los-aau proposal ver1
TRANSCRIPT
8/4/2019 Los-Aau Proposal Ver1
http://slidepdf.com/reader/full/los-aau-proposal-ver1 1/15
PROPOSAL
Creation of Loan Origination
System (LOS) Application
Administration Unit (AAU) at
FUSG
PROPOSAL
Creation of Loan Origination
System (LOS) Application
Administration Unit (AAU) at
FUSG
OASC Presentation
June 11, 2010
8/4/2019 Los-Aau Proposal Ver1
http://slidepdf.com/reader/full/los-aau-proposal-ver1 2/15
ADBS
1. What is Loan Origination System
2. Objectives of the Proposed Creation of LOS-AAU
5. Initial Staff Composition of Proposed LOS-AAU
6. Existing Set-Up vis-à-vis Proposed Set-Up
4. Organizational Chart of FUSG (Existing and Proposed
Set-up)
7. How the Proposed LOS-AAU differed from anordinary System Administrator of other Application
Systems.
8. Advantages of the Proposed Set-Up
3. LOS-AAU Functions
8/4/2019 Los-Aau Proposal Ver1
http://slidepdf.com/reader/full/los-aau-proposal-ver1 3/15
ADBS
• EXPEDITE SCREENING OF LOAN BORROWERS (aided by
internal database verification, on-line link to credit
information, frontline facility to test credit risk criteria
compliance and quick credit scoring)
LOAN ORIGINATION (LOS) SystemLOAN ORIGINATION (LOS) System
The LOS is an automated system sponsored by ADBS aimed to:
• ENABLE SIMULTANEOUS REVIEW OF LOAN
PROPOSALS (thru on-line accessibility of loan applications
from front-liners to HO approving authorities)
• PROVIDE EFFECTIVE CREDIT MONITORING AND
SUPERVISION (via automated credit supervision and control
checklists, ticklers and instructions)
8/4/2019 Los-Aau Proposal Ver1
http://slidepdf.com/reader/full/los-aau-proposal-ver1 4/15
ADBS
Objectives/Rationale of the Proposed
Creation of the LOS-AAU
Objectives/Rationale of the Proposed
Creation of the LOS-AAU
To ensure smooth implementation of the Loan OriginationSystem (LOS)
• LOS is a highly-parameterized credit processing
system that will require constant updating of the
maintainable common codes defined in the system
• Definition of credit officer’s (loan approving groups)
approval limits is complicated in LOS and needs to
be done on a per individual basis
8/4/2019 Los-Aau Proposal Ver1
http://slidepdf.com/reader/full/los-aau-proposal-ver1 5/15
ADBS
LOS-AAU FUNCTIONSLOS-AAU FUNCTIONS
APPLICATION ADMINISTRATION
• First line of support for LOS system users thru:
- telephone assistance
- incident reports handling- recommend system enhancements, if applicable
• Ensure that credit policies are translated into LOS
parameters
• Preparation and implementation of LOS security matrix
8/4/2019 Los-Aau Proposal Ver1
http://slidepdf.com/reader/full/los-aau-proposal-ver1 6/15
ADBS
LOS-AAU FUNCTIONSLOS-AAU FUNCTIONS
• Conduct LOS training for system users
• Issue advisories and bulletins in handling system
problems/work-around procedures
USER ADMINISTRATION *
• Handle enrollment, deletion, and reactivation of
authorized users ID
* To be proposed to LOS Project Steering Committee. Function is now with SID.
8/4/2019 Los-Aau Proposal Ver1
http://slidepdf.com/reader/full/los-aau-proposal-ver1 7/15 ADBS
Field Units Support Group ( FUSG)
MIS & PlanningSupport Department
(MPSD)
MIS &Performance
EvaluationUnit(MPEU)
Executive Assistant
Planning &GP Awards
SupportUnit(PGASU)
DomesticBanking
LoansCommittee(DBLC)
Secretariat
Systems ImplementationDepartment
(SID)
Field OperationsSupport Department
(FOSD)
FieldOperations
SupportUnit I(FOSU I)
FieldOperations
SupportUnit II(FOSU II)
ProjectDevelopment
Unit(PDU)
SystemsSupport
Unit I(SSU I)
SystemsSupport
Unit II(SSU II)
InformationSecurity
Admin.Unit(ISAU)
ORGANIZATIONAL CHART Field Unit Support Group (FUSG) Existing Set-Up
ORGANIZATIONAL CHART Field Unit Support Group (FUSG) Existing Set-Up
8/4/2019 Los-Aau Proposal Ver1
http://slidepdf.com/reader/full/los-aau-proposal-ver1 8/15 ADBS
Field Units Support Group ( FUSG)
MIS & Planning
Support Department(MPSD)
MIS &PerformanceEvaluation
Unit(MPEU)
Executive Assistant
Planning &GP Awards
SupportUnit
(PGPSU)
LendingOperationsSupport
Unit(LOSU)
Systems Implementation
Department(SID)
Field Operations
Support Department(FOSD)
FieldOperations
SupportUnit I
(FOSU I)
FieldOperationsSupport
Unit II(FOSU II)
ProjectDevelopment
Unit(PDU)
SystemsSupport
Unit I(SSU I)
SystemsSupportUnit II
(SSU II)
InformationSecurityAdmin.
Unit(ISAU)
ORGANIZATIONAL CHART Field Unit Support Group (FUSG) Proposed Set-Up - 1
ORGANIZATIONAL CHART Field Unit Support Group (FUSG) Proposed Set-Up - 1
DomesticBankingLoans
Committee
(DBLC)Secretariat
Applica-tion
Adminis-tration
UserAdminis-tration
8/4/2019 Los-Aau Proposal Ver1
http://slidepdf.com/reader/full/los-aau-proposal-ver1 9/15
ADBS
Field Units Support Group ( FUSG)
MIS & PlanningSupport Department
(MPSD)
MIS &PerformanceEvaluation
Unit(MPEU)
Executive Assistant
Planning &GP Awards
Support
Unit(PGPSU)
Systems Implementation
Department (SID)
Field OperationsSupport Department
(FOSD)
FieldOperations
SupportUnit I(FOSU I)
FieldOperations
SupportUnit II(FOSU II)
ProjectDevelop-
ment
Unit(PDU)
SystemsSupport
Unit I(SSU I)
SystemsSupport
Unit II(SSU II)
Informa-tion
SecurityAdmin.Unit
(ISAU)
ORGANIZATIONAL CHART Field Unit Support Group (FUSG) Proposed Set-Up - 2
ORGANIZATIONAL CHART Field Unit Support Group (FUSG) Proposed Set-Up - 2
Lending OperationsSupport Unit
(LOSU)
DomesticBankingLoans
Committee(DBLC)
Secretariat
Applica-tion
Adminis-tration
UserAdminis-
tration
8/4/2019 Los-Aau Proposal Ver1
http://slidepdf.com/reader/full/los-aau-proposal-ver1 10/15
ADBS
ORGANIZATIONAL CHART Proposed Lending Operations Support Unit (LOSU)
ORGANIZATIONAL CHART Proposed Lending Operations Support Unit (LOSU)
HEAD – LOSU
Domestic BankingLoans Committee(DBLC) Secretariat
UserAdministration
ApplicationAdministration
8/4/2019 Los-Aau Proposal Ver1
http://slidepdf.com/reader/full/los-aau-proposal-ver1 11/15
ADBS
Initial Staff Composition for the Proposed
Creation of the LOS-AAU
Initial Staff Composition for the Proposed
Creation of the LOS-AAU
AAU Supervisor One (1) Position ItemMinimum Pay Grade (PG) 9
QS Equivalent to PG 9 AccountOfficer (AO)
AAU Maker/CheckerTwo (2) Position ItemsPay Grade (PG)6
QS equivalent to PG 6 Account Assistant (AA)
• Proposed staff composition must be an existing Account Officer with
credit exposure preferably part of the existing LOS Project Team.
• Annual compensation of the 3 additional staffers is estimated at P1.6M.
8/4/2019 Los-Aau Proposal Ver1
http://slidepdf.com/reader/full/los-aau-proposal-ver1 12/15
ADBS
Existing Set-up vis-à-vis Proposed Set-upExisting Set-up vis-à-vis Proposed Set-up
• Handles DBLC Secretariat
• Team Leader, Application Admin Support
Team, Loan Origination System Project
Existing set-up
• Existing Functions plus LOS-AAUFunctions
Proposed set-up
8/4/2019 Los-Aau Proposal Ver1
http://slidepdf.com/reader/full/los-aau-proposal-ver1 13/15
ADBS
HOW THE PROPOSED LOS-AAU DIFFERS FROM AN ORDINARY
SYSTEMS ADMINISTRATOR OF OTHER APPLICATION SYSTEMS
HOW THE PROPOSED LOS-AAU DIFFERS FROM AN ORDINARY
SYSTEMS ADMINISTRATOR OF OTHER APPLICATION SYSTEMS
PARTICULARS LOS OTHER APPLICATIONSYSTEM
Functionality LOS automates loan processing fromborrower’s loan application to approval. Itfacilitates screening of borrower’scapacity based on the Bank’s criteria. Italso facilitates CFP preparation using
existing parameters defined by the LOS- AAU.
Parameter set-up will be a continuing daily activity of AAU, unlike in accounting system (e.g., approval authorities of system users)
Symbols – accountingsystem that serves asloan subsidiary ledger;only approved loans areinputted in the system
Parameter Changes
LOS is highly parameterized that anychanges or instructions in DBLC andILEC may need immediate updating of common codes in the system.
8/4/2019 Los-Aau Proposal Ver1
http://slidepdf.com/reader/full/los-aau-proposal-ver1 14/15
ADBS
Advantages of the Proposed Set-Up Advantages of the Proposed Set-Up
•Lending Operations Support Unit (LOSU), being thesecretariat of DBLC, is well-informed on loan proposals
deliberated in DBLC. They can validate/tract the actual
loan status against what is on the system
• LOSU is also aware of the changes in credit policies andcan translate these policies into parameters defined in
LOC
• LOSU will serve as first line of support to guide LOSsystem users in relation to the use of the system and
applicability of credit policies