  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Long Lived Bridges:

    Recent Developments in the United States

    and Future Research Needs

    Joseph L. Hartmann, PhD, PE

    Leader, Bridge Design and Construction Team

    Office of Infrastructure R & D

    Federal Highway Administration

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Presentation Topics

    • Bridge Engineering Issues

    • Selected Current FHWA Studies

    • Other Research Needs

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Bridge Engineering Issues

    • Our industry requires structures that are

    – Durable

    – Constructable

    – Maintainable

    – Inspectable

    – Resilient to extreme events

    – Easily adapted to changing demands

    – INEXPENSIVE!

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Bridge Durability

    • Decks

    • Higher performance materials

    – Corrosion/deterioration resistant

    [materials/coatings]

    – Crack/fracture resistant

    – Fire resistant

    – Impact resistant

    • Improved design codes (performance-based?)

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Bridge Construction

    • Fabrication/casting technology

    • Construction QA/QC technologies

    • Accelerated construction technologies

    – Prefab systems and components

    – Erection equipment to handle prefab

    – Simpler foundations and substructures

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Bridge Maintenance and Preservation

    • Decks

    • Joints

    – Superstructure

    – Bearings

    – Substructure

    • Foundations and Approach Slabs

    – Scour

    – Erosion/settlement

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Bridge Inspection and Evaluation

    • Simple/hand-held tools

    • Advanced NDE

    • Structural monitoring (short and long-term)

    • Non-accessible elements/components

    • Load capacity evaluation/rating tools

    • Turning inspection data into useful decision-

    making information

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Extreme Events

    • Earthquake

    • Flood

    • Wind

    • Impact (vehicle, ship/barge)

    • Fire

    • Blast

    • …..

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Adaptable to Change

    • Traffic demands

    • Climate change

    • Age (repair, rehab)

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Overarching Issue…

    Data Information

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Selected current FHWA projects that address

    issues.

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    FHWA Research Mechanisms

    • Contract R&D…consultants, universities,

    others

    • In-House FHWA Laboratories

    – Structures

    – Geotechnical

    – Hydraulics

    – Aerodynamics

    – Non-Destructive Evaluation (NDE) Center

    – Durability (Paint/Coatings/Corrosion)

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    UHPC for Modular Bridge Connections

    SR 31 over Canandaigua Outlet

    Lyons, New York

    61 in. 6 in.

    Closure Pour (UHPC)

    Deck Bulb Tee Prestressed Girder

    41 in.

    6 in.

    Closure Pour (UHPC)

    Precast Deck Panel8 in.

    96 in.

    SR 23 over Otego Creek

    Oneonta, New York

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    FHWA-AASHTO Joint Study (NCHRP 12-84)

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    I-35W Bridge

    Collapse

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    I-35W Bridge Collapse

    • Among the questions raised:

    – Performance of gusset plates

    – Gusset plate evaluation and rating

    – Gusset plate inspection

    [determination of corrosion or remaining section

    of multiple plate systems]

    **Design error…not fatigue, corrosion or inspection.

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Limit State Performance

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Phase 2 Test Matrix – Corroded Specimens

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Corrosion Between Multiple Plates

    • Inaccessible; conventional NDE does not work

    • Technologies being assessed include:

    – Pocket UT (Ultrasonic Portable C-Scan Imaging

    System)

    – Phased Array Ultrasonic Testing

    – Active IR Thermography

    – Portable Radiography

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Corrosion in Concrete Bridges

    • NDE methods being assessed:

    – Microwave (Thermo) Reflectometry

    – Ground Penetrating Radar (GPR)

    – Ultrasonic Echo / Impact Echo

    – Infrared (IR)

    – Half Cell / Linear Polarization

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    NDE Technologies for Hidden Wire Corrosion

    NDE technologies are being

    evaluated for corrosion detection

    in PT external tendons, stay

    cables, and suspension cables

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Long-Term Bridge Performance Program

    (LTBPP)

    • Designated in “SAFETEA-LU” surface

    transportation authorization legislation (August

    2005)

    • Intended as a long-term research effort to

    improve our knowledge of bridge performance

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Tools for

    Program Objectives

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    • Detailed inspection, periodic evaluation and

    monitoring by taking advantage of sensor

    technology

    • Representative sample of “work-horse” highway

    bridges

    • Forensic autopsies of decommissioned bridges

    • Leverage accelerated testing when possible

    Program Approach

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    • Sept. 2009 – Sept. 2011

    • Detailed inspection and

    monitoring of 7 bridges

    • Validate protocols

    and processes

    • Coordinate with SHAs

    for field investigation

    Pilot Bridge Location

    Pilot Bridge Study

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    LTBPP Pilot Bridges

    • Constructed in 1976

    • Single span AASHTO beams with integral abutment

    • CIP concrete deck with asphalt overlay and membrane

    • AADT of 22,250 with 29% truck traffic

    • Constructed in 1979

    • Continuous built-up steel girder

    • CIP concrete deck

    • AADT of 16,500 with 6% truck

    traffic

    Virginia Utah

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    LTBPP Pilot Bridges

    • Constructed in 1969

    • Single span multi-beam steel girder bridge

    • CIP concrete deck, stay-in-place forms

    • AADT of 25,000

    • Constructed in 1975

    • 2-span Pre-stressed post-tensioned

    continuous CIP Box Girder bridge

    • AADT of 24,500 with 21% trucks

    California New Jersey

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Activity VA UT CA NJ MN NY FL

    Bridge Selection Done Done Done Done Underway Underway TBD

    Finite Element Model Done Done Done Done Future * Future * Future *

    Live Load Testing Done Done Done Done Future * Future * Future *

    Visual Inspection Done Done Done Done Future * Future * Future *

    NDE Deck Survey Done Done Done Done Future * Future * Future *

    Coring & Physical

    TestingDone Done Done Done Future * Future * Future *

    Analysis of Results Underway Underway Underway Underway Future * Future * Future *

    * Anticipated

    Completion date:

    03/31/2011

    LTBPP Pilot Study Status

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    • Improved knowledge of State maintenance effectiveness

    • Demonstration of effectiveness of sensor technology in

    bridge inspection/condition assessment

    • Improved bridge life-cycle cost analysis and deterioration

    prediction

    • Basis for implementation of performance based design

    • Protocols for load rating based on structural monitoring

    • Foster the next generation of bridge and asset

    management systems and tools

    Anticipated Impacts of a 20+ Year Program

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Continuing Research Needs

    • Risk-based Inspection Approaches

    • Inaccessible Component Inspection Technology

    • Remote Inspection and Visualization

    • Sensors and Systems

    – Short-term performance evaluation

    – Long-term performance monitoring

    – Motorist warning

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    • Rapid Load Capacity Assessment

    • Underwater Inspection/Imaging

    • SHM Data Fusion and Knowledge Tools

    • Fire-resistant materials

    • Improved welding processes (speed, quality,

    consumables)

    • In-situ stress/strain measurement

    More Needs…

  • TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

    Thank you…questions?