lot fill mcivor forest estate stage 14a junortoun ... · • the layers for building pads are to be...

17
Sandhurst Geotech Pty Ltd, Trading as Geotechnical Testing Services – Southern. ABN: 18 169 924 109 ACN: 169 924 109 Email: [email protected]; Ph: 03 5441 4881; Fax: 03 5441 5089; Mail Address: PO Box 13, STRATHDALE, Vic, 3550 Offices: La Trobe University Applied Science 2 Building 7 Sharon Street, Flora Hill, VIC 3550; Shed 3, 140 Ogilvie Avenue, Echuca , VIC 3654, Geotechnical Investigations Contract Drilling Land Capability Assessments Contamination Assessments Compaction Control Testing On-site Wastewater Management Site Classifications Residential and Industrial Soil, Concrete and Aggregate Testing Laboratories Site Laboratory Construction Material Testing Services www.geotestsouthern.com.au LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN EARTHWORKS SUPERVISION REPORT FOR SLINGO EARTHMOVING GTS Report Number 15C 0564 July 2015

Upload: others

Post on 09-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

Sandhurst Geotech Pty Ltd, Trading as Geotechnical Testing Services – Southern. ABN: 18 169 924 109 ACN: 169 924 109

Email: [email protected]; Ph: 03 5441 4881; Fax: 03 5441 5089; Mail Address: PO Box 13, STRATHDALE, Vic, 3550

Offices: • La Trobe University Applied Science 2 Building 7 Sharon Street, Flora Hill, VIC 3550; • Shed 3, 140 Ogilvie Avenue, Echuca , VIC 3654,

• Geotechnical Investigations • Contract Drilling • Land Capability Assessments • Contamination Assessments • Compaction Control Testing • On-site Wastewater Management •

Site Classifications • Residential and Industrial • Soil, Concrete and Aggregate Testing Laboratories • Site Laboratory

• Construction Material Testing Services • www.geotestsouthern.com.au

LOT FILL McIVOR FOREST ESTATE STAGE 14A

JUNORTOUN

EARTHWORKS SUPERVISION REPORT

FOR SLINGO EARTHMOVING

GTS Report Number 15C 0564 July 2015

Page 2: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

TABLE OF CONTENTS Page number 1 INTRODUCTION 3 2 SCOPE OF WORKS 3 2.1 Area of Work 3 2.2 Placement Specification 3 3 INSPECTION AND TESTING 4 4 SUMMARY OF TEST RESULTS 4 5 STATEMENT OF COMPLIANCE 5

APPENDIX Site Location Density Test Reports

Page 3: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

15C 0564 Report 3

1 INTRODUCTION

Slingo Earthmoving commissioned Geotechnical Testing Services (GTS) to undertake a Level 1 Supervision (AS3798-2007) of the earthworks for the lot fill at McIvor Forest Estate Stage 14A, Junortoun. Level 1 Testing was generally performed in line with AS3798-2007 “Guidelines on Earthworks for Commercial and Residential Development” and provides inspection of the construction of controlled fill and compaction testing in accordance with AS1289 “Methods of Testing Soils for Engineering Purposes”. The Level 1 testing was undertaken by Geotechnicians with supervision provided by a Geotechnical Engineer from GTS.

2 SCOPE OF WORKS

2.1 Area of Work

Geotechnical Testing Services provided Level 1 inspection and testing of the engineered fill placed on Lots 1 to 3 and 12.

The depth of fill across the lots varied from 300mm to 1000mm. Generally where the depth of fill is less than 300mm, it was placed as uncontrolled with no testing or supervision conducted.

A plan showing the test locations and fill depths is included in the Appendix.

2.2 Placement Specification

Whilst there was no earthworks specification compiled for this project, the placement of the fill and associated works generally followed the recommendations outlined in AS3798-2007 “Guidelines for Earthworks for Commercial and Residential Developments” and the construction specification.

In summary, the earthworks comply with the following:

• The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1 (or 5.7.1), based on Standard compaction.

In accordance with Table 8.1 of AS3798-2007, the site would be considered large scale (greater than 1500m2) as such a minimum of 1 test per 500m3, 1 test per 2500m2 or 3 tests per visit is required. The frequency of testing conducted was 1 test per residential lot per layer which exceeds minimum requirements.

Page 4: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

15C 0564 Report 4

3 INSPECTION AND TESTING

Inspection of the excavated base was conducted by a Geotechnical Engineer and it was observed that the unsuitable material (vegetation and top soil/silt) had been removed with the base consisting of a Silty Clay material of good strength.

Level 1 inspection and testing was undertaken by a geotechnician from GTS who nominated the timing and location of the in-situ density tests. The approximate location of each test is recorded on the test reports and attached fill plan. It is noted that for the stabilised sand, compaction testing is not required.

Laboratory compaction testing was undertaken on a one to one basis at our Bendigo laboratory. A summary of the results of the compaction control testing is presented in a table below with the full NATA endorsed test reports included in the Appendix.

4 SUMMARY OF TEST RESULTS

Project No. Report No. Test Date. Location. Reduced

Level (mm)

Moisture Variation %O.M.C

Hilf Density Ratio %

1 15B 0373A 27/2/15 Lot 3 700 1.5 dry 96.0

2 15B 0373B 27/2/15 Lot 2 700 2.5 dry 104.0

3 15B 0373C 27/2/15 Lot 1 700 1.5 dry 100.0

4 15B 0388A 3/3/15 Lot 3 300 1.5 dry 101.0

5 15B 0388B 3/3/15 Lot 2 500 1.5 dry 100.5

6 15B 0388C 3/3/15 Lot 1 500 1.0 dry 100.0

7 15B 0428A 6/3/15 Lot 3 300 2.5 dry 101.0

8 15B 0428B 6/3/15 Lot 2 300 3.0 dry 101.5

9 15B 0428C 6/3/15 Lot 1 300 2.5 dry 102.0

10 15B 0465A 13/3/15 Lot 1 FSL 3.0 dry 100.0

11 15B 0465B 13/3/15 Lot 2 FSL 2.0 dry 98.5

12 15B 0465C 13/3/15 Lot 3 FSL 3.0 dry 99.5

13 15B 0793A 5/5/15 Lot 12 FSL 2.0 dry 96.0

Page 5: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

15C 0564 Report 5

5 STATEMENT OF COMPLIANCE

GTS personnel have provided Level 1 inspection and testing services during the placement of material for the filling of Lots 1 to 3 and 12. The placement of fill and construction techniques adopted was observed throughout the project.

Based on observations made by GTS personnel and the results of field and laboratory tests, we consider that the fill has been placed and compacted and is considered to be engineered or controlled fill. Therefore, subject to residential site classifications, the controlled fill material is deemed a suitable founding medium for future residential buildings. It is noted that top soil material may be spread across the sites following completion of these earthworks and that this top soil material is not considered controlled fill.

Shane Hampton (BE(Hons))

Senior Geotechnical Engineer

Page 6: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

15C 0564 Report 6

APPENDIX

Site Plans and Test Reports

Page 7: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

15C 0564 Report 7

Fig 1 – Site Plan & Test Locations

9

11

10 8

7

6

5 4

3

2

1 12

13

Page 8: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

R53 Version: 01 July 2014

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client:

/A

/B

/C

As Per: AS1289 5.7.1 5.8.1

15B0373

15B0373

15B0373

Test Number:

* If Stabilised Time from

Stabilisation to Lab Test:

*

15B0373A *

*

Material Stabilised:

Approved Signatory:

McIvor Forrest Estate, Junortoun

House Blocks

*

Standard

Report Nº:

Sheet:

-700mm

Date of Report: 3/03/2015

Revision Nº: REV 0

15B0373

1 of 2

B.P.Mott

Project:

Location:

Test Request No / Lot No:

Layer Thickness: (mm)

Depth Below FSL/CSL:

Compaction Type:

Sampling Method:

*

*

Slingo Earthmoving Pty Ltd

P.O Box 1250

CASTLEMAINE

VIC 3450

104.0

15B0373C

100.0

AS1289.1.2.1 part 6.4b

Clayey silt, brown

Clayey silt, brown

Clayey silt, brown

Hilf Density Ratio (%):

Date Sampled: 27/02/2015

Material Description:

*

*96.0

15B0373B

200mm

Print Date: 3/03/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 9: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

R53 Version: 01 July 2014

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client: Slingo Earthmoving Pty Ltd

P.O Box 1250

CASTLEMAINE

VIC 3450

*

*

As Per: AS1289 5.7.1 5.8.1

Offset / Centre Line:

#Map Datum AUS84

Peak Conv. Wet Density: t/m3

Field Wet Density: t/m3

*0.0

*

*

*

*

*

*

* *

*

2.04

#Eastings:

Project Test Number:

#Northings:

* * * * * *

*Percentage Oversize Wet:

*Oversize Sieve Size: (mm)

* * *

* *

Test Number: 15B0373A 15B0373B 15B0373C

62516230 6237

Adj. Peak Conv. Wet Density: t/m3 * *

Centre

2756

Centre

2766

Centre

2778

175 175

Moisture Variation: % (Wet/Dry)

19 19 19 *

*

Time of Test: 3.00pm 3.05pm 3.10pm * * *

*

*

0.0 0.0

* *

* *

-700 -700 -700 * * *

Chainage:

Reduced Level: (mm)

2.02 2.03 *

1.95 2.10 2.03 *

*

1.5Dry 2.5Dry 1.5Dry * * *

* * *

* * * * * *

* * *

HILF DENSITY RATIO (%): 96.0 104.0 100.0 *

Approved Signatory:

*

Adj. Moist. Variation: % (Wet/Dry)

*

*

*

Block 3 Block 2 Block 1 *

Probe Depth: (mm) 175

Moisture Content: % * * *

15B0373

2 of 2

Report Nº:

Sheet:

Date of Report: 3/03/2015

Revision Nº: REV 0

B.P.Mott

Print Date: 3/03/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 10: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

R53 Version: 01 July 2014

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client:

/A

/B

/C

As Per: AS1289 5.7.1 5.8.1

15B/0388

15B/0388

15B/0388

Test Number:

* If Stabilised Time from

Stabilisation to Lab Test:

*

15B/0388A *

*

Material Stabilised:

Approved Signatory:

McIvor Forest Estate Junortoun

House Blocks

*

Standard

Report Nº:

Sheet:

-300mm & -500mm

Date of Report: 5/03/2015

Revision Nº: REV 0

15B/0388

1 of 2

B.P.Mott

Project:

Location:

Test Request No / Lot No:

Layer Thickness: (mm)

Depth Below FSL/CSL:

Compaction Type:

Sampling Method:

*

*

Slingo Earthmoving

P.O Box 1250

CASTLEMAINE

VIC 3450

100.5

15B/0388C

100.0

AS1289.1.2.1 part 6.4b

Silty clay, brown

Silty clay, brown

Silty clay, brown

Hilf Density Ratio (%):

Date Sampled: 3/03/2015

Material Description:

*

*101.0

15B/0388B

200mm

Print Date: 5/03/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 11: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

R53 Version: 01 July 2014

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client: Slingo Earthmoving

P.O Box 1250

CASTLEMAINE

VIC 3450

55026

592

As Per: AS1289 5.7.1 5.8.1

Offset / Centre Line:

#Map Datum AUS84

Peak Conv. Wet Density: t/m3

Field Wet Density: t/m3

*0.0

*

*

*

*

*

*

* *

*

2.03

#Eastings:

Project Test Number:

#Northings:

* * * * * *

*Percentage Oversize Wet:

*Oversize Sieve Size: (mm)

* * *

* *

Test Number: 15B/0388A 15B/0388B 15B/0388C

62616218 6244

Adj. Peak Conv. Wet Density: t/m3 * *

Back

2762

Centre

2765

Centre

2776

175 175

Moisture Variation: % (Wet/Dry)

19 19 19 *

*

Time of Test: 1.25pm 1.35pm 1.40pm * * *

*

*

0.0 0.0

* *

* *

-300 -500 -500 * * *

Chainage:

Reduced Level: (mm)

2.06 2.04 *

2.05 2.07 2.05 *

*

1.5Dry 1.5Dry 1.0Dry * * *

* * *

* * * * * *

* * *

HILF DENSITY RATIO (%): 101.0 100.5 100.0 *

Approved Signatory:

*

Adj. Moist. Variation: % (Wet/Dry)

*

*

*

Lot 3 Lot 2 Lot 1 *

Probe Depth: (mm) 175

Moisture Content: % * * *

15B/0388

2 of 2

Report Nº:

Sheet:

Date of Report: 5/03/2015

Revision Nº: REV 0

B.P.Mott

Print Date: 5/03/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 12: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

R53 Version: 01 July 2014

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client:

/A

/B

/C

As Per: AS1289 5.7.1 5.8.1

15B/0428

15B/0428

15B/0428

Test Number:

No If Stabilised Time from

Stabilisation to Lab Test:

*

15B/0428A *

*

Material Stabilised:

Approved Signatory:

McIvor Forrest Estate Junortoun

House Blocks

*

Standard

Report Nº:

Sheet:

300mm

Date of Report: 11/03/2015

Revision Nº: REV 0

15B/0428

1 of 2

B.P.Mott

Project:

Location:

Test Request No / Lot No:

Layer Thickness: (mm)

Depth Below FSL/CSL:

Compaction Type:

Sampling Method:

*

*

Slingo Earthmoving Pty Ltd

P.O Box 1250

CASTLEMAINE

VIC 3450

101.5

15B/0428C

102.0

AS1289.1.2.1 part 6.4b

Brown Silty Sandy Clay

Brown Silty Sandy Clay

Brown Silty Sandy Clay

Hilf Density Ratio (%):

Date Sampled: 6/03/2015

Material Description:

*

*101.0

15B/0428B

200mm

Print Date: 11/03/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 13: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

R53 Version: 01 July 2014

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client: Slingo Earthmoving Pty Ltd

P.O Box 1250

CASTLEMAINE

VIC 3450

55026

592

As Per: AS1289 5.7.1 5.8.1

Offset / Centre Line:

#Map Datum AUS84

Peak Conv. Wet Density: t/m3

Field Wet Density: t/m3

*0.0

*

*

*

*

*

*

* *

*

2.01

#Eastings:

Project Test Number:

#Northings:

* * * * * *

*Percentage Oversize Wet:

*Oversize Sieve Size: (mm)

* * *

* *

Test Number: 15B/0428A 15B/0428B 15B/0428C

62696228 6244

Adj. Peak Conv. Wet Density: t/m3 * *

*

2758

*

2764

*

2774

175 175

Moisture Variation: % (Wet/Dry)

19 19 19 *

*

Time of Test: 12.50pm 1.10pm 1.20pm * * *

*

*

0.0 0.0

* *

* *

-300.0 -300.0 -300.0 * * *

Chainage:

Reduced Level: (mm)

1.97 2.05 *

2.03 2.00 2.08 *

*

2.5Dry 3.0Dry 2.5Dry * * *

* * *

* * * * * *

* * *

HILF DENSITY RATIO (%): 101.0 101.5 102.0 *

Approved Signatory:

*

Adj. Moist. Variation: % (Wet/Dry)

*

*

*

Block 3 Block 2 Block 1 *

Probe Depth: (mm) 175

Moisture Content: % * * *

15B/0428

2 of 2

Report Nº:

Sheet:

Date of Report: 11/03/2015

Revision Nº: REV 0

B.P.Mott

Print Date: 11/03/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 14: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

R53 Version: 01 July 2014

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client:

/A

/B

/C

As Per: AS1289 5.7.1 5.8.1

15B0465

15B0465

15B0465

Test Number:

No If Stabilised Time from

Stabilisation to Lab Test:

*

15B0465A *

*

Material Stabilised:

Approved Signatory:

McIvor Forrest Estate Junortoun

House Blocks

*

Standard

Report Nº:

Sheet:

FSL

Date of Report: 17/03/2015

Revision Nº: REV 0

15B0465

1 of 2

B.P.Mott

Project:

Location:

Test Request No / Lot No:

Layer Thickness: (mm)

Depth Below FSL/CSL:

Compaction Type:

Sampling Method:

*

*

Slingo Earthmoving Pty Ltd

P.O Box 1250

CASTLEMAINE

VIC 3450

98.5

15B0465C

99.5

AS1289.1.2.1 part 6.4b

Silty clay, brown

Silty clay, brown

Silty clay, brown

Hilf Density Ratio (%):

Date Sampled: 13/03/2015

Material Description:

*

*100.0

15B0465B

200mm

Print Date: 17/03/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 15: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

R53 Version: 01 July 2014

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client: Slingo Earthmoving Pty Ltd

P.O Box 1250

CASTLEMAINE

VIC 3450

*

*

As Per: AS1289 5.7.1 5.8.1

Offset / Centre Line:

#Map Datum AUS84

Peak Conv. Wet Density: t/m3

Field Wet Density: t/m3

*0.0

*

*

*

*

*

*

* *

*

2.02

#Eastings:

Project Test Number:

#Northings:

* * * * * *

*Percentage Oversize Wet:

*Oversize Sieve Size: (mm)

* * *

* *

Test Number: 15B0465A 15B0465B 15B0465C

** *

Adj. Peak Conv. Wet Density: t/m3 * *

Centre

*

Centre

*

Centre

*

175 175

Moisture Variation: % (Wet/Dry)

19 19 19 *

*

Time of Test: 8.25am 8.35am 8.45am * * *

*

*

0.0 0.0

* *

* *

FSL FSL FSL * * *

Chainage:

Reduced Level: (mm)

2.06 2.01 *

2.02 2.03 2.00 *

*

3.0Dry 2.0Dry 3.0Dry * * *

* * *

* * * * * *

* * *

HILF DENSITY RATIO (%): 100.0 98.5 99.5 *

Approved Signatory:

*

Adj. Moist. Variation: % (Wet/Dry)

*

*

*

Block 1 Block 2 Block 3 *

Probe Depth: (mm) 175

Moisture Content: % * * *

15B0465

2 of 2

Report Nº:

Sheet:

Date of Report: 17/03/2015

Revision Nº: REV 0

B.P.Mott

Print Date: 17/03/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 16: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

R53 Version: 01 July 2014

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client:

/A

As Per: AS1289 5.7.1 5.8.1

*

*96.0

*

200mm

Slingo Earthmoving Pty Ltd

P.O Box 1250

CASTLEMAINE

VIC 3450

*

*

*

AS1289.1.2.1 part 6.4b

Silty clay, pale brown

Hilf Density Ratio (%):

Date Sampled: 5/05/2015

Material Description:

B.P.Mott

Project:

Location:

Test Request No / Lot No:

Layer Thickness: (mm)

Depth Below FSL/CSL:

Compaction Type:

Sampling Method:

*

*

Revision Nº: REV 0

15B/0793

1 of 2

Report Nº:

Sheet:

200mm

Date of Report: 8/05/2015

*

Standard

Approved Signatory:

McIvor Forest Estate Stage 14A Junortoun

House Block

No If Stabilised Time from

Stabilisation to Lab Test:

*

15B/0793A *

*

Material Stabilised:

15B/0793

Test Number:

Print Date: 8/05/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 17: LOT FILL McIVOR FOREST ESTATE STAGE 14A JUNORTOUN ... · • The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1

R53 Version: 01 July 2014

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client: Slingo Earthmoving Pty Ltd

P.O Box 1250

CASTLEMAINE

VIC 3450

55026

593

As Per: AS1289 5.7.1 5.8.1

B.P.Mott

2 of 2

Report Nº:

Sheet:

Date of Report: 8/05/2015

Revision Nº: REV 0

Approved Signatory:

*

Adj. Moist. Variation: % (Wet/Dry)

*

*

*

Lot 12 * * *

Probe Depth: (mm) 175

Moisture Content: % * * *

15B/0793

HILF DENSITY RATIO (%): 96.0 * * *

* * * * * *

* * *

*

2.0Dry * * * * *

* * *

* *

* *

-200.0 * * * * *

Chainage:

Reduced Level: (mm)

* * *

1.97 * * *

19 * * *

*

Time of Test: 3.30pm * * * * *

*

*

0.0 *

* *

Test Number: 15B/0793A * *

*6285 *

Adj. Peak Conv. Wet Density: t/m3 * *

Centre

2577

*

*

*

*

* *

Moisture Variation: % (Wet/Dry)

#Eastings:

Project Test Number:

#Northings:

* * * * * *

*Percentage Oversize Wet:

*Oversize Sieve Size: (mm)

* * *

Offset / Centre Line:

#Map Datum AUS84

Peak Conv. Wet Density: t/m3

Field Wet Density: t/m3

**

*

*

*

*

*

*

* *

*

2.05

Print Date: 8/05/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.