Local Conditions-NE Minnesota
Identifying Regional StormwaterChallengesSelecting BMPs for our areaExperience & observations from MNDOT & MPCA BMPs that work / don’t work in NE Minnesota
Local Conditions-NE Minnesota
Regional Construction StormwaterChallenges
Special WatersClayey soilsPoor quality topsoil Steep slopesShallow depth to bedrock
12
Local Conditions-NE Minnesota
Special WatersLake SuperiorTrout Streams
Clayey SoilsVery common throughout region: Duluth, North Shore, North-central MN
Local Conditions-NE Minnesota
Poor Quality TopsoilIn general, the forested region of MNParticularly the Canadian Shield terrain
Steep SlopesCommon throughout region: Duluth, North Shore
Shallow Depth to BedrockCanadian Shield
13
Local Conditions-NE Minnesota
Shaded areas bedrock at surface or < 15 m (50’) BGSShallow depth to bedrockPoor quality topsoilSteep slopes along North ShoreSpecial Waters
Reproduced from Geology of Minnesota, Ojakangas, Matsch 1982 & Minnesota Geological Survey
Definitions
Erosion ControlPreventing (or minimizing) the dislodgment of soil particles
Sediment ControlControlling the movement of soil particles dislodged by failed erosion control practices
14
Definitions
StabilizedMulch, ECBs, sod, rip rap, aggregate surfacing, pavement or other materials that prevent erosion
Surface WaterStreams, rivers, lakes, ponds, wetlands, ditches, storm sewer systems (including curb & gutter)
BMPs for Northeast Minnesota
EROSION CONTROLUp-gradient runoff diversionTemporary slope drainsRapid Stabilization Methods
• Seed w/ oats (Spring, Summer)• Seed w/ winter wheat (Fall)• Straw, or ECBs
Temporary covering w/ geotextile, tarps, poly sheeting, etc.
15
MnDOT Rapid Stabilization Methods
Method 1 – Type 1 Mulch, Disc AnchorMethod 2 – Type 1 Mulch & tack w/HSSMethod 3 – Seed, Fert., Type 6 HSSMethod 4 – Seed, Fert., & cat. 3 ECBsMethod 5 – Geotextile & class II rip rap
BMPs for Northeast Minnesota
SEDIMENT CONTROL BMPsPhased construction
• Construct sensitive areas first• Final grade & stabilize perimeter areas early• Disturb only what is needed for short-term
construction activities
16
BMPs for Northeast Minnesota
SEDIMENT CONTROL BMPs (cont)Perimeter Sediment Control (Overland Sheet Flow)
• Silt Fence– Machine Sliced monofilament fabric– MNDOT Heavy Duty– Preassembled
• Biorolls / Compost tubes• Topsoil berms
BMPs for Northeast Minnesota
SEDIMENT CONTROL BMPs (cont)Stormwater Conveyance Channels
• Riffle & Pool effect• Rock ditch checks/ Stone weepers/ gabions• Boirolls• Sod lined swales• Rip rap• Hay bales
17
BMPs for Northeast Minnesota
SEDIMENT CONTROL BMPs (cont)Inlet Protection
• Inlet Weir• Pop-up retractable riser (Wimco) type• Dandy bag type• Rock snake, rock log (Sac Bag type)
Ponding• Sediment settling• Perf. Riser / monofilament geotextile /pea gravel• Chitosan treatment
BMPs for Northeast Minnesota
SEDIMENT CONTROL BMPs (cont)Dewatering (pumping)
• Discharge to:– Flat surface energy diffuser (plate, plywood, etc.)– Natural basin– Vegetated area– Sanitary sewer (with approval)
• Longer discharge hose !!
18
BMPs for Northeast Minnesota
Poor Quality TopsoilSalvage & re-use existing topsoilImport from adjacent projectsAmend topsoil with:
• Organic materials (black dirt, manure, etc.)• Wood chips from land clearing• Commercial fertilizer• compost
BMPs for Northeast Minnesota
Steep SlopesFlow diversionSlope drainsRiffle & Pool effectTerracing, benchingCat tracking (aka horizontal slope grading)Rip Rap (well defined channel, geotextile)Drop structure
19
BMPs for Northeast Minnesota
Shallow Depth to BedrockRiffle & Pool effectUtilize rock checks to slow runoffCommonly associated with significant elevation differences
MPCA Observations
Erosion control is far more effective than sediment controlProper installation of ECBs is more important than ECB selectionDon’t expect miracles from silt fenceSilt fence not trenched in = no silt fence
20
MPCA Observations
Every construction project should include:Knowledgeable person responsible for ESC workProject SWPPP (on NPDES permitted projects)Landscape rake & shovel Hand seeder, seed appropriate for the application, 10-0-10 commercial fertilizerStraw mulch and/or ECB’sMinimum 200’ of discharge hose for dewaterng
MPCA ObservationsThe root cause of nearly all ESC problem sites is a poor (or non-existent) erosion control effort.A great SWPPP is worthless if not followed in the field.Communication breakdown during construction phase Owner/Consultant should identify exactly what ESC work is required Make all ESC work pay items
21
MPCA Observations
Complying with NPDES permit requirements takes:
KnowledgeSense of PlanningResourcesAttitude
MPCA Observations
Erosion Control is far more effective than Sediment ControlSediment Control
Think “riffle & pool” affect• Sheet flow and concentrated flow runoff• Micro and macro scale
22
MnDOT’sMnDOT’s experienceexperience
Todd Campbell, P.E. Todd Campbell, P.E. District Hydraulics Engineer District Hydraulics Engineer –– MnDOTMnDOTDistrict 1District 1
Wood chip mulch & rock checks
23
Rock gutter check
Rock Sock flow diversion
24
Divert flow around erosive soils
Temporary sediment basin
25
Temporary Stabilization
Wood Chip Entrance
26
Fortified Rock Ditch Check
Bioroll on Ledge Rock
27
ECB installation
Bonded Fiber Matrix
28
Ditch check types
Machine Sliced Mono Silt Fence
29
Vegetated Swale / Rock Checks
Floatation silt curtain – low flow stream
30
Properly stabilized slope
Compost log perimeter sediment control
31
Combination of correct BMPs
Protect trout streams!
32
Stabilizing a difficult site
Questions?
33
BMPs for Northeast Minnesota
Riffle & Pool EffectSheet flow, micro scaleRiffle & Pool
Affect
(Sheet Flow,Micro scale)
Typical grading practice
Dozer travels parallel to contourMini-rills develop from dozer pad imprints
34
Common result of grading on the contour
Sheet flow transforming to rill erosion
Rock CheckSumpStabilized DitchStabilized Grading
35
Failed Erosion & Sediment Control
Failed Erosion & Sediment Control
36
Failed Erosion & Sediment Control
Failed Erosion & Sediment Control
37
Failed Erosion & Sediment Control
Failed Erosion & Sediment Control
38
Construction Practices to Avoid
Successful Erosion Control Practices
39
Successful Sediment Control Practices
Successful Sediment Control PracticesSuccessful Sediment Control Practices
Excavate with Excavate with teeth of bucket teeth of bucket traveling parallel traveling parallel to contourto contourRiffle & PoolRiffle & PoolLoosened, Loosened, roughened roughened subgradesubgrade
40
Successful Sediment Control Practices
Successful Sediment Control Practices
41
Successful Sediment Control Practices
Successful Sediment Control Practices
42
Successful Dewatering Practices
Successful Dewatering Practices
43
Successful Dewatering Practices
Successful Construction PracticesSuccessful Construction Practices
Perimeter Control Perimeter Control Erosion ProtectionErosion ProtectionSand Bag Diversion Sand Bag Diversion BermBermPump, Long Discharge Pump, Long Discharge HoseHose
44
Successful Dewatering Practices
Successful Perimeter Sediment ControlSuccessful Perimeter Sediment Control
Silt Fence properly installedSilt Fence properly installed
45
Successful Perimeter Sediment ControlSuccessful Perimeter Sediment Control
Straw Wattle / Straw Wattle / BiorollBioroll
Successful Perimeter Sediment Control
46
Sequencing Construction…Sequencing Construction…
Establish Final Grade Establish Final Grade Early at Sensitive & Early at Sensitive & Perimeter AreasPerimeter Areas
Sequencing Construction…Sequencing Construction…
Timely Timely Stabilization w/ Stabilization w/ Appropriate Appropriate BMPsBMPs
47
Sequencing ConstructionSequencing Construction
Relax & Watch Relax & Watch Your Risks Your Risks DiminishDiminish
Successful Construction PracticesSuccessful Construction Practices
Vegetated Strip Between Vegetated Strip Between Disturbed areas and Silt Fence Disturbed areas and Silt Fence
48
Successful Perimeter Sediment Control
Water Quality Benefits
Erosion controlErosion controlSediment Sediment removalremovalNutrient & Nutrient & pollutant pollutant removalremovalFlow retentionFlow retentionRunoff coolingRunoff cooling
49
Local Support for NPDES Permit – NE Minnesota
MPCA internet site @ http://www.pca.state.mn.us/water/stormwater/stormwater-c.html
General informationNPDES Permit requirementsPermit formsSpecial waters search
50
Local Support for NPDES Permit – NE Minnesota
http://www.pca.state.mn.us/water/stormwater/stormwater-c.html (cont)
Fact Sheets & Guidance ToolsTraining OpportunitiesMPCA staff contacts
Local Support for NPDES Permit – NE Minnesota
Permit and Program Formspermit applicationPermit Transfer/ModificationSubdivision RegistrationNotice of TerminationInspection checklist
51
Local Support for NPDES Permit – NE Minnesota
Special WatersSpecial Waters listSpecial Waters Search Tool
Fact Sheets and Guidance ToolsOverview of NPDES PermitE & S Control for New HomeownersStormwater Compliance Tool Kit for Small Construction OperatorsConstruction SWPPP Template
Local Support for NPDES Permit – NE Minnesota
Additional Training OpportunitiesMECA
• Annual Conference• E & S control lab at Rice Lake, WI
MNDOT/ U of MN• Inspector/Installer• Site Manager• Design
Resource Professionals Alliance• January 19-21, 2005 - Minneapolis, MN
52
Local Support for NPDES Permit – NE Minnesota
MPCA Staff ContactsNE Minnesota (Aitkin, Carlton, Itasca, Koochiching, St. Louis, Lake, Cook Counties)
Jim Dexter MPCA Northeast Regional Office 525 S. Lake Avenue, Suite 400 Duluth, MN 55802 218-529-6253 [email protected]