look the calibration to understand what and when has been changed in our electronics a. maslennikov,...

8
Look the calibration to understand what and when has been changed in our electronics A. Maslennikov, 26 February 2010, HiLum workshop mber 08 logbook: .2008 - 14:30 J.F.: wing Evgeny, for MEDIUM gain 10 Ohm SMD resistors were red to 50 Ohm SMD resistors on front-end board resulting into 8.33 e consequence the gain for MEDIUM gain should be increased. ain untouched. ct, the transition has taken place between 18 April and 07 November ext slides.

Upload: gerald-harmon

Post on 17-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Look the calibration to understand what and when has been changed in our electronics A. Maslennikov, 26 February 2010, HiLum workshop November 08 logbook:

Look the calibration to understand what and when has been changed in our electronics

A. Maslennikov, 26 February 2010, HiLum workshop

November 08 logbook:

11.11.2008 - 14:30 J.F.:

Following Evgeny, for MEDIUM gain 10 Ohm SMD resistors were soldered to 50 Ohm SMD resistors on front-end board resulting into 8.33 Ohm. As the consequence the gain for MEDIUM gain should be increased. LOW gain untouched.

In fact, the transition has taken place between 18 April and 07 November 2008,see next slides.

Page 2: Look the calibration to understand what and when has been changed in our electronics A. Maslennikov, 26 February 2010, HiLum workshop November 08 logbook:

HEC shape - 18 April 2008 (gen 109, ch1:2, DAC= 5 000 top, 50 000 bottom)

Page 3: Look the calibration to understand what and when has been changed in our electronics A. Maslennikov, 26 February 2010, HiLum workshop November 08 logbook:

EMEC shape - 18 April 2008 (gen 117, ch1:2, DAC= 5 000 top, 50 000 bottom)

Page 4: Look the calibration to understand what and when has been changed in our electronics A. Maslennikov, 26 February 2010, HiLum workshop November 08 logbook:

HEC shape - 07 Nov 2008 (gen 109, ch1:2, DAC= 5 000 top, 50 000 bottom)

Page 5: Look the calibration to understand what and when has been changed in our electronics A. Maslennikov, 26 February 2010, HiLum workshop November 08 logbook:

EMEC shape - 07 Nov 2008 (gen 117, ch1:2, DAC= 5 000 top, 50 000 bottom)

Page 6: Look the calibration to understand what and when has been changed in our electronics A. Maslennikov, 26 February 2010, HiLum workshop November 08 logbook:

Next major intervention was in September 09 (two slides from E. Ladygin, HiLum meeting 21 Sept 09)

FEB’s

• burned board has been repaired

• second board has been prepared

• fuses & zener diodes have been installed on both boards

Next slide

Photo

Question (A.M.): may these Zener diodes provoque the wiggles ?

Page 7: Look the calibration to understand what and when has been changed in our electronics A. Maslennikov, 26 February 2010, HiLum workshop November 08 logbook:
Page 8: Look the calibration to understand what and when has been changed in our electronics A. Maslennikov, 26 February 2010, HiLum workshop November 08 logbook: