16 th International Conference of the TOC Practitioners Alliance - TOCPA www.tocpractice.com April 23, 2015 Johannesburg, South Africa 16 th International Conference of the TOC Practitioners Alliance - TOCPA www.tocpractice.com DBR Implementation in Long Touch Time environment Loubser de Kock, SABN, South Africa 23 rd April, 2015

Upload: jelena-fedurko

Post on 08-Sep-2015

28 views

Category:

Documents


1 download

DESCRIPTION

Loubser de Kock_16 TOCPA_April 2015_South Africa

TRANSCRIPT

  • 16th International Conference of the TOC Practitioners Alliance - TOCPA

    www.tocpractice.com

    April 23, 2015 Johannesburg, South Africa

    16th International Conference of the

    TOC Practitioners Alliance - TOCPAwww.tocpractice.com

    DBR Implementation in Long

    Touch Time environment

    Loubser de Kock, SABN, South Africa23rd April, 2015

  • 16th International Conference of the TOC Practitioners Alliance - TOCPA

    www.tocpractice.com

    Loubser de Kock

    Born 1965, Stellenbosch, South AfricaMatriculated at DF Malherbe High School, PortElizabeth, in 1983.Graduated with a B. Eng - Electronic Engineering atUniversity of Pretoria, 1988.Software Engineer at Denel Land Systems (LIW)(1988-1996); Saab Grintek Defence (1996 2013);SABN (2013 - )My TOC journey began in 2001 when I did a ProjectManagement Course at University of Pretoria (CE-UP)where I met Philip Viljoen.We met again in 2005 when we implemented CCPM ona very challenging project which we recoveredsuccessfully.I also had the privilege of meeting Eli Goldratt at one ofhis Viable Visions Seminars at Emperors Palace,Kempton Park in 2006.

    Contact info:Mobile +27 82 82345743Email [email protected]

    Loubser de Kock

  • 16th International Conference of the TOC Practitioners Alliance - TOCPA

    www.tocpractice.com

    Disclaimer

    The views expressed herein are those of the

    author and do not reflect the official views of the

    SARB Group

  • 16th International Conference of the TOC Practitioners Alliance - TOCPA

    www.tocpractice.com

    Mission:The SABN is the preferred supplier of banknotes to the South African Reserve Bank and other selected Central

    Banks.

    Vision:We are an innovative solutions partner for the high

    security printing industry.

    South African Bank Note

    Company (RF) (Pty) Ltd

  • 16th International Conference of the TOC Practitioners Alliance - TOCPA

    www.tocpractice.com

    Overview

    Mandela Note Security Features

    Security Printing Background

    Steps in Identifying the Constraint

    Subordination actions Constraint Support

    Production Buffer Management System

    Preventative Maintenance Prioritisation System

    Delivery Fever Chart (Month, Quarter, Annual)

    Challenges

    POOGI

  • 16th International Conference of the TOC Practitioners Alliance - TOCPA

    www.tocpractice.com

    Bank Note Security Features

    Feel of the Note Overall crisp feel, substrate, snap

    1. Watermark Mandela Face

    2. See-Through Perfect Print Registration

    3. Micro-Printing - Denomination Numeral in the Animal

    4. Unique Numbering Increasing Font Size

    5. Raised Printing - Coat of Arms, Words Reserve Bank

    6. Raised Printing - Blind People,

    7. Security Thread Changes Colour, Embedded in the Note

    8. Colour Changing Ink

    9. Hidden Image HorisontalNumeral bottom left of animal

    10. Little Dots/Circles

    1010

  • 16th International Conference of the TOC Practitioners Alliance - TOCPA

    www.tocpractice.com

    Security Printing Background

    Duration to print one Bank Note is 28 days.

    Plant is running 1-2 shifts, 5 days a week (16/5)

    Production Time Analysis: Total Curing Time of 19 days (Ink to dry before next

    process)

    Total Machine Touch Time < 1 second

    Total Operator Handling 9 days (inclusive - counting, moving, QA, weekend)

    Production Ramp-up time - 1 month

    Order execution time (1 11 mo).

    Security Inks and Substrate long lead times ( 4 - 9 mo)

  • 16th International Conference of the TOC Practitioners Alliance - TOCPA

    www.tocpractice.com

    Identify the Constraint

    Check where work was piling up.

    At the last step - sorting and packing.

    Calculated the theoretical throughput of the line.

    Confirmed we had a Balanced Line

    Some Curing Stages had a Physical Constraint

    Limited Vault size.

    Operator inertia and efficiency was not considered a constraint.

    These had to be fixed through improvement programs

  • 16th International Conference of the TOC Practitioners Alliance - TOCPA

    www.tocpractice.com

    Production Plant Design

    Highly Configurable depending on demand!

  • 16th International Conference of the TOC Practitioners Alliance - TOCPA

    www.tocpractice.com

    Subordination actions

    Implemented Symphony on the Stores Supply Chain to ensure reliable availability(Previous Presentation)

    Implemented a Kanban system at the constraint

    Consumables

    Machine Spares

    Dedicated Maintenance Crew for Breakdowns

    Backup Electricity Supply only for the constraint

    Implemented a Drum Buffer Rope system

  • 16th International Conference of the TOC Practitioners Alliance - TOCPA

    www.tocpractice.com

    Production Capacity Analysis

    19 days19 days 7 days7 days

    2days2days

    RAW MATERIAL

  • 16th International Conference of the TOC Practitioners Alliance - TOCPA

    www.tocpractice.com

    Buffer Management System

    Calculated the buffer limits (BL = RRLT x MC x 1.5)

    Choke the Release to control the volume of WIP in the system

    Based on orders created a daily demand to drive production daily targets for orders in hand.

    Phase denominations in/out as part of the overall buffer. Denomination composition of buffer.

    Progressive Priorities per Production Process based on Buffer Level

  • 16th International Conference of the TOC Practitioners Alliance - TOCPA

    www.tocpractice.com

    Buffer Status Dashboard

    01 April 2014 to 30 March 2015 WORK IN BUFFER STATUS

    D

    E

    N

    O

    M

    I

    N

    A

    T

    I

    O

    N

    P

    R

    I

    N

    T

    I

    N

    G

    B

    U

    F

    F

    E

    R

    W

    I

    P

    R

    A

    W

    M

    A

    T

    E

    R

    I

    A

    L

    O

    P

    E

    N

    W

    O

    R

    K

    S

    O

    R

    D

    E

    R

    S

    P

    R

    O

    C

    E

    S

    S

    1

    P

    R

    O

    C

    E

    S

    S

    2

    P

    R

    O

    C

    E

    S

    S

    3

    P

    R

    O

    C

    E

    S

    S

    4

    A

    P

    R

    O

    C

    E

    S

    S

    4

    B

    P

    R

    I

    N

    T

    D

    E

    M

    A

    N

    D

    F

    I

    N

    I

    S

    H

    I

    N

    G

    B

    U

    F

    F

    E

    R

    W

    I

    P

    O

    P

    E

    N

    W

    O

    R

    K

    S

    O

    R

    D

    E

    R

    S

    P

    R

    O

    C

    E

    S

    S

    5

    P

    R

    O

    C

    E

    S

    S

    6

    F

    I

    N

    I

    S

    H

    I

    N

    G

    D

    E

    M

    A

    N

    D

    F

    I

    N

    G

    O

    O

    D

    S

    B

    U

    F

    F

    E

    R

    W

    I

    P

    O

    P

    E

    N

    W

    O

    R

    K

    S

    O

    R

    D

    E

    R

    S

    P

    R

    O

    C

    E

    S

    S

    7

    A

    P

    R

    O

    C

    E

    S

    S

    7

    B

    Q

    U

    A

    L

    I

    T

    Y

    A

    S

    S

    U

    R

    A

    N

    C

    E

    A

    V

    A

    I

    L

    A

    B

    L

    E

    S

    T

    O

    C

    K

    D

    E

    L

    I

    V

    E

    R

    Y

    D

    E

    M

    A

    N

    D

    N1 40.9 59.6 5.9 3.6 25.9 5.9 9.1

    N2 0.0 0.4 0.2 0.2 14.8

    N5 35.9 52.6 5.0 6.3 9.4 8.0 12.6 2.2 3.6 4.5 2.3 3.6 3.2 1.4 12.6 1.4 11.3 -0.7

    P10 17.1 0.0 0.0 0.0 29.2 -5.4

    P20 8.3 33.5 5.0 9.0 7.6 0.4 0.2 2.4

    TOTAL 85.1 162.8 15.8 19.3 42.9 13.9 22.1 2.5 3.6 4.5 2.3 3.6 3.2 0.2 12.6 1.4 0.2 57.7 -6.1