1248 - Deputy Chief of Mission ResidenceLocation: KN 73 Street, Kigali, RwandaContract number: SRW60016M0797
100% Submission REV C8 August 2017
2490
HALLWAY R.02FFL +0.170
Living room
Dining room
Foyer
KitchenPantryBathroom 2
Garage Boiler Room
Pantry
Staff Toilet
Kitchen/Laundry Storage
Bathroom 1
Bedroom 1 Bedroom 2/Home Office
Front Porch
1090 1450 1120 1340 1450 990
9200
5520
1050
950
980 870 110
23801980
2190
2450
3920
15308860
3190
FFL -0.510
123456
New roll-in shower,sink, wall and floortiles, counter top.
720
1660 320
1960
790
1220x1220maneuveringclearance
Raised floor
A
B
C
FFL -1.110
existin
g layo
ut - not m
easured
1 2
8160
1760
37803660 1760
BATHROOMR.03
Stairs: 6 steps,300x170mm
1950
12001800
900
900
1200
1800
300
4260
1560
840
490
1260
4000
8730
OUTDOOR TERRACE R0149,1 m²FFL +0.170
4.03F
4.03F
4.02E
4.02E
2.02A
2.02A
2.03B
2.03B
4.01C
4.01C
4.04G
4.01D
4.04G
4.01D
1800
D02
Manhole (Contractor toconfirm invert levels andpipe sizes on site.)
FFL +0.170
1080
Rainwater downpipe fromgutter
FALL
4.05H
4.05H
1530
D01
1350
1350
Soak pit,1000mm diameter,1500mm deep
New plumbing asrequired.
Slope oftheramp: 1:12
Enlarged path
NOTE: The ground where theterrace sits is not flat. Before theconstruction of the stairs andramp, contractor to measure thelevels on site.
New door
D03
FIRST FLOOR PLANSCALE = 1:100
daterev dwn
A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
CONCEPT DRAWINGFIRST FLOOR PROPOSED PLAN
drawing title
C1.02revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:100 A3100% SUBMISSIONissue type
DEPUTY CHIEF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILITY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali, Rwanda
registered architect ©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
A
B
C
1 2
Rainwater downpipe fromgutter
Painted steel gutter to detailRefer to drawings 7.01, 4.03
Galvanized steel flashing
SSL +2.620
9400
5370
existin
g buildingExtend of new roofCancel windows
Extend the existing wall
ROOF PLANSCALE = 1:100
daterev dwn
A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
drawing title
A1.03revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:100 A3100% SUBMISSIONissue type
DEPUTY CHIEF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILITY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali, Rwanda
registered architect ©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
ROOF PLAN
B CA56005460
EXISTINGBUILDING
Ground levelFFL -0.780
Floor levelFFL +0.170
Metal roof levelFFL +3.200
Truss levelFFL +2.560
Demolish stairs
Demolish door and grills.Demolish screening.
Demolish gutter.
GUEST BATHROOMOUTDOOR TERRACE
3090
Demolish metal sheet and flashing.
Demolish truss.
Demolish bathtub.
Demolish tiles.
Terrace levelFFL +0.000
Raise floor.
EXISTINGROOF
Demolish existing tiling and hackdown to existing concrete slab.
DEMOLITION SECTION A-ASCALE = 1:50
daterev dwn
A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
FIRST FLOOR DEMOLITION SECTIONdrawing title
D2.01revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:50 A3100% SUBMISSIONissue type
DEPUTY CHIEF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILITY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali, Rwanda
registered architect ©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
B CA
56005400
2750
2920
2310
EXISTING SLABAND FOUNDATIONS
EXISTINGBUILDING
Floor levelFFL +0.170
Metal roof levelFFL +3.200
Truss levelFFL +2.560
GUEST BATHROOM
existing garden level
New roll-in shower and grab bars.
Screening to schedule
Wheelchair access and handrail to detail.Refer to Structural drawings.
300x300mm creme and light green porcelain floor tiles onliquid applied damp proof and screed to 80mm overallthickness on hollow bricks with concrete infill. Overall floorraised by 170mm.
OUTDOOR TERRACE
2400
Storm water channel to fallsRefer to Structural drawings
Roof gutter to fall behind new fascia
2330
2890
2510
New roof sheet and purlinsRefer to Structural drawings
Treated timber ceiling: 100x25mm,T&G boards fixed to u/s of purlins
Continuous galvanized steel flashingrecessed and sealed in existing wall
300
190
300
EXISTINGROOF
NOTE: THERE IS A LEVEL DIFFERENCEBETWEEN WHERE TERRACE SITS ANDEXISTING PATH. BEFORE THECONSTRUCTION OF STAIRS AND RAMP,LEVELS SHOULD BE MEASURED ONSITE.
PROPOSED SECTION A-ASCALE = 1:25
daterev dwnkey plan A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
FIRST FLOOR SECTIONSECTION A-A
drawing title
C2.02revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:25 A1100% SUBMISSIONissue type
DEPUTY CHIEF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILITY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali, Rwanda
registered architect
©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
a. 23.02.2017 st
BA
56005400
2920
2310
EXISTING SLABAND FOUNDATIONS
EXISTINGBUILDING
existing garden level
Screening to schedule
Wheelchair access and handrail to detail.Refer to Structural drawings.
300x300mm creme and light green porcelain floor tiles onliquid applied damp proof and screed to 80mm overallthickness on hollow bricks with concrete infill. Overall floorraised by 170mm.
OUTDOOR TERRACE
2400
Storm water channel to fallsRefer to Structural drawings
Roof gutter to fall behind new fascia
2330
2890
2510
New roof sheet and purlinsRefer to Structural drawings
Treated timber ceiling: 100x25mm,T&G boards fixed to u/s of purlins
Continuous galvanized steel flashingrecessed and sealed in existing wall
300
190
300
NOTE: THERE IS A LEVEL DIFFERENCEBETWEEN WHERE TERRACE SITS ANDEXISTING PATH. BEFORE THECONSTRUCTION OF STAIRS AND RAMP,LEVELS SHOULD BE MEASURED ONSITE.
PROPOSED SECTION A-ASCALE = 1:25
daterev dwnkey plan A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
FIRST FLOOR SECTIONSECTION A-A
drawing title
C2.02revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:25 A1100% SUBMISSIONissue type
DEPUTY CHIEF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILITY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali, Rwanda
registered architect
©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
a. 23.02.2017 st
2740
2400
1980
2770
780
EXISTING SLABAND FOUNDATIONS
EXISTINGBUILDING
Ground levelFFL -0.780
Terrace levelFFL +0.170
Metal roof levelFFL +3.200
Truss levelFFL +2.570
Floor levelSSL +0.170
300x300 mm creme and light green porcelain floor tiles onliquid applied damp proof and screed to 80mm overallthickness on hollow bricks with concrete infill. Overall floorraised by 170mm.
Window grills to be changed to match with theoriginal grill on the other windows
Door to schedule
OUTDOOR TERRACE
42 31
3990 2730
PROPOSED SECTION B-BSCALE = 1:25
daterev dwnkey plan A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
FIRST FLOOR SECTIONSECTION B-B
drawing title
A2.03revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:25 A1100% SUBMISSIONissue type
DEPUTY CHIEF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILITY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali, Rwanda
registered architect
©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
11
Ground levelFFL -0.780
EXISTINGBUILDING
Proposedterrace levelFFL +0.170
Disabled ramp and handrails to detail
Screening to schedule
250x120x63mm brick stairs: 6 steps,360x170mm each
Planter to detail (1010x940x840mm)
2740
42 3
3990 2690
Ramp levelFFL -0.510
Ground levelFFL -1.110
PROPOSED ELEVATIONSCALE = 1:50
daterev dwn
A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
FIRST FLOOR PROPOSED ELEVATIONdrawing title
B3.01revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:50 A3100% SUBMISSIONissue type
DEPUTY CHIEF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILITY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali, Rwanda
registered architect ©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
a. 27.02.2017 st
B
300x300mm creme and light green porcelain floor tiles onliquid applied damp proof and screed to 80mm overall
thickness on hollow bricks with concrete infill. Overall floorraised by 170mm.
A
Plastered and painted wall,color Sadolin 'La Marne' or similar
5400
Storm water channel to falls.
Screening to schedule
New roof sheet and purlinsRefer to Structural drawings
Treated timber ceiling: 100x25mm,T&G boards fixed to u/s of purlins
Continuous galvanized steel flashingrecessed and sealed in existing wall
EXISTINGROOF
PROPOSED ELEVATION OF EAST WALLSCALE = 1:25
daterev dwnkey plan A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
FIRST FLOOR ELEVATIONEAST WALL PROPOSED ELEVATION
drawing title
B3.02revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:25 A2100% SUBMISSIONissue type
DEPUTY CHIEF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILITY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali, Rwanda
registered architect
©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
HALLWAY R.02FFL +0.170
980 870 110
Roll-in shower and mounted seat
760
BATHROOMR.03
New sink (Plumbing in similarlocation to existing) Type: VaalSanitaryware, TuscanyBasin or similar approved.
900
900310
430
810
700
1050
1130610220
800
700 90
0
430
900 80
2000
1430
460
2000
1450
500
2000
1440
2040
2040
1990
490
610
550
380
810
Polished stainless steelgrab bar
Fill existing window opening withblockwork as shown and tile area.
New ceramic tiles,100x100m.
Ceramic tiles, 100x100mm.
Polished stainlesssteel grab bar
New sink (Plumbing insimilar condition with existing)
Polished stainless steel grab bar
Polished stainless steel grab barsMounted seat
New floor tiles
Polished stainless steel grab bar
Polished stainless steel grab bar
FALL690
1490
To manhole (drainagedesign by others)
Fill existing window opening withblockwork as shown and tile area. Fill existing window opening with
blockwork as shown and tile area.
FALL
700
600 30
500
900
40mm diameter profilefor shower curtain.
900
600
New granite counter top
New granite countertop
New ceramic wall tiles,similar to existing
New ceramic wall tiles,similar to existing
PROPOSED ELEVATION OF BATHROOMSCALE = 1:25
daterev dwnkey plan A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
PROPOSED BATHROOM ELEVATIONROLL-IN SHOWER
drawing title
D3.05revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:25 A2100% SUBMISSIONissue type
DEPUTY CHIEF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILITY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali, Rwanda
registered architect
©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
existing garden level
Extension of handrail310mm, ADA requirement
300x300mm creme and light green porcelain floortiles bedded on mortar to 80mm overall thickness onhollow bricks with concrete infill. Overall floor raisedby 170mm.
1000
760
1150
1310
300
990990
990990
990990
9901010
710 76
0
950
1000
Floor levelFFL +0.170
Ramp levelFFL -0.5100
Ground levelFFL -1.110
1530
1000
760
310
Extension of handrail 310mm,ADA requirement
Existing soil
1000
1000
10001000
10001000
Ramp levelFFL -0.5100
Ground levelFFL -1.110
Ground levelFFL -1.110
Brick to match adjacent existing hardstandingbedded on 25mm mortar, 250x175x63mm
T10's @200 EW in bottom (30 cover)
Mass concrete strip footing (C20) 150x500mmConcrete block 200x160x400mm
Landing area 1530x1530mm, ADA requirement
Painted mild steel with circular section 50mm
Painted mild steel grab bar 50mm diameter
710 76
0
950
1000
125mm C25 concrete ground slab
1000g visqueen dpm100mm stone (fines blinded)Murram fill: All vegetable soil to be reomoved
1310
1150
Brick wall 300mm
Brick to match adjacent existing hardstandingbedded on 25mm mortar, 250x175x63mm
T10's @200 EW in bottom (30 cover)
Mass concrete strip footing (C20) 150x500mmConcrete block 200x160x400mm
Landing area 1530x1530mm, ADA requirement
Painted mild steel with circular section 50mm
Painted mild steel grab bar 50mm diameter
125mm C25 concrete ground slab
1000g visqueen dpm100mm stone (fines blinded)
Murram fill: All vegetable soil to be reomoved
Brick wall 300mm
Storm water channel to falls.
1000
1530
NOTE: THERE IS A LEVEL DIFFERENCEBETWEEN WHERE TERRACE SITS ANDEXISTING PATH. BEFORE THECONSTRUCTION OF STAIRS AND RAMP,LEVELS SHOULD BE MEASURED ONSITE.
NOTE: THERE IS A LEVEL DIFFERENCEBETWEEN WHERE TERRACE SITS ANDEXISTING PATH. BEFORE THECONSTRUCTION OF STAIRS AND RAMP,LEVELS SHOULD BE MEASURED ONSITE.
RAMP/HANDRAIL DETAIL SECTION C-CSCALE = 1:25
daterev dwnkey plan A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
RAMP/HANDRAIL SECTION DETAILC-C & D-D
drawing title
C4.01revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:25 A2100% SUBMISSIONissue type
DEPUTY CHIEF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILITY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali, Rwanda
registered architec t
©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
RAMP/HANDRAIL DETAIL SECTION D-DSCALE = 1:25
300x300 mm creme and light green porcelainfloor tiles on screed to 80mm overall thickness.Overall floor raise is 170mm.
170
260 1470
80
170
880
880
930980
980
Storm water channel to falls
Brick to match adjacent existing hardstandingbedded on 25mm mortar, 250x175x63mm
T12's @200 EW in bottom (30 cover)
125mm C25 concrete slab
300
300
300
300
300
170
170
170
170
Painted mild steel handrail 50mm diameter
Ground levelFFL -0.860
Terrace levelFFL +0.170FALL
Liquid applied damp proof
Liquid applied damp proof
Refer to Structural drawings.
210
Existing column
100x100x4 truss
Gutter to be fixed to purlin and truss
Existing truss
Dimensions of this might changeaccording to manufacturer and availability.
80
150x50x2 'Z' purlins to align with existing truss post
250x120x63mm bricks (Ruliba clay or similar).
300
300
180
NOTE: THERE IS A LEVEL DIFFERENCEBETWEEN WHERE TERRACE SITS ANDEXISTING PATH. BEFORE THECONSTRUCTION OF STAIRS AND RAMP,LEVELS SHOULD BE MEASURED ONSITE.
NOTE: FALL OF THE LANDING SHOULDNOT EXCEED TWO PERCENT
NOTE: MAKE GOOD FINISH ON THESTAIRS. BRICKS ABOVE THE RISERSSHOULD BE ON THE SAME LINE WITHTHE BRICKS ON THE SIDE OF THERISERS.
daterev dwnkey plan A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
STAIRS CROSS SECTION DETAILE-E
drawing title
C4.02revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:10 A1100% SUBMISSIONissue type
DEPUTY CHIEF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILITY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali, Rwanda
registered architect
©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
STAIRS CROSS SECTION E-ESCALE = 1:10
Geotextile membrane
545150
945 1030
150
265
1230
210
930
Mass concrete strip footing (C20) 100x300mm
Concrete block 200x150x400mm
Ground levelFFL -0.860
Terrace levelFFL +0.170
1080300x300 mm creme and light green porcelainfloor tiles on screed to 80mm overall thickness.Overall floor raise is 170mm.
Storm water channel to falls
Brick to match adjacent existing hardstandingbedded on 25mm mortar, 250x175x63mm
T12's @200 EW in bottom (30 cover)
125mm C25 concrete slab
Liquid applied damp proof
Liquid applied damp proof
FALL
Refer to Structural drawings.
80
Existing column
100x100x4 truss
Gutter to be fixed to purlin and truss
Existing truss
Dimensions of this might changeaccording to manufacturer and availability.
80
250x120x63mm bricks (Ruliba clay or similar).
150x50x2 'Z' purlins to align with existing truss post
300
300
180
NOTE: THERE IS A LEVEL DIFFERENCEBETWEEN WHERE TERRACE SITS ANDEXISTING PATH. BEFORE THECONSTRUCTION OF STAIRS AND RAMP,LEVELS SHOULD BE MEASURED ONSITE.
NOTE: SLOPE OF THE LANDINGSHOULD NOT EXCEED TWO PERCENT
NOTE: MAKE GOOD FINISH ON THESTAIRS. BRICKS ABOVE THE RISERSSHOULD BE ON THE SAME LINE WITHTHE BRICKS ON THE SIDE OF THERISERS.
daterev dwnkey plan A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
STAIRS-PLANTER CROSS SECTION DETAILF-F
drawing title
B4.03revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:10 A1100% SUBMISSIONissue type
DEPUTY CHIEF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILITY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali, Rwanda
registered architect
©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
STAIRS CROSS SECTION F-FSCALE = 1:10
885
1050
1000
Brick to match adjacent existing hardstandingbedded on 25mm mortar, 250x175x63mm
Mass concrete strip footing (C20) 150x500mm
Concrete block 200x160x400mm
Painted mild steel with circular section 50mm
Painted mild steel grab bar 50mm diameter
125mm C25 concrete ground slab
1000g visqueen dpm
100mm stone (fines blinded)
Murram fill: All vegetable soil to be removed
Brick side wall, 250x175x63
Ground levelFFL -1.080
Ramp levelFFL -0.340
760
NOTE: THERE IS A LEVEL DIFFERENCEBETWEEN WHERE THE TERRACE SITSAND THE EXISTING PATH. BEFORE THECONSTRUCTION OF STAIRS AND RAMP,LEVELS SHOULD BE MEASURED ONSITE.
NOTE: MAKE GOOD FINISH ON THERAMP. BRICKS ABOVE THE RAMPSHOULD BE ON THE SAME LINE WITHTHE BRICKS ON THE SIDE OF THERAMP.
daterev dwnkey plan A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
RAMP CROSS SECTION DETAILG-G
drawing title
B4.04revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:10 A2100% SUBMISSIONissue type
DEPUTY CHIEF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILITY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali, Rwanda
registered architec t
©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
RAMP CROSS SECTION G-GSCALE = 1:20
885
1050
1000
760
Ground levelFFL -1.110
Ramp levelFFL -0.650
Brick to match adjacent existing hardstandingbedded on 25mm mortar, 250x175x63mm
T10's @200mm EW in bottom (30 cover)
Mass concrete strip footing (C20) 150x500mm
Concrete block 200x160x400mm
Painted mild steel with circular section 50mm
Painted mild steel grab bar 50mm diameter
125mm C25 concrete ground slab
1000g visqueen dpm
100mm stone (fines blinded)
Murram fill: All vegetable soil to be removed
NOTE: THERE IS A LEVEL DIFFERENCEBETWEEN WHERE THE TERRACE SITSAND THE EXISTING PATH. BEFORE THECONSTRUCTION OF STAIRS AND RAMP,LEVELS SHOULD BE MEASURED ONSITE.
NOTE: MAKE GOOD FINISH ON THERAMP. BRICKS ABOVE THE RAMPSHOULD BE ON THE SAME LINE WITHTHE BRICKS ON THE SIDE OF THERAMP.
Brick side wall, 250x175x63
daterev dwnkey plan A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
RAMP CROSS SECTION DETAILH-H
drawing title
B4.05revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:10 A2100% SUBMISSIONissue type
DEPUTY CHIEF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILITY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali, Rwanda
registered architec t
©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
RAMP CROSS SECTION H-HSCALE = 1:10
Type A: Sliding screen in polyester powder coated aluminium framing
QTY.
LOCATION
1
POSSIBLE SUPPLIER: ALUCLAD RWANDA LTD ([email protected], 250 736 416 155) or PRAYOSHA RWANDA LTD ([email protected], 250 786 932 673)D01
2340
9230
110
1030 50 1030 110110
2410
9230
23002300 2190 2190
PLAN
ELEVATION SECTION
2210 110 2200 2200 110 2200 120
10401040 50190 1020 1020 1020 102022050 50 1040 50 1040 190
2340
80
950
2420
DOOR SCHEDULE D01SCALE = 1:20
daterev dwnkey plan A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
DOOR SCHEDULED01
drawing title
D7.01revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:20 A2100% SUBMISSIONissue type
DEPUTY CHIEF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILITY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali, Rwanda
registered architect
©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
1980
QTY.LOCATION
1
1930
50
Type B: 6mm laminated glass double door in aluminum frame
1760
1680
840840
PLAN
ELEVATION SECTION
840 840
D02 POSSIBLE SUPPLIER: ALUCLAD RWANDA LTD ([email protected], 250 736 416 155) orPRAYOSHA RWANDA LTD ([email protected], 250 786 932 673)
daterev dwn
key plan
A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
DOOR SCHEDULED02
drawing title
B7.02revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:20 A3100% SUBMISSIONissue type
DEPUTY CHEIF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILTY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali
registered architect
©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
notes
DOOR SCHEDULE D02SCALE = 1:20
N
PLAN
ELEVATION SECTION
Type C: Solid timber hardwood door (single leaf) in solid timber hardwood frame, painted in white,complete with ironmongery
2080
2050
50
2050
2100
950
950
910
830
302050
QTY.LOCATION
1D03 POSSIBLE SUPPLIER: WALNUT INTERIORS UGANDA
(walnutinteriors.co.ug, 250 736 416 155)
daterev dwn
key plan
A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
DOOR SCHEDULED03
drawing title
A7.03revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:20 A3100% SUBMISSIONissue type
DEPUTY CHEIF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILTY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali
registered architect
©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
notes
DOOR SCHEDULE D03SCALE = 1:20
N
PROJECT TITLE:CLIENT:FBW DOCUMENT REF:
DRAWING NO DRAWING TITLE Scale 30% 60% 90% 100% REV A REV B REV C
SITE SURVEY1248-ARCH-S01 Site Survey 1:200 A1248-ARCH-S02 Existing Floor Plan 1:100 A1248-ARCH-S03 Existing Outdoor Cover Terrace Plan 1:50 A1248-ARCH-S04 Existing Section A-A 1:50 A B1248-ARCH-S05 Existing Section B-B 1:50 A1248-ARCH-S06 Existing Elevation 1:50 A
PLANS1248-ARCH-1.01 First Floor Demolition Plan 1:100 A B1248-ARCH-1.02 First Floor Proposed Plan 1:100 A B B C1248-ARCH-1.03 First Floor Roof Plan 1:100 A
SECTIONS1248-ARCH-2.01 First Floor Demolition Section 1:50 A B C D1248-ARCH-2.02 First Floor Section A-A 1:25 A B C1248-ARCH-2.03 First Floor Section B-B 1:25 A
ELEVATIONS1248-ARCH-3.01 First Floor Proposed Elevation 1:50 A B1248-ARCH-3.02 East Wall Proposed Elevation 1:25 A B1248-ARCH-3.05 Proposed Bathroom Elevation 1:25 A B C D
DETAILS1248-ARCH-4.01 Ramp/Handrail Section Detail C-C&D-D 1:25 A B C1248-ARCH-4.02 Stairs Cross Section Detail E-E 1:10 A B C1248-ARCH-4.03 Stairs Cross Section Detail E-E 2:25 A B1248-ARCH-4.04 Ramp Cross Section Detail G-G 1:10 A B1248-ARCH-4.05 Ramp Cross Section Detail H-H 1:10 A B
SCHEDULES1248-ARCH-7.01 Door Schedule D01 1:20 A B C D1248-ARCH-7.02 Door Schedule D02 1:20 A B1248-ARCH-7.03 Door Schedule D03 1:20 A
Drawing Register and Issue Sheet architecturalDeputy Chief in Mission ResidenceUS Embassy, Rwanda
12/08
/2016
20/10
/2016
21/12
/2017
27/02
/2017
1248-ARCH-REG
23/03
/2017
16/06
/2017
08/08
/2017
PROJECT TITLE:CLIENT:FBW DOCUMENT REF:
DRAWING NO DRAWING TITLE Scale 100% 100% 100%
1248-STRUC-1.01 Site Plan 1:100 A B B1248-STRUC-1.02 Steel Roof Details 1:20,50 A B C1248-STRUC-1.03 Ramp & Stair Details 1:25 A B B1248-STRUC-1.04 Ramp & Stair Details (cont.) 1:25 A B B
Drawing Register and Issue Sheet structuralDeputy Chief in Mission ResidenceUS Embassy, Rwanda
24-0
2-20
17
23-0
3-20
17
08-0
8-20
17
1248-STRUC-REG
moodboard Deputy Chief in Mission Residence - barrier-free accessibility improvements
2490
HALLWAY R.02FFL +0.170
Living room
Dining room
Foyer
KitchenPantryBathroom 2
Garage Boiler Room
Pantry
Staff Toilet
Kitchen/Laundry Storage
Bathroom 1
Bedroom 1 Bedroom 2/Home Office
Front Porch
1090 1450 1120 1340 1450 990
9200
5520
1050
950
980 870 110
23801980
2190
2450
3920
15308860
3190
FFL -0.510
123456
New roll-in shower,sink, wall and floortiles.
720
1660 320
1960
790
1220x1220maneuveringclearance
Raised floor
A
B
C
FFL -1.110
existin
g layo
ut - not m
easured
1 2
8160
1760
37803660 1760
BATHROOMR.03
Stairs: 6 steps,300x170mm
1950
12001800
900
900
1200
1800
300
4260
1560
840
490
1260
4000
8730
OUTDOOR TERRACE R0149,1 m²FFL +0.170
4.03F
4.03F
4.02E
4.02E
2.02A
2.02A
2.03B
2.03B
4.01C
4.01C
4.04G
4.01D
4.04G
4.01D
1800
D02
ManholeFFL +0.170
1080
Rainwater downpipe fromgutter
FALL
4.05H
4.05H
1530
D01
1350
1350
Soak pit,1000mm diameter,1500mm deep
New plumbing asrequired.
Slope oftheramp: 1:12
Enlarged path
NOTE: The ground where theterrace sits is not flat. Before theconstruction of stairs and ramp,level should be measured on site.
FIRST FLOOR PLANSCALE = 1:100
daterev dwn
A R C H I T E C T S& E N G I N E E R SP.O. Box 708KigaliRwandaPh:Ph:Mail:Web:
+250 (0) 788 388 777+250 (0) 280 510 [email protected]
CONCEPT DRAWINGFIRST FLOOR PROPOSED PLAN
drawing title
B1.02revisiondrawing no.
ARCHdiscipline
1248project no.
paper sizescale
1:100 A3100% SUBMISSIONissue type
DEPUTY CHIEF IN MISSION RESIDENCEBARRIER-FREE ACCESSIBILITY IMPROVEMENTS
project
project address
client
KN 73 StreetKigali, RwandaU.S. Embassy KigaliKG 3 Avenue, Kigali, Rwanda
registered architect ©2017. This drawing is the copyright of FBW Rwanda Ltd. and must not bereproduced without permission. The moral right of the author is hereby asserted.
- Contractor to check all dimensions on site prior to fabrication.- Do not scale from drawing. All dimensions are in mm unless otherwise specified.- All dimensions are structural opening dimensions unless otherwise specified.- This drawing is to be read in conjunction with all other relevant drawings, bills of quantities and specifications.- Any discrepancies are to be pointed out to Contract Administrator.- Contractor to ensure standard of workmanship is as described in specification.- Contractor to provide samples of all finishing materials for CA approval.
general notes
Antje EckoldtARB Registration No. 064044A
feature wall options
internal floor
opt 1
opt 2
mesh screening / windowstexture external ramp / stairscolors
concept / winter garden
1248 – Deputy Chief in Mission Residence – Schedule of finishes page 1 of 1 prepared by FBW Rwanda Ltd.
1248 – Deputy Chief of Mission Residence EXTERNAL WORKS:
- Use good brick on the new pathway and disabled ramp bedded on mortar. - New brick application should follow the direction of existing bricks. - Painted in light green mild steel circular section handrails on the disabled ramp. - Make good landscaping around new pathway and ramp. - Make good concrete planter adjacent to new stairs.
BUILDING EXTERIOR:
- External walls: Paint the wall facing to garden to same colour scheme if necessary. - Make good to existing walls. - Metal roof gutter behind new fascia board.
SCHEDULE OF FINISHES June 2016 Issue: Stage 4B
Area (m2) Floor Walls Doors Windows Ceiling
Built-in furniture / fixtures Misc
Room Refer to detail dwgs
1.01 OUTDOOR COVERED TERRACE
49.1
10mm thick 300x300mm Anti-slip cream and light green porcelainic floor tiles on screed to overall thickness of 80mm on hollow bricks with concrete infill
Plaster and paint matt finish
Sliding screening in polyester power coated aluminium framing
12.5mm suspended gypsum boards on cold rolled steel framing painted in white emulsion
Aluminium threshold plate between exterior brick and interior tiles
Recessed tile skirting to block walls Steel trusses primed and painted white
1.02 CORRIDOR
9
Powder coated aluminium glazed door with frame panted in white with grills on glass matching the existing door.
Aluminium threshold plate between hallway and outdoor covered terrace
1.03 GUEST BATHROOM
5.4
10mm thick 300x300mm Anti-slip white porcelainic floor tiles to overall thickness of 30mm
10mm thick 100mx100m porcelainic wall tiles
Solid timber hardwood door
As existing made good.
Sink, roll in shower, and grab bars all compatible with ADA standards
Fixtures 1248-DCMCategory/ Description Sample Manufacturer Model FinishesDoors
Exterior Double Door Locally made on site To be made by contractorRefer drawings for dimesions Polyester powder coated aluminium 1
Sliding screen Locally made on site To be made by contractorRefer drawings for dimesions Polyester powder coated aluminium 1
Sanitary
Sink Grohe-Dawn, South AfricaVaal Sanitaryware, Tuscany Basin, 700603 (Supplied by client)
Tuscany Basin with three semi-punched tapholes, bolted to the wall
http://vaalsan.co.za/products.php?id=31&product_category=Basins
1
Shower Seat Hafele, Germany
Shower seat, Folding, 555mm Wide, Dimension: 555x380mm (Supplied by client)
Steel and plyamid, Color:Pure white
https://www.hafele.com/us/en/product/shower-seat-folding-555-mm-wide/00000023000038fd00030023/#SearchParameter=&Category=VFbAqBtG3A4AAAFJraZygnXe&FF.followSear
1
Grab bar Delabie, France
Ultra-satin Polished Stainless Steel, Product Ref: 50509P2 Dimension: Tube 32mm, 900mm centers, 15mm thick (Supplied by client)
304 Stainless steel UltraSatin polished satin
http://www.delabie.com/products/50509s
3
Grab bar Delabie, France
Ultra-satin Polished Stainless Steel, Product Ref: 50506P2 Dimension: Tube 32mm, 600mm centers, 15mm thick (Supplied by client)
304 Stainless steel UltraSatin polished satin
http://www.delabie.com/products/50506p2
1
QuantityFull Website for Hyperlink above GSA #