lp cosmic trigger

7
Th. Chaminade, P. Colas, K. Dehmelt, M. Karolak, G. De Lentdecker, S. Hervé, X. Janssen, D. Jourde, Y. Kato, H. Kuroiwa, Y. Kudenko, T. Matsuda, F. Pierre, J.M. Reymond, M. Riallot, F. Senée, S. Turnbull LP cosmic Trigger

Upload: tanisha-blackwell

Post on 01-Jan-2016

25 views

Category:

Documents


1 download

DESCRIPTION

LP cosmic Trigger. Th. Chaminade, P. Colas, K. Dehmelt, M. Karolak, G. De Lentdecker, S. Hervé, X. Janssen, D. Jourde, Y. Kato, H. Kuroiwa, Y. Kudenko, T. Matsuda, F. Pierre, J.M. Reymond, M. Riallot, F. Senée, S. Turnbull. Support mechanics and wrapping ready since Feb-March - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: LP cosmic Trigger

Th. Chaminade, P. Colas, K. Dehmelt, M. Karolak, G. De Lentdecker, S. Hervé, X. Janssen, D. Jourde, Y.

Kato, H. Kuroiwa, Y. Kudenko, T. Matsuda, F. Pierre, J.M. Reymond, M. Riallot, F. Senée, S. Turnbull

LP cosmic Trigger

Page 2: LP cosmic Trigger

Warsaw, June 12, 2008 P. Colas, LP trigger 2

Support mechanics and wrapping ready since Feb-March

1 module has been assembled (3 slabs)

Page 3: LP cosmic Trigger

Thermics (J.M. Reymond)Based on thermoelectric coolers (TEC) (Peltier devices) and hybrid HYTEK controller

HY5610 controller: 12v, +/- 2Amps, Stability 0,01°C

Proportional / Integral Control

Upper Copper

Thermic gel

Al Support

Lower Copper

Page 4: LP cosmic Trigger

Warsaw, June 12, 2008 P. Colas, LP trigger 4

The thermo-mechanics and card support is designed.

The supplies and cables are delivered.

The final delivery of mechanical pieces is due to June 26.

Page 5: LP cosmic Trigger

Warsaw, June 12, 2008 P. Colas, LP trigger 5

Status as of early May 2008, with test PCB: not perfect (oscillation of the amplifiers), but works

Decision to go for a clean card

10 mV

Page 6: LP cosmic Trigger

Warsaw, June 12, 2008 P. Colas, LP trigger 6

The first final card arrived and was tested yesterday

Excellent result: 40 mV/photo-electron, stable signals

Other cards to be delivered tomorrow

40 mV

Analogic sum of 2 MPPCs

40 p.e. : expect 1.6 V output

Page 7: LP cosmic Trigger

Warsaw, June 12, 2008 P. Colas, LP trigger 7

The trigger system will be soon ready for mounting. Will use standard logic modules at the beginning, maybe TLU when available.

Later on the logic should be programmed on a FPGA.