DATA SHEET
Construction of Pump House for the LPDS (3mx3m)
District :Erode Village : Thoddampalayam
Taluk :Sathyamangalam
Rate Amount
Rs Ps Rs. Ps
1 2 3 4 5 6
1 1m3
Earthwork excavating and depositing
on bank within initial lead of 10 M.& initial lift of 2M.
In hard stiff clay,stiff black cotton, hard red earth, shales,
murram, gravel, stoneyearth, and earth mixed with
small size boulders as per S.S.20.B.and S.I.62. 57.50 1m3
57.50
for foundation
2 1m3
supplying and filling the basement with filling sand
in layers of not more than 15cm thick as well ramped
consolidated..etc 633.50 1m3
633.50
3 1m3
Filling charges 9.00 1m3
9.00
642.50
SUB DATA
CEMENT MORTAR 1:4 FOR 1Cu.m.
360.0 Kg. Cement 4400.00 1 M.T 1584.00
1m3
Sand 633.50 1m3
633.50
1m3
Mixing charges 29.70 1m3
29.70
2247.20
Rate For 1 Cu.M. = Rs. 2247.20
CEMENT MORTAR 1:5 FOR 1Cu.m.
288.0 Kg. Cement 4400.00 1 M.T 1267.20
1.0 Cu.M Sand 633.50 1 Cu.M 633.50
1.0 Cu.M 29.70 1 Cu.M 29.70
1930.40
Rate For 1 Cu.M. = Rs. 1930.40
MAIN DATA
4 Cost of cement concrete 1:5:10 using 40 m.m.
size H.B.Stones For 10 Cu.M.
9.0 Cu.M H.B.Stones 40 m.m. size 594.50 1 Cu.M 5350.50
4.5 Cu.M Cement mortar 1:5 1930.40 1 Cu.M 8686.801.8 Nos. Mason II class 162.00 1 No. 291.60
17.7 Nos. Muzdoor class I 112.00 1 No. 1982.40
14.1 Nos. Muzdoor class II 101.00 1 No. 1424.10
17735.40
Rate For 1 Cu.M. = Rs. 1773.54 1301.64
1
1 2 3 4 5 6
Sl.No. Quantity Description of item Unit
-
7/28/2019 Lps Estimte & Rcc Room
2/39
5 Random rubblemasonry in C.M.1:5 for 10 Cu.M
10.0 Cu.m Random rubble stone for masonry work 296.00 1 Cu.M 2960.00
1.0 Cu.M Bond stone 394.50 1 Cu.M 394.50
3.4 Cu.M Cement mortar 1:5 1930.40 1 Cu.M 6563.36
7.1 Nos. Mason I class 179.00 1 No. 1270.90
10.6 Nos. Mason II class 162.00 1 No. 1717.20
14.1 Nos. Muzdoor class I 112.00 1 No. 1579.20
14.1 Nos. Muzdoor class II 101.00 1 No. 1424.1015909.26
Rate For 1 Cu.M. = Rs. 1590.92 1590.93
6 Brickwork in CM 1:5 using best country bricks of size 83/4x4 1/2x 2 3/4
for 2.83 m
1300 nos Bricks 2421.00 1000nos 3147.30
0.708 m3
C M 1:5 1930.40 1 m3
1366.72
1 No Mason I class 179.00 1 No. 179.00
3 Nos Mason II class 162.00 1 No. 486.00
2 Nos Muzdoor class I 112.00 1 No. 224.00
6Nos Muzdoor class II 101.00 1 No. 606.006009.02
Rate For 1 Cu.M. = Rs. 2123.33 600.9
7 Plastering with cement mortar 1:5
12m.m. thick for 1 sq.m.
0.14 Cu.m Cement mortar 1:5 1930.40 1 Cu.M 270.26
1.1Nos Mason I class 179.00 1 No. 196.90
0.5No Muzdoor class I 112.00 1 No. 56.00
1.10 Nos. Muzdoor class II 101.00 1 No. 111.10
634.26
Rate For 1 Sq.M. = Rs. 63.42 63.43
8
a r ca ng an supp y ng an erec ng requ re no ostructural steel members like MS angle as purlins of size
65mmx65mm
1 kg Cost of MS angles 52.00 1 kg 52.00
1m2
Fabrication and erection labour charges 12.30 1m2
12.30
Add 2.50% for wastage 1.3
65.60
Rate For 1 Kg = Rs. 65.60
9 10 m2
sheet 6mm thck of approved quality for roofing with
necessary U and J bolts and nuts,bitumen GI washers
etc..
11 m2
AC corrugated sheet 138.00 1m2
1518.0020Nos Adjustable GI J bolt of 6mm dia 5.00 1No 100.00
2.20 Nos Fitters II nd class 146.00 1No 321.20
1.1 Nos Carpenter I st claa 176.00 1No 193.60
3.20 Nos Muzdoor class I 112.00 1 No. 358.40
20 Nos Bitumen Washers 15mm dia 1.00 1 No. 20.00
Rate for 1 Sq.m-Rs 251.12 2511.20
-
7/28/2019 Lps Estimte & Rcc Room
3/39
10 100 m2
White Washing 2 coats freshly burnt shell lime etc
0.07 m3
Shell lime 850.00 1m3 59.50
1.60 Nos Mason II class 162.00 1 No. 259.20
0.50 Nos Muzdoor class I 112.00 1 No. 56.00
2.70 Nos Muzdoor class II 101.00 1 No. 272.70
LS Gum ganjee water,Brush,Scaffolding charges ...etc... 7.60
655.00
Rate for 1 Sq.m-Rs 6.55
1110 m
2 Painting 2coats on new iron works for door without
priming coats etc
2.22 litres Enamel paint 150.00 Litre 333.00
1.10 Nos Painter I st class 143.00 1 No 157.30
490.30
Rate for 1 Sq.m-Rs 49.03
Certified that the above rates are adopted as per the current P.W.D standard shedule ofrates for the year 2008-09
Counter signed
Assistant Executive Engineer, Junior Engineer,
Agricultural Engineering Department, Agricultural Engg Department,
Gobichettipalayam Gobichettipalayam
-
7/28/2019 Lps Estimte & Rcc Room
4/39
Construction of Pump House for the LPDS (3mx3m)
District :Erode Village : Thoddampalayam
Taluk :Sathyamangalam
Length Breadth Depth Quantity Rate Amount
M. M. M. M3
1 2 3 4 5 6 7 8 9
1 Earthwork excavating and
depositing on bank within
initial lead of 10 M.&
initial lift of 2M.In hard stiff clay
stiff black cotton, hard red earth,
shales,murram, gravel, stoneyearth,
and earth mixed with small size
boulders as per S.S.20.B.and S.I.62.
For foundation
1x1 11.72 0.60 0.90 6.33
1x1 1.20 0.50 0.15 0.09
6.42 57.50 369.15
2
Cost of cement concrete 1:5:10 using
40 m.m.HB stony julli
All round Main Wall 1x1 11.72 0.60 0.15 1.05
For step 1x1 1.20 0.50 0.15 0.09
1.14 1773.54 2030.35
3Random rubblemasonry in C.M.1:5
BGL:- All round Main Wall 1x1 11.72 0.45 0.75 3.96
AGL:- Basement all round 1x1 11.72 0.45 0.60 3.16
7.12 1590.92 11327.19
4 Brick work in CM1:5
Back side Wall 1x1 3.46 0.23 2.40 1.91
Front Side wall 1x1 0.23 2.10 1.67
Side Walls 1x2 2.40 0.23 2.40+2.10/2 2.48
For Step1 1x1 0.50 0.20 0.12
For Step2 1x1 0.25 0.20 0.06
6.25
Deduction:- For Door 1x1 0.23 2.00 0.46
For Cement jolly work 1x1 0.23 0.45 0.065.72 2123.33 12151.82
5 supplying and filling the basement with filling sand
in layers of not more than 15cm thick as well ram
consolidated..etc
For Basement 1x1 2.18 0.30 1.82
1.82 642.50 1168.14
Sl.
no.Nos.Description of work
1.20
2.78
1.00
0.60
1.20
3.46
DETAILED CUM ABSTRACT ESTIMATE
-
7/28/2019 Lps Estimte & Rcc Room
5/39
6 Supplyng and fixing of MS Door of
size 1mx2m 1No 4500.00 4500.00
7
Supplyng and fixing of RCC jolly of size-
0.60mx0.45m 1No 300.00 300.00
8 Flooring concrete in CC1:5:10 1x1 2.78 2.18 0.15 0.91 1773.54 1612.25
9 Fabricating and supplying and erecting
required no of structural steel members
like MS angle as purlins of size ISA6565-
6mm thick
Purlins 1x4 5.80 kg/m 92.80 65.60 6087.68
10 Supplying and laying of asbestos cment
fully corrugated sheet 6mm thck of
approved quality for roofing with
necessary U and J bolts and
nuts,bitumen GI washers etc..
1x1 3.00 10.50 251.12 2636.76
11 Plastering in cm1:5-12mm thick
InnerSide:Back wall 1x1 3.00 2.40 7.20
Front Wall 1x1 2.40 2.10 5.04
Side Wall 1x2 3.00 2.40+2.10/2 13.5
OuterSide:Back wall 1x1 3.46 2.40 8.30
Front Wall 1x1 3.46 2.10 7.27
Side Wall 1x2 2.40 2.40+2.10/2 10.8
For Step1 1x1 1.20 0.45 0.54
For Step2 1x1 1.20 0.45 0.54
Floor 1x1 3.00 3.00 9.0062.19
Deduction:- For Door 1x1 2.00 2.00
For Cement jolly work 1x1 0.45 0.27
59.92 63.42 3800.13
12 White Washing 2 coats freshly burnt
shell lime etc 1x1 59.92 6.55 392.48
13Painting 2coats on new iron works for
door without priming coats etc
For door1x2 1.00 2.00 4.00 49.03 196.12
46572.06
or 47000
1.00
0.60
3.50
4.00
-
7/28/2019 Lps Estimte & Rcc Room
6/39
-
7/28/2019 Lps Estimte & Rcc Room
7/39
-
7/28/2019 Lps Estimte & Rcc Room
8/39
Construction of Pump House for the LPDS (3mx3m)
District :Erode Village : Thoddampalayam
Taluk :Sathyamangalam
Length Breadth Depth Quantity Rate Amount
M. M. M. M3
1 2 3 4 5 6 7 8 9
1 Earthwork excovating and
depositing on bank within
initial lead of 10 M.&
initial lift of 2M.In hard stiff clay
stiff black cotton, hard red earth,
shales,murram, gravel, stoneyearth,
and earth mixed with small size
boulders as per S.S.20.B.and S.I.62.
For foundation
1x1 12.92 0.60 0.90 6.98
1x1 1.20 0.50 0.15 0.09
7.07 57.50 406.34
2
Cost of cement concrete 1:5:10 using
40 m.m.HB stony julli
All round Main Wall 1x1 12.92 0.60 0.15 1.16
For step 1x1 1.20 0.50 0.15 0.09
1.25 1773.54 2221.89
3Random rubblemasonry in C.M.1:5
BGL:- All round Main Wall 1x1 12.92 0.45 0.75 4.36
AGL:- Basement all round 1x1 12.92 0.45 0.60 3.49
7.85 1590.92 12486.97
4 Brick work in CM1:5
Back side Wall 1x1 3.46 0.23 2.40 1.91
Front Side wall 1x1 0.23 2.10 1.67
Side Walls 1x2 3.00 0.23 2.40+2.10/2 3.11
For Step1 1x1 0.50 0.20 0.12
For Step2 1x1 0.25 0.20 0.06
6.87
Deduction:- For Door 1x1 0.23 2.00 0.46
For Cement jolly work 1x1 0.23 0.45 0.066.34 2123.33 13470.40
5 supplying and filling the basement with filling sand
in layers of not more than 15cm thick as well ram
consolidated..etc
For Basement 1x1 2.78 0.30 2.32
2.32 642.50 1489.65
2.78
0.60
DETAILED CUM ABSTRACT ESTIMATE
Sl.
no.Description of work Nos.
1.00
3.46
1.20
1.20
-
7/28/2019 Lps Estimte & Rcc Room
9/39
-
7/28/2019 Lps Estimte & Rcc Room
10/39
-
7/28/2019 Lps Estimte & Rcc Room
11/39
-
7/28/2019 Lps Estimte & Rcc Room
12/39
Sl
No.
1 Earth work excavation and depositing on
bank within initial lead and initial lift in
hard stiff clay, stiff black cotton, hard red
earth slabs etc as per Ss 20B & SI 62 for foundation
1 x 1 79.20 0.50 0.90
2 Sand filling with filling sand including
watering etc. for
Foundation 1 x 1 79.20 0.50 0.10
Basement 1 x 1 1.20 1.20 0.30
Steps 1 x 1 1.20 1.00 0.10
3 CC 1:4:8 using 40mm HBGS metal for
Foundation 1 x 1 79.20 0.50 0.20
Basement for step 1 x 1 1.20 1.00 0.20
Basement 1 x 1 1.20 1.20 0.15
4 R.R. Masonry in CM 1:5 for
Footing 1 x 1 79.20 0.50 0.60
Basement 1 x 1 6.92 0.45 0.45
5 Brick work in CM 1:5 using II Class
Bricks of size 22cm x 11cm x 7.5cm for super structures.
All round main Wall 1 x 1 79.00 0.23 3.05
Deduction for Door 1 x 1 1.00 0.23 2.00
Deductions for Jolly 1 x 1 0.60 0.23 0.45
Deduction for Lintel 1 x 1 1.20 0.23 0.10
Description of Work L B D
-
7/28/2019 Lps Estimte & Rcc Room
13/39
Step-I 1 x 1 1.20 0.80 0.00
Step-II 1 x 1 1.20 0.60 0.00
Step-III 1 x 1 1.20 0.40 0.00
Step-IV 1 x 1 1.20 0.20 0.00
6 Centering charges lintel and roof slab
including strutting
Roof Slab 1 x 1 28.00 11.50
Roof Slab Side 1 x 1 79.00 0.10
Deduct Wall placement 1 x 1 6.92 0.23
Lintel Bottom 1 x 1 1.00 0.23
Lintel Front side 1 x 1 1.00 0.03
Lintel Back side 1 x 1 1.20 0.10
Lintel side 1 x 2 0.23 0.10
7 Supplying and fabricating and placing in
osition of steel rods for RCC slab1 x 1
8 Supplying and fixing of RCC jolly of size
0.60M x 0.45M
1 x 1
9 RCC in 1:2:4 using 20mm HBGS jelly for
roof slab, sunshade and lintel
Roof Slab 1 x 1 28.00 11.50 0.10
Lintel 1 x 1 1.20 0.23 0.10
1 x 1 0.075+0.052.00
10 Supplying and fixing of M.S. Door of size1.00Mx2.00M in M.S. angle 40mm x
40mm x 6mm M.S. angle
40mmx40mmx6mm MS flat
1 x 1
11 Plastering in CM 1:5, 20mm thick
Pump Room inner side 1 x 4 1.50 3.05
Sunshade 1.00 0.45
-
7/28/2019 Lps Estimte & Rcc Room
14/39
Pump Room Outer side 1 x 4 1.96 4.05
Steps, Treads 1 x 4 1.20 0.20
Side of step-IV 1 x 2 0.80 0.15
Side of step III 1 x 2 0.60 0.15
Side of step VI 1 x 2 0.40 0.15
Side of Step-I 1 x 2 0.20 0.15
Sides of soffits of Door 1 x 1 6.00 0.23
Sides of soffits of Jolly 1 x 1 2.10 0.23
Deduct for Door 1 x 2 1.00 2.00
Deduct for Jolly 1 x 2 0.60 0.45
Floor Plastering 1 x 1 1.50 1.50
12 Plastering in CM 1:3- 12mm thick for
Ceiling Inner side of pump Room 1 x 1 28.00 1.50
Ceiling outer side Projection 1 x 1 8.64 0.20
Ceiling outer side face 1 x 1 9.44 0.10
Sunshade Bottom side 1 x 1 1.00 0.45
1 x 1 0.075+0.05
2.00
Sunshade of Top side 1 x 1 1.00 0.45
13 Pointing with CM 1:3 in RR Masonry
1 x 1
14 Weathering course over RCC ro9of
including fixing one course of pressed tile
etc. complete
1 x 1 2.36 2.36
15 Colour washing two coats with approved
Cement paint for cement plastered
surfaces & Sunshades top and side surface
1 x 1
Basement 9.60 0.45
Sunshade side face 1.90
-
7/28/2019 Lps Estimte & Rcc Room
15/39
16 White washing two coats for ceiling
surfaces and sunshade bottom
1 x 1
T ESTIMATE
Vill :
Taluk Hosur
Dist :
Fiel :
Name of work : Construction of Pump Room
Sl
No.
1 5.60 m3 50 1 m
3 280
2 1.17 m3 322.3 1 m
3 377.09
Qty Rate Per Amount
-
7/28/2019 Lps Estimte & Rcc Room
16/39
5 3.63 m3 1761.86 1 m
3 6,395.55
6 5.348 m2 382 1 m
2 2,042.92
7 0.30 Qtl 3292.6 1Qtl 987.78
15 5.37 m2 5.5 1 m
2 29.53
3 1.70 m3 1656.37 1 m
3 2,815.82
8 1No. 500 1No. 500
4 3.89 m3 1379.69 1 m3 5,366.99
10 1No. 3850 1No 3,850.00
9 0.613 m3 2677.86 1 m
3 1,641.52
12 5.94 m2 61.28 1 m
2 364
11 34.34 m2 96.87 1 m
2 3,326.51
14 32.66 m2 7.75 1 m2 253.11
13 5.57 m2 272.27 1 m
2 1,516.54
16 4.32 m2 55.42 1 m
2 239.41
-
7/28/2019 Lps Estimte & Rcc Room
17/39
Ass
ista
nt
Exe
.
En
gin
eer
Assistan
t
Enginee
r
Agr
icul
tur
al
En
gin
eeri
ng
Dept.
Hos
ur
13.23
30,000.00
17 L.S.
-
7/28/2019 Lps Estimte & Rcc Room
18/39
35.640 5.60m3 8 0.30479951 2.438 28 28.2
8.25 0.30479951 2.515 11.5
8.50.30479951 2.591 79 79.2
8.75 0.30479951 2.667
3.960 0.62 9 0.30479951 2.743
0.432 0.43 9.25 0.30479951 2.819
0.120 0.12 9.5 0.30479951 2.896
4.512 0.17 m3 9.75 0.30479951 2.972
10 0.30479951 3.048
10.25 0.30479951 3.124
10.5 0.30479951 3.2
7.920 1.24 10.75 0.30479951 3.277
0.240 0.24 11 0.30479951 3.353
0.216 0.22 11.25 0.30479951 3.429
8.376 1.70 m3 11.5 0.30479951 3.505
11.75 0.30479951 3.581
12 0.30479951 3.658
12.25 0.30479951 3.734
23.760 2.49 12.5 0.30479951 3.81
1.401 1.4 12.75 0.30479951 3.886
25.161 3.89 m3 13 0.30479951 3.962
13.25 0.30479951 4.039
13.5 0.30479951 4.115
13.75 0.30479951 4.191
14
0.30479951 4.267
14.25 0.30479951 4.343
55.419 3.82 14.5 0.30479951 4.42
0.460 0.46 14.75 0.30479951 4.496 0.460
0.062 0.06 15 0.30479951 4.572 0.062
0.028 0.03 15.25 0.30479951 4.648 0.028
ContentsContents
-
7/28/2019 Lps Estimte & Rcc Room
19/39
0.000 0.144 15.5 0.30479951 4.724
0.000 0.108 15.75 0.30479951 4.801
0.000 0.072 16 0.30479951 4.877
0.000 0.036 16.25 0.30479951 4.953
54.869 3.63 m3 16.5 0.30479951 5.029
16.750.30479951 5.105
17
0.30479951 5.182
17.25 0.30479951 5.258
322.000 5.57 17.5 0.30479951 5.334
7.900 0.944 17.75 0.30479951 5.41
1.592 1.592 18 0.30479951 5.486 1.592
0.230 0.23 18.25 0.30479951 5.563
0.025 0.03 18.5 0.30479951 5.639
0.120 0.12 18.75 0.30479951 5.715
0.046 0.046 19 0.30479951 5.791
328.729 5.348 m2 19.25 0.30479951 5.867
19.5 0.30479951 5.944
19.750.30479951 6.02
0.000 0.30 Qtl. 20 0.30479951 6.096
20.25 0.30479951 6.172
0.000 1 No. 20.5
0.30479951 6.248
20.75 0.30479951 6.32521
0.30479951 6.401
21.25 0.30479951 6.477
32.200 0.557 21.5 0.30479951 6.553
0.030 0.008 21.75 0.30479951 6.629
0.028 22 0.30479951 6.706. .
32.258 0.613 m3 22.5 0.30479951 6.858
22.75 0.30479951 6.934
0.000 1No. 23
0.30479951 7.01
23.25 0.30479951 7.087
23.5 0.30479951 7.163
23.75 0.30479951 7.239
18.300 14.4 24 0.30479951 7.315
0.208
-
7/28/2019 Lps Estimte & Rcc Room
20/39
31.752 18.81 24.25 0.30479951 7.391
0.960 0.96 24.5 0.30479951 7.468
0.240 0.24 24.75 0.30479951 7.544
0.180 0.18 25 0.30479951 7.62
0.120 0.12 25.25 0.30479951 7.696
0.060 0.06 25.50.30479951 7.772
1.380 1.38 25.75 0.30479951 7.849
0.483 0.48 26 0.30479951 7.925
4.000 4 26.25 0.30479951 8.001 4.000
0.540 0.54 26.5 0.30479951 8.077 0.540
2.250 2.25 26.75 0.30479951 8.153
51.185 34.34 m3 27 0.30479951 8.23
27.25 0.30479951 8.306
27.5 0.30479951 8.382
27.75 0.30479951 8.458
42.000 2.25 28 0.30479951 8.534
1.728 1.728 28.25 0.30479951 8.611
0.944 0.944 28.5 0.30479951 8.687
0.450 0.45 28.75 0.30479951 8.763
0.119 29 0.30479951 8.839
29.25 0.30479951 8.915
0.450 0.45 29.5 0.30479951 8.992
45.691 5.94 m2 29.75 0.30479951 9.068
30 0.30479951 9.144
30.25 0.30479951 9.22
30.5 0.30479951 9.296
4.320 30.75 0.30479951 9.373
31 0.30479951 9.449
31.25 0.30479951 9.525
31.5 0.30479951 9.601
31.75
0.30479951 9.677
5.570 5.57 m2
32 0.30479951 9.75432.25 0.30479951 9.83
32.5
0.30479951 9.906
51.185 32.66 m2 32.75 0.30479951 9.982
33 0.30479951 10.058
0.118
4.32 m2
-
7/28/2019 Lps Estimte & Rcc Room
21/39
33.25
0.30479951 10.135
5.37 m2 33.5 0.30479951 10.211
-
7/28/2019 Lps Estimte & Rcc Room
22/39
-
7/28/2019 Lps Estimte & Rcc Room
23/39
Hosur
-
7/28/2019 Lps Estimte & Rcc Room
24/39
Sl
No.
1 Earth work excavation and depositing on
bank within initial lead and initial lift in
hard stiff clay, stiff black cotton, hard red
earth slabs etc as per Ss 20B & SI 62 for foundation
1x1 6.92 0.9 0.9
2 Sand filling with filling sand including
watering etc. for
Foundation 1x1 6.92 0.9 0.1
Basement 1x1 1.2 1.2 0.3
Steps 1x1 1.2 1 0.1
3 CC 1:4:8 using 40mm HBGS metal for
Foundation 1x1 6.92 0.9 0.2
Basement for step 1x1 1.2 1 0.2
Basement 1x1 1.2 1.2 0.15
4 R.R. Masonry in CM 1:5 for
Footing 1x1 6.92 0.6 0.6
Basement 1x1 6.92 0.45 0.45
5 Brick work in CM 1:5 using II Class
Bricks of size 22cm x 11cm x 7.5cm for super structures.
All round main Wall 1x1 6.92 0.23 2.4
Deduction for Door 1x1 1 0.23 2
Deductions for Jolly 1x1 0.6 0.23 0.45
Deduction for Lintel 1x1 1.2 0.23 0.1
Description of Work Nos. L B D
-
7/28/2019 Lps Estimte & Rcc Room
25/39
Step-I 1x1 1.2 0.8 0.15
Step-II 1x1 1.2 0.6 0.15
Step-III 1x1 1.2 0.4 0.15
Step-IV 1x1 1.2 0.2 0.15
6 Centering charges lintel and roof slab
including strutting
Roof Slab 1x1 2.36 2.36 -
Roof Slab Side 1x1 9.44 - 0.1
Deduct Wall placement 1x1 6.92 0.23 -
Lintel Bottom 1x1 1 0.23 -
Lintel Front side 1x1 1 - 0.025
Lintel Back side 1x1 1.2 0.1 -
Lintel side 1x2 0.23 - 0.1
7 Supplying and fabricating and placing in
osition of steel rods for RCC slab1x1 - - -
8 Supplying and fixing of RCC jolly of size
0.60M x 0.45M
1x1 - - -
9 RCC in 1:2:4 using 20mm HBGS jelly for
roof slab, sunshade and lintel
Roof Slab 1x1 2.36 2.36 0.1
Lintel 1x1 1.2 0.23 0.1
0.075+0.
2
10 Supplying and fixing of M.S. Door of size
1.00Mx2.00M in M.S. angle 40mm x
40mm x 6mm M.S. angle
40mmx40mmx6mm MS flat
1x1 - - -
11 Plastering in CM 1:5, 20mm thick
Sunshade 1x1 1 0.45
-
7/28/2019 Lps Estimte & Rcc Room
26/39
Pump Room inner side 1x4 1.5 - 2.4
Pump Room Outer side 1x4 1.96 - 2.4
Steps, Treads 1x4 1.2 0.2 -
Side of step-IV 1x2 0.8 - 0.15
Side of step III 1x2 0.6 - 0.15
Side of step VI 1x2 0.4 - 0.15
Side of Step-I 1x2 0.2 - 0.15
Sides of soffits of Door 1x1 6 - 0.23
Sides of soffits of Jolly 1x1 2.1 - 0.23
Deduct for Door 1x2 1 - 2
Deduct for Jolly 1x2 0.6 - 0.45
Floor Plastering 1x1 1.5 1.5 -
12 Plastering in CM 1:3- 12mm thick for
Ceiling Inner side of pump Room 1x1 1.5 1.5 -
Ceiling outer side Projection 1x1 8.64 0.2 -
Ceiling outer side face 1x1 9.44 - 0.1
Sunshade Bottom side 1x1 1 0.45 -
0.075+0.
2
Sunshade of Top side 1x1 1 0.45 -
13 Pointing with CM 1:3 in RR Masonry
14 Weathering course over RCC ro9of
including fixing one course of pressed tile
etc. complete1x1 2.36 2.36 -
15 Colour washing two coats with approved
Cement paint for cement plastered
surfaces & Sunshades top and side surface
1x1
Sunshade side face 1x1 1.9 -
Basement 1x1 9.6 - 0.45
-
7/28/2019 Lps Estimte & Rcc Room
27/39
16 White washing two coats for ceiling
surfaces and sunshade bottom
1x1 - - -
T ESTIMATE
Vill : Poonapalli
Taluk : Hosur
Dist : Krishnagiri
Fiel : 24, 29 & 30
Name of work : Construction of Pump Room
Sl
No.
Qty Descript
ion
Rate Per Amount
-
7/28/2019 Lps Estimte & Rcc Room
28/39
1 5.60 m3 Earth
work
excavati
on and
depositi
ng on
bankwithin
initial
lead and
initial
lift in
hard stiff
clay,
stiff
black
cotton,hard red
earth
slabs etc
as per Ss
20B &
SI 62 for
foundati
50 1 m3 280
2 1.17 m3 Sand
filling
withfilling
sand
includin
g water
etc.
322.3 1 m3 377.09
3 1.70 m3 CC
1:4:8
using
40mm
HBGS
Metal
1656.37 1 m3 2,815.82
4 3.89 m3 R.R.
Masonry
in CM
1:5
1379.69 1 m3 5,366.99
-
7/28/2019 Lps Estimte & Rcc Room
29/39
5 3.63 m3 Brick
work in
CM 1:5
using II
Class
Bricks
of size22cm x
11cm x
7.5cm
all round
main
walls
1761.86 1 m3 6,395.55
6 5.348 m2 Centerin
g
charges
lintel
and roof
slab
includin
g
strutting
382 1 m2 2,042.92
7 0.30 Qtl Supplyin
g and
fabricating and
placing
in
position
of steel
rods for
RCC
slab
3292.6 1Qtl 987.78
8 1No. Supplying &
fixing &
RCC
ell
500 1No. 500
-
7/28/2019 Lps Estimte & Rcc Room
30/39
15 5.37 m2 White
washing
5.5 1 m2 29.53
Ass
ista
ntExe
.
En
gin
eer
Assistan
t
Enginee
r
9 0.613 m3 RCC
1:2:4
using
20mm
ell
2677.86 1 m3 1,641.52
10 1No. Supplyin
g andfixing of
M.S.
Door
3850 1No 3,850.00
11 34.34 m2 Plasterin
g in
CM 1:5
96.87 1 m2 3,326.51
12 5.94 m2 Ceiling
Plasterin
1:3
61.28 1 m2 364
13 5.57 m2 Weather
ing
Course
272.27 1 m2 1,516.54
14 32.66 m2 Colour
washing
7.75 1 m2 253.11
16 4.32 m2 Pointing
in CM
1:3
55.42 1 m2 239.41
17 Unfores
eenItems
L.S. 13.23
Total #######
-
7/28/2019 Lps Estimte & Rcc Room
31/39
Agr
icul
tur
al
En
gineeri
ng
Dep
t.
Agricultural
Enginee
ring
Dept.
Hos
ur
-
7/28/2019 Lps Estimte & Rcc Room
32/39
5.60m3
0.62
0.43
0.12
0.17 m3
1.24
0.24
0.22
1.70 m3
2.49
1.4
3.89 m3
3.82
0.46
0.06
0.03
Contents
-
7/28/2019 Lps Estimte & Rcc Room
33/39
0.144
0.108
0.072
0.036
3.63 m3
5.57
0.944
1.592
0.23
0.03
0.12
0.046
5.348 m2
0.30 Qtl.
1 No.
0.557
0.008
0.613 m3
1No.
0.208
-
7/28/2019 Lps Estimte & Rcc Room
34/39
14.4
18.81
0.96
0.24
0.18
0.12
0.06
1.38
0.48
4
0.54
2.25
34.34 m3
2.25
1.728
0.944
0.45
0.45
5.94 m2
5.57 m2
32.66 m2
0.118
4.32 m2
-
7/28/2019 Lps Estimte & Rcc Room
35/39
5.37 m2
-
7/28/2019 Lps Estimte & Rcc Room
36/39
-
7/28/2019 Lps Estimte & Rcc Room
37/39
-
7/28/2019 Lps Estimte & Rcc Room
38/39
-
7/28/2019 Lps Estimte & Rcc Room
39/39
Hosur