Sandhurst Geotech Pty Ltd, Trading as Geotechnical Testing Services – Southern. ABN: 18 169 924 109 ACN: 169 924 109
Email: [email protected]; Ph: 03 5441 4881; Fax: 03 5441 5089; Mail Address: PO Box 13, STRATHDALE, Vic, 3550
Offices: • La Trobe University Applied Science 2 Building 7 Sharon Street, Flora Hill, VIC 3550; • Shed 3, 140 Ogilvie Avenue, Echuca , VIC 3654,
• Geotechnical Investigations • Contract Drilling • Land Capability Assessments • Contamination Assessments • Compaction Control Testing • On-site Wastewater Management •
Site Classifications • Residential and Industrial • Soil, Concrete and Aggregate Testing Laboratories • Site Laboratory
• Construction Material Testing Services • www.geotestsouthern.com.au
LOT FILL McIVOR FOREST ESTATE STAGE 14A
JUNORTOUN
EARTHWORKS SUPERVISION REPORT
FOR SLINGO EARTHMOVING
GTS Report Number 15C 0564 July 2015
TABLE OF CONTENTS Page number 1 INTRODUCTION 3 2 SCOPE OF WORKS 3 2.1 Area of Work 3 2.2 Placement Specification 3 3 INSPECTION AND TESTING 4 4 SUMMARY OF TEST RESULTS 4 5 STATEMENT OF COMPLIANCE 5
APPENDIX Site Location Density Test Reports
15C 0564 Report 3
1 INTRODUCTION
Slingo Earthmoving commissioned Geotechnical Testing Services (GTS) to undertake a Level 1 Supervision (AS3798-2007) of the earthworks for the lot fill at McIvor Forest Estate Stage 14A, Junortoun. Level 1 Testing was generally performed in line with AS3798-2007 “Guidelines on Earthworks for Commercial and Residential Development” and provides inspection of the construction of controlled fill and compaction testing in accordance with AS1289 “Methods of Testing Soils for Engineering Purposes”. The Level 1 testing was undertaken by Geotechnicians with supervision provided by a Geotechnical Engineer from GTS.
2 SCOPE OF WORKS
2.1 Area of Work
Geotechnical Testing Services provided Level 1 inspection and testing of the engineered fill placed on Lots 1 to 3 and 12.
The depth of fill across the lots varied from 300mm to 1000mm. Generally where the depth of fill is less than 300mm, it was placed as uncontrolled with no testing or supervision conducted.
A plan showing the test locations and fill depths is included in the Appendix.
2.2 Placement Specification
Whilst there was no earthworks specification compiled for this project, the placement of the fill and associated works generally followed the recommendations outlined in AS3798-2007 “Guidelines for Earthworks for Commercial and Residential Developments” and the construction specification.
In summary, the earthworks comply with the following:
• The layers for building pads are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1 (or 5.7.1), based on Standard compaction.
In accordance with Table 8.1 of AS3798-2007, the site would be considered large scale (greater than 1500m2) as such a minimum of 1 test per 500m3, 1 test per 2500m2 or 3 tests per visit is required. The frequency of testing conducted was 1 test per residential lot per layer which exceeds minimum requirements.
15C 0564 Report 4
3 INSPECTION AND TESTING
Inspection of the excavated base was conducted by a Geotechnical Engineer and it was observed that the unsuitable material (vegetation and top soil/silt) had been removed with the base consisting of a Silty Clay material of good strength.
Level 1 inspection and testing was undertaken by a geotechnician from GTS who nominated the timing and location of the in-situ density tests. The approximate location of each test is recorded on the test reports and attached fill plan. It is noted that for the stabilised sand, compaction testing is not required.
Laboratory compaction testing was undertaken on a one to one basis at our Bendigo laboratory. A summary of the results of the compaction control testing is presented in a table below with the full NATA endorsed test reports included in the Appendix.
4 SUMMARY OF TEST RESULTS
Project No. Report No. Test Date. Location. Reduced
Level (mm)
Moisture Variation %O.M.C
Hilf Density Ratio %
1 15B 0373A 27/2/15 Lot 3 700 1.5 dry 96.0
2 15B 0373B 27/2/15 Lot 2 700 2.5 dry 104.0
3 15B 0373C 27/2/15 Lot 1 700 1.5 dry 100.0
4 15B 0388A 3/3/15 Lot 3 300 1.5 dry 101.0
5 15B 0388B 3/3/15 Lot 2 500 1.5 dry 100.5
6 15B 0388C 3/3/15 Lot 1 500 1.0 dry 100.0
7 15B 0428A 6/3/15 Lot 3 300 2.5 dry 101.0
8 15B 0428B 6/3/15 Lot 2 300 3.0 dry 101.5
9 15B 0428C 6/3/15 Lot 1 300 2.5 dry 102.0
10 15B 0465A 13/3/15 Lot 1 FSL 3.0 dry 100.0
11 15B 0465B 13/3/15 Lot 2 FSL 2.0 dry 98.5
12 15B 0465C 13/3/15 Lot 3 FSL 3.0 dry 99.5
13 15B 0793A 5/5/15 Lot 12 FSL 2.0 dry 96.0
15C 0564 Report 5
5 STATEMENT OF COMPLIANCE
GTS personnel have provided Level 1 inspection and testing services during the placement of material for the filling of Lots 1 to 3 and 12. The placement of fill and construction techniques adopted was observed throughout the project.
Based on observations made by GTS personnel and the results of field and laboratory tests, we consider that the fill has been placed and compacted and is considered to be engineered or controlled fill. Therefore, subject to residential site classifications, the controlled fill material is deemed a suitable founding medium for future residential buildings. It is noted that top soil material may be spread across the sites following completion of these earthworks and that this top soil material is not considered controlled fill.
Shane Hampton (BE(Hons))
Senior Geotechnical Engineer
15C 0564 Report 6
APPENDIX
Site Plans and Test Reports
15C 0564 Report 7
Fig 1 – Site Plan & Test Locations
9
11
10 8
7
6
5 4
3
2
1 12
13
R53 Version: 01 July 2014
COMPACTION ASSESSMENT
Nuclear Gauge Method Hilf (Wet) Density Ratio
TEST REPORT:
Client:
/A
/B
/C
As Per: AS1289 5.7.1 5.8.1
15B0373
15B0373
15B0373
Test Number:
* If Stabilised Time from
Stabilisation to Lab Test:
*
15B0373A *
*
Material Stabilised:
Approved Signatory:
McIvor Forrest Estate, Junortoun
House Blocks
*
Standard
Report Nº:
Sheet:
-700mm
Date of Report: 3/03/2015
Revision Nº: REV 0
15B0373
1 of 2
B.P.Mott
Project:
Location:
Test Request No / Lot No:
Layer Thickness: (mm)
Depth Below FSL/CSL:
Compaction Type:
Sampling Method:
*
*
Slingo Earthmoving Pty Ltd
P.O Box 1250
CASTLEMAINE
VIC 3450
104.0
15B0373C
100.0
AS1289.1.2.1 part 6.4b
Clayey silt, brown
Clayey silt, brown
Clayey silt, brown
Hilf Density Ratio (%):
Date Sampled: 27/02/2015
Material Description:
*
*96.0
15B0373B
200mm
Print Date: 3/03/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.
R53 Version: 01 July 2014
COMPACTION ASSESSMENT
Nuclear Gauge Method Hilf (Wet) Density Ratio
TEST REPORT:
Client: Slingo Earthmoving Pty Ltd
P.O Box 1250
CASTLEMAINE
VIC 3450
*
*
As Per: AS1289 5.7.1 5.8.1
Offset / Centre Line:
#Map Datum AUS84
Peak Conv. Wet Density: t/m3
Field Wet Density: t/m3
*0.0
*
*
*
*
*
*
* *
*
2.04
#Eastings:
Project Test Number:
#Northings:
* * * * * *
*Percentage Oversize Wet:
*Oversize Sieve Size: (mm)
* * *
* *
Test Number: 15B0373A 15B0373B 15B0373C
62516230 6237
Adj. Peak Conv. Wet Density: t/m3 * *
Centre
2756
Centre
2766
Centre
2778
175 175
Moisture Variation: % (Wet/Dry)
19 19 19 *
*
Time of Test: 3.00pm 3.05pm 3.10pm * * *
*
*
0.0 0.0
* *
* *
-700 -700 -700 * * *
Chainage:
Reduced Level: (mm)
2.02 2.03 *
1.95 2.10 2.03 *
*
1.5Dry 2.5Dry 1.5Dry * * *
* * *
* * * * * *
* * *
HILF DENSITY RATIO (%): 96.0 104.0 100.0 *
Approved Signatory:
*
Adj. Moist. Variation: % (Wet/Dry)
*
*
*
Block 3 Block 2 Block 1 *
Probe Depth: (mm) 175
Moisture Content: % * * *
15B0373
2 of 2
Report Nº:
Sheet:
Date of Report: 3/03/2015
Revision Nº: REV 0
B.P.Mott
Print Date: 3/03/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.
R53 Version: 01 July 2014
COMPACTION ASSESSMENT
Nuclear Gauge Method Hilf (Wet) Density Ratio
TEST REPORT:
Client:
/A
/B
/C
As Per: AS1289 5.7.1 5.8.1
15B/0388
15B/0388
15B/0388
Test Number:
* If Stabilised Time from
Stabilisation to Lab Test:
*
15B/0388A *
*
Material Stabilised:
Approved Signatory:
McIvor Forest Estate Junortoun
House Blocks
*
Standard
Report Nº:
Sheet:
-300mm & -500mm
Date of Report: 5/03/2015
Revision Nº: REV 0
15B/0388
1 of 2
B.P.Mott
Project:
Location:
Test Request No / Lot No:
Layer Thickness: (mm)
Depth Below FSL/CSL:
Compaction Type:
Sampling Method:
*
*
Slingo Earthmoving
P.O Box 1250
CASTLEMAINE
VIC 3450
100.5
15B/0388C
100.0
AS1289.1.2.1 part 6.4b
Silty clay, brown
Silty clay, brown
Silty clay, brown
Hilf Density Ratio (%):
Date Sampled: 3/03/2015
Material Description:
*
*101.0
15B/0388B
200mm
Print Date: 5/03/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.
R53 Version: 01 July 2014
COMPACTION ASSESSMENT
Nuclear Gauge Method Hilf (Wet) Density Ratio
TEST REPORT:
Client: Slingo Earthmoving
P.O Box 1250
CASTLEMAINE
VIC 3450
55026
592
As Per: AS1289 5.7.1 5.8.1
Offset / Centre Line:
#Map Datum AUS84
Peak Conv. Wet Density: t/m3
Field Wet Density: t/m3
*0.0
*
*
*
*
*
*
* *
*
2.03
#Eastings:
Project Test Number:
#Northings:
* * * * * *
*Percentage Oversize Wet:
*Oversize Sieve Size: (mm)
* * *
* *
Test Number: 15B/0388A 15B/0388B 15B/0388C
62616218 6244
Adj. Peak Conv. Wet Density: t/m3 * *
Back
2762
Centre
2765
Centre
2776
175 175
Moisture Variation: % (Wet/Dry)
19 19 19 *
*
Time of Test: 1.25pm 1.35pm 1.40pm * * *
*
*
0.0 0.0
* *
* *
-300 -500 -500 * * *
Chainage:
Reduced Level: (mm)
2.06 2.04 *
2.05 2.07 2.05 *
*
1.5Dry 1.5Dry 1.0Dry * * *
* * *
* * * * * *
* * *
HILF DENSITY RATIO (%): 101.0 100.5 100.0 *
Approved Signatory:
*
Adj. Moist. Variation: % (Wet/Dry)
*
*
*
Lot 3 Lot 2 Lot 1 *
Probe Depth: (mm) 175
Moisture Content: % * * *
15B/0388
2 of 2
Report Nº:
Sheet:
Date of Report: 5/03/2015
Revision Nº: REV 0
B.P.Mott
Print Date: 5/03/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.
R53 Version: 01 July 2014
COMPACTION ASSESSMENT
Nuclear Gauge Method Hilf (Wet) Density Ratio
TEST REPORT:
Client:
/A
/B
/C
As Per: AS1289 5.7.1 5.8.1
15B/0428
15B/0428
15B/0428
Test Number:
No If Stabilised Time from
Stabilisation to Lab Test:
*
15B/0428A *
*
Material Stabilised:
Approved Signatory:
McIvor Forrest Estate Junortoun
House Blocks
*
Standard
Report Nº:
Sheet:
300mm
Date of Report: 11/03/2015
Revision Nº: REV 0
15B/0428
1 of 2
B.P.Mott
Project:
Location:
Test Request No / Lot No:
Layer Thickness: (mm)
Depth Below FSL/CSL:
Compaction Type:
Sampling Method:
*
*
Slingo Earthmoving Pty Ltd
P.O Box 1250
CASTLEMAINE
VIC 3450
101.5
15B/0428C
102.0
AS1289.1.2.1 part 6.4b
Brown Silty Sandy Clay
Brown Silty Sandy Clay
Brown Silty Sandy Clay
Hilf Density Ratio (%):
Date Sampled: 6/03/2015
Material Description:
*
*101.0
15B/0428B
200mm
Print Date: 11/03/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.
R53 Version: 01 July 2014
COMPACTION ASSESSMENT
Nuclear Gauge Method Hilf (Wet) Density Ratio
TEST REPORT:
Client: Slingo Earthmoving Pty Ltd
P.O Box 1250
CASTLEMAINE
VIC 3450
55026
592
As Per: AS1289 5.7.1 5.8.1
Offset / Centre Line:
#Map Datum AUS84
Peak Conv. Wet Density: t/m3
Field Wet Density: t/m3
*0.0
*
*
*
*
*
*
* *
*
2.01
#Eastings:
Project Test Number:
#Northings:
* * * * * *
*Percentage Oversize Wet:
*Oversize Sieve Size: (mm)
* * *
* *
Test Number: 15B/0428A 15B/0428B 15B/0428C
62696228 6244
Adj. Peak Conv. Wet Density: t/m3 * *
*
2758
*
2764
*
2774
175 175
Moisture Variation: % (Wet/Dry)
19 19 19 *
*
Time of Test: 12.50pm 1.10pm 1.20pm * * *
*
*
0.0 0.0
* *
* *
-300.0 -300.0 -300.0 * * *
Chainage:
Reduced Level: (mm)
1.97 2.05 *
2.03 2.00 2.08 *
*
2.5Dry 3.0Dry 2.5Dry * * *
* * *
* * * * * *
* * *
HILF DENSITY RATIO (%): 101.0 101.5 102.0 *
Approved Signatory:
*
Adj. Moist. Variation: % (Wet/Dry)
*
*
*
Block 3 Block 2 Block 1 *
Probe Depth: (mm) 175
Moisture Content: % * * *
15B/0428
2 of 2
Report Nº:
Sheet:
Date of Report: 11/03/2015
Revision Nº: REV 0
B.P.Mott
Print Date: 11/03/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.
R53 Version: 01 July 2014
COMPACTION ASSESSMENT
Nuclear Gauge Method Hilf (Wet) Density Ratio
TEST REPORT:
Client:
/A
/B
/C
As Per: AS1289 5.7.1 5.8.1
15B0465
15B0465
15B0465
Test Number:
No If Stabilised Time from
Stabilisation to Lab Test:
*
15B0465A *
*
Material Stabilised:
Approved Signatory:
McIvor Forrest Estate Junortoun
House Blocks
*
Standard
Report Nº:
Sheet:
FSL
Date of Report: 17/03/2015
Revision Nº: REV 0
15B0465
1 of 2
B.P.Mott
Project:
Location:
Test Request No / Lot No:
Layer Thickness: (mm)
Depth Below FSL/CSL:
Compaction Type:
Sampling Method:
*
*
Slingo Earthmoving Pty Ltd
P.O Box 1250
CASTLEMAINE
VIC 3450
98.5
15B0465C
99.5
AS1289.1.2.1 part 6.4b
Silty clay, brown
Silty clay, brown
Silty clay, brown
Hilf Density Ratio (%):
Date Sampled: 13/03/2015
Material Description:
*
*100.0
15B0465B
200mm
Print Date: 17/03/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.
R53 Version: 01 July 2014
COMPACTION ASSESSMENT
Nuclear Gauge Method Hilf (Wet) Density Ratio
TEST REPORT:
Client: Slingo Earthmoving Pty Ltd
P.O Box 1250
CASTLEMAINE
VIC 3450
*
*
As Per: AS1289 5.7.1 5.8.1
Offset / Centre Line:
#Map Datum AUS84
Peak Conv. Wet Density: t/m3
Field Wet Density: t/m3
*0.0
*
*
*
*
*
*
* *
*
2.02
#Eastings:
Project Test Number:
#Northings:
* * * * * *
*Percentage Oversize Wet:
*Oversize Sieve Size: (mm)
* * *
* *
Test Number: 15B0465A 15B0465B 15B0465C
** *
Adj. Peak Conv. Wet Density: t/m3 * *
Centre
*
Centre
*
Centre
*
175 175
Moisture Variation: % (Wet/Dry)
19 19 19 *
*
Time of Test: 8.25am 8.35am 8.45am * * *
*
*
0.0 0.0
* *
* *
FSL FSL FSL * * *
Chainage:
Reduced Level: (mm)
2.06 2.01 *
2.02 2.03 2.00 *
*
3.0Dry 2.0Dry 3.0Dry * * *
* * *
* * * * * *
* * *
HILF DENSITY RATIO (%): 100.0 98.5 99.5 *
Approved Signatory:
*
Adj. Moist. Variation: % (Wet/Dry)
*
*
*
Block 1 Block 2 Block 3 *
Probe Depth: (mm) 175
Moisture Content: % * * *
15B0465
2 of 2
Report Nº:
Sheet:
Date of Report: 17/03/2015
Revision Nº: REV 0
B.P.Mott
Print Date: 17/03/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.
R53 Version: 01 July 2014
COMPACTION ASSESSMENT
Nuclear Gauge Method Hilf (Wet) Density Ratio
TEST REPORT:
Client:
/A
As Per: AS1289 5.7.1 5.8.1
*
*96.0
*
200mm
Slingo Earthmoving Pty Ltd
P.O Box 1250
CASTLEMAINE
VIC 3450
*
*
*
AS1289.1.2.1 part 6.4b
Silty clay, pale brown
Hilf Density Ratio (%):
Date Sampled: 5/05/2015
Material Description:
B.P.Mott
Project:
Location:
Test Request No / Lot No:
Layer Thickness: (mm)
Depth Below FSL/CSL:
Compaction Type:
Sampling Method:
*
*
Revision Nº: REV 0
15B/0793
1 of 2
Report Nº:
Sheet:
200mm
Date of Report: 8/05/2015
*
Standard
Approved Signatory:
McIvor Forest Estate Stage 14A Junortoun
House Block
No If Stabilised Time from
Stabilisation to Lab Test:
*
15B/0793A *
*
Material Stabilised:
15B/0793
Test Number:
Print Date: 8/05/2015. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.
R53 Version: 01 July 2014
COMPACTION ASSESSMENT
Nuclear Gauge Method Hilf (Wet) Density Ratio
TEST REPORT:
Client: Slingo Earthmoving Pty Ltd
P.O Box 1250
CASTLEMAINE
VIC 3450
55026
593
As Per: AS1289 5.7.1 5.8.1
B.P.Mott
2 of 2
Report Nº:
Sheet:
Date of Report: 8/05/2015
Revision Nº: REV 0
Approved Signatory:
*
Adj. Moist. Variation: % (Wet/Dry)
*
*
*
Lot 12 * * *
Probe Depth: (mm) 175
Moisture Content: % * * *
15B/0793
HILF DENSITY RATIO (%): 96.0 * * *
* * * * * *
* * *
*
2.0Dry * * * * *
* * *
* *
* *
-200.0 * * * * *
Chainage:
Reduced Level: (mm)
* * *
1.97 * * *
19 * * *
*
Time of Test: 3.30pm * * * * *
*
*
0.0 *
* *
Test Number: 15B/0793A * *
*6285 *
Adj. Peak Conv. Wet Density: t/m3 * *
Centre
2577
*
*
*
*
* *
Moisture Variation: % (Wet/Dry)
#Eastings:
Project Test Number:
#Northings:
* * * * * *
*Percentage Oversize Wet:
*Oversize Sieve Size: (mm)
* * *
Offset / Centre Line:
#Map Datum AUS84
Peak Conv. Wet Density: t/m3
Field Wet Density: t/m3
**
*
*
*
*
*
*
* *
*
2.05