lpr ppt sept2011 (1)
TRANSCRIPT
![Page 1: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/1.jpg)
![Page 2: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/2.jpg)
Project Overview• The community that nurtures nature in urban living, Lions Park Residences that offers low-rise
condominium units, strategically located near commercial destinations, the Makati and Ortigas business districts as well as the new NAIA 3.
The lush surroundings of this urban community boast of amenities such as a multi-purpose hall, a landscaped park, a resort-type swimming pool and a playground complete with a fish pond and a butterfly garden.
It also has barbeque pits ideal for family picnics and commercial area for all your various personal needs.• Everything you need is just a few steps away from this environment-friendly community, feel secured and
at home as you choose from a Studio, 1-bedroom unit, 2-bedroom unit or 3 bedroom unit. Truly, Lions Park Residences is undoubtedly an excellent investment especially to OFWs and retirees who are looking for a place to stay or a home to retire in Manila.
• To address the needs of the home owners, the Quadrillion Property Management (QPMI), the property management team of Lions Park, offers leasing and professional management .
Realize your dream home today.
![Page 4: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/4.jpg)
![Page 5: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/5.jpg)
Amenities
The Pavilion
![Page 6: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/6.jpg)
Amenities
Lap Pool & Kiddie Pool
![Page 7: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/7.jpg)
Amenities
Central Park
Koi Pond
Children’s Play area
Water Bubblers
![Page 8: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/8.jpg)
How to get there:
At Lions Park Residences, you will not
have to worry for everything is just a
few meters away. This lush community
is strategically located at Sta. Ana
Drive, Sun Valley, Parañaque City. It is
also accessibly situated near business
centers and transportation hubs, only
10-15 minutes to Makati CBD, 25-35
minutes to Ortigas CBD and 5 minutes
to the NAIA 2.
![Page 9: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/9.jpg)
Building Features
Elevated water tanks 24/7 water supply
Underground drainage & sewerage system
2.4 meter-wide corridors
2 meter-wide entrance
Elevator
Generator for common areas
![Page 10: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/10.jpg)
Affordability
Reservation fee starting at P15,000
As low as P10-15,000 monthly amortization
Flexible payment schemes
(down payment – payable up to 16 months; balance – payable up to 30 years through Pag-IBIG)
Financing through in-house, bank or PAG-IBIG.
![Page 11: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/11.jpg)
Unit Features (GOLD)RESIDENTIAL AREAA. Floor Finishes Living, Dining & Kitchen Ceramic tiles with painted baseboard Bedroom Vinyl planks with painted baseboard Toilet Unglazed ceramic tiles
B. Wall Finishes With ficemboard partitions Interior walls Painted Finish Toilet Painted paint cement finish above glazed tiles
C. Ceiling Finishes Living, Dining & Kitchen Painted plain cement finish Bedrooms Painted plain cement finish Toilet Painted ficemboard finish
D. Kitchen Modular Kitchen cabinet with stainlesssink and stainless counter top No overhead cabinet.
E. Door Entrance & Bedroom door Solid finger jointed wood with sheet
laminated and solid wood core doorjambs plus casing
Balcony door (GF only) Aluminum framed sliding glass panel Toilet door PVC door
F. Windows Aluminum windows
G. Finishing Hardware Cylindrical lockset for main and bedroomPrivacy lockset for T&B door
H. Toilet Fixtures Water closet and Lavatory “American Classic Brand” or approved equivalent Shower Faucet Complete set of shower with faucet & fittings
I. Electrical Complete outlet and lighting devices with circuit breaker
![Page 12: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/12.jpg)
Alpaca Building Floor Plans
![Page 13: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/13.jpg)
Alpaca Building Floor Plans
![Page 14: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/14.jpg)
Floor Plans
ALPACA – GROUND BUILDING LAYOUT
![Page 15: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/15.jpg)
Floor Plans
![Page 16: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/16.jpg)
Elephant Building Floor Plans
![Page 17: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/17.jpg)
Elephant Building Floor Plans
![Page 18: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/18.jpg)
Floor Plans
![Page 19: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/19.jpg)
ELEPHANT MODEL UNIT
![Page 20: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/20.jpg)
Dove Building Floor Plans
![Page 21: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/21.jpg)
Typical Floor Plan
![Page 22: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/22.jpg)
OVERVIEW OF PAVILION& CENTRAL PARK
![Page 23: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/23.jpg)
As of June 2011
![Page 24: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/24.jpg)
As of June 2011
![Page 25: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/25.jpg)
Construction Updates – Pool
SWIMMING POOL BRIDGE OVERKOI POND
![Page 26: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/26.jpg)
Construction Updates – Pavilion
STAIRS GOING UP GROUND FLOOR
2ND FLOOR
![Page 27: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/27.jpg)
Construction Updates – Central Park
ENTRY POINTS
WATER FEATURES (BUBBLERS)
KOI PONDCHILDREN’S PLAY AREA
![Page 28: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/28.jpg)
Construction Updates
BUTTERFLY BLDG.
CAMEL BLDG.
BISON BLDG.
CODFISH BLDG.
ANTELOPE BLDG.
![Page 29: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/29.jpg)
Construction Updates – Dolphin Building
![Page 30: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/30.jpg)
Construction Updates – Dolphin Building
![Page 31: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/31.jpg)
Construction Updates- Fox Parking Lot
Covered walkway ongoing construction
![Page 32: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/32.jpg)
Awarding of Alpaca to CE Construction
![Page 33: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/33.jpg)
Alpaca Building - Topping Off
Led by the ff: LPR Site Engineer Arnel Silvano, LPR Property Manager Ms. Nina Yamson, Marketing Supervisor Ms. Lei Macasaet-Pacheo, LPR Project Director Mr. Mike Pacheo, CDCH Architect Beth
Vidal and CECON Engineer Robert Suggang
![Page 34: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/34.jpg)
Construction Updates – Alpaca Building
As of June 2011
![Page 35: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/35.jpg)
Interior of Alpaca Building
![Page 36: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/36.jpg)
TOILET AND BATH
KITCHEN AREA
![Page 37: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/37.jpg)
FIRE HOSE CABINET
ELEVATOR HALLWAY CEILING
![Page 38: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/38.jpg)
Sprinkler head
Sprinkler pressure testing per floor
![Page 39: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/39.jpg)
Exterior of Alpaca Building
Landscaping works & repainting of trench grating
Main Entrance
![Page 40: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/40.jpg)
Completed construction of Pressurization Blower RoomWater Tank & Fire pump Room
Construction
![Page 41: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/41.jpg)
LAUNDRY POSTS
FIRE EXIT STAIRS
ADDITIONAL SACP by HIMMAX
Construction of Entrance Ramp
![Page 42: Lpr ppt sept2011 (1)](https://reader037.vdocuments.us/reader037/viewer/2022103114/554e0b34b4c90518298b50e8/html5/thumbnails/42.jpg)