LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING Version 1: January 2016
PREPARED FOR THE NYC MAYOR’S OFFICE OF SUSTAINABILITY
![Page 2: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/2.jpg)
GREENER, GREATER BUILDINGS PLAN
Improving energy and water efficiency in NYC’s largest buildings.
Local Law 84 Benchmarking Local Law 85 NYC Energy Conservation Code Local Law 87 Energy Audits & Retro-Commissioning Local Law 88 Lighting Upgrades & Sub-metering See http://nyc.gov/ggbp for more info
Local Law 88: Lighting Upgrades and Sub-Metering 2
![Page 3: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/3.jpg)
WHY TARGET LIGHTING?
Local Law 88: Lighting Upgrades and Sub-Metering 3
Energy Used in NYC Buildings
Other End Uses 82%
Lighting 18%
![Page 4: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/4.jpg)
WHY TARGET SUB-METERING?
Commercial tenants use the majority of energy, but often do not know how much they use because they: - Pay a flat rate not based on
usage
- Do not receive monthly statements
Local Law 88: Lighting Upgrades and Sub-Metering 4
![Page 5: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/5.jpg)
WHAT IS LOCAL LAW 88?
- Upgrade lighting systems in all non-residential spaces
- Install electrical sub-meters in non-residential tenant spaces
- Provide monthly energy statements
Local Law 88: Lighting Upgrades and Sub-Metering 5
![Page 6: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/6.jpg)
WHO IS RESPONSIBLE FOR COMPLYING?
- Property owners and co-op and condo associations are responsible
- They may delegate reporting to a property manager or consultant
Local Law 88: Lighting Upgrades and Sub-Metering 6
![Page 7: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/7.jpg)
WHY START NOW?
Local Law 88 comes into effect January 2025. Leases being signed now run past that date. Start the work now to:
- Avoid Tenant Disruption - Save Money Immediately
- Incentivize Tenants to Save
- Plan Capital Expenditures
Local Law 88: Lighting Upgrades and Sub-Metering 7
![Page 8: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/8.jpg)
GETTING STARTED
- 1 building greater than or equal to 50,000 gross square feet
- 2 or more buildings (same tax lot) together greater than 100,000 gross square feet
- 2 or more buildings (in condo ownership) together greater than 100,000 gross square feet
View the full list of covered buildings at http://www.nyc.gov/html/gbee/html/plan/ll87_covered_buildings_list.shtml
Step 1: Determine if property is subject to LL88
Local Law 88: Lighting Upgrades and Sub-Metering 8
![Page 9: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/9.jpg)
GETTING STARTED Step 2: Determine if the property is exempt
- Small residential housing exempt (1-3 families, no report required)
- Residential uses exempt (must file documentation of exemption)
- House of worship exempt from lighting upgrades (must comply with metering and must document lighting exemption)
Local Law 88: Lighting Upgrades and Sub-Metering 9
![Page 10: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/10.jpg)
DOING THE WORK
Step 3: Determine who will be the compliance administrator
Local Law 88: Lighting Upgrades and Sub-Metering 10
- Someone responsible for complying with other city laws
- Someone dedicated to complying with LL88
![Page 11: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/11.jpg)
DOING THE WORK: LIGHTING
Buildings come into compliance during turnover / space renovations.
Track renovations and make sure to upgrade spaces not renovated.
Local Law 88: Lighting Upgrades and Sub-Metering 11
![Page 12: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/12.jpg)
DOING THE WORK: LIGHTING
Buildings that do not need to upgrade:
- Have lighting components that comply with July 2010 energy code or later - Have compliant areas within larger non-compliant areas that have closable
doors and/or permanent floor-to-ceiling partitions
Local Law 88: Lighting Upgrades and Sub-Metering 12
T-5 Fluorescent lights with occupancy sensors installed in a warehouse
![Page 13: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/13.jpg)
DOING THE WORK: LIGHTING
Step 4: Create a tracking document - Create a list of all areas of the
building, including:
- landlord shared spaces (such as lobbies, back of house spaces such as mechanical areas, stairwells)
- all tenant spaces
- List any lighting upgrades after 2010 and year of DOB filing
Local Law 88: Lighting Upgrades and Sub-Metering 13
![Page 14: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/14.jpg)
DOING THE WORK: LIGHTING
Step 5: Develop an Upgrade Plan
Develop a plan to renovate during tenant occupancy if: - No lighting upgrades are
executed during lease turnover
- Current lease expires after January 1, 2025
Local Law 88: Lighting Upgrades and Sub-Metering 14
![Page 15: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/15.jpg)
DOING THE WORK: LIGHTING
Step 6: Work lighting upgrades into your standard lease
- Better to upgrade during turnover
- Retrofitting lighting during occupancy is more expensive
Local Law 88: Lighting Upgrades and Sub-Metering 15
![Page 16: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/16.jpg)
DOING THE WORK: LIGHTING
Step 7: Consider hiring a lighting consultant There are two components to energy code lighting standards: - Lighting power densities: watts of lighting per square foot
- Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can:
- Comply with today’s lighting power densities by simply swapping existing light bulbs for LED lights
- Install new lighting controls simply by swapping out light switches
Local Law 88: Lighting Upgrades and Sub-Metering 16
![Page 17: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/17.jpg)
DOING THE WORK: SUB-METERING Step 8: Assess what meters the building currently has!!An existing building may have:""- One Con Ed master meter for the entire building
(one bill paid by the building)""- Multiple Con Ed “direct” meters for spaces throughout the building
(paid directly by the owners / lessors of those spaces)""Either of these kinds of buildings can also have sub-meters (not controlled by Con Ed) for smaller spaces."
Local Law 88: Lighting Upgrades and Sub-Metering 17
![Page 18: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/18.jpg)
DOING THE WORK: SUB-METERING
Step 9: Develop a meter installation plan - Each tenant space
greater than 10,000 gross square feet
- Entire floor greater than 10,000 gross square feet leased to 2 or more tenants
Local Law 88: Lighting Upgrades and Sub-Metering 18
![Page 19: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/19.jpg)
DOING THE WORK: SUB-METERING
Step 9: Develop a meter installation plan Option 1 - Install meters as leases become due Pro: Staggered spending Con: Does not allow for cost savings in bulk purchasing of meters Option 2 - Install meters all at once Pro: Cheaper overall Pro: Allows for multi-channel meter option Con: Disruptive for tenants Con: Requires more capital
Local Law 88: Lighting Upgrades and Sub-Metering 19
![Page 20: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/20.jpg)
DOING THE WORK: SUB-METERING Step 10: Decide what type of meter you will use
Manual Meter - Traditional meter
- Someone must walk
through the building to manually record readings
Local Law 88: Lighting Upgrades and Sub-Metering 20
![Page 21: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/21.jpg)
DOING THE WORK: SUB-METERING Step 10: Decide what type of meter you will use
Automatic Meter
- Can communicate with local building network or the cloud
- Can electronically deliver billing directly to tenants (if integrated correctly)
- Owners must install cabling throughout the building
- Cost of cabling can vary
Local Law 88: Lighting Upgrades and Sub-Metering 21
![Page 22: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/22.jpg)
DOING THE WORK: SUB-METERING
Step 10: Decide what type of meter you will use
Local Law 88: Lighting Upgrades and Sub-Metering 22
Multi-Channel Meter Single Channel vs. Multi-Channel Meter - Single-Channel meters
are most common
- Multi-Channel meters can read power usage from 2-16 electric services
- Multi-Channel meters are very cost effective
![Page 23: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/23.jpg)
DOING THE WORK: SUB-METERING
Local Law 88: Lighting Upgrades and Sub-Metering 23
Meter Pros Cons Economic Effects
Manual - Common - Least Expensive - If already installed,
purchase same brand to save time
- Professional must read meter
- Delays bills/statements and tenant reaction to bills
- Extra labor costs to read meter
- Installation costs
Automatic - Direct reporting to cloud
- Run through cable or wireless
- Usage can be available in real time
- Installing cable can take up space and time
- Cost of cable installation can vary
- Meters cost 10% more than manual
- No labor cost to read meters
Multi-Channel
- Easy to install all at once
- Can read 2-16 locations
- Challenge to implement on pre-existing channels/meters
- Disrupts tenants
- Overall purchase, installation, and commission is cheaper than individual meters
![Page 24: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/24.jpg)
DOING THE WORK: SUB-METERING
Step 11: Adjust standard leases Leases signed now should address:
- Metering - Energy bills - Costs
Indicate in lease deal:
- If owner or tenant will pay for meter and installation
- That owner needs access to tenant space to asses metering and lighting compliance for LL88
Local Law 88: Lighting Upgrades and Sub-Metering 24
![Page 25: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/25.jpg)
DOING THE WORK: SUB-METERING
Step 12: Provide tenants monthly statements REQUIRED Provide monthly statements showing electricity use (January 2025) Each tenant must receive a statement of their own energy use OPTIONAL Provide tenants’ energy consumption data in real-time
Local Law 88: Lighting Upgrades and Sub-Metering 25
![Page 26: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/26.jpg)
SUBMIT YOUR REPORT
Step 13: Submit your compliance report Reports are due (on or prior to) January 1, 2025, certifying: - Upgrade of lighting system
- Installation of sub-meters
Local Law 88: Lighting Upgrades and Sub-Metering 26
![Page 27: LOCAL LAW 88: LIGHTING UPGRADES AND SUB-METERING · 1/14/2016 · - Lighting controls: switches, sensors, timers, etc. A lighting consultant can determine if you can: - Comply with](https://reader034.vdocuments.us/reader034/viewer/2022050423/5f91f3e43fba624724062c35/html5/thumbnails/27.jpg)
CONGRATULATIONS!
YOU COMPLIED WITH LOCAL LAW 88!
Local Law 88: Lighting Upgrades and Sub-Metering 27