london school of economics centre building redevelopment...ondon school of economics is an...

1
ondon School of Economics is an educational project spread L over 161459 sq. ft.i(15,000 sq. m.) in Kensington, London, UK consisting of 1 Building with 13 floors located at Houghton Street, London. The purpose of using BIM is for renovation work. It is a public research university & a constituent college of the Federal University of London founded in 1895 by Fabian Society members Sidney Webb, Beatrice Webb, Graham Wallas, and George Bernard Shaw for the betterment of society. Copyright © 2018 Pinnacle Infotech, Inc. Global Leader in BIM Services www.pinnaclecad.com London School of Economics Centre Building Redevelopment [Educational] Kensington, London England, UK Project Speciality Pinnacle's Value Addition Challenges & Solutions Challenge - There was a dire need of satisfying the prefabricators specifications which required extensive communication with all parties Solution - Used BIM expertise to complete the project within limited time frame London School of Economics is basically a Febricated Riser Drawing and an Educational Project. For Drainage System we have used HDPE Material and we have used Copper Material For Water Supply. We have converted the model Revit to Febrication first. BIM Start Date: October, 2017 161,459 sq ft Average Team Size: Project Area: 5 Engineers BIM End Date: November, 2017 Architect: B+R Architects Construction Consultant: Dornan Engineering Services* Trades Covered: MEPFP (Mechanical, Electrical, PHE, Fire Protection) Software Used: Autocad Fabrication-2015, Autodesk AutoCAD MEP 2015, Navisworks Manage 2016 Scope of Work Our scope of work for the project included: 1. 3D Model Validation & Updation - MEPFP 3D Model Conversion in Autodesk Fabrication (FAB MEP) Floor by Floor 2. Constructability Review, BIM Clash Coordination - Combining Models & Inference Check in Navisworks for adjustment of Riser 3. Generation of Riser Drawings (35 Sheets)- Providing MEPFP Shop Drawings for Risers • BIM helped to meet project requirement, discovering & resolving issues at an early stage of construction, saving time, eliminating rework • Design & Construction Information modeled as single discipline for coordinating into a fully composite 3D Model, allowing 2d models to be extracted as required • Using BIM, we reviewed interdisciplinary coordination, floor to floor alignment or continuation to other areas • Effective BIM application reaped benefits throughout project lifecycle starting from design development to technical design, construction and use • BIM Workflow ensured design & construction activity to flow seamlessly among project stakeholders through simple exchange of model & data for ensuring complete & accurate information • Conducted Aesthetic Check, Title Block, Match lines, Deliverables, Value Engineering • Resolved Clashes & Generated RFIs for Constructing Clash Free Constructible MEP 3D Model • Generated 2 Dimentional Riser Drawings in a vertical plane showing major items of echanical, electrical, plumbing & fire protection items floor by floor • Used Newforma to streamline project communication • Conducted Visual Check, ensuring no unintended model components • Detected Problems where building components were clashing • Ensured quality through dedicated team effort, detecting potential problems at the earliest convenience, correcting discrepancies Shop Drawings

Upload: others

Post on 17-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

ondon School of Economics is an educational project spread Lover 161459 sq. ft.i(15,000 sq. m.) in Kensington, London, UK consisting of 1 Building with 13 floors located at Houghton

Street, London. The purpose of using BIM is for renovation work. It is a public research university & a constituent college of the Federal University of London founded in 1895 by Fabian Society members Sidney Webb, Beatrice Webb, Graham Wallas, and George Bernard Shaw for the betterment of society.

Copyright © 2018 Pinnacle Infotech, Inc.

Global Leader in BIM Serviceswww.pinnaclecad.com

London School of Economics

Centre Building Redevelopment

[Educational]

Kensington, LondonEngland, UK

Project Speciality

Pinnacle's Value Addition

Challenges & Solutions

Challenge - There was a dire need of satisfying the prefabricators specifications which required extensive communication with all partiesSolution - Used BIM expertise to complete the project within limited time frame

London School of Economics is basically a Febricated Riser Drawing and an Educational Project. For Drainage System we have used HDPE Material and we have used Copper Material For Water Supply. We have converted the model Revit to Febrication first.

BIM Start Date: October, 2017

161,459 sq ft

Average Team Size:

Project Area:

5 Engineers

BIM End Date: November, 2017

Architect: B+R Architects

Construction Consultant: Dornan EngineeringServices*

Trades Covered: MEPFP (Mechanical, Electrical, PHE, Fire Protection)

Software Used: Autocad Fabrication-2015, Autodesk AutoCAD MEP 2015, Navisworks Manage 2016

Scope of Work

Our scope of work for the project included:1. 3D Model Validation & Updation - MEPFP 3D Model Conversion in Autodesk Fabrication (FAB MEP) Floor by Floor2. Constructability Review, BIM Clash Coordination - Combining Models & Inference Check in Navisworks for adjustment of Riser 3. Generation of Riser Drawings (35 Sheets)- Providing MEPFP Shop Drawings for Risers

• BIM helped to meet project requirement, discovering & resolving issues at an early stage of construction, saving time, eliminating rework• Design & Construction Information modeled as single discipline for coordinating into a fully composite 3D Model, allowing 2d models to be extracted as required• Using BIM, we reviewed interdisciplinary coordination, floor to floor alignment or continuation to other areas• Effective BIM application reaped benefits throughout project lifecycle starting from design development to technical design, construction and use

• BIM Workflow ensured design & construction activity to flow seamlessly among project stakeholders through simple exchange of model & data for ensuring complete & accurate information• Conducted Aesthetic Check, Title Block, Match lines, Deliverables, Value Engineering• Resolved Clashes & Generated RFIs for Constructing Clash Free Constructible MEP 3D Model• Generated 2 Dimentional Riser Drawings in a vertical plane showing major items of echanical, electrical, plumbing & fire protection items floor by floor• Used Newforma to streamline project communication• Conducted Visual Check, ensuring no unintended model components• Detected Problems where building components were clashing• Ensured quality through dedicated team effort, detecting potential problems at the earliest convenience, correcting discrepancies

Shop Drawings