES :
1. Glass Toys. 2. Glass Bangle. 3. Wire & Welding Electrodes 4. Pre-Stressing Anchorages & Equipment.
11.5 The officers of this Institute attended on regular basis the meetings organized by
Deptt. of Industries, Govt. of Jharkhand on the issues pertaining to Cluster
Development, Facilitation Council, Capital and Interest Subsidy, etc.
11.6 During the year under report regular Governing Council meetings and Annual
General Meeting(AGM) with JGMTRTC Ranchi , GTRTC, Dumka and MSME-Tool
Room were held.
10 Annual Report 2013-14
MSME-Development Institute, Ranchi
11.7 A Special Drive has been initiated jointly by the Deptt. Of Industries, Govt. of
Jharkhand and MIN. Of MSME to organize sensitization-cum- awareness programmes
on policies of MSME including nine components of NMCP in different districts of
Jharkhand without financial assistance for the benefit of existing as well as new
MSMEs.
11.8 Officers of this Institute attended Seminar organized by NSE on equity participation
by MSME at hotel BNR, Chankaya, station road, Ranchi.
11.9 The officers of this Institute attended on regular basis the meetings organized by
SLBC and RBI, Ranchi to discuss credit facilities to MSMEs.
12. Significant Work Undertaken By The Institute During The Year 2012-13:
12.1 The Hindi Workshop was organized during the year 2013-14.
12.2 The officers of this Institute responded to fill up the requisite data as devised in the
questionnaire supplied by the Indian Institute of Public Administration, New Delhi.
12.3 The officers of this Institute carried out Quick District Industrial Potential Survey of
three districts of Jharkhand.
12.4 The officers of this Institute participated in PMEGP Udyog Melas organized by Deppt.
Of Industries, Govt. of Jharkhand.
12.5 One MSEs were disbursed the Subsidy amount of Rs.33,452/- for acquiring BAR
CODE.
12.6 Two MSEs were disbursed the subsidy amount of Rs.90,000/- for acquiring ISO-9000:14000.
12.7 Two MSEs was disbursed the Subsidy amount of Rs.1,67,844/- for acquiring Product
Standard (i.e.IS Mark). 12.8 One Seminar on Lean Manufacturing was organized by this Institute jointly with
NPC, Patna at Hotel Ashoka, Ranchi on 13-03-14. 12.9 Officer of this Institute graced the occasion of Design Clinic as Chief Guest organized
by DC(Handicraft) at Kokar, Ranchi. 12.10 Officers of this Institute attended Seminar on Packaging of Handicrafts organized by
IIP, Kolkata at Institute of Social Service, Ranchi, on 28-03-2014.
11 Annual Report 2013-14
MSME-Development Institute, Ranchi
13. Revenue Earning Statement: MARCH; 2013
275000, 16%
390061, 23%
565263, 33%
4200, 0%
8100, 1%
7400, 0%
31214, 2%
383000, 23%
38500, 2%Capacity Assessment and Consultancy
Project Appraisals
NSIC Regn./GSPP
MDP Fees
EDP Course Fee
Bar-Coding
ESDP Course Fee
VDP Revenue
Others
Sl. No. Activity Total cumulative
1. Revenue from Workshop NIL 2. Specialized Training Programmes (CAD/CAM) NIL 3. Sale of Trainee Products NIL 4. Seminar Fees / VDP NIL 5. Capacity Assessment and Consultancy 275000 6. Project Appraisals 390061 7. Sick unit Studies/Sale of Form. NIL 8. Inplant Studies NIL 9. Surveys NIL 10. Energy Audits NIL 11. NSIC Regn./GSPP 565263 12. Sale of Publications NIL 13. PD Accounts NIL 14. Others (RTI) 38500 15. MDP Fees 4200 16. EDP Course Fee 8100 17. Bar-Coding 7400 18. ESDP Course Fee 31214
19. IPR NIL 20. Packaging for Export NIL 21. VDP Revenue 383000
Total 1702738
12 Annual Report 2013-14
MSME-Development Institute, Ranchi
14. TARGET ALLOTTED TO MSME-DI, RANCHI INCLUDING BR. MSME-DI, DHANBAD
Year 2013-14 Sl.No. Name of the
Trg. Prg. Target
Allotted Sanction Received
Programmes Conducted
Achievement %
2013-14 2013-14 2013-14 2013-14
1. ESDP 64 64 64 100% 2. EDP 30 30 30 100% 3. MDP 17 17 17 100% 4. IMC 82 82 82 100% 5. VDP 12 12 10 83% 6. BAR-CODE 2 2 2 100% 7. IPR 1 1 1 100% TOTAL 208 208 206
0
20
40
60
80
100
120
TARGET2013-14 ACHIEVEMENT2013-14
ACHIEVEMENT%
ESDP
EDP
MDP
IMC
VDP
BAR-CODE
IPR
- 13 -
MSME-Development Institute, Ranchi
Annual Report 2013 –14
- 14 - Annual Report 2013-14
MSME-Development Institute, Ranchi
- 15 - Annual Report 2013-14
MSME-Development Institute, Ranchi
- 16 - Annual Report 2013-14
MSME-Development Institute, Ranchi
- 17 - Annual Report 2013-14
MSME-Development Institute, Ranchi
One day Awareness Programme on INTELLECTUAL PROPERTY RIGHT (IPR)
on 16-07-2013
- 18 - Annual Report 2013-14
MSME-Development Institute, Ranchi
- 19 - Annual Report 2013-14
MSME-Development Institute, Ranchi
- 20 - Annual Report 2013-14
MSME-Development Institute, Ranchi
- 21 - Annual Report 2013-14
MSME-Development Institute, Ranchi
- 22 - Annual Report 2013-14
MSME-Development Institute, Ranchi
- 23 - Annual Report 2013-14
MSME-Development Institute, Ranchi
National Level Vendor Development Programme at Jamshedpur during 11 – 14 January, 2014 Hon’ble Chief Minister of Jharkhand Sri Hemant Soren (5th from left)
- 24 - Annual Report 2013-14
MSME-Development Institute, Ranchi
- 25 - Annual Report 2013-14
MSME-Development Institute, Ranchi
State Level Vendor Development Programme at Jamshedpur on 04-09-2013
- 26 - Annual Report 2013-14
MSME-Development Institute, Ranchi
ANNEXURE-V(B)
- 27 - Annual Report 2013-14
MSME-Development Institute, Ranchi
ANNEXURE-V(C)
State Level Vendor Development Programme at Ranchi on 27-11-2014
- 28 - Annual Report 2013-14
MSME-Development Institute, Ranchi
ANNEXURE-V(D)
- 29 - Annual Report 2013-14
MSME-Development Institute, Ranchi
ANNEXURE-V(E)
- 30 - Annual Report 2013-14
MSME-Development Institute, Ranchi
- 31 - Annual Report 2013-14
MSME-Development Institute, Ranchi
ANNEXURE-VI(A)