location changes

1
Our Locations had to be changed. This is because the site manager at our school was delaying his decision on whether or not he would give permission to film on school premises with boys for the third time filming. We required filming this many times because we didn’t have the sufficient camera shots. In addition, some of our camera shots weren’t to the best of standards which meant that we had to re-film them. As our school closes at 6pm and needs students to start leaving at 5:45 we only had a limited time to film. This is because we had to wait for the majority of the school students to be off the premises, which were at around 4:00 4:15pm, before we started filming. However, after about a week of waiting, we were told that we couldn’t film at school with boys on site for the third time. This hugely impacted our planned filming and also resulted in three scheduled days of filming to be cancelled. We therefore had to decide whether we changed our storyboard completely and changed the location or if we would find somewhere similar to film. After some persuading, Beatriz’s volunteering place, Trinity at Bowes church, allowed us to use their halls to film our coursework. However, they asked us to agree to repay them by filming a music concert that was happening on Friday 30 th March. As our filming was pushed back so far, we had to work extra hard to complete the editing of our two minute movie opening. This also meant that we had to attend school during our Easter holiday on Thursday 5 th April to finish our blogs and final two minute movie opening. Beatriz Arredondo recorded the final version of the voices we used in our final piece. She also edited the credits. RoshaniPerera created the CCTV monitor effect. Mary-Grace Vicente was unable to attend as she had to go to work.

Upload: perer050308

Post on 03-Jul-2015

127 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Location changes

Our Locations had to be changed. This is because the site manager at our school was delaying his

decision on whether or not he would give permission to film on school premises with boys for the

third time filming. We required filming this many times because we didn’t have the sufficient camera

shots. In addition, some of our camera shots weren’t to the best of standards which meant that we

had to re-film them. As our school closes at 6pm and needs students to start leaving at 5:45 we only

had a limited time to film. This is because we had to wait for the majority of the school students to

be off the premises, which were at around 4:00 – 4:15pm, before we started filming.

However, after about a week of waiting, we were told that we couldn’t film at school with boys on

site for the third time. This hugely impacted our planned filming and also resulted in three scheduled

days of filming to be cancelled. We therefore had to decide whether we changed our storyboard

completely and changed the location or if we would find somewhere similar to film. After some

persuading, Beatriz’s volunteering place, Trinity at Bowes church, allowed us to use their halls to film

our coursework. However, they asked us to agree to repay them by filming a music concert that was

happening on Friday 30th March.

As our filming was pushed back so far, we had to work extra hard to complete the editing of our two

minute movie opening. This also meant that we had to attend school during our Easter holiday on

Thursday 5th April to finish our blogs and final two minute movie opening. Beatriz Arredondo

recorded the final version of the voices we used in our final piece. She also edited the credits.

RoshaniPerera created the CCTV monitor effect. Mary-Grace Vicente was unable to attend as she

had to go to work.