LOCAL VENTILATION UPGRADE FOR THE WELDING SHOP OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE BUILDING, CAMOSUN COLLEGE, SAANICH, B.C. MECHANICAL TECHNICAL SPECIFICATION June 11, 2009 Avalon Mechanical Consultants Ltd. 300-1245 Esquimalt Road Victoria, BC V9A 3P2 voice: (250) 384-4128 fax: (250) 384-4134

Upload: dangduong

Post on 28-Aug-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

LOCAL VENTILATION UPGRADE FOR THE WELDING SHOP

OXYGEN/ACETYLENE WORKSTATIONS

JACK WHITE BUILDING, CAMOSUN COLLEGE,

SAANICH, B.C.

MECHANICAL TECHNICAL SPECIFICATION

June 11, 2009 Avalon Mechanical Consultants Ltd. 300-1245 Esquimalt Road Victoria, BC V9A 3P2 voice: (250) 384-4128 fax: (250) 384-4134

Page 2: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 2 of 7 ----------------------------------------------------------------------------------------------------------------------------------------------------

SECTION 15 SPECIFICATIONS – INDEX

1 GENERAL PROVISIONS ............................................................................................... 3

2 SCOPE…………………………………… ....................................................................... 4

3 HVAC – FUME EXTRACTION SYSTEM ................................................................... 6

4 EXECUTION - SHEET METAL .................................................................................. 10

5 ELECRICAL ................................................................................................................... 10

6 CONTROLS - SCOPE ................................................................................................... 11

7 CONTROLS - PRODUCTS .......................................................................................... 15

8 CONTROLS - SCHEULE OF DDC INPUT AND OUTPUT POINTS: .................. 16

9 CONTROLS - EXECUTION ........................................................................................ 18

10 CONTROLS - ENCLOSURES AND WIRING ........................................................... 18

11 CONTROLS - STRATEGIES AND SOFTWARE PROGRAMMING ................... 20

12 COMMISSIONING ........................................................................................................ 22

13 TAB & COMMISSIONING .......................................................................................... 25

DRAWING INDEX

M 1 Oxy-Acetylene Canopy Hoods / Main Floor Plan & Section Views

M 2 Oxy-Acetylene Canopy Hoods / Partial Roof Plan & Equipment Details

Page 3: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 3 of 7 ----------------------------------------------------------------------------------------------------------------------------- -----------------------

Avalon Mechanical Consultants Ltd. PAGE 3

Jan. 25, 2002

1 GENERAL PROVISIONS

1.1 All Clauses of the contract agreement, general conditions and requirements shall apply to the work

in this division.

1.2 Obtain and pay for all permits, and give all notices.

1.3 Ensure that all work and material shall comply with, but not be limited to, the requirements of the

latest edition of the following Codes and Standards:

1.3.1 B.C. Building Code 1998 (BCBC).

1.3.2 Local Municipal Codes Bylaws and Standards

1.3.3 British Columbia Fire Code

1.3.4 Provincial Fire Marshal Regulations and the Fire Marshall Act

1.3.5 N.F.P.A. 13 Sprinkler System Installation 1999.

1.3.6 Applicable N.F.P.A. Regulations

1.3.7 Canadian Electrical Code 2002 (CEC) CSA Standard C22.1

1.3.8 B.C. Safety Standards Act and Regulations

1.3.9 M58 Electrical Safety Regulation

1.3.10 M61 Gas Safety Regulation

1.3.11 M63 Safety Standards General Regulation.C. Electrical Safety Branch Bulletins.

1.3.12 WorkSafeBC – Workers’ Compensation Board (WCB) Regulations,

1.3.13 ANSI and ASTM Standard III-1988,

1.3.14 SMACNA Standards.

1.3.15 RCABC Roofing Specification Manual.

1.3.16 CSA Standards & ULC Standards

1.3.17 ASHRAE 90.1

1.4 Carry out work in a neat and professional manner to the satisfaction of the Engineer and The Owner

(Camosun College).

1.5 The use of a trade name for materials does not preclude the use of approved alternate materials of

equal performance and quality. Where materials, equipment and other products are specified by

manufacturer’s name, other manufacturer’s products may be substituted upon obtaining written

approval of the Engineer five working days prior to opening of bids. Submit list of proposed

equivalent products, with detailed dimensional, material and performance specifications, in

duplicate to the Engineer with a stamped, self-addressed envelope. Fax submittals will not be

accepted. Alternates are not accepted unless approved by the Engineer in writing. Approved

alternates will be announced to all bidders by addendum.

1.6 Additional costs which are required to provide equal performance to the original design intent

(including, but not limited to redesign, electrical upgrade, extra controls, relocations, structural, etc.)

and which result from the use of approved alternates, shall be borne by the Contractor.

Page 4: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 4 of 7 ----------------------------------------------------------------------------------------------------------------------------------------------------

Avalon Mechanical Consultants Ltd. PAGE 4

1.7 Cover and protect benches and equipment within occupied areas during work, and clean each area

(including removal of debris and redundant materials) at the end of each work shift. Remove

garbage from site each day.

1.8 Work in the occupied areas shall be performed during un-occupied hours as stipulated by the

Camosun Project Manager. As the installation proceeds insure that all installed components are

secured and “made safe” at the end of each work shift.

1.9 Make good any damages to existing equipment and building components caused by work under this

contract at no extra cost to the Owner.

1.10 Provide the manufacturers’ recommended service procedures for all components during the first

year of operation following the date of approved substantial completion.

1.11 The entire installation shall be guaranteed against defects in manufacture and installation for a

period of one year following the date of approved substantial completion. Provide on-site repair

and/or replacement of failed components in a timely manner.

1.12 All mechanical work for this project shall be carried out in coordination with roofing and electrical

trades. Consult with project manager, and sub-trades to ensure to insure the entire project work is

carried out in a logical sequence while minimizing any disruptions to building occupants.

2 SCOPE

2.1 Supply all materials and labour necessary to ensure complete and efficient systems in accordance

with the intent of the specifications and drawings. Should there be any discrepancies or unclear

directions, advise the Engineer before any work is commenced. Contact Avalon Mechanical

Consultants Ltd. (tel. 384-4128) on any such items in this Division.

2.2 Work under this Contract includes, but is not limited to, provision of the following fully functional

items:

2.3 All materials and labour required to complete one new stand alone fume extraction system serving

11 existing oxy/acetylene workstations in the welding shop. This new fume extraction system shall

include 11 new overhead canopy hoods (each with its own occupancy enabled control damper), one

new rooftop fan (with a variable speed drive motor), and all the ducting, dampers, and controls

required to make the system complete and functional as per the drawings and these specifications.

2.4 All materials and labour required to complete one new stand alone variable volume make-up air

handling system. This make-up air unit will modulate its airflow based on the barometric pressure

differential between the welding shop and the outdoors. The unit will be equipped with a electric

resistance heater. Air will be tempered to 17C via 7 stages of electric heat, plus a variable SCR first

stage. Provide all the ducting, dampers, sensors, and controls required to make the system complete

and functional as per the drawings and these specifications.

Page 5: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 5 of 7 ----------------------------------------------------------------------------------------------------------------------------- -----------------------

Avalon Mechanical Consultants Ltd. PAGE 5

2.5 Complete structural changes as called for in structural drawings. Coordinate with Structural

Engineer (Genivar Engineering - [email protected]).

2.6 Sheet Metal Work, including all new ducting, with associated hangers and hardware.

2.7 All required sensors and switches as per drawings and specifications. Coordinate with controls

contractor to ensure a complete and functional system as per the drawings and these specifications.

2.8 Air Balancing for new fume extraction system.

2.8.1 Plumbing – Provide and install three new 2-way control valves (one for each of the three existing

hydronically heated make-up air units AMU-1, AMU-2, & AMU-8). These valves shall be sized

based on the existing hot water piping feeding these units (one size smaller than existing) . These

new three way control valves shall be connected to the DDC system. The existing control of these

three makeup units is to remain in place and operational until future phase (welding booth

ventilation upgrade) is implemented.

2.8.2 (sized based on the existing hot water piping feeding these units (one size smaller than existing

piping)). These new three way control valves shall be connected to the DDC system (refer to

points list). Note: existing control of these three makeup units is to remain in place and

operational until future phase (welding booth ventilation upgrade) is implemented.

2.9 Electrical - Line Voltage: All Power wiring to be carried out be a licensed electrician and be done

in accordance with the design/build requirements contained in this specification. Coordinate with

Electrical Contractor to insure that all components (e.g., starters, H/O/A switches, etc.) are

provided.

2.10 Electrical – Low Voltage: Low voltage control wiring (<25Volts) may be carried out by controls

contractor.

2.11 The TAB agency shall compile 3 copies of all maintenance instructions and performance data

concerning the new rooftop Exhaust Fan, Canopy Hoods, Controls, etc. Enclose these in labelled 3-

ring binders and hand over to the Consultant, together with as-built record drawings. Coordinate

with DDC Contractor so that control schematics, wiring diagrams, updated shop drawings and panel

printouts are included. (See Section 7).

Page 6: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 6 of 7 ----------------------------------------------------------------------------------------------------------------------------------------------------

Avalon Mechanical Consultants Ltd. PAGE 6

3 HVAC – FUME EXTRACTION SYSTEM

3.1 Canopy Hoods:

Provide one 2m X 2m overhead canopy hood for each of the eleven existing oxy/acetylene quad

workstations as indicated on drawings. Each canopy hood shall be supported by factory supplied legs

connected as shown on the drawings. Standard of acceptance: Lincoln Euromate “Modular Extraction

Hood” 2X2 m.

3.2 Canopy Hood Task Lights: (Provide shop drawings)

Provide two 4ft. fluorescent light fixtures to the underside of each canopy hood as indicated on drawing.

Each fixture to be a single tube 30-watt 4 ft. T-8 strip light with a clear polycarbonate T8 tube-shield

cover over each fluorescent lamp. Acceptable manufacturers: GE, Philips, Osram Sylvania (power wiring

by Div.16).

3.3 Ductwork and accessories

3.3.1 Solid round ductwork: galvanized sheet metal spiral ductwork to SMACNA class 4" w.c. Fittings

to SMACNA. Dimensions indicated on drawing are clear internal dimensions. Refer to “Duct

Gauge Table” on drawing.

3.3.2 Balancing dampers (BD) : single blade with a locking quadrant and pivot pins which are

anchored on both sides of the duct. Install on each branch duct run-out to each new canopy hood

where indicated according to the drawings.

3.3.3 Take-offs: conical type, to SMACNA.

3.3.4 Flexible Duct Connections: DuroDyne heavy neoprene flex material (1/8" thickness) at ducting

connection to new rooftop exhaust fan EF-30.

3.4 Control Dampers:

3.4.1 CD-1 (Canopy Hood Control Dampers x 11) Control Dampers to be “Butterfly type” consisting

of a single circular blade mounted to a pivoting shaft. Damper leakage shall not exceed 0.15 cfm

per inch of blade circumference at a pressure differential of 4” w.c. Dampers shall be rated for a

maximum pressure differential of 6” w.c.. Damper frame and blade shall be fabricated from

galvanized steel. Install on each branch duct run-out to each new canopy hood where indicated on

drawings. Standard of Acceptance: Ruskin CDRS25 round control damper (12” dia). Each CD-1

to be direct coupled with an on-off, spring return failsafe 120V actuator . Standard of Acceptance:

Belimo AF120

Page 7: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 7 of 7 ----------------------------------------------------------------------------------------------------------------------------- -----------------------

Avalon Mechanical Consultants Ltd. PAGE 7

3.5 Exhaust Fan:

EF-30 (Rooftop Exhaust Fan x 1) Centrifugal high efficiency Backward Inclined flat blade industrial fan

with a direct drive motor. Fan to be mounted on vibration isolators secured to rooftop sleepers as

indicated on drawings. Exhaust Fan EF-30 will be equipped with a Variable Speed Drive (VSD) (refer to

section 3.7 below). Exhaust Fan EF-30 shall be furnished with the following features:

a. Spark Resistant construction (nonferrous wheel)

b. Gravity backdraft damper at fan outlet

c. Bolted access door (for access to fan interior)

d. Spring vibration isolator mounts (rated for the size and weight of the fan assembly)

e. Weather Cover to protect motor, shaft & bearings

f. Weatherproof finish suitable for mounting outdoors

g. For Design Duty: 10,000 CFM @ 3.3" TSP

h. Voltage: 460/3/60

i. Fan c/w access door, drains.

j. Coordinate with Div. 16 to ensure a HOA (on/off motor control) is provided to isolate EF-30

k. Fan starter, motor, disconnects, and controls will be supplied by the manufacturer.

l. Connection of Fan controls by electrical (Div 16).

m. Standard of Acceptance: Twin City Fan model: BC-SW 330, SWSI, Arrangement 4 , or

approved equal.

3.5.1 Submit shop drawings of the proposed fan EF-30. Include the following:

a. capacity ratings: fan curves.

b. Method of installation with proposed curbs/sleepers, mounting details, sizes and location of

spring vibration isolator mounts.

c. size and location of all connections

d. technical details of construction, including fan wheel , direct drive motor, bearings.

e. details of vibration isolation;

f. operating weight;

g. electrical data;

h. details concerning installation of seismic restraint measures.

3.6 Make-up Air Unit MUA 30:

Roof mounted make up air unit MUA 30 shall have the following features:

a. Rated at 9000 cfm at 1.5” w.c.

b. 100 % outdoor air

c. 460 volt 3 phase power

d. Variable speed drive motor (as per section 3.7 below)

e. Screen on air inlet

f. 2” filters Merv 8

g. Electric resistance heat section 142 Kw

h. Electric heat with 8 stages of on-off control plus last stage with SCR control

i. Electric heat controlled by single input 4-20 ma.

j. Install on roof as shown on drawings.

k. Standard of acceptance: Haakon packaged fan-coil makeup air unit.

Page 8: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 8 of 7 ----------------------------------------------------------------------------------------------------------------------------------------------------

Avalon Mechanical Consultants Ltd. PAGE 8

3.7 Variable Speed Drives:

Variable Speed Drive VSD for EF-30 and MUA-30:

3.7.1 Variable frequency drive with integral fusible disconnects; manufacturer-certified as compatible

with fan motor, and with bypass to allow full speed operation on drive failure. Provide load side

reactor or other filters as required for electrical protection. Ensure compatibility with DDC

Controls so that control signal will vary fan speed appropriately without the need for extra

components or costs. Meet manufacturer’s recommendations.

3.7.2 Variable frequency drive to vary the rpm of the EF-30 fan motor in accordance with the control

signal from the DDC system.

3.7.3 Variable frequency drive shall be of the Pulse Width Modulated (PWM), voltage source

type, utilizing fixed diode bridge input rectification and Insulated Gate Bipolar Transistor

(IGBT) output devices.

3.7.4 VSD shall be UL or CSA / NRTL-C certified.

3.7.5 The VSD shall be dual current rated for constant and variable torque loads. The VSD shall

have a constant torque overload rating of 150% for 60 seconds and a variable torque

overload rating of 115% for 60 seconds.

3.7.6 The VSD shall be capable of starting and stopping and outputting a variable

voltage/frequency waveform with the motor disconnected.

3.7.7 The VSD shall have a minimum displacement power factor of 0.96 or higher at all output

frequencies.

3.7.8 Input voltages shall be +/- 10%

3.7.9 Input frequency shall be 50/60 Hz +/- 5%

3.7.10 The VSD is to be supplied in a wall or floor mount NEMA 1 enclosure. Coordinate with

Contractor for final selection of wall or floor enclosure.

3.7.11 Warranty of the VSD package shall be for thirty-six months from the date of

commissioning completion. The warranty shall include all parts and repair labour.

3.7.12 The keypad shall have the ability to enable or disable reverse & stop button.

3.7.13 An integral PID motor speed controller shall be a programmable feature above 7.5 HP.

3.7.14 Software settings shall be lockable by both software and digital input.

3.7.15 A non volatile memory shall be provided so that programming and fault log memory will

not be lost in the event of a power failure.

3.7.16 The VSD shall offer the following protective features and digital displays as a minimum:

a. Instantaneous over current protection.

b. Electronic thermal overload protection.

c. Over voltage protection and Under voltage protection.

d. Ground fault protection.

e. Phase loss protection.

f. Current transformer fault.

Page 9: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 9 of 7 ----------------------------------------------------------------------------------------------------------------------------- -----------------------

Avalon Mechanical Consultants Ltd. PAGE 9

g. Instantaneous power failure protection.

h. Unattended start protection.

i. External trip input and display.

j. CPU error, EEPROM error and Option board error.

3.7.17 All systems shall include 5% impedance harmonically compensated line reactors rated to

carry 150% total RMS current continuously.

3.7.18 All systems shall include 5% impedance harmonically compensated load reactors rated to

carry 150% total RMS current continuously.

3.7.19 The VSD shall operate within the following environmental ratings without de-rating:

a. .Ambient temperature of -10 to 40 degrees Celsius.

b. .Humidity of 20% to 90% non-condensing.

c. .Altitude of 1200 meters.

d. .Vibration of 0.5 G or less.

3.7.20 Acceptable Suppliers:

Hitachi, ABB, Toshiba, Baldor, Benshaw, Cutler Hammer, Danfoss Graham, Trane TR1,

Seimens and Mitsubishi or APPROVED equal.

3.7.21 Approvals must be in writing by Engineer. Application for equal must be made at lest 5

working days before tender closing, and must contain a succinct list of all technical

features.

3.7.22 VSD's shall be installed by the mechanical contractor, and connected by the Electrical

Contractor. The manufacturer's representative and the commissioning agent shall be

present and shall supervise VSD start-up.

3.8 2-Way Control Valves

3.8.1 Provide and install three new 2-way control valves (one for each of the three existing

hydronically heated make-up air units AMU-1, AMU-2, & AMU-8). These valves shall be

sized based on the existing hot water piping feeding these units (one size smaller than

existing). Site verify to determine existing piping sizes. Valves to be installed in existing

hot water supply branch line feeding each of these three make-up air units. Control valves

to be coupled with a low voltage actuator which will be connected to the DDC control

system by the controls contractor (section-6). Provide shop drawings for both the valves

and the actuators to engineer for approval prior to bid submittal.

Page 10: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 10 of 7 ----------------------------------------------------------------------------------------------------------------------------------------------------

Avalon Mechanical Consultants Ltd. PAGE 10

4 EXECUTION - SHEET METAL

4.1 Install equipment to manufacturers' instructions.

4.2 Install ductwork on site to avoid interference with structural elements etc. Conserve headroom and

space.

4.3 Reduce any vibration of sheet metal which is audible in surrounding occupied areas until it is

inaudible.

4.4 Ducts shall be straight and smooth inside with joints neatly finished. Install and support ductwork in

accordance with SMACNA. Use full radius elbows (2 x diameter) for changes in direction.

Maximum slope of transitions is 1 in 4.

4.5 Make solid ducts airtight with mastic type duct sealer.

4.6 Provide seismic restraints for all new canopy hoods. Use slack cables to limit lateral movement of

canopy hoods and attached ducting as per SMACNA.

4.7 Branch take-offs to be 150% the size of the branch duct.

4.8 Coordinate closely with Controls Contractor and Balancing Agent to ensure that sensors, etc. are

properly located.

4.9 Any damper actuators which bind or which in any way are not able to operate correctly, shall be

repaired or replaced by sheet metal trade.

5 ELECRICAL

Electrical by Division 16

Page 11: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 11 of 7 ----------------------------------------------------------------------------------------------------------------------------- -----------------------

Avalon Mechanical Consultants Ltd. PAGE 11

6 CONTROLS - SCOPE

6.1 Scope of Work:

6.1.1 Provide expansions to the DDC control systems on the existing Burke/MutiNet/RCS Local Area

Network or provide new Delta Controls Network with all hard and virtual points and programs

visible on RCS network via BACNET interface.

6.1.2 System to meet the intent of the drawings and specifications. Install items listed in the Schedule of

New & Relocated Input and Output Control Points at a minimum.

6.1.3 Provide all relays, wiring, sensors, actuators, valves, panels, controllers, enclosures, etc.,

installation supervision and labour, including calibration, adjustments, commissioning and check-

outs, and as-builts necessary for complete and fully operational system.

6.1.4 Provide all software and licenses necessary to do programming and to view system information,

including database. Provide software programming as required to implement the new sequences of

operation. Software shall employ the Graphic Guidelines and Naming Convention as described on

the ARES Website. Coordinate with Camosun to ensure that the other HVAC systems in all

related buildings operate properly at all times during installation and programming.

6.1.5 Provide 2 copies of the required Commissioning Report, which describes how all features were

exercised and their functions verified. Provide 2 copies of an O&M Manual containing guarantee,

product warrantees, all maintenance instructions and performance data, certificate of acceptance

from Inspection Authority, and product spec sheets.

6.1.6 The Commissioning Agent shall assign one person, experienced and qualified in commissioning

control systems through practical experience and a comprehensive knowledge of the interactive

nature of HVAC systems and DDC controls, to verify the performance of the control systems by

conducting random tests of the control sequences until he is satisfied that the controls are

performing according to the intention of the Controls Specification. The Controls Contractor shall

loan a current copy of all control software/devices needed for full access to the control system, at

no charge to the Commissioning Agent. The software/devices shall be returned to the Controls

Contractor in good working order at the completion of the commissioning process. The Controls

Contractor shall cooperate fully with the Commissioning Agent and work together to obtain a

fully operating system, providing additional technicians and trades people to assist the designated

commissioning person as required.

Page 12: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 12 of 7 ----------------------------------------------------------------------------------------------------------------------------------------------------

Avalon Mechanical Consultants Ltd. PAGE 12

6.2 Graphic Programming

6.2.1 Provide a dynamic graphics operating system with all equipment shown, within an accurately

drawn system schematic, so the operator can “click” on equipment symbols and have a schematic

appear with status and values of all points visible, and being dynamically refreshed. The

Contractor can obtain ACAD or DXF file of the drawings from Avalon Mechanical Consultants.

6.2.2 The system shall have direct access, via points or icons linked to each on-line graphic, to the

following (without loading different software programs):

a. Point reports and Point definitions (to view or directly revise parameters).

b. Trend logs (tables or graphs).

c. Operator Control Language (to view or directly revise programs).

d. Group displays (to add or delete points, or access GCL).

e. Global variables.

f. Set points and schedules (to view or directly revise).

g. PID controllers (to view or directly revise parameters).

6.2.3 The software shall allow the operator to easily utilize colour graphics in generating user defined,

dynamic data displays or system groups. The graphic images are created in any third party

application (e.g. CorelDraw, VisioTechnical) and exported as a bit mapped image for use within

the DDC system.

6.2.4 The operator shall be able to annotate the graphic with any combination of hard points, soft points,

and keywords, and have the ability to link any group to any other group from any controller in the

system.

6.2.5 The operator will have the ability to display either the description, value or status of a point, using

any colour.

6.2.6 Any point shall have the ability to be hidden from view, yet retain functionality if accessed.

6.2.7 The graphics must support mouse and keyboard cursor access.

Page 13: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 13 of 7 ----------------------------------------------------------------------------------------------------------------------------- -----------------------

Avalon Mechanical Consultants Ltd. PAGE 13

6.3 Overview of Work:

6.3.1 The upgrade is required to provide each quad workstation with a single canopy hood, of

approximately 6 feet square, suspended above it, and centered over it. The resulting 11 new

canopy hoods would then be ducted to a common main duct which would elbow up thru the roof

to a single variable speed rooftop exhaust fan (EF-30). The intention is for the students to stand

outside of the canopy, so that little contaminated air enters their breathing zone.

6.3.2 Each workstation hood would be equipped with a dedicated control damper in the duct branch

serving it. These control dampers would be operated by occupancy sensors located at each

workstation. Input signals from these sensors would regulate the fan speed according to how many

stations were being used at any one time. A duct static pressure sensor would provide a further

input to insure that a minimum negative pressure is maintained during operation of EF-30. When

operating, each canopy hood would exhaust about 1530 cfm. None of this exhausted air would be

recirculated back into the shop.

6.3.3 New variable speed electrically heated make-up air unit MAU-30 is to provide outdoor air to

maintain building static pressure and IAQ. The air will be tempered to 17C via 7 stages of electric

heat, plus a variable SCR first stage. Airflow of MUA-30 shall be controlled based on the input of

a “ultra-low” barometric differential pressure sensor (Transducer) which would provide a

modulating signal to the DDC in relation to the barometric pressure differential between the

welding shop and the outdoors.

6.3.4 Existing fixed volume hydronically heated make-up air units AMU-1, AMU-2, & AMU-8 are to

remain as backup make-up air systems. Each of these three units shall be fitted with a new 2-way

control valve . These new three way control valves shall be connected to the DDC system (refer to

points list). Note: The existing control of these three makeup units is to remain in place and

operational until future phase (“welding booth ventilation upgrade”) is implemented.

6.4 “Design/Build” Power Wiring

The Contractor shall be responsible for

a. the design of the new electrical system required for proper operation of the proposed DDC system

expansion,

b. the electrical system’s compliance with all applicable codes, (including the BC Building Code,

and The Canadian Electrical Code) and authorities having jurisdiction, and

c. installation of wiring and electrical devices in accordance with the design, and as per the

manufacturer’s specifications.

d. Coordinate with Camosun (Mark Terpstra) to determine what provisions exist for CCS power.

Inform the Engineer of any shortcomings or concerns prior to tender closing. There is a parallel

but separate electrical contract taking place, so coordination with the other Contractor may be

required.

Page 14: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 14 of 7 ----------------------------------------------------------------------------------------------------------------------------------------------------

Avalon Mechanical Consultants Ltd. PAGE 14

6.5 General Conditions:

6.5.1 The CCS shall be remotely accessible via internet thru Camosun’s system located in building 5.

6.5.2 The operating system of the entire CCS shall operate with the existing Windows NT and RC

Studio software on the existing operator’s work station located in Building 5.

6.5.3 The operating system of the CCS shall co-exist with other vendors’ systems, presently operating in

Windows, to provide a multi vendor work station at the Camosun.

6.5.4 System Architecture: Gain approval of Camosun Project Manager for system architecture.

6.5.5 There will be other work being done concurrently under other Contracts. This work includes the

following:

a. Installation of EF and air handler and variable frequency drives,

b. Sheet metal work,

c. Electrical,

d. Commissioning TAB and re-commissioning.

e. Provision of input/output points and programming for some items relating to the above is part of

this CCS installation, and coordination with the other Contractors is required.

6.5.6 No communication computers will be provided for this project. Communication will be via the

existing operators’ workstation. The Contractor shall make the new and existing CCS operating

system operational on this computer and demonstrate remote communication to all points in the

expanded DDC system, and onto the network.

6.5.7 Install all components in accordance with the manufacturers’ recommendations.

6.5.8 Coordinate with sub-trades to ensure that supply of sensors, valves, wells, etc. is accounted for.

Inform the Engineer of any shortcomings prior to tender closing.

6.5.9 Contractor shall submit design data (including system architecture, and spare point capacity), shop

drawings and software sequences for approval prior to installation.

6.5.10 Coordinate the schedule of work with the Camosun Project Manager. The buildings must be kept

in operation. The work of this contract involves working in a museum. All conditions and

procedures that are currently in place must be maintained at all times while the work is being

carried out. Obtain permission from the Camosun Facilities Department before interrupting any

electrical or fire protection services. Ensure that all services are restored prior to the end of the

work shift. On no account will the Contractor stand, walk on, or work off the furniture, fittings or

exhibits in the buildings. Allow as necessary for ladders, scaffolding, etc. to carry out the work.

Dust containment procedures must be employed for any work that creates dust - such as concrete

drilling or cutting access holes in drywall.

6.5.11 Remove all debris and surplus material and leave the premises broom clean each morning; vacuum

Page 15: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 15 of 7 ----------------------------------------------------------------------------------------------------------------------------- -----------------------

Avalon Mechanical Consultants Ltd. PAGE 15

clean all electrical equipment.

6.6 Power Surge Protection

The DDC system shall be protected form power line surges and voltage transients by means of a

powerline filter or UPS.

6.7 Power Failure Protection

6.7.1 The DDC system shall have automatic protection from any power failure of at least forty-eight

(48) hours duration.

6.7.2 This protection shall at a minimum include continuous real-time clock operation and automatic

system restart upon power return.

6.7.3 Outputs shall have the option of being set to “staggered start” upon power reset.

7 CONTROLS - PRODUCTS

7.1 Field Instrumentation

7.1.1 Input and output devices and accessories to be compatible with the control system, and to be as

specified herein. Provide all that is required to make the points listed in the Schedule of DDC

Input & Output Points fully functional. Provide shop drawings.

7.1.2 Reliable Controls or Delta Controls DDC outdoor temperature sensor.

7.1.3 Reliable Controls or Delta Controls DDC duct S/A temperature sensor (for MUA-30).

7.1.4 Ultra-low barometric differential pressure sensor (Transducer) (for MUA-30)

Standard of Acceptance: Greystone Ultra-low Pressure Transducer ,ULP series, two port

differential with selectable pressure ranges, output 0 to 10Vdc

7.1.5 Venturi type duct mounted sensor with pitot type velocity sensor having 4-20 mA output and

sensing range from 0 to 3500 fpm . Mounted in the main exhaust air duct (leading to EF-30) at

location approved by consultant.

7.1.6 Occupancy Sensors:

Provide four Occupancy sensors for each overhead canopy hood as indicated on drawings. Each

Occupancy sensor shall be installed on the outside edge of the canopy hood directly above each of

the four work tables (pointing downward as indicated on drawing).

Occupancy sensors shall have the following features:

a. Automatic temperature compensation

b. EMI and RFI protection

Page 16: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 16 of 7 ----------------------------------------------------------------------------------------------------------------------------------------------------

Avalon Mechanical Consultants Ltd. PAGE 16

c. Dual element sensor

d. Anti-tamper switch

e. Adjustable lens position (0o or 10

o) (beam pattern adjustment)

f. Selectable operating voltage 12Vdc or 24 Vdc

g. Adjustable alarm signal duration

h. Standard of acceptance: Paradoor 460 (by Paradox) Vertical View Motion Detector .

7.2 Relays, etc. compatible with the control system, and as specified herein.

7.2.1 Relay, Point Type “RY”

a. Description - Control relay (electro-mechanical relay).

b. Technical Performance - 240 V, 10A to suit application.

c. Standard of Acceptance - IDEC-RH Series Johnson R1020 series.

8 CONTROLS - SCHEULE OF DDC INPUT AND OUTPUT POINTS:

8.1 Points List is a guideline. Provide any additional points, equipment, or components that may be

required to meet the design intent.

8.1.1 Device legend (see Points List below)

AO Analog output

ASD Adjustable speed drive

BPS Building pressure sensor

CO2 Duct Carbon Dioxide sensor

CT Current Transformer

DA Damper actuator

DC Dry contact

DI Digital Input

DO Digital output

DRH Duct relative humidity sensor

DSP Duct static pressure sensor

DTS Duct temperature sensor

O/C Open/closed

NML Normal position

RTS Room Temp Sensor

RY Relay

Page 17: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 17 of 7 ----------------------------------------------------------------------------------------------------------------------------- -----------------------

Avalon Mechanical Consultants Ltd. PAGE 17

SCHEDULE OF DDC INPUT & OUTPUT CONTROL POINTS Date: 8-Jun-09

CAMOSUN COLLEGE – INTERURBAN Page 1 of 1

Logical Point Code

Digital

Analog

Legend:

O= open F=full pressure

C= closed Z=zero pressure Device Type NML Fail

Point Description

system point DO O/C DI AO O/C AI Remarks

NEW DDC SYSTEM

Jack White Cutting Tables

EF-30 on/off & status RY; CT EF30 EF-30 1 1 on/off; fan status

EF-30 VFD & Feedback signal EF30 EF30 FS 1 1

Table Occupancy Sensors OS EF30 COS* 44 occupancy sensors on

canopies

Table Dampers DA EF30 TA* 11 2-position

MAU-30 on/off & status RY; CT EF30 MAU30 1 1 on/off; fan status

MAU-30 VFD & Feedback signal EF30 MAU30FS 1 1

MAU-30 Electric Heat signal EF30 MAU30H 1 4 to 20mA for 7 stages + 1 SCR stage

MAU-30 Supply Air Temp DTS EF30 MAU30SAT 1 duct mount, 6" probe

Room Temperature RTS Weld Shp RT

Bldg Pressure BPS Weld Shp WSBP 1 neg 15 Pa to pos 15 Pa

Space CO2 CO2 Weld Shp WSCO2 1 0 to 2000 ppm

Jack White Grinding Rm

EcoGate 12 system signal Grind EA Gr Alm 1 alarm from separate system

Existing AMU-1,2&8 Enable RY Weld Shp AMU* 3 3 existing rooftop Make-up fans

Existing AMU-1,2&8 Heat AO Weld Shp AMU*HCV 3 three 2-way control valves

on existing coils

TOTAL 16 45 6 7

Page 18: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 18 of 7 ----------------------------------------------------------------------------------------------------------------------------------------------------

Avalon Mechanical Consultants Ltd. PAGE 18

9 CONTROLS - EXECUTION

9.1 General

9.1.1 Install equipment to manufacturers' instructions.

9.1.2 Provide what is necessary for a complete and fully operational system, including the following:

9.1.3 All relays, wiring, sensors, transducers, actuators, power supplies, panels, controllers, enclosures,

and other required components.

9.1.4 All software necessary to program and control the system and to view system information.

9.1.5 Installation supervision and labour, including calibration, software, adjustments, and check-outs.

9.1.6 Install wiring on site to avoid interference with structural elements etc. Conserve headroom and

space. Install square and parallel to building walls and ceilings. Fire stop penetrations through fire

separation walls, floors or ceilings. Provide complete, permanent grounding of entire system.

9.1.7 All wiring in inaccessible spaces or electrical and mechanical rooms to be within conduit. All

exposed wiring to be within conduit. Accessible concealed low voltage wiring may be plenum-

rated cable.

9.1.8 Carefully calibrate Barometric Pressure Differential Transducer & Monitor (sensor) as per

manufacturer’s recommendations.

9.1.9 Piping sensor wells shall block less than 30% of pipe cross sectional area. Hand over to piping

trade for installation.

9.1.10 Field mounted components to be properly supported on pipe stands, channel brackets, plywood

panels securely attached to walls, or as approved by Engineer.

10 CONTROLS - ENCLOSURES AND WIRING

10.1 Enclosures

10.1.1 All controllers shall be installed neatly in an appropriately sized enclosure as per the

manufacturer’s specifications.

10.1.2 Relays, transformers, and I/O devices and peripherals shall be installed in separate enclosures and

not in the enclosures containing the controllers.

10.1.3 All wires penetrating the enclosure that are not required to be in conduit must be neatly bundled

and strapped in place.

Page 19: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 19 of 7 ----------------------------------------------------------------------------------------------------------------------------- -----------------------

Avalon Mechanical Consultants Ltd. PAGE 19

10.1.4 All Building Controllers will be installed in enclosures that are complete with hinged and key-

locked doors. The door will be painted and labelled suitably bearing the manufacturer’s system

name, the controller address, and the installing contractor’s contact information. This enclosure

will be mounted at a height that provides easy access without the need of a ladder.

10.1.5 Custom Application Controllers may reside above T-bar ceiling spaces in conventional screw lid

enclosures.

10.1.6 All enclosures will be CSA rated.

10.1.7 A hard points list shall be affixed on the inside surface of the door/cover of the enclosure.

10.1.8 The inside bottom surface of the enclosure shall be clean of dirt, metal shavings, and debris.

10.1.9 All junction boxes will have covers properly and firmly affixed after installation completion.

10.2 Controls – I/O Wiring

10.2.1 All input/output device wiring will use #18-2 solid core cable with individually jacked conductors

and jacketed sheath over the pair.

10.2.2 Use plenum cable where permitted by codes, but run wire in rigid conduit in the following areas:

a. mechanical or electrical rooms,

b. where exposed in finished areas,

c. where subject to physical damage.

10.2.3 All I/O wiring passing near or within the enclosure of a VFD will be shielded, with the shield

terminated at the device end.

10.2.4 All I/O wiring will be suitably identified using Panduit adhesive wire-marker or equivalent at the

controller end.

10.2.5 All I/O wiring within controller enclosure shall be neat and tidy and suitably bundled and strapped

or contained in Panduit wire duct or equivalent.

10.2.6 All I/O wiring that requires a transition to a different conductor to meet electrical code

requirement shall be executed using a terminal strip. Screw on (Marret) connections are not

acceptable for any connection other than to connect low-voltage pigtails at the device end (e.g.,

thermistors, 24VAC/VDC transducers, actuators etc.).

10.2.7 Low voltage I/O wiring may be mixed together within a conduit.

10.3 Controls - Power Wiring

10.3.1 Provide power wiring and transformers and grounding to each controller and component as per the

Page 20: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 20 of 7 ----------------------------------------------------------------------------------------------------------------------------------------------------

Avalon Mechanical Consultants Ltd. PAGE 20

manufacturer’s specification.

10.3.2 Each new Building Controller will have its own dedicated power supply. No other controller, I/O

device, building power or lighting device will be powered from this supply.

10.3.3 Custom Application Controllers may share a common power supply, but this supply will not be

used for any other device (e.g. I/O devices).

10.3.4 Power wiring shall not be mixed with I/O wiring in a conduit.

10.3.5 Use plenum cable where permitted by codes, but run wire in rigid conduit in the following areas:

a. mechanical or electrical rooms,

b. where exposed in finished areas,

c. where subject to physical damage.

11 CONTROLS - STRATEGIES AND SOFTWARE PROGRAMMING

11.1 Define and commission new points, and provide software which results in proper operation of all

connected equipment in a timely fashion. Correct any malfunctions immediately.

11.2 Prevent short cycling of equipment, prevent potential freezing, and produce alarms for all unusual

conditions which can have adverse effects on equipment or comfort.

11.3 Ensure that existing weekly and annual run schedules remain in effect for all equipment as new

software is implemented.

11.4 Ensure that existing set points remain in effect for all equipment as new software is implemented,

unless new set points are defined in the Sequences of Operation below.

11.5 Basis of Design: The primary purpose of this project is to provide demand controlled ventilation

for the oxy-acetylene work stations.

11.6 The human interfacing with the system will be approved by CAMOSUN. At the least, a high level

password should be required for access to set points, changing points from automatic to manual,

programming, etc.

11.7 The Contractor is required to develop, simulate/test and implement the strategies below.

11.8 Sequences of Operation :

11.8.1 The sequences described herein are not intended to be complete. Prevent short cycling of

equipment, prevent potential freezing, and produce alarms for unusual conditions which can have

adverse effects on equipment. All modulating points and set points shall be trended once every 3

minutes. All digital points shall have change of state recorded. Allow for ongoing programming

refinements to improve the strategies, based upon discoveries in the first hours, days and weeks of

Page 21: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 21 of 7 ----------------------------------------------------------------------------------------------------------------------------- -----------------------

Avalon Mechanical Consultants Ltd. PAGE 21

DDC operation, and to achieve proper operation, as judged by the Engineer. All new output points

shall be programmed by the Contractor in accordance with the design intent.

11.8.2 EF-30 on/off & status RY; CT EF30

11.8.2.1 Fan to be enabled when movement is sensed at any table. Minimum on-time 2 minutes.

11.8.3 EF-30 VFD & Feedback EF30 FS

11.8.3.1 Speed drive to be controlled so that each open damper increases airflow at fan by approximately

1530 cfm (note if all hoods open, the total flow will be only 9000 – this allows for a diversity

factor)

11.8.3.2 Alarm to report fan failure.

11.8.4 Table Dampers TA

11.8.4.1 Each damper will open whenever any of the 4 occupancy sensors served senses occupancy.

Damper to stay open for 2 minutes after last occupancy sensed.

11.8.5 MAU-30 on/off & status RY; CT MAU30

11.8.5.1 Fan to be enabled whenever shop building pressure is less than -12 Pa, or shop temperature is

less than 14C. Minimum on-time 2 minutes.

11.8.6 MAU-30 VFD MAU30FS

11.8.6.1 Speed drive to be controlled so that space pressure set point of -8 Pa is maintained.

11.8.6.2 Alarm to report fan failure.

11.8.7 MAU-30 Electric Heat MAU30H

11.8.7.1 If MAU-30 fan is on, and shop space temperature drops below 15C, or if SAT <17C, then enable

first stage SCR to maintain SAT = 18C.

11.8.7.2 If SAT< 17.5, then stage 2

11.8.7.3 If SAT< 17, then stage 3

11.8.7.4 If SAT< 16.5, then stage 4

11.8.7.5 If SAT< 16, then stage 5

11.8.7.6 If SAT< 15.5, then stage 6

11.8.7.7 If SAT< 15, then stage 7

11.8.7.8 If SAT< 14.5, then stage 8

11.8.8 Existing AMU-1,2 & 8 Enable Weld Shp AMU*

11.8.8.1 If MUA30 is on, and space pressure drops 5 Pa, 10 Pa, 15 Pa, turn on AMU 1, 2 and 8

respectively.

11.8.9 Existing AMU-1,2&8 Heat Weld Shp AMU*HCV

11.8.9.1 If AMU is on, then maintain space temp set point in accordance with weekly schedule

Page 22: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 22 of 7 ----------------------------------------------------------------------------------------------------------------------------------------------------

Avalon Mechanical Consultants Ltd. PAGE 22

12 COMMISSIONING

12.1 Scope of Work

12.1.1 Coordinate with separate Commissioning Agent (hired by CAMOSUN), but be responsible for

commissioning the proper control of all equipment supplied or wired under this contract.

Commissioning is the process of assuring and verifying that the installation is functioning fully in

accordance with the contract documents design intent. The following tasks must be performed:

a. Prepare all functional testing criteria (including specific documentation) for all new controls.

b. Submit all testing documentation to the Consultant for review (with Shop Drawings).

c. Attend all commissioning meetings as required by the Consultant.

d. Execute or delegate all commissioning tasks as set out in the final functional testing criteria

documents.

e. Participate in troubleshooting those systems that do not meet the functional testing criteria and

provide all necessary follow up testing and documentation.

f. Include completed functional test documentation in the final Commissioning Report.

12.2 The Controls Contractor shall provide advance notice to the Commissioning Agent before carrying

out end-to-end checks of the control systems so that the Commissioning Agent may be present

while the tests are being carried out.

12.3 Check lists shall include end to end check out sheets.

12.4 The required submittals are summarized below:

a. Contractor Submittal Drawings and Equipment Data

b. Pre-start/Start-up Checklists by contractor’s commissioning agent

c. Functional Performance Test Checklists by contractor’s commissioning agent

d. Commissioning Report

e. As-built line drawings f. O&M Manuals

12.5 The Controls Contractor shall provide functional test plans and submit a draft for approval with

shop drawings. Written, repeatable test procedures to prove proper function shall be described.

The Consultant/Engineer shall review and approve the plans subject to incorporation of

recommended amendments.

12.6 The start-up and checkouts must be clearly documented according to the respective manufacturer's

written instructions and the Contract Documents. Once the start-up is successful, the Contractor

shall conduct the functional test. These tests must be documented to clearly describe the following:

a. the individual test procedures,

b. the expected system response or acceptance criteria for each procedure,

c. the actual response or findings,

d. pertinent comments.

Page 23: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 23 of 7 ----------------------------------------------------------------------------------------------------------------------------- -----------------------

Avalon Mechanical Consultants Ltd. PAGE 23

12.7 Commissioning Execution

12.7.1 Each control sequence and strategy shall be tested, verified and documented by the Contractor,

including:

a. start-up,

b. shut down,

c. auto and manual modes,

d. modulation up and down over unit's range of capacity,

e. component staging,

f. power failure and backup/restart,

g. interlocks,

h. alarms,

i. sensor calibration.

12.7.2 Verify that temperature sensors are situated out of sun, direct supply air, process heat and dead air

regions.

12.7.3 Verify that duct and pipe temperature sensors are mounted correctly, and are thermally

isolated/insulated to sense the correct average temperature of flow.

12.7.4 Calibrate all sensors/transducers in project area and ensure proper operation.

12.7.5 Set-up weekly and annual run schedules for all equipment as determined in consultation with the

Engineer, and as described herein.

12.7.6 Set-up run time totalizers for all digital outputs and digital status points.

12.7.7 Set-up trendlogs for all analog inputs, set points and PID controllers. Submit printed trendlogs and

run time totals for all equipment for one week of system operation prior to total completion of

work.

12.7.8 Set-up alarms for failure of all controlled devices and significant deviation from set points.

12.7.9 PID or PI Controllers: Tune each controller for accurate operation without oscillation, hunting,

dithering or end-stop dithering. Actuator movement should not occur before the effects of the

previous movements have had enough time to affect the sensor (e.g., 10 minutes for an RTS or 1

minute for an MAT sensor). Movement of the respective dampers is not required if space

temperature is within 0.5 deg C of setpoint, or when MAT is within 1 degree of set point.

12.7.10Verify correct sensor scale ranges.

12.7.11Verify that new outputs which are in manual mode are investigated, resolved, and placed in auto.

Page 24: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 24 of 7 ----------------------------------------------------------------------------------------------------------------------------------------------------

Avalon Mechanical Consultants Ltd. PAGE 24

12.7.12Verify that areas which are not under 24/7 operation have appropriate schedules and setbacks.

12.7.13Verify that set points are appropriate. Review any problems with Engineer.

12.7.14Verify that control strategies are effective and efficient.

12.8 Controls contractor shall commission the entire installation and verify correct operation and full

systems’ performance according to the design intent. Rectify any defects. Produce a report detailing

performance and accuracy of all field devices and submit to the Engineer for approval. Provide

panel printout (.pdf) (including programs) and 48 hours of trend logs on all outputs to Engineer at

completion of installation. Include a copy of the program in the O+M Manual, together with

detailed instructions on how to access the system.

12.9 Training

12.9.1 Demonstrate all sequences of operation and trend graphs to personnel designated by the Engineer. In

addition, provide 4 hours of basic Owner training on operation of the system, including

a. DDC system overview,

b. hardware descriptions,

c. manual over-rides,

d. software and graphics, set point reviews,

e. reviewing and trending space temperature and RH,

f. demonstration of stability of temperatures and airflows

g. alarms and reaction procedures;

h. energy features;

Page 25: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 25 of 7 ----------------------------------------------------------------------------------------------------------------------------- -----------------------

Avalon Mechanical Consultants Ltd. PAGE 25

13 TAB & COMMISSIONING

Note: Commissioning work may be carried out by a separate Commissioning Agent, or by the

Testing & Balancing Contractor.

13.1 Scope of Work

13.1.1 Be responsible for the commissioning of all equipment supplied under this contract including new

exhaust fan, speed drive, control dampers, and DDC controls. Commissioning is the process of

assuring and verifying that the installation is functioning fully in accordance with the contract

documents design intent. The following tasks must be performed:

13.1.2 Prepare all functional testing criteria (including specific documentation) for all new controls,

dampers as well as the exhaust fan speed drive.

13.1.3 Execute or delegate all commissioning tasks as set out in the final functional testing criteria

documents.

13.1.4 Participate in troubleshooting those systems that do not meet the functional testing criteria and

provide all necessary follow up testing and documentation.

13.1.5 Submit completed functional test documentation for inclusion into the final Commissioning

Report.The required submittals are summarized below:

a. Contractor Submittal Drawings and Equipment Data

b. Pre-start/Start-up Checklists by contractor’s commissioning agent

c. Functional Performance Test Checklists by contractor’s commissioning agent

d. Commissioning Report by contractor’s commissioning agent

e. Air Balance Report by contractor’s commissioning agent

f. As-built drawings

g. O&M Manuals prepared by contractor’s balancing agent.

13.1.6 Written, repeatable test procedures to prove proper function shall be described. The start-up and

checkouts must be clearly documented according to the respective manufacturer's written

instructions and the Contract Documents. Once the start-up is successful, the Contractor shall

conduct the functional test. These tests must be documented to clearly describe the following:

a. the individual test procedures,

b. the expected system response or acceptance criteria for each procedure,

c. the actual response or findings,

d. Pertinent comments.

Page 26: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 26 of 7 ----------------------------------------------------------------------------------------------------------------------------------------------------

Avalon Mechanical Consultants Ltd. PAGE 26

13.2 Commissioning – Execution

13.2.1 The Commissioning Agent shall assign one person, experienced and qualified in commissioning

control systems through practical experience and a comprehensive knowledge of the interactive

nature of HVAC systems and DDC controls, to verify the performance of the control systems by

conducting random tests of the control sequences until he is satisfied that the controls are

performing according to the intention of the Controls Specification.

13.2.2 The Controls Contractor shall loan a current copy of all control software/devices needed for full

access to the control system, at no charge to the Commissioning Agent. The software/devices shall

be returned to the Controls Contractor in good working order at the completion of the

commissioning process. The Controls Contractor shall cooperate fully with the Commissioning

Agent and work together to obtain a fully operating system, providing additional technicians and

trades people to assist the designated commissioning person as required.

13.2.3 Each control sequence and strategy shall be tested, verified and documented by the Contractor,

including:

a. start-up,

b. shut down,

c. auto and manual modes,

d. successful occupancy sensing at each worktable of each workstation

e. modulation up and down over unit's range of capacity,

f. component staging,

g. power failure and backup/restart,

h. interlocks,

i. alarms,

j. sensor/calibration.

13.2.4 Inspect the Test and adjust flows of each hood thru normal operating range of speed drive to meet

those indicated. Clearly mark and permanently set all dampers. First measure air flow thru canopy

hood at exhaust fans minimum speed with only 2 hoods open, then measure airflows in canopy

hoods with 6 hoods open at 100% fan speed , finally measure and record airflows through all

hoods with all hoods open at 100% fan speed. Note: the DDC control system is programmed to

ensure that at minimum fan speed there will always be at least 2 hoods with open control dampers.

13.2.5 The intention of the system is to maintain a design airflow of 1530 cfm for each hood that is open

up to a maximum of 6 hoods (with any combination of 2 to 6 hoods served by the system).

13.2.6 The system has been designed with a 60% diversity factor (6 out of 11 hoods open at any given

time). When more than 6 hoods are open the diversity is exceeded and the resulting airflow thru

each hood will fall below the design airflow (1530cfm/hood) and should be balanced roughly

equally between all the open hoods.

Page 27: LOCAL VENTILATION UPGRADE FOR OXYGEN/ACETYLENE WORKSTATIONS JACK WHITE ...camosun.ca/.../2009/09-06-2023-jack-white-oxy-acetylene-ventilation... · local ventilation upgrade for the

Camosun College, Jack White Building Welding Shop, Oxy/Acetylene Workstations LOCAL VENTILATION UPGRADE Interurban Road, Saanich, B.C. Page 27 of 7 ----------------------------------------------------------------------------------------------------------------------------- -----------------------

Avalon Mechanical Consultants Ltd. PAGE 27

13.2.7 Fill out checklists and submit to the consultant a written deficiencies report on any equipment or

installation deficiencies, including, but not limited to, objectionable noise, significant air leakage,

poor alignment of components causing unnecessary resistance to air flow, components not

functioning as per design intent.

13.2.8 Provide variable sheaves and adjust new motors’ performance as required.

13.2.9 Ensure proper operation of exhaust fan EF-30 and it’s variable speed drive motor by the control

system.

13.2.10Verify safe and proper operation of the exhaust fan system.

13.3 Report

13.3.1 Include as-built schematics and detailed results of all measurements and settings.

13.3.2 Provide with full O+M manual for all equipment. Submit 3 copies in 3-hole binders with shop

drawings, switchgear locations and identification, maintenance procedures and schedules, and

warrantees.

13.3.3 Provide the following measurements with the other report requirements:

a. All air flows (hood airflows below and above design diversity)

b. Pressures and differential pressure

c. RPM

d. Voltage and Amperage per phase.

END