August 2, 2011LCR Pile Dike Assessment Page 2
Client logo
Columbia River Basin – Early 1800’s
Lewis and Clark Lewis and Clark Basin Map
August 2, 2011LCR Pile Dike Assessment Page 3
Client logo
Columbia River Basin
Basin Map Basin Statistics
• Basin Area is 258,000 Sq. Miles
• Drains 7 States and BC
• 1243 Miles Long
• Largest River Flowing to Pacific
Ocean from North America
• Supports Many Species of
Anadromous Fish
August 2, 2011LCR Pile Dike Assessment Page 4
Client logo
Nineteenth Century Basin Changes Impacting
Anadromous Fish Populations
Dredging – Starting 1864 Canneries – Starting 1867
August 2, 2011LCR Pile Dike Assessment Page 5
Client logo
Twentieth Century Basin Changes Impacting
Anadromous Fish Populations
Pile Dikes? Dams
August 2, 2011LCR Pile Dike Assessment Page 6
Client logo
Columbia River Average Daily Flow
at The Dalles, Oregon
August 2, 2011LCR Pile Dike Assessment Page 7
0
100000
200000
300000
400000
500000
600000
700000M
ax
6-J
an
14-J
an
22-J
an
30-J
an
7-F
eb
15-F
eb
23-F
eb
3-M
ar
11-M
ar
19-M
ar
27-M
ar
4-A
pr
12-A
pr
20-A
pr
28-A
pr
6-M
ay
14-M
ay
22-M
ay
30-M
ay
7-J
un
15-J
un
23-J
un
1-J
ul
9-J
ul
17-J
ul
25-J
ul
2-A
ug
10-A
ug
18-A
ug
26-A
ug
3-S
ep
11-S
ep
19-S
ep
27-S
ep
5-O
ct
13-O
ct
21-O
ct
29-O
ct
6-N
ov
14-N
ov
22-N
ov
30-N
ov
8-D
ec
16-D
ec
24-D
ec
Flo
w a
t T
he D
alles
(cfs
)
Date
Pre-Regulation (1879 - 1942)
Post-Regulation (1974 - 2010)
Client logo
Federal Columbia River Power System
• USBR and USACE Own
and Operate 31 Dams
• Built and Operated by the
Federal Government
• System Provides:
– Hydropower
– Navigation
– Flood Control
– Irrigation
• Has impacted 13 Federally
Listed ESA Fish Species
August 2, 2011LCR Pile Dike Assessment Page 8
Client logo
Cumulative Impacts to Columbia River Fish Has Led To
Multiple Listings Under the ESA
• Harvest
• Dams
– Migration Obstacle
• Upstream Passage
• Downstream Passage
• Increased predation
– Flow Regulation
• Reduced Peak Flows
• Increased Low Flows
• Habitat Loss
– Diking, Draining, Development
• Hatcheries
August 2, 2011LCR Pile Dike Assessment Page 9
Client logo
Historic Ecosystem Losses in the Lower Columbia River
Estuary – Last 150 Years
• 52,000 acres wetland/marsh habitats
• 3,800 acres of riparian forest habitat
• 27,000 acres of forested wetland
August 2, 2011LCR Pile Dike Assessment Page 10
Client logo
Percentage Change in Columbia River Estuary Aquatic
Habitat Types
Habitat Type Change
• Shallow Tidal Flats +10%
• Deep Water -7%
• Medium Depth Water -25%
• Tidal Marsh -43%
• Tidal Swamp -77%
August 2, 2011LCR Pile Dike Assessment Page 11
Client logo
FCRPS Biological Opinion
• FCRPS Action Agencies Include USACE, BPA, and USBR
• FCRPS Consultation With NOAA Fisheries on ESA Listed Species
• Biological Opinion Issued by NOAA Fisheries 2008
• Action Agencies Concluded That Operation of These Projects
Without Further Mitigation, Would Jeopardize Listed Species
• Mitigation Measures Include 73 Detailed Reasonable and Prudent
Alternatives (RPA)
• RPA 38:
– Increase access to productive habitat
– Reduce avian predation of juvenile salmonids
• Piling and Pile Dike Removal Program
August 2, 2011LCR Pile Dike Assessment Page 12
Client logo
Columbia River Pile Dikes
• Construction Initiated 1885
• Constructed Ended in
1960’s
• Over 233 Constructed
• River Mouth to RM 138
• Reduce Dredging
• Protect Dredge Material
• Provide Bank Protection
• Stabilize Shipping Channel
August 2, 2011LCR Pile Dike Assessment Page 13
Client logo
Potential Pile Dike Modifications That May Improve
Salmonid Habitat In the Estuary (BiOp AMP)
• Complete or partial removal of pile dikes
• Reconstruction of pile dikes
• Remove creosote-containing piles
• Placement/removal of dredged material
• Placement of LWD
• Replacement of lost habitat types
August 2, 2011LCR Pile Dike Assessment Page 14
Client logo
Columbia River Pile Dike and Pile Field Examples
August 2, 2011LCR Pile Dike Assessment Page 15
Client logo
Pile Dike Design and Construction - Elevation
August 2, 2011LCR Pile Dike Assessment Page 16
Client logo
Pile Dike Design and Construction - Section
August 2, 2011LCR Pile Dike Assessment Page 17
Client logo
USACE Portland District Pile Dike Assessment
• BiOp Obligation and O&M
• AECOM Assessed Each of
233 Pile Dikes For:
– Structural Integrity
– Functional Integrity
– Potential Impact On Juvenile
Salmonids
August 2, 2011LCR Pile Dike Assessment Page 18
Client logo
Suspected Pile Dike Impacts to Juvenile Salmonids
• Contaminants Leaching
From Treated Piling
• Cover For Piscivorous Fish
• Perches For Avian
Predators
• Shallow Water Habitat
August 2, 2011LCR Pile Dike Assessment Page 19
Client logo
East Sand Island – Lower Columbia River
• World’s Largest Tern and
Cormorant Colonies
• Tern Average Annual
Juvenile Salmonid
Consumption = 5.3 Million
• Cormorant Consumption
Likely Similar
• Island Constructed Of
Dredge Material Protected
By a Pile Dike System
August 2, 2011LCR Pile Dike Assessment Page 20
Client logo
Habitat Components of the Pile Dike Assessment –
Field Work
• Presence/Absence of Shallow Water Habitat
• Presence of Aquatic Vegetation
• Adjacent Wetland Areas
• Presence/Absence of Bank Erosion
• Access to Adjacent Shallow Water Habitat
• Presence of Avian Predators
August 2, 2011LCR Pile Dike Assessment Page 23
Client logo
Habitat Improvement Opportunities Evaluated
• Removal of Pile Dike (reduce erosion)
• Removal of Individual Piles (improve access)
• Extend Pile Dike (increase shallow water)
• Remove Creosote Treated Piles (improve water quality)
• Place Large Woody Debris (increase cover)
• Place Fill (increase shallow water/decrease bank slopes)
August 2, 2011LCR Pile Dike Assessment Page 24
Client logo
Pile Dike Assessment Habitat Impact Findings
• Very Few Treated Piling –
Not a Contaminant Threat
• Piscivorous Fish Activity
Unobservable – Impact
Inconclusive
• Avian Perching Observed
(Primarily Cormorants) –
Impact Inconclusive
August 2, 2011LCR Pile Dike Assessment Page 25
Client logo
Pile Dike Assessment Habitat Impact Findings
• Juvenile Salmonid Rearing
Habitat
– Creation of Shallow Water
Habitat (SWH)
– Protection of 3800 Acres SWH
– Bed Erosion Not Noted
– Adjacent Areas Will Support
Creation of SWH
– Addition of LWD Not
Warranted In Main Channel
– Additional Studies
Recommended
August 2, 2011LCR Pile Dike Assessment Page 26
Client logo
East Sand Island – Lower Columbia River
• Island Constructed Of
Dredge Material Protected
By a Pile Dike System
• Removal of Pile Dikes May
Allow Natural Reworking of
Dredge Material
• Role of Large Predators
• 2011 Bald Eagle
Harassment of Nesting
Colonies: 90-100%
Reproductive Loss
August 2, 2011LCR Pile Dike Assessment Page 27
Client logo
Thank You
David Gorman, PE
Ecosystem Restoration Engineer
AECOM
Portland, Oregon
August 2, 2011LCR Pile Dike Assessment Page 28