REPUBLIKA E KOSOVËS / REPUBLIKA KOSOVA / REPUBLIC OF KOSOVA QEVERIA E KOSOVËS / VLADA KOSOVA /GOVERNMENT OF KOSOVA MINISTRIA E ENERGJISE DHE MINIERAVE MINISTARSTVO ENERGIJE I RUDARSTVA MINISTRY OF ENERGY AND MINING REQUEST FOR EXPRESSIONS OF INTEREST FOR THE DEVELOPMENT OF THE SIBOVC LIGNITE FIELD IN KOSOVO AND ASSOCIATED POWER GENERATION CAPACITY Offering: In accordance with Republic of Kosovo policy, the Ministry of Energy and Mining, on behalf of the Project Steering Committee (“PSC”), is soliciting through a Pre-Qualification Memorandum expressions of interest from qualified private investors in the Project, which encompasses the following components: a) Construction of a new electric power generation plant, ‘Kosova e Re Power Plant’ (“KRPP”) with an estimated installed capacity of initially 500 MW with the possibility of expanding up to 1000 MW and (limited) associated interconnection facilities; b) Immediate development of the Sibovc Lignite Field to provide lignite fuel for both the existing lignite fired generation in Kosovo (Kosovo A and Kosovo B) and the new KRPP generation unit(s) as they enter service; and c) Private sector participation in Kosovo B, an existing lignite fired electric power generation plant. Schedule: The Transaction Advisors of the PSC will review the credentials submitted and reserve the right to request additional information if necessary to confirm compliance with the criteria established by the PSC. The timetable for pre-qualification and short-listing is as follows: Interested investors are invited to a conference and site visit in Prishtina during 20-21 January 2010. Applicants must submit their credentials for pre-qualification by 29 January 2010. Announcement of the short-list of pre-qualified bidders by end of Q1 2010. For Information on Prequalification and to access the Pre-Qualification Memorandum: Ministry of Energy and Mining – LPTAP Project Office Attention: Mr Lorik Haxhiu Arberia, 24 Maji Street, No.15 Prishtina 10000, Republic of Kosovo Telephone: +381 38 213 770 E-mail: [email protected] Web: www.lignitepower.com

Upload: lorik-haxhiu

Post on 26-Mar-2016

213 views

Category:

Documents


0 download

DESCRIPTION

• Interested investors are invited to a conference and site visit in Prishtina during 20-21 January 2010. • Applicants must submit their credentials for pre-qualification by 29 January 2010. • Announcement of the short-list of pre-qualified bidders by end of Q1 2010. QEVERIA E KOSOVËS / VLADA KOSOVA /GOVERNMENT OF KOSOVA MINISTRIA E ENERGJISE DHE MINIERAVE MINISTARSTVO ENERGIJE I RUDARSTVA MINISTRY OF ENERGY AND MINING

TRANSCRIPT

Page 1: LPTAP_ADVERTISEMENT_EOI_18DEC09_FINAL

REPUBLIKA E KOSOVËS / REPUBLIKA KOSOVA / REPUBLIC OF KOSOVA

QEVERIA E KOSOVËS / VLADA KOSOVA /GOVERNMENT OF KOSOVA

MINISTRIA E ENERGJISE DHE MINIERAVE MINISTARSTVO ENERGIJE I RUDARSTVA

MINISTRY OF ENERGY AND MINING

REQUEST FOR EXPRESSIONS OF INTEREST FOR THE

DEVELOPMENT OF THE SIBOVC LIGNITE FIELD IN KOSOVO AND ASSOCIATED POWER GENERATION CAPACITY

Offering: In accordance with Republic of Kosovo policy, the Ministry of Energy and Mining, on behalf of the Project Steering Committee (“PSC”), is soliciting through a Pre-Qualification Memorandum expressions of interest from qualified private investors in the Project, which encompasses the following components:

a) Construction of a new electric power generation plant, ‘Kosova e Re Power Plant’ (“KRPP”) with an estimated installed capacity of initially 500 MW with the possibility of expanding up to 1000 MW and (limited) associated interconnection facilities;

b) Immediate development of the Sibovc Lignite Field to provide lignite fuel for both the existing lignite fired generation in Kosovo (Kosovo A and Kosovo B) and the new KRPP generation unit(s) as they enter service; and

c) Private sector participation in Kosovo B, an existing lignite fired electric power generation plant.

Schedule: The Transaction Advisors of the PSC will review the credentials submitted and reserve the right to request additional information if necessary to confirm compliance with the criteria established by the PSC. The timetable for pre-qualification and short-listing is as follows:

• Interested investors are invited to a conference and site visit in Prishtina during 20-21 January 2010. • Applicants must submit their credentials for pre-qualification by 29 January 2010. • Announcement of the short-list of pre-qualified bidders by end of Q1 2010.

For Information on Prequalification and to access the Pre-Qualification Memorandum:

Ministry of Energy and Mining – LPTAP Project Office Attention: Mr Lorik Haxhiu

Arberia, 24 Maji Street, No.15 Prishtina 10000, Republic of Kosovo

Telephone: +381 38 213 770 E-mail: [email protected]