low cost housing santa rosa building type b … · the royal vibhavadi 46/29 soi vibhavadi 48lad...

23
GSPublisherVersion 0.0.100.100 Unexpected Co.Ltd. Unexpected Co.Ltd. The Royal Vibhavadi 46/29 Soi Vibhavadi 48Lad Yao, Chatuchak Bangkok, 10900 Thailand un_expected BUILDING TYPE B ARCHITECTURE APPROVAL SET LOW COST HOUSING SANTA ROSA City of Santa Rosa Province of Laguna Philippines

Upload: haminh

Post on 24-May-2019

213 views

Category:

Documents


0 download

TRANSCRIPT

GSPublisherVersion 0.0.100.100

Unexpected Co.Ltd.Unexpected Co.Ltd. The Royal Vibhavadi 46/29

Soi Vibhavadi 48Lad Yao, ChatuchakBangkok, 10900 Thailand

un_expected

BUILDING TYPE BARCHITECTURE APPROVAL SET

LOW COST HOUSING SANTA ROSA

City of Santa RosaProvince of Laguna

Philippines

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A0-02

1:90, 1:100, 1:1SCALE :

Specifications

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

Legend Material Specifications

Table of Content

Sheet Topic

Flooring Specifications

Ceiling Specifications

Wall Specifications

1 HC Bricks / Screed Patching / Outdoor / Semigloss (White)

F1 TBC, Total Thickn. 50 mm

Drawing Set Architecture

TBC

Index DescriptionC1 Raw Ceiling / Sreed Patching / Outdoor - Semigloss (White)A

A-01

1A-01

2A-01

3A-014

A-01

View Marker

1A-01

Detail Marker

Section Marker

+2.50

Floor Level

NNorth Orientation

Height Level to Reference +0.00

Dimension GridProperty Line

C111

F2

1C2

Flooring Spec. MarkerCeiling Spec. Marker

Detail NameSheet Reference

Sheet ReferenceSection Name

View NameSheet Reference

Structural ConcreteBrickwork Visible

Partition Wall Double Sided

Brick Hollow Core, Various Thickness

Door Spec MarkerWindow Spec Marker

Wall Spec. Marker

Ceiling Spec Marker

AA-01

AA-01

AA-01

AA-01

TBC

F2 Ceramic Tile, TBC, Total Thickn. 50 mm

TBC

234 Wall Tile / Size 1''x1'5

Partition Wall Single Sided

Index Description

HC Bricks / Screed Patching / Outdoor / Semigloss (Beige)HC Bricks / Screed Patching / Indoor / Semigloss (White)

TBCTBCTBC

Index Description

Dimension Element

TBCTBC

C2

C3

C4

C5

Raw Ceiling / Sreed Patching / Indoor - Matt (White)

Overview Electrical Installation

Brand Spec.Symbol Mounting HeightDescription / Type

SPower (220 V) Double

Wall mounted

120 cm

above FF

30/90/120 cm

above FF

30 cm

above FF

Light Switch

Wall mounted

Phone Line Double

Wall mounted

TV Line

Wall mounted

PANASONIC Full Color Wide Refina (Metallic White)

PANASONIC Full Color Wide Refina (Metallic White)

PANASONIC Full Color Wide Refina (Metallic White)

PANASONIC Full Color Wide Refina (Metallic White)30 cm

above FF

IDA0-01A0-02A1-01A2-02A2-02A2-02A2-02A2-02A2-02A3-01A3-02A3-03A3-04A3-05A3-06A4-01A4-02A4-03A5-01A5-02A6-01A7-01A8-01

Layout NameCoverSpecificationsMaster PlanFloor Plan 2nd to 4th Floor (A)Floor Plan 2nd to 4th Floor (B)Floor Plan First Floor (A)Floor Plan First Floor (B)Floor Plan Roof (A)Floor Plan Roof (B)Elevation NorthElevation SouthElevation EastElevation WestElevation Section NorthElevation Section SouthSection ASection BSection CDetail Main StairDetail Escape StairApp. Unit DetailDetail BathroomDetail Doors / Windows

Size594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420594 / 420

No0102030405060708091011121314151617181920212223

Remark

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A1-01

1:750, 1:75SCALE :

Master Plan

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

39.0013.00

39.00

38.4

5

37.81

40.0012.00

40.0012.00

40.00

1

16

1

13

1

16

1 Motorbike Parking

15

1

23

Garbage Collection

Garbage CollectionRoad (8 M) / - 0.20

Garbage Collection

Firetruck

Garbage Collection

Road (8 M) / - 0.20

Garbage Collection

Detention

Playground

Green

Playground

Green

V. Pump

Type B+12.95 Type B

+12.95Type B+12.95 Type B

+12.95

Type A+12.95

Type A+12.95

Type A+12.95

Type A+12.95

Type A+12.95

Type A+12.95

+0.00

+0.00

+0.00

+0.00

+0.00

Area Calculation / Stanta Rosa

Area [m2] PercentageArea Type

4830.11 21.8 %Streetscape

5822.82 26.3 %Building Footprint

22147.00 100 %Property

11494.07 51.9 %Landscape

22592.91 102.0 %TFA (4 Floor Levels)

A1-

SITE LAYOUT1:750

N

BUILDING TYPE B

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A2-02

1:100, 1:1333.33SCALE :

Floor Plan First Floor (A)

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

5

5 5 511

2

3

32

511

23

32 6

5 5 5

5511

2

3

32

1 1

2

3

3 2

1 1

2

3

3 2

1 1

2

3

3 2

11

2

3

32

11

2

3

32

1 1

2

3

3 2

1 1

2

3

3 2

1 1

2

3

3 2

11

2

3

32

11

2

3

32

1 1

2

3

3 2

1 1

2

3

3 2

11

2

3

32

11

2

3

32

DN 6 x 15 = 90

5 x

18

= 90

1

2

3

4

5

UP

17

x 17

5 = 3

.00

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

UP

17

x 17

5 = 3

.00

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

A B C D E F G H I J

12 12

11 11

7 7

8 8

10 10

9 9

K

103.

702.

302.

002.

303.

70

4014

.20

4010

.00

11.0

03.

702.

302.

002.

303.

7010

50 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.45 50

40 38.65 40

4.00 4.00 4.00 4.00 4.00 4.00 4.00 50

4.00 4.00 4.00 4.00 4.00 4.00 4.00 50

4014

.20

4010

.00

S1A5-01

S1A5-01

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Stair

Stair

Corridor

Entrance

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

AA4-01

BA4-02

BA4-02

S3A5-02

S3A5-02

CA4-03

CA4-03

E5A3-05

E5A3-05

E6A3-06

E6A3-06

S2A5-01

S2A5-01

1A-

1st Floor Plan1:100

2A3-02

4A3-04

1A3-01

3A3-03

NSECTION A

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A2-02

1:100, 1:1333.33SCALE :

Floor Plan First Floor (B)

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

5

5555

5 5 55

11

2

3

32

11

2

3

32

1 1

2

3

3 2

11

2

3

32

5

6

1 1

2

3

3 2

1 1

2

3

3 2

11

2

3

32

11

2

3

32

1 1

2

3

3 2

1 1

2

3

3 2

1 1

2

3

3 2

11

23

32

11

2

3

32

1 1

2

3

3 2

11

2

3

32

11

2

3

32

1 1

2

3

3 2

DN 6 x 15 = 90

1 2 3 4 5 6

5 x

18

= 90

1

2

3

4

5

UP

17

x 17

5 = 3

.00 1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

UP

17

x 17

5 = 3

.00 1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

A B C D E F G H I J

6 6

5 5

1 1

2 2

4 4

3 3

K

14.7

02.

302.

002.

303.

7010

10.0

040

14.2

040

10 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.45 10

40 38.65 40

103.

702.

302.

002.

303.

7011

.00

4.00 4.00 4.00 4.00 4.00 4.00 4.00 50

4.00 4.00 4.00 4.00 4.00 4.00 4.00 50

10.0

040

14.2

040

S1A5-01

S1A5-01

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Stair

Stair

Corridor

Entrance

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

AA4-01

E5A3-05

E5A3-05

E6A3-06

E6A3-06

1B-

1st Floor Plan1:100

SECTION B

2A3-02

4A3-04

1A3-01

3A3-03

N

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A2-02

1:100, 1:1333.33SCALE :

Floor Plan 2nd to 4th Floor (A)

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

5

5 5 5 5

5 5 55 11

2

3

32

11

23

32

11

2

3

32

1 1

2

3

3 2

1 1

2

3

3 2

1 1

2

3

3 2

11

2

3

32

11

2

3

32

1 1

2

3

3 2

1 1

2

3

3 2

1 1

2

3

3 2

11

2

3

32

11

2

3

32

1 1

2

3

3 2

1 1

2

3

3 2

11

2

3

32

11

2

3

32

UP

17

x 17

5 = 3

.00

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

UP

17

x 17

5 = 3

.00

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

A B C D E F G H I J

12 12

11 11

7 7

8 8

10 10

9 9

K

4.00 4.00 4.00 2.45 1.55 2.45 1.55 4.00 2.45 1.55 2.45 1.55 2.45 1.55 2.45 10

39.05 40

4014

.60

15.0

0

AA4-01

BA4-02

BA4-02

S3A5-02

S3A5-02

CA4-03

CA4-03

E5A3-05

E5A3-05

E6A3-06

E6A3-06

Stair

Stair

CorridorBath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

S2A5-01

S2A5-01

2A-

2nd - 4th Floor1:100

2A3-02

4A3-04

1A3-01

3A3-03

NSECTION A

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A2-02

1:100, 1:1333.33SCALE :

Floor Plan 2nd to 4th Floor (B)

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

5

5555

5 5 55 5

11

2

3

32

11

2

3

32

1 1

2

3

3 2

11

2

3

32

1 1

2

3

3 2

1 1

2

3

3 2

11

2

3

32

11

2

3

32

1 1

2

3

3 2

1 1

2

3

3 2

1 1

2

3

3 2

11

23

32

11

2

3

32

1 1

2

3

3 2

11

2

3

32

11

2

3

32

1 1

2

3

3 2

UP

17

x 17

5 = 3

.00 1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

UP

17

x 17

5 = 3

.00 1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

A B C D E F G H I J

6 6

5 5

1 1

2 2

4 4

3 3

K

4.00 4.00 4.00 26.55

AA4-01

E5A3-05

E5A3-05

E6A3-06

E6A3-06

Stair

Stair

Corridor

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

Bath

Kitchen

Living

2B-

2nd - 4th Floor1:100

SECTION B

2A3-02

4A3-04

1A3-01

3A3-03

N

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A2-02

1:100, 1:1333.33SCALE :

Floor Plan Roof (A)

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

A B C D E F G H I J

12 12

11 11

7 7

8 8

10 10

9 9

KA

A4-01

BA4-02

BA4-02

S3A5-02

S3A5-02

CA4-03

CA4-03

E5A3-05

E5A3-05

E6A3-06

E6A3-0610

.00

4014

.20

40

11.0

03.

702.

302.

002.

303.

7010

10.0

040

14.2

040

11.0

03.

702.

302.

002.

303.

7010

10 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.45 10

40 10 38.45 10 40

Roof Access1.0 x 1.5 M

Roof Access1.0 x 1.5 M

Slop

e 1/

200Slope 1/200

Slope 1/200Slop

e 1/

200 Slope 1/200Sl

ope

1/20

0 Slope 1/200Slop

e 1/

200

Slop

e 1/

200Slope 1/200Sl

ope

1/20

0Slope 1/200

Water TankWater Tank

S2A5-01

S2A5-01

3A-

Roof Plan1:100

2A3-02

4A3-04

1A3-01

3A3-03

NSECTION A

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A2-02

1:100, 1:1333.33SCALE :

Floor Plan Roof (B)

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

A B C D E F G H I J

6 6

5 5

1 1

2 2

4 4

3 3

KAA4-01

E5A3-05

E5A3-05

E6A3-06

E6A3-06

4014

.20

4010

.00

103.

702.

302.

002.

303.

7011

.00

4014

.20

4010

.00

103.

702.

302.

002.

303.

7011

.00

10 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.45 10

40 10 38.45 10 40

Roof Access1.0 x 1.5 M

Roof Access1.0 x 1.5 M

Slope 1/200Slop

e 1/

200

Slop

e 1/

200Slope 1/200 Sl

ope

1/20

0Slope 1/200 Slop

e 1/

200Slope 1/200

Slope 1/200Slop

e 1/

200Slope 1/200Sl

ope

1/20

0

Water TankWater Tank

3B-

Roof Plan1:100

SECTION B

2A3-02

4A3-04

1A3-01

3A3-03

N

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A3-01

1:100SCALE :

Elevation North

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

K J I H G F E D C B A

±0.00

+0.90

+3.90

+6.90

+12.90

+16.05

+13.25

40 38.65 40

+9.90

2.45 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1020

2

1

2

2

2

1

1

1

1

1

1

1

1

2

E1-

Elevation North1:100

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A3-02

1:100SCALE :

Elevation South

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

A B C E' F' H' I' J' KD E F G' G H I J

4.00 4.00 4.00 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45

40 38.65 40

+0.90

+13.25

+3.90

+6.90

+9.90

+12.90

+15.95+15.95

2

1

2

2

2

1

1

1

1

2

1

1

1

1

E2-

Elevation South1:100

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A3-03

1:100SCALE :

Elevation East

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

1 2 3 4 5 6 7 8 9 10 11 12

3.70 2.30 2.00 2.30 3.70 11.00 3.70 2.30 2.00 2.30 3.70

+0.90

+3.90

+6.90

+12.90+13.25+13.25

+0.90

+3.90

+6.90

+12.90

+15.95+15.95

+9.90+9.90

10

80 40 14.60 10.00 14.60 40

2

2

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

2

2

2

2

2

2

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

2

2

2

2

2 2

1

E4-

Elevation East1:100

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A3-04

1:100SCALE :

Elevation West

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

12 11 10 9 8 7 6 5 4 3 2 1

3.70 2.30 2.00 2.30 3.70 11.00 3.70 2.30 2.00 2.30 3.701.20 14.20 1.20 8.40 1.20 14.20 1.20

+0.90

+16.05 +16.05

+13.25+13.25

2

2

2

2

1

1

1

1

1

1

1

1

2

2

2

21

1

1

1

1

1

1

1

1

1

1

1

2

2

2

2 1

1

1

1

1

1

1

1

2

2

2

2

1

1

1

1

E3-

Elevation West1:100

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A3-05

1:100SCALE :

Elevation Section North

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

A B C D E' E F' F G' G H' H I' I J' J K

4.00 4.00 4.00 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.4510

40 38.65 40

E5-

Elevation Section North1:100

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A3-06

1:100SCALE :

Elevation Section South

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

K J J' I I' H H' G G' F F' E E' D C B A

2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 4.00 4.00 4.0040 38.65 40

10

1.00

9.00

E6-

Elevation Section South1:100

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A4-01

1:100SCALE :

Section A

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

12 11 10 9 8 7 6 5 4 3 2 1

+0.90

+3.90

+1.00

+4.00

+7.00

+12.95

+10.00

+7.00

+4.00

+1.00

+6.90

+9.90 +10.00

7525

2.75

252.

7525

2.75

252.

7520

5

1.00

3.00

3.00

3.00

2.95

5

+13.25

+15.95

+12.90

+15.95

+4.00 +3.90

+0.90

±0.00

+0.90

+3.90

+6.90

±0.00

+8.59

+5.59

+2.59

3.70 2.30 2.00 2.30 3.70 11.00 3.70 2.30 2.00 2.30 3.70

1.20 14.20 10.80 14.20 1.20

10 10

A-

Section A1:100

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A4-02

1:100SCALE :

Section B

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

A B C D E F G H I J K

+4.00

+1.00

+7.00

+10.00

+12.95 +13.25+12.90

+6.90

+3.90

+0.90

±0.00

7525

2.75

252.

7525

2.75

252.

7520

5

1.00

3.00

3.00

3.00

2.95

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.4540 38.65 40

10 10

B-

Section B1:100

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A4-03

1:100SCALE :

Section C

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

K J J' I I' H H' G G' F F' E E' D C B A

2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 1.55 2.45 4.00 4.00 4.00

40 38.65 40

1010

7525

2.75

252.

7525

2.75

252.

7520

2.70

1515

1.00

3.00

3.00

3.00

2.95

3.00

±0.00

+1.00

+4.00

+7.00

+10.00

+13.00

+15.95+15.95

C-

Section C1:100

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A5-01

1:50SCALE :

Detail Main Stair

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

+2.59

+5.59

+8.59

+1.00

+4.00

+7.00

+10.00

+12.95

252.

7525

2.75

252.

7525

2.75

20

251.

3425

2.75

252.

7525

4.16

20

UP

17 x 17.5 = 300 CM

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

3.791.30 1.19 1.30

1.50

2.50

1.30

1.35

2.26

411.

28

5.30

UP

17 x 17.5 = 300

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

1.50

2.50

1.30

142.

0432

1.30

5.30

3.792.49 1.30

DN

17 x 17.5 = 300 CM

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

3.791.30 1.19 1.30

1.50

2.50

1.30

1.50

142.

361.

30

5.30

S2-

Main Stair Section1:50

D2-

Stair 1.11:50

D3-

Stair 1.21:50

D4-

Stair 1.31:50

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A5-02

1:50SCALE :

Detail Escape Stair

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

202.

492.

7525

2.75

254.

16

1.00

3.00

3.00

3.00

3.00

252.

7525

3.00

3.00

2.75

15

+2.59

+5.59

+8.59

+0.10

+1.00

+4.00

+7.00

+10.00

Stair

2.251.00 25 1.00

3.00

1.00

4.00

DN

17 x 17.5 = 300 CM

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

2.80

1.20

4.00

1.00 25 1.002.25

UP

17 x 17.5 = 300 CM

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

1.00 25 1.00

2.80

1.20

4.00

2.25

5 x 18 = 90

1

2

3

4

5

1.00

1.45

S3-

Escape Stair Section1:50

D6-

Stair 2.11:50

D8-

Stair 2.31:50

D7-

Stair 2.21:50

D5-

Stair 2.01:50

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A7-01

1:25SCALE :

Detail Bathroom

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

0

3

375 25

01

02

03

04 I-01

SLOPE 1:200

FD

BathA: 2.67 m2

4540

4540

2.80

95

2.80

95

+0.95

+3.75

2.85

90

2.80

85

+0.95

+3.75

5

1.-

1st Floor1:25

I-01-

041:25

I-01-

031:25

I-01-

021:25

I-01-

011:25

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A8-01

1:1SCALE :

Detail Doors / Windows

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

ID 1 2 3 5 6Quantity 138 138 139 8 2

Position Unit Unit Unit Coomon

Plan View

3D Front View

90

2.40

80

2.00

752.

001.50

2.10

90

2.10

Nominal W x H Size 0.900x2.400 0.800x2.000 0.750x2.000 1.500x2.100 0.900x2.100

TypeSingle Hinged Door withupper Transom

Single Hinged Door Single Hinged Door Double Door / Leaf Metal

Door LeafSolid Frame / UPVC (Alt.Wood)

Solid Frame / UPVC (Alt.Wood)

Solid Frame with Vent Grill/ UPVC (Alt. Wood)

Double Door / Leaf Metal

Door Frame UPVC (Alt. Wood) UPVC (Alt. Wood) UPVC (Alt. Wood) Steel FrameEquipment TBC TBC TBC

NoteUpper Trasom with TopHung Single Glas Frame

DOOR LIST

ID 1 2 3 5 5Position Unit Unit Unit CommonQuantity 138 138 138 27 43

Plan View

3D Front View

80

40

90

1.70

1.20

2.40

40

1.50

601.

50

Type Fixed Air Vent Sliding with upper transom Sliding with upper transom Single Pane / Side

Transom None Fixed Frame / Single Glas Pane Fixed Frame / Single Glas Pane None

Sash Metal Grill Sliding Frame / Single Glas Pane Sliding Frame / Single Glas Pane Side Hung / Solid Pane

Frame UPVC / Alt. Aluminum UPVC / Alt. Aluminum UPVC / Alt. Aluminum UPVC / Alt. Aluminum

Equipment TBC (Manufacturer) TBC (Manufacturer) TBC (Manufacturer) TBC (Manufacturer)

Note

Window List

GSPublisherVersion 0.0.100.100

21/2015

Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900

23

DRAWING NO.

SUB TOTAL

TOTAL

DATE :

DRAWN BY :

DESCRIPTIONDATENO.

REVISION

PROJECT/PROJECT NO.

DRAWING TITLE :ARCHITECTS :

Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110

STRUCTURAL ENGINEER :

ELECTRICAL ENGINEER :

OWNER :

PROJECT :

MECHANICAL ENGINEER :

SANITARY ENGINEER :

M.Schoch

31/03/2017

LOW COST HOUSING SANTA ROSA

Approval

A6-01

1:50SCALE :

App. Unit Detail

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines

Low Incoming Housing - Santa Rosa

un_expected

511

2

3

32

511

2

3

32

4.00

50 90 60 1.20 60

1.05 875 1.875

1.10 90 75 80 10 55

1.22

582

575

1.875 2.125

2.50 1.504.10

60

1035

1.50

F1 C1

F1 C1

F1 C1

F1 C1Balcony

BathA: 2.67 m2

KitchenA: 4.94 m2

LivingA: 13.40 m2

3

3

3

4

2

33

3

4

3

1

4

3

4

11

2

LF 01

LF 01

LF 01

1.50 2.30

1.00

60

60

20

20

90

60

C1

S

S

S

C1

C1

C0

CL

CL

S

20

20

90

20 20

5050 50(30)

(30)

(30)

(30)

(80)

(30)

(30)

TV

Phone

(30)

TV

Phone

A-

Furniture1:50

B-

Finishing1:50

C-

Lighting1:50

D-

Electrical1:50