locally preferred alternative modern streetcar...the metropolitan council into the region’s...
TRANSCRIPT
-
riverviewcorridor.com
NORTH
Ford Site
34th
Ave
.
Minnehaha Pkwy
50th St
E 46th St
Hiawatha AveM
innehaha Ave
54th St
TH55
TH5
I-35 E
Randolph Ave
St. Clair Ave
Davern S
t
Minneapolis
Mall of America
Saint PaulMississippi Rive r
TTHH5
Spur
Terminal 1
Terminal 2
Grand
Randolph
Otto
DavernMaynard
Montreal
St. Clair
Fort Snelling
Historic Fort Snelling
Homer
SpSpuurr
H
W. 7t
h St
METRO Green Line connection
Smith Ave. concepts
Canadian Pacific Spur segment
Hwy 5 river crossing concepts
METRO Blue Line connection
Bloomington South Loop concepts
Key characteristics of Riverview locally preferred alternative
ROUTE LENGTH
11.7 miles
TOTAL NUMBER OF
STATIONS
20
TRAVEL
TIME
44 min.
2040 DAILY RIDERSHIP
Total 20,400Transit-dependent
4,600New Riders 2,700
ESTIMATEDCAPITAL
COST (2029$)
$2.066B
OPERATION & MAINTENANCE COST (2027$)
$ M per year
#
Key
METRO Green LineMetro Transit A Line BRT
METRO Blue Line
Riverview Locally Preferred Alternative
Existing Station
Riverview Station
Sub-option to be analyzed in
O
c
future project phase Sf
#
GGrraandrrrGGGGGGraandr
O Green Line connection
ceptsDowntown Saint Paul
Operating Environment• Dedicated and shared use.• Dedicated connections with METRO Green and Blue lines.• Decisions will be made in future phases to determine.
which segments will be dedicated vs. shared use.
T
R I V E R V I E WC O R R I D O R
LOCALLY PREFERRED ALTERNATIVE Modern StreetcarW. 7th - Hwy 5/Fort SnellingSaint Paul – Bloomington, Minnesota
The Riverview Corridor connects neighborhoods, historic districts, businesses, thriving commercial districts and downtown Saint Paul to the regional transportation network. It includes Union Depot and Lowertown, downtown Saint Paul, Seven Corners, West 7th and Highland Park neighborhoods, Minneapolis-St. Paul International Airport, Bloomington’s South Loop and the Mall of America.
The Riverview Corridor Policy Advisory Committee approved a modern streetcar route along West 7th Street as the Locally Preferred Alternative (LPA) in 2017. The LPA was adopted by the Metropolitan Council into the region’s Transportation Policy Plan in 2019.
The new modern streetcar line will share segments of track, stations and other infrastructure with existing METRO Blue and Green light rail lines and also connect to planned Bus Rapid Transit corridors serving the Twin Cities East Metro area.
RiverviewCorridor.com
Key characteristics of Riverview locally preferred alternative
ROUTE LENGTH
11.7 miles
TOTAL NUMBER OF
STATIONS
20
TRAVEL
TIME
44 min.
2040 DAILY RIDERSHIP
Total 20,400Transit-dependent
4,600New Riders 2,700
ESTIMATEDCAPITAL
COST (2029$)
$2.066B
OPERATION & MAINTENANCE COST (2027$)
$ M per year
#
-
RiverviewCorridor.com
Community EngagementMeaningful community engagement is critical to informed decision making and building trust among residents and business owners. Ramsey County is committed to continue public engagement through the Engineering and Pre-Environmental analysis and design process.
Next stepsThe Engineering and Pre-Environmental Phase of the project begins October 2020 and continues through 2023. This phase will examine impacts and gather detailed information to inform the project’s preliminary design.
Modern Streetcar chosen as Locally Preferred Alternative
3 Years
Engineering and Pre-Environmental Phase
3 Years
Project Development
2 Years
Final Engineering
3 Years
Construction
3-4 Years Operations
WE ARE HEREOngoing Public Engagement
Federal Transit Administration Process