local content forum 2009 march 23, 2009 localization of complex industry experiences, success...

29
Local Content Forum 2009 March 23, 2009 Localization of Complex Industry Experiences, Success Factors, Challenges & Lessons Learned Abdulmohsen Almajnouni VP, Saudi Operations Alkhorayef Petroleum Company (APC) March 23, 2009 Local Content Forum 2009 Eastern Province Chamber of Commerce Alkhorayef Petroleum Company (APC) Prospective

Upload: darrell-duford

Post on 16-Dec-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Local Content Forum 2009 March 23, 2009

Localization of Complex Industry

Experiences, Success Factors, Challenges & Lessons Learned

Abdulmohsen Almajnouni

VP, Saudi Operations

Alkhorayef Petroleum Company (APC)

March 23, 2009

Local Content Forum 2009

Eastern Province Chamber of Commerce

Alkhorayef Petroleum Company (APC) Prospective

Local Content Forum 2009 March 23, 2009

Outline

IntroductionAPC Product & ServicesAPC 2015 VisionLocalization, Technology Transfer, and R&DExperience and AchievementsSuccess FactorsChallengesLesson LearnedFinal Remarks

Local Content Forum 2009 March 23, 2009

Introduction to Alkhorayef Petroleum Company (APC)

APC has two world class manufacturing facilities: WSP (Electrical Submersible Pumps) and WEPCO (Stainless Steel Foundry)

700 employees in Saudi Arabia, Kuwait, Rest of Middle East, Asia-Pacific, Russia, and Africa

APC active in the Oil Business since 1988

Core business areas are Artificial Lift Contracting, Supply of Re-Engineered Stainless Steel Components, Well Services, and the Design, Financing, Construction, Operation and Maintenance of Specialty Oil Production Projects including Water Injection, Filtration and Early Production Facilities

Our Customers are the Producing Departments in major oil companies such as Saudi Aramco, Kuwait Oil Company, Khafji Joint Operations, Chevron, National Oil Companies etc.

Revenue $ 150,000,000 annually

http://www.alkhorayefpetroleum.com/

Local Content Forum 2009 March 23, 2009

APC 16 years sales growth

0

100

200

300

400

500

600

Sales SR Millions

Local Content Forum 2009 March 23, 2009

Saudi Arabia Saudi ARAMCO Khafji Joint Operations (KJO) Riyadh Water Authority

Kuwait Kuwait Oil Company (KOC) Saudi/Kuwait Joint Operations (JO)

Oman (PDO) Sudan

Greater Nile Petroleum Operating Co. (GNPOC) White Nile Petroleum Operating Co. (WNPOC) PETRODAR

Iraq (SOC) Iran (NIOC, TOTAL) Libya

AGIP, AGOCO, OMV REPSOL, SIRTE, CPTL VEBA, WAHA, ZOC

Malaysia (PETRONAS) Indonesia (Sinar Timur Engineering, Conoco-Philips) Russia (Lukoil, Conoco-Philips)Nigeria (Sterling)

Current Customers & Contracts

Local Content Forum 2009 March 23, 2009

VenezuelaColombiaArgentina

Brazil

Germany

NigeriaEgypt

AlgeriaIndonesiaVietnam

Japan

APC International Locations

Facilities 2008

Tripoli, Libya

Heglig,Sudan

Medan, Indonesia

Riyadh,KSA

Amghara, Kuwait

Ahwaz, Iran

Wafra, Kuwait

Dammam,KSA

Shanghai, China

Moscow, Russia

Local Content Forum 2009 March 23, 2009

WSP / Alkhorayef

ESP Industry Experience

In ESP business for over 20 yrs.

Conducted over 20,000 repairs

Only ESP Company with expertise to repair all brands

Developed Own Product Line

Awarded ESP contracts in excess of US$1,000 Million

Local Content Forum 2009 March 23, 2009

Manufacturing Facility - Dammam

Commissioned Q1 2006Total Land Area 15,000 Square Meters5,525 Square Meters of Covered Space4,475 Square Meters of Yard & Warehouse SpaceFully Equipped to Manufacture ESP Systems Ranging From 400 BPD/8 HP to 39,000 BPD/1,350 HPThe Plant Includes:

EngineeringQA Lab.Inspection & TestingWarehousingMachinesMotor Winding AssemblySandblastingCorrosion CoatingFinishing & Logistics

Local Content Forum 2009 March 23, 2009

ISO 9002: 1994BSI Certification:1996ISO 9001: 2000BSI Certification: 2003

Maintain Highest Quality Standards Apply to Every Aspect of Our Business Quality Policy Executed Through Quality Manual Quality Manual Supported by QADs & QAPs Monitored & Evaluated to Ensure Conformity

WSP / Alkhorayef Facilities

Quality Assurance

Quality Policy

Quality Assurance

Manual

Quality Assurance Directives

Quality

Assurance & Tes

t Instructions,

Manufacturing Proces

s Instructions,

Drawings

Local Content Forum 2009 March 23, 2009

Manufactured Products

Multi-Stage PumpRotary Gas SeparatorMulti-Chamber ProSeal SectionsThree Phase Electric MotorWestronic Motor ControllerSwitchboard (Fixed Speed Drive)VSD (Variable Speed Drive) & Skid Mounted

Local Content Forum 2009 March 23, 2009

Multi-Chamber ProSeal SectionsRotary Gas SeparatorMulti-Stage Pump

Local Content Forum 2009 March 23, 2009

Switchboard (Fixed Speed Drive) Three Compartment 4800V, 200A

Westronic Motor Controller

Three Phase Electric Motor

Local Content Forum 2009 March 23, 2009

VSD (Variable Speed Drive) Skid MountedVSD (Variable Speed Drive)

Local Content Forum 2009 March 23, 2009

Total Plant Capacity – 11,647 pcs. per yr. (152 strings per mo.)Plant Currently Operating @ 36% of Total Capacity – 4,159 pcs. per yr. (54 strings per mo.)

Plant Capacity

Local Content Forum 2009 March 23, 2009

Lean Manufacturing System

Toyota Production System (TPS)Porche, Boeing, Nike

Customer focused Goals of Lean

Improve QualityEliminate WasteReduce LeadtimesReduce Total Costs

Local Content Forum 2009 March 23, 2009

WEPCO CONCEPTS

Understanding original design,

Understanding process conditions,

Applying most advanced engineering techniques and metallurgical expertise,

Fully documented processes,

BETTER THAN NEW components for enhanced operational performance.

Local Content Forum 2009 March 23, 2009

Stainless Steel Casting Foundry

Production Model

Machining & Finishing

MouldingMetallurgy Laboratory

&Corrosion Laboratory

Quality AssuranceMechanical & Chemical Tests

Final Product tothe end-users

Engineering Review

WEPCO FULL INTEGRATION OF PRODUCTION CHAIN

Local Content Forum 2009 March 23, 2009

APC 2015 Vision

World-class supplier of ESPsReverse and Re-engineering of Pumps and PartsTop-notch Foundry and casting facilityTop supplier of Specialty Chemicals (Drilling fluids, Stimulus products, Oilfield chemicals, Refining and Petrochemical and Water Treatment chemical programs)All associated services to Oil and Gas

Local Content Forum 2009 March 23, 2009

Localization & Technology Transfer

Started as a major agent/distributed of the top ESP Companies in the WorldDeveloped strategy & vision to manufacture ESP in SaudiBuilt workshops and repair centersRecruited the top expertsPurchased motor winding technology and associated systemsDeveloped our own technologies

Local Content Forum 2009 March 23, 2009

Provide technology of international standards without compromiseDevelop new products continuously to address market demand and satisfy our customersLead the industry in product quality, reliability and innovation

Engineering & R&D Responsibilities

Local Content Forum 2009 March 23, 2009

Engineering and R&D Experience

9 managers with a total of 201 years experienceAvg. experience level per manager is 22 years26 personnel with total of 467 years experienceAvg. experience level per employee is 18 years

Local Content Forum 2009 March 23, 2009

Experience and Achievements

Manufacturer of top notch ESPs and Foundry of Pump parts in Saudi ArabiaCompeted with the top players (SLB, BHI, WFD, Wood Group, etc)Established R&D Facility in Dammam and Shanghai, ChinaImplementation of LEAN ProcessISO certificates

Local Content Forum 2009 March 23, 2009

Experience and Achievements

Penetrated Gulf, ME, Asia, Russia, and AfricaDiversity of workforceLocalization of workforceDevelopment of new productsContribution to SPSP

Local Content Forum 2009 March 23, 2009

Saudi Petroleum Services Polytechnic

Part of APC to support Saudi Arabia local economy, we have signed an agreement with Ministry of Petroleum to contribute SR 1,500,00.00 for the establishment of the

Part of this commitment, APC will be sponsoring 50 young Saudi at the Institute, who are currently studying at the Institute since September 2008. These candidates will be signing their employment contracts with the InstituteAPC’s Chairman vision to localize our workforceGraduates of the Institute will be distributed in various locations between the operations and plant.

Local Content Forum 2009 March 23, 2009

Success Factors

Mission, Vision, Determination, and Buy-inShare-holder and Board of Directors SupportRecruitment of right resourceInvestment in HRVery ambitious Saudization ProgramLocal Economy Support by Saudi Aramco, SABIC, SWCC, SEC, etc.Availability of infrastructure to manufactureOverhead Control

Local Content Forum 2009 March 23, 2009

Challenges

Achieving a level of excellence that surpasses that of the International Oil Field CompaniesIdentifying the right resourcesComplexity of the IndustryR&DTransferring the knowledge and “know-how” to the localsSupply Chain Management

Local Content Forum 2009 March 23, 2009

Lesson Learned

Comprehensive marketing strategyEngineering and R&D Competition with International Service Companies is more difficult locally compared to overseasAugmented support of Local Companies (psychologically, financially, strategically, and logistically)Goals can be achieved by hard work, determination, and strategic planningLocal Saudi and ME markets can accommodate more local manufactures More alliance and partnership within Saudi Companies is needed more than ever to compete with international Companies

Local Content Forum 2009 March 23, 2009

Final Remarks

APC achieved its goals through vision, determination, local support, and desires to make itSaudi and ME market is big enough to accommodate more local factoriesInternational Companies should partner to localize and transfer technology in-house Major local Customers should augment supports to Local ManufacturersMore collaboration and partnership is needed to compete in the real world

Local Content Forum 2009 March 23, 2009

Thank You