lr verification guidelines for the application of the ... pspc... · application of the performance...

Download LR Verification Guidelines for the application of the ... PSPC... · application of the Performance Standard for Protective Coatings ... coating. Method of surface preparation. Statement

If you can't read please download the document

Upload: phungthien

Post on 06-Feb-2018

220 views

Category:

Documents


1 download

TRANSCRIPT

  • LR Verification Guidelines for the LR Verification Guidelines for the LR Verification Guidelines for the LR Verification Guidelines for the application of the Performance application of the Performance application of the Performance application of the Performance

    Standard for Protective Coatings Standard for Protective Coatings Standard for Protective Coatings Standard for Protective Coatings (PSPC)(PSPC)(PSPC)(PSPC)

    Version 04 Date: November 2011

  • 2011 Ver.04 1

    MARINE SERVICES

    Contents Contents Contents Contents 1. 1. 1. 1. IntroductionIntroductionIntroductionIntroduction. 2 2222. . . . Verification Verification Verification Verification Requirements by the LR SurveyorRequirements by the LR SurveyorRequirements by the LR SurveyorRequirements by the LR Surveyor

    1. Before coating application is started 3 2. During coating application 6 3. After coating completion and prior to ship delivery 7

    3. Procedural Flow Chart3. Procedural Flow Chart3. Procedural Flow Chart3. Procedural Flow Chart 8

    APPENDIX 1 APPENDIX 1 APPENDIX 1 APPENDIX 1 ---- CTF Check List. 9

    APPENDIX 2APPENDIX 2APPENDIX 2APPENDIX 2

    A1 Shop Priming Application 10 A2 Shop Priming Verification 11 B1 Verification Procedures PSPC- BWT 12

    APPENDIX 3APPENDIX 3APPENDIX 3APPENDIX 3 ---- ExampExampExampExample le le le Working Records (Working Records (Working Records (Working Records (for the Approvedfor the Approvedfor the Approvedfor the Approved Inspector Inspector Inspector Inspector)))) Coating Log Primary Surface Preparation. 15 Coating Log Edge and Weld Condition. 16 Coating Log Coating Application. 17 Coating Log DFT Measurement 18

  • 2011 Ver.04 2

    MARINE SERVICES

    1. Introduction 1. Introduction 1. Introduction 1. Introduction Lloyds Registers verification requirements and procedures for new construction are to be built under the regulations detailed by the documents listed below, collectively referred to as PSPC-BWT in this document. The related standards and documents for reference are:

    It is anticipated that a pre- job meeting and agreement will be carried out and form the basis of the verification guidelines, this should include the items listed below but not be limited to this:

    Confirmation of the coating suppliers, if not already agreed. Coating Specification. Treatment of fixtures and fittings, if not included in the coating

    specification. Inspection schedule and standards. Number of tests to be carried out e.g. salt tests, profile assessment,

    dust tape tests etc. Applicators working procedures and equipment including e.g.

    supervision organisation chart, experience of supervisors and operatives, access to surfaces (staging), lighting, equipment capacities and availability etc.

    Applicators QC procedures (e.g. monitoring of ambient conditions / ventilation and pre-official inspections for surface preparation, cleaning, DFT etc.)

    Communications including procedures for calling inspections (e.g. minimum acceptable advance notice and acceptable hours, including weekends evenings, holidays). Also procedures for informing LR of forthcoming inspections.

    1111

    All other All other All other All other Ship TypesShip TypesShip TypesShip Types

    UI SC223

    Z17

    Rec.101 Rec.102

    PR34

    Rec.87

    MSC.215(82)

    MSC.1/Cir 1330

    CSR ShipsCSR ShipsCSR ShipsCSR Ships

    2222

    3333

    1 1 1 1 Footnotes in PR34 are mandatory 2222 Rec.87 will be referred to by MSC.1/Cir 1330 3 3 3 3 PR34 will be deleted by IACS, CSR Rules will refer to MSC.215(82)

  • 2011 Ver.04 3

    MARINE SERVICES

    Reporting procedures and report formats (see Appendix 3 for recommended reporting templates)

    Procedures for reporting non-conformances and resolving their satisfactory repair.

    Appointment of the inspection body or bodies (i.e. shipyard, coating supplier, ship owner, independent or a combination of two or more).

    Clarification of how many inspectors will be required. Assistance to be given to the inspectors. Names and qualifications of inspectors (copies of current certificates

    including information to allow traceability and confirmation will be required).

    Procedures for the settlement of disputes. Health and safety.

    The Lloyds Register PSPC-BWT new building verification process for surveyors can be broken into three stages:

    i.i.i.i. Before coating application is started.

    ii.ii.ii.ii. During coating application.

    iii.iii.iii.iii. After coating completion and prior to ship delivery. Any deviation should be raised to the shipyard, or the Approved Inspector, as deemed appropriate by LR. In the event of corrective action a Class Certificate will not be issued until all corrective actions have been closed out. 2.2.2.2. Verification RequirementsVerification RequirementsVerification RequirementsVerification Requirements by the by the by the by the LR LR LR LR SurveyorSurveyorSurveyorSurveyor 2.12.12.12.1 Before coating Before coating Before coating Before coating application application application application is startedis startedis startedis started The minimum PSPC-BWT requirements are included in the CTF check list (see appendix 1). The CTF is to be compiled by the shipyard before work is started. Notes:Notes:Notes:Notes:

    The minutes of the pre job agreement are to be reviewed by LR.

    Selection of coating System - See MSC 215(82) Table 1.1. The criteria for selection are to be confirmed by the shipyard, ship owner and coating supplier.

    PSPC Type Approval Certificate or Statement of Compliance. Details are held at LR London.

    The PTDS will comply with The Type Approval Certificate.

    The Coating Specification will include at least the following:

  • 2011 Ver.04 4

    MARINE SERVICES

    Shop primer.Shop primer.Shop primer.Shop primer. Manufacturer. Name of Product. Code of Product. Type. Specified DFT. Surface Preparation. Compatibility with the main coating.

    Main CoatingMain CoatingMain CoatingMain Coating Manufacturer. Name of Product. Code of Product. Type. Number, sequence and colour of Full coats. Method of Application (Airless Spray). NDFT of Each Coat. NDFT of the Total System. Number, sequence and colour of Stripe coats including method of

    application

    SurfSurfSurfSurface preparation requirements will include ace preparation requirements will include ace preparation requirements will include ace preparation requirements will include Intact shop primer. Corrosion. Broken down and damaged shop primer. Block pre-erection (if applicable). Erection welds. Main ballast coating damages.

    The MSC.215(82) specifies minimumminimumminimumminimum surface preparation and application standards.

    Any additionaladditionaladditionaladditional requirements of the coating supplier, Flag, Class or Owner should also be included into the specification.

    All interpretations shall be in compliance with SC223.

    The inspection and coating procedure stages should be agreed between the ship-owner, shipyard and coating manufacturer.

    Bodies responsible for inspection are required to provide the names of their respective Approved Inspectors, together with verified copies of the inspectors certificates. Evidence will be available to confirm that all certificates are current. If there is to be more than one inspection body, there must be a clear line of authority.

    Typical examples of the builders quality control documentation include the following:

    Shop Priming Plant Verification and Daily Record. Daily Log - To list all inspections for each working day.

  • 2011 Ver.04 5

    MARINE SERVICES

    Preparation & Application Progress Report. Block Report - Secondary Surface Preparation & Cleaning Inspection

    Report. Pre-Erection joint Report -Secondary Surface Preparation & Cleaning

    Inspection Report. Hull Stage Erection Joint & Damages Report -Secondary Surface.

    Preparation & Cleaning Inspection Report. Block Report- Coating Inspection Report. Block Pre-erection / Hull Stage Coating Inspection Report. Pre-Delivery Inspection Report - (Completion Report). Non Conformity Report.

    The format of reports may vary as agreed between the shipyard, ship-owner and the Approved Inspector but must comply with the requirements of the PSPC-BWT. Note:Note:Note:Note: The shop priming plant QC procedures will normally be subject to a separate audit by the Approved Inspector. The minimum QC Working Report contents for the PSPC-BWT (See MSC.215(82) 3.4.2) are:

    Applied Actual Space and area (in square metres) for each compartment.

    Applied coating system. Time of coating, thickness, number of layers. Ambient conditions during coating. Method of surface preparation. Statement by the Approved Coating Inspector that the coating was

    applied in accordance with the specifications and to the satisfaction of the coating supplier representative. Deviations from the specifications and their correction will be reported.

    LR will confirm the relevant boxes in the CTF Check List and the Shop-priming Plant Verification as appropriate before work is started. VerVerVerVerification Requirementification Requirementification Requirementification Requirementssss:::: All documentation required to satisfy the terms of the PSPC-BWT has been prepared by the ship-yard as listed in the CTF Check List. LR will complete a CTF Check List for each vessel to which the PSPC-BWT regulations apply.

    Inspection procedures have been agreed between the shipyard, the ship owner and the main coating supplier before work is started. These are most likely to be discussed and agreed at a pre-job meeting or meetings. The pre-job agreement must satisfy all of the requirements of the PSPC-BWT and the shipyard is to present the minutes of the agreement to LR for review. LR may also request to participate in the pre-job agreement process.

    That the Shop Priming Plant Verification Report (see Appendix 2) is

    available for the pre-job agreement process and that the standards achieved are acceptable to the shop primer supplier, the main coating supplier and the Approved Inspector.

  • 2011 Ver.04 6

    MARINE SERVICES

    If the shop primed steel is purchased from a location or supplier different from the shipyard, the steel shall have all the relevant quality control documents from that supplier or location, and that the local LR surveyor has witnessed and also supplied the relevant completed forms. This also includes finished or semi-finished blocks supplied from a different site or manufacturer.

    The shop primer must be approved in accordance with PSPC-BWT

    otherwise it must be removed.

    The Approved Inspector should participate in the shop primer verification process as early as possible after being appointed. The Approved Inspector will then be included as a signatory in the verification process. It may also be decided that the main coating supplier participates in the verification process.

    The shop-priming plant documentation may require modification depending upon the agreed inspection bodies.

    The date of the verification must be valid from the start of plate processing.

    2.2 2.2 2.2 2.2 During During During During coating applicationcoating applicationcoating applicationcoating application For Approved Inspectors unknown to Lloyds Register, verification will be required as early as possible in the contract. For inspectors known to LR or when acceptable standards have been established, spot check verification is acceptable. LR will record their monitoring verification details in the LR Form1215.Form1215.Form1215.Form1215.

    For automatic shop primer application regular audits of QC records, without a physical check of the plants operations is acceptable. NoteNoteNoteNote: LR is to confirm that the ship yards QC system ensures that all calibration certificates for inspection instruments are maintained up to date. If not, LR will require all current certificates for review. All sections of the form form form form 1215121512151215 pertaining to the relevant sections of MSC.215 (82) section 6.2 and SC223 shall be completed on a regular basis and be retained for future reference. Details will include:

    Area inspected. Date & time. Official report number. Block or location on the vessel. Approved Inspectors findings. Any unresolved disagreements between inspection bodies and the

    eventual outcome. NCR details, if applicable.

  • 2011 Ver.04 7

    MARINE SERVICES

    Verification Requirements:Verification Requirements:Verification Requirements:Verification Requirements: Through document audits and / or physical spot checks, that all the requirements of the PSPC-BWT are fulfilled.

    Monitoring of the coating inspection requirements, as required by the MSC.215(82) (Section 7.5) means checking, on a sampling basis, that the inspectors are using correct equipment, techniques and reporting methods, as described in SC223. This will require that the Approved Inspector physically demonstrates to the LR Surveyor that inspection procedures are properly carried out and are accurately recorded in the appropriate reports. Examples of these reports are shown in Appendix 3.

    An appropriateappropriateappropriateappropriate level of inspection should be agreed within the pre-job agreement, for example:

    Approximately 10% of block inspections. A minimum of two hull stage tank inspections A minimum of two pre-delivery tank inspections.

    The Approved Inspector should be able to show compliance to items listed in Appendix 1 and Appendix 2.

    Note:Note:Note:Note:

    Non-conformances are to be documented in a Non - Conformance Report (NCR) and closed off by the Approved Inspector after correction.

    Non-conformances are considered non-compliances, if the shipyard or contractor refuses to repair, or where the repair is to be carried out later in the contract, when the NCR will remain in place to act as a reminder.

    Routine requirements for repair after inspection will not be subject to an NCR if repair is to be carried out immediately. Inspections resulting in rejection should be detailed in the Preparation & Application Progress Report.

    2.3 2.3 2.3 2.3 After After After After coacoacoacoating ting ting ting completion and prior to completion and prior to completion and prior to completion and prior to ship ship ship ship deliverydeliverydeliverydelivery Verification Requirements:Verification Requirements:Verification Requirements:Verification Requirements:

    The shipyard has completed the CTF in accordance with the PSPC-BWT and that all relevant documentation required for the CTF is included.

    That the Approved Inspector(s) has signed all the relevant reports

    confirming that standards complied with the MSC.215(82) and all other agreed documentation, the PTDS and were carried out to the satisfaction of the coating supplier's representative.

    That the owner has been given the CTF for placement onboard

    NoteNoteNoteNote:::: The CTF should include the maintenance specification.

  • 2011 Ver.04 8

    MARINE SERVICES

    3333.0 .0 .0 .0 . . . . Procedural Flow ChartProcedural Flow ChartProcedural Flow ChartProcedural Flow Chart The chart outlines the key stages listed in the PSPC-BWT requirements. Items 1 and 2 are to be agreed by the shipyard ship-owner and coating supplier. LR verification requirements are items 3 to 12. Example reports are attached for items 6 to items 11 in Appendix 1 and 2.

    1) Confirmation of Coating supplier,

    and surface preparation

    requirements

    2) Selectioon of the coating system

    (PSPC: Table 1.1.1)

    3) Verification of Type Approval Certificate

    and Contents of PTDS

    (PSPC: 3.4.1,3.4.2 &7.2)

    Details held centrally by LR.

    4) Verifacation that all documentation required for the

    PSPC is available.

    LR will verify the contents of the CTF.

    .All documentation is to be available at the pre-job

    meetiing.

    8) Block surface preparation,

    application and inspection

    (PSPC: Table 1.3.1 & to 1.3,6) or in-

    situ tank surface preparation and

    coating application if not carried out

    in block stage

    7) Steel dressing & inspection

    (PSPC Tables 1.3.1 and 6.2)

    6) Confirmation of application conditions of

    the shop primer

    (PSPC: Tables1.2.1 to 1.2.3)

    Confirmation of the location of all block and

    tank coating operations i.e. shipyard or

    external

    5) Pre-job meeting to agree procedures of inspection

    and coating processes.

    (PSPC: 3.2 & IACS PR No 34 Para 3.1).

    The Approved Inspector may be appointed at this

    meeting. LR will verify the Approved inspector's

    qualifications.

    Shipyard to present LR with meeting notes for review.

    9) Block pre-erection, surface

    preparation, application and

    inspection (If applicable)

    10) Insitu Tank Erection and Damage

    Inspection & repair

    11) Pre-delivery (Completion Inspection, repair

    and verification

    (PSPC 1.3.C)

    12) Confirmation of Completion of all documentation

    (see section: Contents of CTF and appended Tables)

    Notes:Notes:Notes:Notes: PSPC: IMO Resolution MSC,215(82) PSPC Performance standard for Protective Coatings for Dedicated Seawater Ballast Tanks in all Types of ships and Double-sided Skin Spaces of Bulk

    Carriers LRYAG: LR PSPC Yard Auditing Procedures IACS UI SC223 For Application of SOLAS Regulation 11-1/3-2 Performance Standard for Protective Coatings (PSPC) for Dedicated Sea Water Ballast Tanks in Al Types of Ships and Double-

    Side Skin Spaces of Bulk Carriers, adopted by Resolution MSC 215(82) IACS PR34: IACS Procedural Requirement on Application of the IMO Performance Standard for Protective Coatings, Resolution 215(82) under Common Structural Rules for Bulk Carriers and

    Oil Tankers.

  • Shipyard:Shipyard:Shipyard:Shipyard: Project/NB No:Project/NB No:Project/NB No:Project/NB No:

    Location:Location:Location:Location: Shipowner:Shipowner:Shipowner:Shipowner:

    BuilderBuilderBuilderBuilderApproved Approved Approved Approved InspectorInspectorInspectorInspector

    OwnerOwnerOwnerOwner SupplierSupplierSupplierSupplier DocumentDocumentDocumentDocumentincludedincludedincludedincluded

    ConformanceConformanceConformanceConformanceAgreedAgreedAgreedAgreed

    iiii Ballast tank description and drawings PPPP PPPP PPPP(1)(1)(1)(1)

    iiiiiiii Selection of Coating System PPPP PPPP PPPP(1)(1)(1)(1)

    Coating supplier to be aware of service conditions.

    iiiiiiiiiiii Type Certificate of Approval PPPP PPPP(1)(1)(1)(1) PPPP Compatibility of primer

    vvvv Product Technical Data Sheet (PTDS) PPPP PPPP

    (1)(1)(1)(1)

    PPPPLR will verify it coplies with the current Type Approval

    Certificate.

    vvvv Coating specification PPPP (4)(4)(4)(4) PPPP PPPP (1)(1)(1)(1) See coating specification requirements.

    vivivivi Product Safety Data Sheet (PSDS ) PPPP PPPP(1)(1)(1)(1)

    viiviiviivii Pre-job agreement and job specification PPPP

    (4)(4)(4)(4)

    PPPP PPPP

    (3)(3)(3)(3)

    PPPP

    The participation of the ship yard, owner and coating

    supplier is mandatory.

    LR may participate in the pre-job meeting at their discretion.

    Shipyard to present LR with meeting notes for review.

    viiviiviiviiInspection procedures for surface preparation and application

    PPPP(4)(4)(4)(4)

    PPPP PPPP(3)(3)(3)(3)

    PPPP To be agreed at the pre-job meeting.

    ixixixix Inspection bodies PPPP PPPP PPPP(1)(1)(1)(1)

    To be agreed at the pre-job meeting.

    xxxxName(s) of Approved Inspector(s) and verified copies of their certificates(s)

    PPPP PPPP PPPP(1)(1)(1)(1)

    PPPP To be agreed at the pre-job meeting.

    xixixixi Shop Primer Application PPPPPPPP

    Shop Primer Shop Primer Shop Primer Shop Primer SupplierSupplierSupplierSupplier

    x(1)(2)(5)x(1)(2)(5)x(1)(2)(5)x(1)(2)(5)

    See attached tables - Shop Promer Plant Daily Record and

    Audit Check List. Shipyard to confirm Ballast/DSS supplier is

    copied with all updated audits.

    xiixiixiixii Preparation & Application PPPP XXXX(1)(2)(1)(2)(1)(2)(1)(2)

    See attached tables for recommended contents.

    xiiixiiixiiixiii Block/Hull Preparation & Application PPPP XXXX(1)(2)(1)(2)(1)(2)(1)(2) Details of manufactures technical assistance (if given) to be

    included.

    xivxivxivxiv Pre-delivery Inspection and Repair Reports PPPP XXXX(1)(2)(1)(2)(1)(2)(1)(2)

    xvxvxvxv Non Conformance and Correction Reports PPPP XXXX(1)(2)(1)(2)(1)(2)(1)(2)

    xvixvixvixvi Maintance procedures for in-service repair PPPP PPPPOwner to acknowledge receipt and agreement to the

    maintenance programme.

    Names of LR Signatories:PPPP Parties to indicate their agreement to the

    document subject matter.

    XXXX

    Appendix 1. Appendix 1. Appendix 1. Appendix 1. CONTENTS OF THE CTF

    CommentCommentCommentComment

    (1) To be signed by LR as available for the pre-job agreement

    (2) To be signed by LR as completed by the Approved Inspector prior to delivery.

    (3) Agreement to be presented to LR for review before work is started

    (4) There should be scope for review. -See also LR Document Contents of CTF- Section 4

    (5) Shipyard to present verification of the main coating supplier's acceptance of application conditions

    Shipyard to supply all necessary documents for the CTF

    Mandatory SignatoriesMandatory SignatoriesMandatory SignatoriesMandatory Signatories

    Examples to be available at the pre-job

    meeting. Prior to delivery LR will verify that

    the Approved Inspector(s) has signed

    confirmation that standards comply with

    PSPC, the PTDS and have been carried out

    to the satisfaction of the coating supplier's

    representitive

    LR will verify all neccessary documents are included in the CTF

    See also LR Document - Contents of the CTFSee also LR Document - Contents of the CTFSee also LR Document - Contents of the CTFSee also LR Document - Contents of the CTFThe completed CTF is to be kept permanently on-board and copied to Lloyd's Register, London,The completed CTF is to be kept permanently on-board and copied to Lloyd's Register, London,The completed CTF is to be kept permanently on-board and copied to Lloyd's Register, London,The completed CTF is to be kept permanently on-board and copied to Lloyd's Register, London,

    Completed reports to be signed by the ApprovedInspector as work progressess and included in the finalised CTF before delivery. See also section 2.A - Shop Primer Verification.

    ReportsReportsReportsReports

    Lloyd's Verification RequirementLloyd's Verification RequirementLloyd's Verification RequirementLloyd's Verification Requirement

    DocumentDocumentDocumentDocument

    Coating Selection & SpecificationCoating Selection & SpecificationCoating Selection & SpecificationCoating Selection & Specification

    Inspection Inspection Inspection Inspection

  • 2011 Ver.04 10

    Appendix 2 Appendix 2 Appendix 2 Appendix 2 A1 A1 A1 A1

    SHOP PRIMING PLANT VERIFICATIONSHOP PRIMING PLANT VERIFICATIONSHOP PRIMING PLANT VERIFICATIONSHOP PRIMING PLANT VERIFICATION AT AT AT AT

    Shop Primer Manufacturer: ___________________________ Shop primer Name and Code: _________________________ The shipyard has copied Ballast/DSS coating suppliers the attached audit. The Ballast/DSS coating suppliers have indicated their agreement to the following standards for:

    o Blasting and Profile o Salt removal. o Ambient application conditions o Measured DFTs

    The Ballast / DSS coating suppliers accept the primer and the conditions of its application as the substrate for spaces where their coatings are to be applied is in compliance with MSC.215(82). The yard shall ensure that primers used are LR approved prefabrication primers and their compatibility with intended top coating systems has been approved On behalf of the ship-yard __________________________________________ __________________________________ __________________________________ ________________ Signature Name Position Date

  • 2011 Ver.04 11

    Appendix 2 Appendix 2 Appendix 2 Appendix 2 A2 A2 A2 A2

    SHOP PRIMING PLASHOP PRIMING PLASHOP PRIMING PLASHOP PRIMING PLANT VERIFICATION NT VERIFICATION NT VERIFICATION NT VERIFICATION

    Shipyard or Contractor:Shipyard or Contractor:Shipyard or Contractor:Shipyard or Contractor: Manufacturer: Manufacturer: Manufacturer: Manufacturer:

    Location:Location:Location:Location: Date of Audit: Date of Audit: Date of Audit: Date of Audit: Product Name & Code: Product Name & Code: Product Name & Code: Product Name & Code:

    Standard Conditions and SettingsStandard Conditions and SettingsStandard Conditions and SettingsStandard Conditions and Settings Standardised SettingsStandardised SettingsStandardised SettingsStandardised Settings CommentCommentCommentComment

    GeneralGeneralGeneralGeneral

    Condition Before BlastingCondition Before BlastingCondition Before BlastingCondition Before Blasting

    Steel surface condition Grade 'B' or better

    Oil and grease removal To be acceptable

    Water removal To be acceptable

    RH < 85%

    Dew point 3 C

    Surface Condition After blastingSurface Condition After blastingSurface Condition After blastingSurface Condition After blasting

    Blast Standard - above Sa 2 ISO 8501 - 1 Or better

    Blast Standard - below Sa 2 ISO 8501 - 1 or better

    Blast Profile -above (shipyard to clarify method of test) 30-75m ISO 8501-1 and 2

    Blast Profile - below (shipyard to clarify method of test) 30-75m ISO 8501-1 and 2

    Salt contamination ISO 8502-9 or NACE SP0508-2010 50 mg/m2

    Air temperature (range) C to C

    Surface temperature (range) C to C

    RH < 85%

    Dew point 3 C

    ApplicationApplicationApplicationApplication

    Specified NDFT Min m Max m

    Measured DFT - above (Smooth plate) Min m Max m

    Measured DFT - below (Smooth plate) Min m Max m

    Film continuity - above (viewed using clear film) Acceptable

    Film continuity - below (viewed using clear film) Acceptable

    Abrasive inclusion - above and below Acceptable

    Date of introduction of this shop-primer variant The formulation will not be modified without prior approval of Lloyd's RegisterDate of introduction of this shop-primer variant The formulation will not be modified without prior approval of Lloyd's RegisterDate of introduction of this shop-primer variant The formulation will not be modified without prior approval of Lloyd's RegisterDate of introduction of this shop-primer variant The formulation will not be modified without prior approval of Lloyd's Register

    Applicator's QC: Date Applicator's QC: Date Applicator's QC: Date Applicator's QC: Date

    Conditions confirmed and agreed: Conditions confirmed and agreed: Conditions confirmed and agreed: Conditions confirmed and agreed: CCCCoooonnnnffffoooorrrrmmmmaaaannnncccceeee bbbbaaaasssseeeedddd oooonnnn aaaapppppppplllliiiiccccaaaattttoooorrrrssss QQQQCCCC rrrreeeeccccoooorrrrddddssss::::

    Shop Primer Supplier: date Shop Primer Supplier: date Shop Primer Supplier: date Shop Primer Supplier: date Shisyard DateShisyard DateShisyard DateShisyard Date Lloyd's Register: date Lloyd's Register: date Lloyd's Register: date Lloyd's Register: date

  • 2011 Ver.04 12

    Appendix 2 Appendix 2 Appendix 2 Appendix 2 B1 . PSPC B1 . PSPC B1 . PSPC B1 . PSPC----BWTBWTBWTBWT VERIFICATION PROCEDURES VERIFICATION PROCEDURES VERIFICATION PROCEDURES VERIFICATION PROCEDURES

    These Guidelines are intended to assist in the LR verification and should be used together with the workingThese Guidelines are intended to assist in the LR verification and should be used together with the workingThese Guidelines are intended to assist in the LR verification and should be used together with the workingThese Guidelines are intended to assist in the LR verification and should be used together with the working Procedures agreed in the Pre Procedures agreed in the Pre Procedures agreed in the Pre Procedures agreed in the Pre----job Meeting and the LR Shipyard Auditing/Gap Analysis Guidelines. LR is to check, on a job Meeting and the LR Shipyard Auditing/Gap Analysis Guidelines. LR is to check, on a job Meeting and the LR Shipyard Auditing/Gap Analysis Guidelines. LR is to check, on a job Meeting and the LR Shipyard Auditing/Gap Analysis Guidelines. LR is to check, on a sampling basis, that the Approved Inspector uses correct equipment, techniques & reporting methodssampling basis, that the Approved Inspector uses correct equipment, techniques & reporting methodssampling basis, that the Approved Inspector uses correct equipment, techniques & reporting methodssampling basis, that the Approved Inspector uses correct equipment, techniques & reporting methods

    ItemItemItemItem

    PSPCPSPCPSPCPSPC RequirementRequirementRequirementRequirement CommentCommentCommentComment

    BeforeBeforeBeforeBefore Start Start Start Start

    Steel dressing & PreSteel dressing & PreSteel dressing & PreSteel dressing & Pre----CleaningCleaningCleaningCleaning

    Removal of sharp edges ISO 8501-3 Grade P2 (2mm radius) All sharp edges should be rounded to a minimum of 2 mm radius. The PSPC requires 3 pass grinding however, other methods will be acceptable to LR provided the required standard is achieved.

    Removal of undercuts/laminations/ spatter/other steel defects

    ISO 8501-3 Grade P2

    Removal of oil and grease To be removed Visual or Water droplet test - Water must wet out surface to be tested. (UV lamp may be proposed but this method will only be effective with certain types of oil and grease)

    Surface PreparationSurface PreparationSurface PreparationSurface Preparation

    Welds and corroded areas

    Damaged Shop primer

    Sa 2 ISO 8501 1 Profile 30m to 75m ISO 8503-1 and 2

    The ISO 8503 Comparator method does not include grade 30m to 75 m. The profile will therefore be judged using the appropriate medium grade comparator. Note that there are two types of comparator, one for grit and one for shot.

    Blo

    cks

    Intact shop primer See the coatings Type Approval Certificate The Type Approval Certificate PTDS and the PSPC will indicate the minimum required standard of preparation.

    Erection Joints St 3 ISO 8501 - 1 or Sa 2 ISO 8501 - 1 Blast profile as above

    The coating supplier may require a minimum surface profile after grinding / discing (see PTDS). If areas are to be blasted suitable procedures should be place to avoid over blast damage.

    Damages St 3 ISO 8501 - 1 or Sa 2 ISO 8501 - 1 -Blast profile as above

    If damages >2 % of the total area then blasting to Sa 2 is mandatory. The Hull Stage Tank report requires that the damaged area be estimated and recorded If damages are to be blasted, a minimum area per damaged spot must be agreed prior to the start of blasting and steps taken to avoid over blast damage. Small isolated areas of damage should be mechanically repaired. If widespread small damages are present then the entire affected area should be blasted to avoid unnecessary over blast damage. Note over blast damage can be very difficult to see, hence the importance taking adequate steps for its prevention. .B

    lock

    pre

    -ere

    ctio

    n

    & T

    an

    ks

    Areas >25 m2

    Sa 2 ISO 8501 - 1 Blast profile as above

    For areas greater than 25 m2

    blasting to Sa 2 is mandatory.

    Overlap areas

    ---- The agreed method of abrasive cleaning must be acceptable to coating supplier and ensure acceptable inter-coat adhesion.

    Soluble Salt test - Surfaces ISO 8502-9 or NACE SP0508-2010 50 mg/m

    2 (250 S/cm)

    The minimum number of tests per block or tank should have been agreed at the pre - job meeting. Additional tests may be necessary depending on conditions at the time of verification. PSPC requires a minimum of one test per block. Sampling should be by Bresle Patch or similar (Size A-1250 i.e. 1250 13 mm

    2) and conductivity measured in accordance with ISO 8502 9. Tests areas

    should focus on areas most likely to be contaminated or on areas likely to have been 'missed' during the cleaning process e.g. behind bars, tank floors, areas of corrosion etc.

  • 2011 Ver.04 13

    Appendix 2 Appendix 2 Appendix 2 Appendix 2 B1 (cont) PSPC B1 (cont) PSPC B1 (cont) PSPC B1 (cont) PSPC---- BWT VERIFICATION PROCEDURESBWT VERIFICATION PROCEDURESBWT VERIFICATION PROCEDURESBWT VERIFICATION PROCEDURES

    These Guidelines are intended to assist in the LR verification and should be used together with the working procedures agreedThese Guidelines are intended to assist in the LR verification and should be used together with the working procedures agreedThese Guidelines are intended to assist in the LR verification and should be used together with the working procedures agreedThese Guidelines are intended to assist in the LR verification and should be used together with the working procedures agreed in the Pre in the Pre in the Pre in the Pre----job Meeting and the LR Shipyard Auditing/Gap Analysis Guidelines. LR is to check, on a job Meeting and the LR Shipyard Auditing/Gap Analysis Guidelines. LR is to check, on a job Meeting and the LR Shipyard Auditing/Gap Analysis Guidelines. LR is to check, on a job Meeting and the LR Shipyard Auditing/Gap Analysis Guidelines. LR is to check, on a sampling basis, that the Approved Inspector uses correct equipment, techniques & reporting methodssampling basis, that the Approved Inspector uses correct equipment, techniques & reporting methodssampling basis, that the Approved Inspector uses correct equipment, techniques & reporting methodssampling basis, that the Approved Inspector uses correct equipment, techniques & reporting methods

    ItemItemItemItem

    PSPCPSPCPSPCPSPC RequirementRequirementRequirementRequirement CommentCommentCommentComment

    After surface PreparationAfter surface PreparationAfter surface PreparationAfter surface Preparation and before 1st coat and before 1st coat and before 1st coat and before 1st coat

    Dust removal ISO 8502 -3 Rating 1 Class '3',4' or '5'

    The dust quantity rating is not to exceed quantity rating 1 for dust classes 3, 4, or 5. Dust of lower classes is to be removed if visible on the surface without magnification.

    Air Temp C

    RH 85%

    Steel Temp ( 3C than Dew Point)

    Dew Point C

    Q.C. to monitor conditions during and after application until work is completed.Q.C. to monitor conditions during and after application until work is completed.Q.C. to monitor conditions during and after application until work is completed.Q.C. to monitor conditions during and after application until work is completed.

    Drum identification and batch number to be verified

    To comply with the PSPC and the PTDS

    Batch number of both the base and curing agent to be recorded in the coating report. Normally only one batch will be required for any single area. The Approved Inspector must agree if more than two batches are to be used in any area and record the reasons in the Preparation & Application Record.

    Note; The PSPC does not specify ambient conditions during surface preparation: it is important, however, to confirm that ambient conditions required for coating are achieved before the cleaning inspection is started. If ambient conditions do not meet dew point/RH/surface and air temperature criteria, the quality of surface preparation is likely to deteriorate before application of the first full coat and stripe coat is complete. Coating application should commence as soon as possible after surface preparation has been accepted and must be completed before any visible deterioration has occurred. Separate preparation and cleaning inspections may be preferred to avoid re-cleaning if surface preparation is not accepted. Depending on shipyard practice, however, cleaning and surface preparation inspections may be carried out simultaneously. Loose spatter should be removed before the cleaning inspection. Cleaning inspections should always be carried out from the top of the area down.

    After 1st Spray Coat applicationAfter 1st Spray Coat applicationAfter 1st Spray Coat applicationAfter 1st Spray Coat application

    Coatings to be free from: Sags, runs and puddles Craters Pinholes Bubbles

    Holidays Inclusions Other defects

    Steps must be taken to avoid similar problems in the future

    See section H - final coat verification. If defects are widespread or if considered significant the cause must be urgently investigated. If necessary coating activities should be halted until the cause of the defect is remedied.

    DFT Spot Check Flat surfaces Longitudinal stiffeners Transverse stiffeners and girders Large brackets and primary supports Around openings Areas Inaccessible by airless spray

    As considered necessary by the Approved Inspector.

    Excessive thickness removed To be repaired in accordance with the suppliers recommendations.

    Before subsequent full coats and stripe coatsBefore subsequent full coats and stripe coatsBefore subsequent full coats and stripe coatsBefore subsequent full coats and stripe coats

    Over coating interval To comply with the PTDS See section 3.4 above

    Adequate ventilation in place

    Bulk contamination removed

    Dust removal

    Inclusions

    Air Temp

    RH

    Steel Temp

    Dew Point

    Drum identification and batch no verified

    Same as section 3.4 but with confirmation of acceptable over coating interval and the exclusion of salt tests, unless contamination is suspected) . Inclusions to be removed and the coating repaired in accordance with the suppliers instructions.

  • 2011 Ver.04 14

    Appendix 2Appendix 2Appendix 2Appendix 2 B B B B1111 (Cont) PSPC (Cont) PSPC (Cont) PSPC (Cont) PSPC ---- BWT BWT BWT BWT VERIFICATION PROCEDURES VERIFICATION PROCEDURES VERIFICATION PROCEDURES VERIFICATION PROCEDURES

    These Guidelines are intended to assist in the LR verification and should be used together with the working procedures agreed in the PreThese Guidelines are intended to assist in the LR verification and should be used together with the working procedures agreed in the PreThese Guidelines are intended to assist in the LR verification and should be used together with the working procedures agreed in the PreThese Guidelines are intended to assist in the LR verification and should be used together with the working procedures agreed in the Pre----job meeting and job meeting and job meeting and job meeting and the LR Shipyard Auditing/Gap Analysis Guidelines. LR is to check, on a the LR Shipyard Auditing/Gap Analysis Guidelines. LR is to check, on a the LR Shipyard Auditing/Gap Analysis Guidelines. LR is to check, on a the LR Shipyard Auditing/Gap Analysis Guidelines. LR is to check, on a sampling basis, that the Approved Inspector uses correct equipment, techniques & reporting methodssampling basis, that the Approved Inspector uses correct equipment, techniques & reporting methodssampling basis, that the Approved Inspector uses correct equipment, techniques & reporting methodssampling basis, that the Approved Inspector uses correct equipment, techniques & reporting methods

    ItemItemItemItem

    PSPCPSPCPSPCPSPC RequirementRequirementRequirementRequirement CommentCommentCommentComment

    After Stripe CoatingAfter Stripe CoatingAfter Stripe CoatingAfter Stripe Coating

    Coatings free from: Inclusions Pinholes Sags, runs and puddles Other defects

    See Section 3.8

    Film Continuity Welds Edges Cut outs Areas Inaccessible by airless spray

    Scallops & rat holes e.t.c to be verified using a mirror as necessary The substrate should not to be visible

    The sequence of stripe coats will normally be agreed at the pre - job meeting. It may be that both stripe coats are applied between the first and second full coats. Normally each full coat and intermediate stripe coat will be a different colour to its substrate. If the second stripe coat is to by applied after the second full coat it is normal practice to apply the same colour as the last full coat. The extent of the second stripe coat will be agreed at the pre-job meeting

    Final Coat VerificationFinal Coat VerificationFinal Coat VerificationFinal Coat Verification

    1.1.1.1. Inclusions to be removed and repaired according to the suppliers recommendations

    2.2.2.2. Sags, runs and puddles if present, will normally be caused by poor application technique. In exceptional cases the cause may be a batch or formulation problem.

    3.3.3.3. Defects such as craters, pinholes & bubbles may be causes by surface contamination or surface condition, ambient conditions application techniques or problems with the product. If present, the cause should be investigated immediately to avoid re-occurrence in other blocks or tanks.

    Coatings to be free from: Inclusions Sags, runs and puddles Craters Pinholes Bubbles Other defects

    Steps must be taken to avoid similar problems in the future

    Depending on the extent of the defect it may be necessary to halt production untDepending on the extent of the defect it may be necessary to halt production untDepending on the extent of the defect it may be necessary to halt production untDepending on the extent of the defect it may be necessary to halt production until the problem can be resolved.il the problem can be resolved.il the problem can be resolved.il the problem can be resolved.

    Film Continuity: Flat surfaces Welds Edges Cut uts Areas inaccessible by airless spray

    Scalops & rat holes etc. to be verified using a mirror as necessary. The substrate should not to be visible

    DFT Check: Flat surfaces Longitudinal stiffeners Transverse stiffeners and girders Large brackets and primary supports Around openings Areas inaccessible by airless spray

    SSPS-PA2:2004 & PSPC Annex 3

    LR will confirm that the DFT procedures as detailed in PSPC Annex 3 are being followed by the Approved Inspector. The Approved Inspector will demonstrate to LR by a series of spot checks that measurements are taken in the areas as required by the PSPC. The Approved Inspector will also demonstrate that measured DFT's are in accordance with the Type Approval Certificate, the PTDS and the PSPC. Note; The PSPC refers to NDFT (Nominal dry film thickness) and a 90/10 rule. This means 90% of all thickness measurements shall by greater than, or equal to the NDFT, and none of the remaining 10% shall be below 0.9 x NDFT (See Table 1.1,5 of the PSPC). Excessive thickness must also be avoided and be within the coating supplier's maximum values quoted in the PTDS It is not the responsibility of LR to verify the overall condition of the block or tank or to carry out the verification without the presence of the Approved Inspector.

    Excessive thickness: To be repaired in accordance with the suppliers recommendations

    Note:Note:Note:Note: The Pre-delivery (Completion) Inspection should be carried out after sea trials / ballasting whenever possible.

  • 2011 Ver. 04 15

    COATING LOG (PRIMARY SURFACE PREPARATION)

    Sheet No.

    NAME/NO. OF SHIP

    PLATE NUMBERS

    INSPECTION DATE

    ENVIRONMENT

    BEFORE WEATHER CHANGES

    MEASURED TIME

    DRY TEMP. (C) RELATIVE HUMIDITY (%) DEW POINT (%)

    SURFACE TEMP. (C)

    REMARKS:

    SURFACE PREPARATION

    SURFACE PROFILES

    WATER SOLUBLE SALTS (mg/m

    2 of NaCl)

    REMARKS:

    SHOP PRIMER

    MANUFACTURER

    PRODUCT NAME

    IDENTIFICATION MARK/NUMBER

    MANUFACTURES RECOMMENDED D.F.T.

    MEASURED D.F.T.

    CURING

    REMARKS:

    COATING INSPECTORS NAME:

    SIGNATURE

    Form PSP

    Appendix 3Appendix 3Appendix 3Appendix 3 Example Reporting Forms

  • 2011 Ver. 04 16

    COATING LOG (EDGE & WELD CONDITION)

    Sheet No.

    NAME/NO. OF SHIP

    PART OF STRUCTURE (BLOCK /TANK No., etc.)

    CONSTRUCTION STAGE BLOCK ASSEMBLY / ERECTION

    SSSSTEEL CONDITIONTEEL CONDITIONTEEL CONDITIONTEEL CONDITION Type of Defect Repair Method Repair Confirm / Date

    SURFACE TREATMENT

    INSPECTION DATE REMARKS

    METHOD, GRADE

    COATING INSPECTORS NAME:

    SIGNATURE:

    Form SSP

  • 2011 Ver. 04 17

    COATING LOG (COATING APPLICATION)

    Sheet No.

    FIRST COAT SECOND COAT

    BEFORE AFTER BEFORE AFTER

    INSPECTION DATE

    ENVIRONMENT

    DRY TEMP. (C)

    RELATIVE HUMIDITY (%)

    DEW POINT (%)

    SURFACE TEMP. (C)

    WATER SOLUBLE SALTS (mg/m2

    of NaCl) X X X

    DUST X X X

    OIL CONTAMINATION X X

    ABRASIVE INCLUSION X X

    STRIPE COATS

    MANUFACTURER

    PRODUCT NAME OF COATING

    PRODUCT IDENTIFICATION MARK/ NUMBER

    REMARKS:

    COATING INSPECTORS NAME:

    SIGNATURE:

    Form CA

  • 2011 Ver. 04 18

    COATING LOG (DRY FILM THICKNESS MEASUREMENT)

    Sheet No.

    NAME/NO. OF SHIP

    PART OF STRUCTURE (BLOCK /TANK No., etc.)

    CONSTRUCTION STAGE BLOCK ASSEMBLY / ERECTION

    DRY FILM THICKNESS MEASUREMENT

    DRY FILM THICKNESS (m) NUMBER OF POINTS RATIO 320 -

    288 - 320

    0 - 288

    TOTAL 100%

    MAXIMUM THICKNESS (m) MINIMUM THICKNESS (m)

    REMARKS:

    FINAL COATING CONDITION

    TYPE OF DEFECT REPAIR METHOD REPAIR DATE / CONFIRMED

    COATING INSPECTORS NAME:

    SIGNATURE:

    Form DFT

  • Lloyd's Register, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause as the Lloyd's Register Group. The Lloyd's Register Group assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Lloyd's Register Group entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract. Lloyds Register 2011