low cost housing santa rosa building type b … · the royal vibhavadi 46/29 soi vibhavadi 48lad...
TRANSCRIPT
GSPublisherVersion 0.0.100.100
Unexpected Co.Ltd.Unexpected Co.Ltd. The Royal Vibhavadi 46/29
Soi Vibhavadi 48Lad Yao, ChatuchakBangkok, 10900 Thailand
un_expected
BUILDING TYPE BARCHITECTURE APPROVAL SET
LOW COST HOUSING SANTA ROSA
City of Santa RosaProvince of Laguna
Philippines
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A0-02
1:90, 1:100, 1:1SCALE :
Specifications
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
Legend Material Specifications
Table of Content
Sheet Topic
Flooring Specifications
Ceiling Specifications
Wall Specifications
1 HC Bricks / Screed Patching / Outdoor / Semigloss (White)
F1 TBC, Total Thickn. 50 mm
Drawing Set Architecture
TBC
Index DescriptionC1 Raw Ceiling / Sreed Patching / Outdoor - Semigloss (White)A
A-01
1A-01
2A-01
3A-014
A-01
View Marker
1A-01
Detail Marker
Section Marker
+2.50
Floor Level
NNorth Orientation
Height Level to Reference +0.00
Dimension GridProperty Line
C111
F2
1C2
Flooring Spec. MarkerCeiling Spec. Marker
Detail NameSheet Reference
Sheet ReferenceSection Name
View NameSheet Reference
Structural ConcreteBrickwork Visible
Partition Wall Double Sided
Brick Hollow Core, Various Thickness
Door Spec MarkerWindow Spec Marker
Wall Spec. Marker
Ceiling Spec Marker
AA-01
AA-01
AA-01
AA-01
TBC
F2 Ceramic Tile, TBC, Total Thickn. 50 mm
TBC
234 Wall Tile / Size 1''x1'5
Partition Wall Single Sided
Index Description
HC Bricks / Screed Patching / Outdoor / Semigloss (Beige)HC Bricks / Screed Patching / Indoor / Semigloss (White)
TBCTBCTBC
Index Description
Dimension Element
TBCTBC
C2
C3
C4
C5
Raw Ceiling / Sreed Patching / Indoor - Matt (White)
Overview Electrical Installation
Brand Spec.Symbol Mounting HeightDescription / Type
SPower (220 V) Double
Wall mounted
120 cm
above FF
30/90/120 cm
above FF
30 cm
above FF
Light Switch
Wall mounted
Phone Line Double
Wall mounted
TV Line
Wall mounted
PANASONIC Full Color Wide Refina (Metallic White)
PANASONIC Full Color Wide Refina (Metallic White)
PANASONIC Full Color Wide Refina (Metallic White)
PANASONIC Full Color Wide Refina (Metallic White)30 cm
above FF
IDA0-01A0-02A1-01A2-02A2-02A2-02A2-02A2-02A2-02A3-01A3-02A3-03A3-04A3-05A3-06A4-01A4-02A4-03A5-01A5-02A6-01A7-01A8-01
Layout NameCoverSpecificationsMaster PlanFloor Plan 2nd to 4th Floor (A)Floor Plan 2nd to 4th Floor (B)Floor Plan First Floor (A)Floor Plan First Floor (B)Floor Plan Roof (A)Floor Plan Roof (B)Elevation NorthElevation SouthElevation EastElevation WestElevation Section NorthElevation Section SouthSection ASection BSection CDetail Main StairDetail Escape StairApp. Unit DetailDetail BathroomDetail Doors / Windows
Size594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420
No0102030405060708091011121314151617181920212223
Remark
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A1-01
1:750, 1:75SCALE :
Master Plan
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
39.0013.00
39.00
38.4
5
37.81
40.0012.00
40.0012.00
40.00
1
16
1
13
1
16
1 Motorbike Parking
15
1
23
Garbage Collection
Garbage CollectionRoad (8 M) / - 0.20
Garbage Collection
Firetruck
Garbage Collection
Road (8 M) / - 0.20
Garbage Collection
Detention
Playground
Green
Playground
Green
V. Pump
Type B+12.95 Type B
+12.95Type B+12.95 Type B
+12.95
Type A+12.95
Type A+12.95
Type A+12.95
Type A+12.95
Type A+12.95
Type A+12.95
+0.00
+0.00
+0.00
+0.00
+0.00
Area Calculation / Stanta Rosa
Area [m2] PercentageArea Type
4830.11 21.8 %Streetscape
5822.82 26.3 %Building Footprint
22147.00 100 %Property
11494.07 51.9 %Landscape
22592.91 102.0 %TFA (4 Floor Levels)
A1-
SITE LAYOUT1:750
N
BUILDING TYPE B
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A2-02
1:100, 1:1333.33SCALE :
Floor Plan First Floor (A)
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
5
5 5 511
2
3
32
511
23
32 6
5 5 5
5511
2
3
32
1 1
2
3
3 2
1 1
2
3
3 2
1 1
2
3
3 2
11
2
3
32
11
2
3
32
1 1
2
3
3 2
1 1
2
3
3 2
1 1
2
3
3 2
11
2
3
32
11
2
3
32
1 1
2
3
3 2
1 1
2
3
3 2
11
2
3
32
11
2
3
32
DN 6 x 15 = 90
5 x
18
= 90
1
2
3
4
5
UP
17
x 17
5 = 3
.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
UP
17
x 17
5 = 3
.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
A B C D E F G H I J
12 12
11 11
7 7
8 8
10 10
9 9
K
103.
702.
302.
002.
303.
70
4014
.20
4010
.00
11.0
03.
702.
302.
002.
303.
7010
50 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.45 50
40 38.65 40
4.00 4.00 4.00 4.00 4.00 4.00 4.00 50
4.00 4.00 4.00 4.00 4.00 4.00 4.00 50
4014
.20
4010
.00
S1A5-01
S1A5-01
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Stair
Stair
Corridor
Entrance
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
AA4-01
BA4-02
BA4-02
S3A5-02
S3A5-02
CA4-03
CA4-03
E5A3-05
E5A3-05
E6A3-06
E6A3-06
S2A5-01
S2A5-01
1A-
1st Floor Plan1:100
2A3-02
4A3-04
1A3-01
3A3-03
NSECTION A
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A2-02
1:100, 1:1333.33SCALE :
Floor Plan First Floor (B)
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
5
5555
5 5 55
11
2
3
32
11
2
3
32
1 1
2
3
3 2
11
2
3
32
5
6
1 1
2
3
3 2
1 1
2
3
3 2
11
2
3
32
11
2
3
32
1 1
2
3
3 2
1 1
2
3
3 2
1 1
2
3
3 2
11
23
32
11
2
3
32
1 1
2
3
3 2
11
2
3
32
11
2
3
32
1 1
2
3
3 2
DN 6 x 15 = 90
1 2 3 4 5 6
5 x
18
= 90
1
2
3
4
5
UP
17
x 17
5 = 3
.00 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
UP
17
x 17
5 = 3
.00 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
A B C D E F G H I J
6 6
5 5
1 1
2 2
4 4
3 3
K
14.7
02.
302.
002.
303.
7010
10.0
040
14.2
040
10 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.45 10
40 38.65 40
103.
702.
302.
002.
303.
7011
.00
4.00 4.00 4.00 4.00 4.00 4.00 4.00 50
4.00 4.00 4.00 4.00 4.00 4.00 4.00 50
10.0
040
14.2
040
S1A5-01
S1A5-01
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Stair
Stair
Corridor
Entrance
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
AA4-01
E5A3-05
E5A3-05
E6A3-06
E6A3-06
1B-
1st Floor Plan1:100
SECTION B
2A3-02
4A3-04
1A3-01
3A3-03
N
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A2-02
1:100, 1:1333.33SCALE :
Floor Plan 2nd to 4th Floor (A)
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
5
5 5 5 5
5 5 55 11
2
3
32
11
23
32
11
2
3
32
1 1
2
3
3 2
1 1
2
3
3 2
1 1
2
3
3 2
11
2
3
32
11
2
3
32
1 1
2
3
3 2
1 1
2
3
3 2
1 1
2
3
3 2
11
2
3
32
11
2
3
32
1 1
2
3
3 2
1 1
2
3
3 2
11
2
3
32
11
2
3
32
UP
17
x 17
5 = 3
.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
UP
17
x 17
5 = 3
.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
A B C D E F G H I J
12 12
11 11
7 7
8 8
10 10
9 9
K
4.00 4.00 4.00 2.45 1.55 2.45 1.55 4.00 2.45 1.55 2.45 1.55 2.45 1.55 2.45 10
39.05 40
4014
.60
15.0
0
AA4-01
BA4-02
BA4-02
S3A5-02
S3A5-02
CA4-03
CA4-03
E5A3-05
E5A3-05
E6A3-06
E6A3-06
Stair
Stair
CorridorBath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
S2A5-01
S2A5-01
2A-
2nd - 4th Floor1:100
2A3-02
4A3-04
1A3-01
3A3-03
NSECTION A
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A2-02
1:100, 1:1333.33SCALE :
Floor Plan 2nd to 4th Floor (B)
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
5
5555
5 5 55 5
11
2
3
32
11
2
3
32
1 1
2
3
3 2
11
2
3
32
1 1
2
3
3 2
1 1
2
3
3 2
11
2
3
32
11
2
3
32
1 1
2
3
3 2
1 1
2
3
3 2
1 1
2
3
3 2
11
23
32
11
2
3
32
1 1
2
3
3 2
11
2
3
32
11
2
3
32
1 1
2
3
3 2
UP
17
x 17
5 = 3
.00 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
UP
17
x 17
5 = 3
.00 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
A B C D E F G H I J
6 6
5 5
1 1
2 2
4 4
3 3
K
4.00 4.00 4.00 26.55
AA4-01
E5A3-05
E5A3-05
E6A3-06
E6A3-06
Stair
Stair
Corridor
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
Bath
Kitchen
Living
2B-
2nd - 4th Floor1:100
SECTION B
2A3-02
4A3-04
1A3-01
3A3-03
N
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A2-02
1:100, 1:1333.33SCALE :
Floor Plan Roof (A)
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
A B C D E F G H I J
12 12
11 11
7 7
8 8
10 10
9 9
KA
A4-01
BA4-02
BA4-02
S3A5-02
S3A5-02
CA4-03
CA4-03
E5A3-05
E5A3-05
E6A3-06
E6A3-0610
.00
4014
.20
40
11.0
03.
702.
302.
002.
303.
7010
10.0
040
14.2
040
11.0
03.
702.
302.
002.
303.
7010
10 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.45 10
40 10 38.45 10 40
Roof Access1.0 x 1.5 M
Roof Access1.0 x 1.5 M
Slop
e 1/
200Slope 1/200
Slope 1/200Slop
e 1/
200 Slope 1/200Sl
ope
1/20
0 Slope 1/200Slop
e 1/
200
Slop
e 1/
200Slope 1/200Sl
ope
1/20
0Slope 1/200
Water TankWater Tank
S2A5-01
S2A5-01
3A-
Roof Plan1:100
2A3-02
4A3-04
1A3-01
3A3-03
NSECTION A
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A2-02
1:100, 1:1333.33SCALE :
Floor Plan Roof (B)
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
A B C D E F G H I J
6 6
5 5
1 1
2 2
4 4
3 3
KAA4-01
E5A3-05
E5A3-05
E6A3-06
E6A3-06
4014
.20
4010
.00
103.
702.
302.
002.
303.
7011
.00
4014
.20
4010
.00
103.
702.
302.
002.
303.
7011
.00
10 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.45 10
40 10 38.45 10 40
Roof Access1.0 x 1.5 M
Roof Access1.0 x 1.5 M
Slope 1/200Slop
e 1/
200
Slop
e 1/
200Slope 1/200 Sl
ope
1/20
0Slope 1/200 Slop
e 1/
200Slope 1/200
Slope 1/200Slop
e 1/
200Slope 1/200Sl
ope
1/20
0
Water TankWater Tank
3B-
Roof Plan1:100
SECTION B
2A3-02
4A3-04
1A3-01
3A3-03
N
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A3-01
1:100SCALE :
Elevation North
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
K J I H G F E D C B A
±0.00
+0.90
+3.90
+6.90
+12.90
+16.05
+13.25
40 38.65 40
+9.90
2.45 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1020
2
1
2
2
2
1
1
1
1
1
1
1
1
2
E1-
Elevation North1:100
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A3-02
1:100SCALE :
Elevation South
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
A B C E' F' H' I' J' KD E F G' G H I J
4.00 4.00 4.00 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45
40 38.65 40
+0.90
+13.25
+3.90
+6.90
+9.90
+12.90
+15.95+15.95
2
1
2
2
2
1
1
1
1
2
1
1
1
1
E2-
Elevation South1:100
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A3-03
1:100SCALE :
Elevation East
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
1 2 3 4 5 6 7 8 9 10 11 12
3.70 2.30 2.00 2.30 3.70 11.00 3.70 2.30 2.00 2.30 3.70
+0.90
+3.90
+6.90
+12.90+13.25+13.25
+0.90
+3.90
+6.90
+12.90
+15.95+15.95
+9.90+9.90
10
80 40 14.60 10.00 14.60 40
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2 2
1
E4-
Elevation East1:100
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A3-04
1:100SCALE :
Elevation West
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
12 11 10 9 8 7 6 5 4 3 2 1
3.70 2.30 2.00 2.30 3.70 11.00 3.70 2.30 2.00 2.30 3.701.20 14.20 1.20 8.40 1.20 14.20 1.20
+0.90
+16.05 +16.05
+13.25+13.25
2
2
2
2
1
1
1
1
1
1
1
1
2
2
2
21
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2 1
1
1
1
1
1
1
1
2
2
2
2
1
1
1
1
E3-
Elevation West1:100
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A3-05
1:100SCALE :
Elevation Section North
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
A B C D E' E F' F G' G H' H I' I J' J K
4.00 4.00 4.00 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.4510
40 38.65 40
E5-
Elevation Section North1:100
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A3-06
1:100SCALE :
Elevation Section South
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
K J J' I I' H H' G G' F F' E E' D C B A
2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 4.00 4.00 4.0040 38.65 40
10
1.00
9.00
E6-
Elevation Section South1:100
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A4-01
1:100SCALE :
Section A
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
12 11 10 9 8 7 6 5 4 3 2 1
+0.90
+3.90
+1.00
+4.00
+7.00
+12.95
+10.00
+7.00
+4.00
+1.00
+6.90
+9.90 +10.00
7525
2.75
252.
7525
2.75
252.
7520
5
1.00
3.00
3.00
3.00
2.95
5
+13.25
+15.95
+12.90
+15.95
+4.00 +3.90
+0.90
±0.00
+0.90
+3.90
+6.90
±0.00
+8.59
+5.59
+2.59
3.70 2.30 2.00 2.30 3.70 11.00 3.70 2.30 2.00 2.30 3.70
1.20 14.20 10.80 14.20 1.20
10 10
A-
Section A1:100
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A4-02
1:100SCALE :
Section B
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
A B C D E F G H I J K
+4.00
+1.00
+7.00
+10.00
+12.95 +13.25+12.90
+6.90
+3.90
+0.90
±0.00
7525
2.75
252.
7525
2.75
252.
7520
5
1.00
3.00
3.00
3.00
2.95
4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.4540 38.65 40
10 10
B-
Section B1:100
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A4-03
1:100SCALE :
Section C
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
K J J' I I' H H' G G' F F' E E' D C B A
2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 4.00 4.00 4.00
40 38.65 40
1010
7525
2.75
252.
7525
2.75
252.
7520
2.70
1515
1.00
3.00
3.00
3.00
2.95
3.00
±0.00
+1.00
+4.00
+7.00
+10.00
+13.00
+15.95+15.95
C-
Section C1:100
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A5-01
1:50SCALE :
Detail Main Stair
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
+2.59
+5.59
+8.59
+1.00
+4.00
+7.00
+10.00
+12.95
252.
7525
2.75
252.
7525
2.75
20
251.
3425
2.75
252.
7525
4.16
20
UP
17 x 17.5 = 300 CM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
3.791.30 1.19 1.30
1.50
2.50
1.30
1.35
2.26
411.
28
5.30
UP
17 x 17.5 = 300
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
1.50
2.50
1.30
142.
0432
1.30
5.30
3.792.49 1.30
DN
17 x 17.5 = 300 CM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
3.791.30 1.19 1.30
1.50
2.50
1.30
1.50
142.
361.
30
5.30
S2-
Main Stair Section1:50
D2-
Stair 1.11:50
D3-
Stair 1.21:50
D4-
Stair 1.31:50
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A5-02
1:50SCALE :
Detail Escape Stair
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
202.
492.
7525
2.75
254.
16
1.00
3.00
3.00
3.00
3.00
252.
7525
3.00
3.00
2.75
15
+2.59
+5.59
+8.59
+0.10
+1.00
+4.00
+7.00
+10.00
Stair
2.251.00 25 1.00
3.00
1.00
4.00
DN
17 x 17.5 = 300 CM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
2.80
1.20
4.00
1.00 25 1.002.25
UP
17 x 17.5 = 300 CM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
1.00 25 1.00
2.80
1.20
4.00
2.25
5 x 18 = 90
1
2
3
4
5
1.00
1.45
S3-
Escape Stair Section1:50
D6-
Stair 2.11:50
D8-
Stair 2.31:50
D7-
Stair 2.21:50
D5-
Stair 2.01:50
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A7-01
1:25SCALE :
Detail Bathroom
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
0
3
375 25
01
02
03
04 I-01
SLOPE 1:200
FD
BathA: 2.67 m2
4540
4540
2.80
95
2.80
95
+0.95
+3.75
2.85
90
2.80
85
+0.95
+3.75
5
1.-
1st Floor1:25
I-01-
041:25
I-01-
031:25
I-01-
021:25
I-01-
011:25
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A8-01
1:1SCALE :
Detail Doors / Windows
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
ID 1 2 3 5 6Quantity 138 138 139 8 2
Position Unit Unit Unit Coomon
Plan View
3D Front View
90
2.40
80
2.00
752.
001.50
2.10
90
2.10
Nominal W x H Size 0.900x2.400 0.800x2.000 0.750x2.000 1.500x2.100 0.900x2.100
TypeSingle Hinged Door withupper Transom
Single Hinged Door Single Hinged Door Double Door / Leaf Metal
Door LeafSolid Frame / UPVC (Alt.Wood)
Solid Frame / UPVC (Alt.Wood)
Solid Frame with Vent Grill/ UPVC (Alt. Wood)
Double Door / Leaf Metal
Door Frame UPVC (Alt. Wood) UPVC (Alt. Wood) UPVC (Alt. Wood) Steel FrameEquipment TBC TBC TBC
NoteUpper Trasom with TopHung Single Glas Frame
DOOR LIST
ID 1 2 3 5 5Position Unit Unit Unit CommonQuantity 138 138 138 27 43
Plan View
3D Front View
80
40
90
1.70
1.20
2.40
40
1.50
601.
50
Type Fixed Air Vent Sliding with upper transom Sliding with upper transom Single Pane / Side
Transom None Fixed Frame / Single Glas Pane Fixed Frame / Single Glas Pane None
Sash Metal Grill Sliding Frame / Single Glas Pane Sliding Frame / Single Glas Pane Side Hung / Solid Pane
Frame UPVC / Alt. Aluminum UPVC / Alt. Aluminum UPVC / Alt. Aluminum UPVC / Alt. Aluminum
Equipment TBC (Manufacturer) TBC (Manufacturer) TBC (Manufacturer) TBC (Manufacturer)
Note
Window List
GSPublisherVersion 0.0.100.100
21/2015
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
23
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
Approval
A6-01
1:50SCALE :
App. Unit Detail
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Low Incoming Housing - Santa Rosa
un_expected
511
2
3
32
511
2
3
32
4.00
50 90 60 1.20 60
1.05 875 1.875
1.10 90 75 80 10 55
1.22
582
575
1.875 2.125
2.50 1.504.10
60
1035
1.50
F1 C1
F1 C1
F1 C1
F1 C1Balcony
BathA: 2.67 m2
KitchenA: 4.94 m2
LivingA: 13.40 m2
3
3
3
4
2
33
3
4
3
1
4
3
4
11
2
LF 01
LF 01
LF 01
1.50 2.30
1.00
60
60
20
20
90
60
C1
S
S
S
C1
C1
C0
CL
CL
S
20
20
90
20 20
5050 50(30)
(30)
(30)
(30)
(80)
(30)
(30)
TV
Phone
(30)
TV
Phone
A-
Furniture1:50
B-
Finishing1:50
C-
Lighting1:50
D-
Electrical1:50