low flow management in wallonia • philippe...
TRANSCRIPT
![Page 1: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/1.jpg)
1
Low flow management in Wallonia
ir Philippe Dierickx NHV, Maastricht, 24 october 2014
![Page 2: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/2.jpg)
2
Introduction
Water uses and drought impacts
Complex low flow management examples
State of art in Wallonia :
Observations
Forecastings
Real-time management
Summary
![Page 3: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/3.jpg)
Wallonia
Flanders
Bxl
Netherlands
France
Lux
Germ
an
y
Meuse (Maas): 12.355 km²
Escaut (Schelde): 3.774 km²
Rhine : 767 km²
Seine : 40 km²
TOTAL: 16.936 km²
~18.000 km of rivers
River basins of Wallonia
![Page 4: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/4.jpg)
4
Wallonia has a complex and intensive use of its water ressources for :
Inland navigation
Drinkable water
Hydraulic power production
Thermic and nuclear power plants cooling
Agriculture
Tourism
More critical because :
Needs are growing
Environment rules are more important (fish migration, water quality…)
Impact of global warming scenarios
Economic issues
low flow management is necessary to aim different and sometimes conflicting goals !
Water uses on the walloon river network
![Page 5: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/5.jpg)
5
Wallonia has a typical north-west continental climate with, usually:
stratiform rainfalls or snow events filling underground and reservoirs in winter
convective events with heavy rainfalls in summer
droughts are mainly observed during fall in september and october
variable: droughts are sometimes observing during spring or at the beginning of winter
What’s a drought for Wallonia ?
there is no legal definition, as statistics or threshold
some local definitions exist but for only specific purposes as intakes / oulets
a situation for which one some actions must be done to limit the consumption of water
Droughts in Wallonia
![Page 6: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/6.jpg)
450 km of navigable waterways
60 % of controled rivers
40 % of canals
Navigation
From 300 to 9.000 T ships
![Page 7: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/7.jpg)
• 40 weirs on controled rivers
• 80 locks
water consumption
water regulation
Weirs and locks Navigation
![Page 8: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/8.jpg)
New locks 2015
New lock 2017
New locks 2025
Navigation
![Page 9: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/9.jpg)
Drought impacts on navigation
Resizing of locks will increase the water consumption
Resizing of locks should increase the navigation
Navigation will be more sensitive to droughts (even without climate changes)
Difficulties to maintain water levels for full loaded ships
More waiting time at locks to reduce consumption (ships gathering)
Economic impacts
Projects:
Improve the regulation of water to mitigate loss of water
Optimize water supplies through reservoirs
Reduce the leaks at locks
Optimize the traffic management
Use pumping station with cost optimization
![Page 10: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/10.jpg)
Upper Maas
1 power plant
+ 3 projects
Maas
6 power plants
Sambre
3 power plants
+ 3 projects
Hydraulic power plants on navigable waterways
EDF-Luminus
Energie Fleuves
Muyle
Projects
Mérytherm
Albert Canal
1 under constr.
![Page 11: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/11.jpg)
Hydraulic power plants
Hun Marcinelle
Monsin
Total: ~80 MW
Droughts decrease power production of sustainable energy
![Page 12: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/12.jpg)
Thermic and nuclear plants cooling
Tihange: 3.000 MW
Drought means slow velocities and less dissipation of hot water returned by plants
production could be limited (especially during hot weather conditions)
economical impacts are quite important
![Page 13: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/13.jpg)
Reservoirs • 9 reservoirs: 5 public, 4 private
![Page 14: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/14.jpg)
Reservoirs
• Navigation support
• Drinkable water
• Flood control
• Power production
• Tourism
La Gileppe
Eau d’Heure reservoirs
Eupen
Nisramont
![Page 15: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/15.jpg)
15
Reservoirs
Eau d’Heure volumes
Theoretical capacity Effective capacity
Water supply for
navigation
After the 2003 drought, almost 3 years were
necessary to get back to full capacity
10.106 m³
![Page 16: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/16.jpg)
Drinkable water
Groundwater
Surface water
![Page 17: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/17.jpg)
17
Drinkable water
During extreme droughts, some practices
could be forbidden to avoid waste of water
but hard to control
![Page 18: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/18.jpg)
Tourism
Some reservoirs are recreational areas:
supply water for navigation during summer is conflicting
Some rivers are famous for kayak
lovers but activities are stopped
during droughts due to
environmental troubles
Small waterways are
maintained for
tourism navigation
![Page 19: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/19.jpg)
Fish migration
Fish passes require water consumption
Nowadays, reserved discharges are enforced to maintain enough water above weirs to
reduce fish mortality through power plant or to keep enough water downstream
reservoirs
![Page 20: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/20.jpg)
20
Charleroi-Brussels Canal
The canal ensures the link between the Maas Basin and the Schelde basin
from south to north (Flanders and Brussels) and west (Liège) to east
(Tournai through Center Canal)
![Page 21: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/21.jpg)
21
Charleroi-Brussels Canal
Water supply &
power
Navigation & fish migration
Natural flow
Pumpings
Natural flow
Natural flow
![Page 22: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/22.jpg)
Highly complex water management for :
Navigation
Environmental issues
Costs
Benefits
Tourism
request hydrologic, hydraulic and economic models !
Charleroi-Brussels Canal
![Page 23: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/23.jpg)
Lower Maas Monsin
Netherlands
Common M. Lixhe
Albert Canal Lanaye
Genk
Navigable Maas
Wallonia
Flanders
Flanders
Jeker
Liège
Maas downstream Liège (Luik)
Q Liège > 60 m³/s Waterlevel of 60 m DNG to keep
permanently on a 60 km reach
![Page 24: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/24.jpg)
Lower Maas Monsin
Netherlands
Common M. Lixhe
Albert Canal
Lanaye
Genk
Navigable Maas
Lock
Monsin
Lock
Visé
Diverse
Flows
Borgharen Non navig.
Maas
Juliana
Canal
Zuid
Willems
vaart
Wallonia
Flanders
Flanders
Berwinne
Fishways
Jeker
Liège
Maas downstream Liège (Luik)
Q Liège < 60 m³/s
![Page 25: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/25.jpg)
Maas downstream Liège (Luik)
Year 2011: several low water events
7 months
During droughts, the Canal consumption could be close to
the discharges in Liège
![Page 26: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/26.jpg)
Normal waterlevel for navigation: 60 m
59 m
Maas downstream Liège (Luik)
Year 2011: several low water events
1 m
![Page 27: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/27.jpg)
Maas downstream Liège (Luik)
In 2015: new lock (L225 x W25 x H14) in Lanaye with a pumping station and turbines
Permit (fish migration) :
• obligation of pumping if Q Lixhe < 50 m³/s
• turbines allowed if Q Liège > 120 m³/s
![Page 28: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/28.jpg)
Challenge: how to keep water levels during droughts ?
different outlets : locks of Lanaye, Genk, Monsin dam & power plant
different managers : Wallonia (SPW), Flanders (Scheepvaart), Private company (EDF-Luminus)
keep enough water downstream
respect environmental permits
optimize benefits / costs
improvment of hydrologic knowledge
simulation models (hydraulic & economic)
agreement between partners
real-time management
Maas downstream Liège (Luik)
![Page 29: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/29.jpg)
29
Today on the walloon hydrologic network
• main observed consequences of droughts are related to navigation
• just enough water to avoid problems for drinkable water and refreshment of
industries
• BUT we never had to face up to 2 consecutive years with low water
the phreatic aquifer was always reloaded
close to the limits
• the probability of this « worst case scenario » is raising due to growing needs and
climate change
• politicians and inhabitants are not enough concerned by water scarcity
• however, some actions are on the way…
![Page 30: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/30.jpg)
30
Observations
A good measurement is ALWAYS better
than an excellent calculation or estimation !
![Page 31: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/31.jpg)
31
Rainfall network and weather radars
RMI
Wacondah network
![Page 32: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/32.jpg)
32
Wacondah network
140 stations on navigable waterways and tributaries.
5’ step (GPRS)
Water level network
![Page 33: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/33.jpg)
33
Aqualim network
180 stations on non navigable waterways
Water level network
![Page 34: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/34.jpg)
34
Discharges measurement by rating curves
Propeller
ADCP
Increasing of measurement during
low water as rating curves are more
sensitive to :
- cross sections changes
- grass inside the river
- artificial perturbations
Accuracy must be improved
![Page 35: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/35.jpg)
35
Haccourt Visé
Amay
Waulsort
Ronet
Tournai Solre
Châtelet
Tailfer (2015)
Marchienne
Lessines
Huy
Monceau
Clabecq (2015)
Discharges measurement by ADM
Best solution for flow measurement
on navigable waterways
Clomines (2016)
![Page 36: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/36.jpg)
36
Piez’eau network
400 stations including 150 in real-time
Groundwater network
![Page 37: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/37.jpg)
37
Weir sensors
Accuracy is important for flow
management
![Page 38: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/38.jpg)
Weir sensors calibration
38 38
For instance, we have to keep 20 cm
above some weirs on the Maas river
for fish migration
![Page 39: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/39.jpg)
Leaks estimation
39 39
On field measurement
![Page 40: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/40.jpg)
40
Database and series
Requirements:
telemetry : mainly GPRS or optical fibers
efficient quality control
automatic
manual
![Page 41: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/41.jpg)
41
Drought forecasting
Weather models
Ensemble predictions
NWP
Hydrologic observations
+
Stochastic models
Potential / effective evapotranspiration
(LSA SAF)
+
Not accurate !!!
![Page 42: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/42.jpg)
42
Qr (t,x)
Zr (t,x)
Y
X
Qb (t) Qin (t)
PLC Zamont (t)
Phausse (t)
Ovanne (t)
Qc (t)
PLC
Zc (t) Qmesuré (t)
Z* = Consigne
Development of simulation models for water management
Water levels AND discharges
regulation
With economical issues
![Page 43: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/43.jpg)
43
Water level regulation could be… very bad
![Page 44: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/44.jpg)
44
Mesure de niveau
amont Interface ISN-02
Module de filtrage
AE-95
AFFICHAGE
18 bits
4x4 BCD
1 Valid.
1 Déft4 - 20 mA
Cap
teur
Lig
ne
Inte
rfac
e
Conta
cts
Tendances
Hauteur
(cote état-major)
Communication
RS232 ou RS485
Vers relayage
des organnes de
commandeAFFICHAGE 0 3
0 3
>
<
=
1 5
1 8
>
<
=Roues codeuses BCD
Hauteur
filtrée
1 5 1 8
BCD
Communication
RS232 ou RS485
Roues codeuses
Module de temporisation
et de commande des relais
AE-96
Hauteur de
référence
Comparateurs à
fourchette
2 x CSP 17/005
Délai
Hydrologic observations
database
Structure monitoring database
Automatic local
management
Structure commands
Optimization of local flows including global informations
![Page 45: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/45.jpg)
45
Progression…
time to think about water scarcity !!!
![Page 46: Low flow management in Wallonia • Philippe Dierickxbigfiles.nhv.nu/Maastricht2014/2014.10.24_Dierickx.pdf · 10/24/2014 · Inland navigation ... there is no legal definition,](https://reader033.vdocuments.us/reader033/viewer/2022050211/5f5d94abaa003540b571cf1e/html5/thumbnails/46.jpg)
CONTACT
Service public de Wallonie
Direction générale opérationnelle Mobilité et Voies hydrauliques
Boulevard du Nord, 8
B-5000 NAMUR
BELGIQUE
Tél: + 32 81 77 29 83
Fax: + 32 81 77 37 88
Thank you