lobby renovation presentation may 22, 2019 · 2019-10-31 · 05.18.2018 watt plaza 07 entry view...
TRANSCRIPT
WATT PLAZAPRESENTATION
MARCH 21 ST, 2019MAY 22, 2019
LOBBY RENOVATION PRESENTATION
AGENDA:ARCHITECTURE ( ENTRIES )INTRODUCTION TO RENOVATION TEAM
DESIGN PRESENTATION - STUDIOS
CONSTRUCTION SCHEDULE PRESENTATION - CLUNE
FREQUENTLY ASKED QUESTIONS
OPEN FORUM
FLOOR PLAN - COURTYARD 09.06.2018
WATT PLAZA 13
6
10. 02. 2018
03.21.2019WATT PLAZA 03
6
LOBBY/CONFERENCE CENTER FLOOR FINISH PLAN
ARTWORK ARTWORK
ARCHITECTURE ( ENTRIES )
MAIN ENTRY05.18.2018
WATT PLAZA 07ENTRY VIEW OPTION 2
09.06.2018WATT PLAZA 09
6
10. 02. 2018
MAIN ENTRY05.18.2018
WATT PLAZA 08ENTRY NIGHT VIEW
09.06.2018WATT PLAZA 10
6
10. 02. 2018
EAST ENTRY03.23.2018
WATT PLAZA 12EAST ENTRTY
09.06.2018WATT PLAZA 11
6
10. 02. 2018
MAIN ENTRY VIEW09.06.2018
WATT PLAZA 14
6
10. 02. 2018
LOBBY SECTIONLOBBY SECTION05.18.2018
WATT PLAZA 12
6
09.06.2018WATT PLAZA 15
6
10. 02. 2018
LOBBY LOUNGE VIEWLOBBY LOUNGE VIEW 105.18.2018
WATT PLAZA 13
6
09.06.2018WATT PLAZA 16
6
10. 02. 2018
LOBBY LOUNGE VIEW 205.18.2018
WATT PLAZA 14
6
LOBBY LOUNGE VIEW09.06.2018
WATT PLAZA 17
6
10. 02. 2018
CONF. CENTER VIEW05.18.2018
WATT PLAZA 23
6
CONF. CENTER VIEW09.06.2018
WATT PLAZA 20
6
10. 02. 2018
COURTYARD VIEW05.18.2018
WATT PLAZA 20COURTYARD VIEW
09.06.2018WATT PLAZA 22
6
10. 02. 2018
ELEVATOR LOBBY/CORRIDOR
1875 ENTRY VIEW05.18.2018
WATT PLAZA 45
6
1857 ENTRY09.06.2018
WATT PLAZA 34
6
10. 02. 2018
ELEVATOR LOBBY VIEW05.18.2018
WATT PLAZA 46
ELEVATOR LOBBY09.06.2018
WATT PLAZA 33
6
10. 02. 2018
RESTROOMSCONSTRUCTIONLOGISTICS PLAN
START: JULY, 2019
FINISH: MARCH, 2020
NO.2ST
AIR
TELE
. /
ELEC
.
LOBBY
ELEVATOR
NO.1
UP
STAIR
FIRE CONTROL
ROOM
LOBBY
ELEVATOR
NO.2ST
AIR
TELE. /
ELEC.
NO.1
UP
STAIR
LOBBY
ELEVATOR
LOBBY
ELEVATOR
BU
S S
TO
PS
HE
LT
ER
LOADING
DOCK
RAMP
DOWN
RAMP
DOWN
RAMP
DOWN
RAMP
DOWN
RAMP
DOWN
RAMP
ROOM
UP
1. THE DEMOLITION PLAN IS A GRAPHIC REPRESENTATION OF THE EXISTING FIELD CONDITIONS BASED ON THE INFORMATION PROVIDED TO THE ARCHITECT. IT IS NOT INTENDED TO BE A RECORD DRAWING OF THE EXISTING BUILDING. DEMOLITION DRAWINGS ARE DEVELOPED TO SHOW BOUNDARIES AND SCOPE TO THE NON-STRUCTURAL DEMOLITION OF SELECTED ITEMS. THE CONTRACTOR SHALL PERFORM A DETAILED WALK-THROUGH WITH THE TENANT'S REPRESENTATIVE TO CONFIRM THE SCOPE OF WORK, VERIFY THE EXISTING CONDITIONS, AND ALL CONFLICTS WITH THE SCHEDULED SCOPE OF WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF AND REPLACEMENT OF EXISTING UTILITIES AS REQUIRED TO COMPLETE THE NEW SCOPE OF WORK AS SHOWN IN THE CONTRACT DOCUMENTS. THE ARCHITECT SHALL BE NOTIFIED OF ALL DISCREPANCIES FOUND BETWEEN THE ACTUAL FIELD CONDITIONS AND THE DRAWINGS.
2. DEMO CONTRACTOR SHALL COMPLY WITH ALL PERTINENT CITY OF LOS ÁNGELE REQUIREMENTS FOR DEMOLITION, INCLUDING BUT NOT LIMITED TO, REMOVAL OF DEBRIS FROM BUILDING, EXTERIOR DUST CONTROL, LOCATION AND TYPE OF CONTAINERS, AND OFFSITE DISPOSAL OF WASTE AND DEBRIS.
3. DEMO CONTRACTOR SHALL COMPLY WITH ALL PERTINENT REQUIREMENTS OF THE CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (CAL-OSHA) FOR DEMOLITION. PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION TO ENSURE PUBLIC SAFETY.
4. DEMO CONTRACTOR SHALL CONFIRM THE BUILDING OWNER’S APPROVED METHODS OF DEMOLITION, ROUTING OF DEBRIS REMOVAL AND LOCATION OF CONTAINERS. ALL DEBRIS AND WASTE SHALL BE PLACED IN APPROVED CONTAINERS, COVERED OVERNIGHT AND WEEKENDS, AND HAULED AWAY ON A REGULAR BASIS. THE EXTERIOR OF THE BUILDING AND ADJACENT PUBLIC PROPERTY SHALL BE PROTECTED FROM DAMAGE. EXTERIOR AREAS SHALL BE SWEPT CLEAN DAILY.
5. BEFORE COMMENCING DEMOLITION, SURVEY AREAS WITH BUILDING OWNER’S REPRESENTATIVE TO DETERMINE ITEMS TO BE SALVAGED AND RETURNED TO OWNER.
DEMOLITION PLAN - GENERAL NOTES
6. HAZARDOUS MATERIAL ABATEMENT IS NOT INCLUDED IN THE SCOPE OF WORK IN THESE DOCUMENTS, AND THE ARCHITECT TAKES NO RESPONSIBILITY FOR THEIR DETECTION OR REMOVAL. THE ABATEMENT, REMOVAL, PREPARATION AND/OR STABILIZATION OF THESE MATERIALS SHALL BE PERFORMED BY A HAZARDOUS MATERIALS REMEDIATION COMPANY, TO BE SELECTED UNDER SEPARATE CONTRACT. THE INTENT IS THAT ASBESTOS-CONTAINING MATERIALS SUBJECT TO FULL OR PARTIAL DEMOLITION WILL BE REMOVED AND ABATED PRIOR TO THE GENERAL CONTRACTOR COMMENCING WORK.
7. PROTECT EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE. DO NOT INTERRUPT UTILITIES SERVING OCCUPIED FACILITIES, EXCEPT WHEN AUTHORIZED BY BUILDING OWNER AND AUTHORITIES HAVING JURISDICTION. IN SUCH CASES, PROVIDE TEMPORARY UTILITIES AS REQUIRED.
8. EXISTING FIRE SPRINKLERS, FIRE HOSE VAVLE AND EXISTING FIRE ALARM TO REMAIN OPERATIONAL THROUGHOUT THE CONSTRUCTION PROCESS.
9. REMOVE ALL EXISTING FLOOR COVERINGS, WALL COVERING AND WALL BASE THROUGHOUT, U.O.N. CLEAN AND PREP SURFACES TO RECEIVE NEW FINISHES.
10. CONTRACTOR TO PATCH AND REPAIR ANY EXISTING WALLS THAT ARE DAMAGED. PREP ALL EXISTING WALLS TO RECEIVE NEW LEVEL 4 FINISHES.
11. WHERE WALL TILES HAVE BEEN REMOVED AND (E) GYPSUM BOARD HAS BEEN DAMAGED, REPLACE AREA W/ (N) GYPSUM BOARD APPROPRIATE TO RECEIVE (N) WALL TILES.
12. REMOVE ALL (E) MINIBLINDS. REPLACE ROLL-DOWN SHADES T.M.E. AS NEEDED.
13. PREPARE ALL (E) UNFURRED COLUMNS TO RECEIVE P1 FINISH UON.
14. ALL FURRED COLUMNS TO BE DEMOLISHED TO ORIGINAL GYP. BD.
DEMOLITION PLAN - SHEET NOTES DEMOLITION PLAN - LEGEND
18.4 18.6 18.8 1918.218
1.A2.A
1.B
1.C
1.D
1.D.5
1.E
1.F
1.G
1.H
1.H
1.4.5
1.5
1.6
1.7
1.8
1.4
1.3
1.2
1.1
2.D.5
2.E
2.F
2.G
2.H
2.D
2.C
2.B
2.4.5
2.4
2.3
2.2
2.1
2.5
2.6
2.7
2.8
PA.5
PA.8
PB.1
1
2
2
2
22
2
5
66
7
8
2
10
13
13
2
14
1515
15
15
15
16
16
22
22
3
12
2
12 12
2324
NIC NIC
2
3
2
2
2
2 2
22
222
27
PARTITIONS TO BE REMOVED U.O.N.(D) PARTITIONS CONTAINING WINDOWS AND DOORS DESIGNATED AS BEING DEMOLISHED ARE ALSO TO BE REMOVED.
EXISTING PARTITION TO REMAIN
EXISTING DOOR TO REMAIN
EXISTING DOOR TO BE REMOVED U.O.N.
EXISTING TENANT AREA NOT IN SCOPE
EXISTING TO REMAIN
EXISTING TO BE RELOCATED
EXISTING ELECTRICAL FIXTURE TO BE REMOVED. WALL TO BE PATCHED AND REPAIRED AS NEEDED.
(E)
(RR)
(D)
1100 Glendon Ave #1753, Los Angeles, CA 90024 ~ (310) 385-1550
N
P R O J E C T N O.
DATE:ISSUED FOR:
C O P Y R I G H T © 2 0 1 4 b y S T U D I O S a r c h i t e c t u r e
1/11/2019 9:54:08 PMC
:\User s\bkracke\D
ocu ments\W
ATT P LAZA_2017_CEN
TRAL_50%
CD
_bkracke.r vt
A1.20
DEMOLITION /EXISTING CONDITIONS
- FLOOR 1
17522.00
WATT PLAZA
17522.00
1875 & 1925 Century Park E, LosAngeles, CA 90067
20 DEMOLISH EXISTING RADIUSED ENTRY, PARAPET AND ROOF STRUCTURE TO LINE OFNEW WORK. REMOVE SIGNAGE, LIGHTING, MEP, FLS DEVICES AS REQUIRED. CAP ANDTERMINATE AS NEEDED TO PREPARE FOR NEW WORK.
21 NOT USED22 DEMOLISH WHITE OPAQUE GLASS WALL PANELS IN CORRIDOR TO RECEIVE NEW
FINISH.23 DEMO PAVERS TO MATCH NEW WORK24 REMOVE EXISTING STONE PAVERS IN AREA OF CALLOUT. EVALUATE SETTING BED
AND WATERPROOFING SUBSTRATE. PATCH AND REPAIR AS NECESSARY AND REPAIRAREA FOR NEW WORK
25 REMOVE GLAZING PANEL AT 2ND FLOOR EXTERIOR AND REPAIR EXISTING FRAME TORECEIVE NEW CASEMENT WINDOW RETROFIT ACCESS PANEL.
26 DEMOLISH EXISTING GRAVEL ROOF TO EXISTING LWIC. REFER TO ROOF PLAN FORNEW ROOF SPECIFICATION AND SCOPE.
27 REMOVE EXISTING CONCRETE TOPPING SLAB AT EXTERIOR SIDEWALK PLUSWATERPROOFING MEMBRANE. REFER TO NEW WORK EX EXTENTS AND TIEINS.
1 DEMOLISH EXISTING RADIUSED GLASS DOOR/WALL AT ROTUNDA ENTRY.2 DEMOLISH EXISTING WALL/DOOR.3 SELECTIVELY REMOVE AND SALVAGE RUBBER BASE, CEILING TILES, GRID AND
LIGHTING FIXTURES. COORDINATE WITH BUILDING MANAGEMENT FOR STORAGE OFATTIC STOCK.
5 SELECTIVELY DEMOLISH EXISTING FACADE FOR NEW WORK. REFER TO NEWCONSTRUCTION SCOPE FOR COORDINATION OF EXACT EXISING FACADE TO BEDEMOLISHED.
6 DEMOLISH EXISTING RAMP, REFER TO FLOOR PLAN FOR NEW LOCATION.7 REMOVE EXISTING DOOR AND FRAME.8 DEMOLISH NEW OPENING FOR NEW DOOR OPENING IN EXISTING WALL; REFER TO
FLOOR PLAN AND STRUCTURAL FOR LOCATION AND FRAMING.10 REMOVE AND SALVAGE EXISTING DOOR, AND REVERSE SWING OF DOOR. REFER TO
NEW WORK FOR MORE INFORMATION.12 SELECTIVELY DEMOLISH EXISTING LEVEL 1 STOREFRONT PANELS BETWEEN PRECAST
COLUMNS, PREPARE OPENING FOR NEW STOREFRONT EGRESS DOORS.13 COMPLETELY DEMOLISH VACANT TENANT SUITE AREA AS SHOWN. REMOVE ANY
EQUIPMENT, MILLWORK, FINISHES, CEILINGS, LIGHTING, MEP AND INTERIORPARTITIONS.
14 DEMOLISH EXISTING MEZZANINE OFFICE AND STORAGE ROOM, STRUCTURALSLAB,STAIR CASE, CEILING, MEP AND ASSOCIATED EQUIPMENT AND UTILITYCONNECTIONS.
15 DEMOLISH EXISTING CEILING & LIGHTING IN CORRIDOR. REMOVE STONE FLOORING &WALL PANELS IN CORRIDOR & ELEVATOR LOBBY. GRIND AND CLEAN STRUCTURALSLAB TO PREPARE FOR NEW WORK.
16 DEMOLISH AND REMOVE EXISTING SECURITY DESK. SALVAGE AND PROTECT ANYPOWER AND DATA CONDUIT CONNECTIONS IN FLOOR SLAB.
17 CUT AND REMOVE EXISTING STRUCTURAL ROOF SLAB AND FRAMING MEMBERS ATNEW SKY LIGHT OPENING. GC TO PROVIDE TEMP BEAMS AND SHORING IS REQUIREDTO ALLOW FOR THE INSTALLATION OF NEW STRUCTURAL.REFER TO STRUCTURALDWGS FOR MORE INFORAMTION.
18 DEMOLISH ANY ROOFTOP EQUIPMENT ASSOCIATED WITH DEMO WORK BELOW.VERIFY IN FIELD FOR EXTENTS. PATCH AND REPAIR STRUCTURAL ROOF SLAB ANDWATERPROOF BUILDING ENVELOPE TO MAINTAIN A CONTINUOUS WEATHER ANDINSULATION BARRIER.
SCHEMATIC DESIGN 02.05.18
DD PROGRESS ISSUANCE 03.30.18
100% DD SET 06.12.18
50% CONSTRUCTION DOCUMENTS 01.11.19
Mobilize Phase
1 Week Phase
Legend Temp 12' barricade studs and plywood painted gray to receive possible graphics
Temp fencing with green screen, construction access and stocking
Full height barricade
Area off limits to public the entire duration
Areas in white to be demoed in coordinated phases see next slides for more info
Existing wall to be demoed once areas in white and red are completely demoed
CENTRALPLANT ACCESS
VAULT
A A A
A A A
A
A
A
AA
A
A
A
BU
S S
TO
PS
HE
LT
ER
H/C
RA
MP
ELE
VA
TO
RS
ST
AIR
SO
FF
ICE
EXHAUSTGRATE
PLANT ACCESS
EX. VENT
VENT
CENTRAL
EX. MH
EX.SDMH
VAULT
EX
PA
NS
ION
JO
INT H
/C R
AM
PH/C
RAM
P
EXISTING SIDEWALK
EXISTING SIDEWALK
EXISTING SIDEWALK
EXISTING SIDEWALK
EX
IST
ING
SI D
EW
AL
KE
XIS
TIN
G S
IDE
WA
LK
CO
NS
TE
LL
AT
ION
BL
VD
.
PA
RK
ING
ST
RU
CT
UR
E (
E)
CENTURY PARK EAST
CO
NS
TE
LL
AT
ION
BL
VD
.
ALLEYALLEY
PA
RK
ING
ST
RU
CT
UR
E
EN
TR
AN
CE
& E
XIT
LOADIN
G D
OCK (E
)
LOADIN
G D
OCK (E
)
RAM
P (E)
DOW
N
RAM
P (E)
DOW
N
TRASH
COM
PACTO
R
EXISTINGEXHAUST
GRATE
WALK
(E)
EX
ISIT
ING
ST
AIR
S
EX.
VENT
EX.
VENT
EX.
VENT
EX.
VENT
EX.
VENT
NEWVENT
RETAINING WALL BELOW (E)
(E) RETAINING WALL BELOW
RETA
ININ
G W
ALL B
ELOW
(E)
ATM
STA
IR (E
)
(E) CANTILEVER EDGE
UP
18.4 18.6 18.8 1918.218
1.A2.A
1.B
1.C
1.D
1.D.5
1.E
1.F
1.G
1.H
1.4.5
1.5
1.6
1.7
1.8
1.4
1.3
1.2
1.1
2.D.5
2.E
2.F
2.G
2.H
2.D
2.C
2.B
2.4.5
2.4
2.3
2.2
2.1
2.5
2.6
2.7
2.8
PA.5
PA.8
PB.1
A2.02
2
A2.03
2
DN
A2.03
1
LOBBY LOUNGE100
NOOK102
PANTRY103
COURTYARD104MEDIUM CONF
RM105
LARGE CONF RM106
1875 ENTRYLOBBY
113
1875 ELEVATORLOBBY
114
1875 CORRIDOR115
ENTRY LOBBY117
1925 CORRIDOR118
1925 VESTIBULE119
1925 ELEVATORLOBBY
120
1925 ENTRYLOBBY
121
RETAIL TENANTSUITE K
RETAIL TENANTSUITE J
BANK TENANTSUITE B
NIC NIC
ELEC ROOM123
RETAIL TENANTSUITE I
RETAIL TENANTSUITE A
RETAIL TENANTSUITE G
RETAIL TENANTSUITE M
FEDEX SHIPPINGSUITE L
STORAGESUITE P
LOADING DOCKSUITE Q
DRY CLEANINGSUITE F
RETAIL TENANTSUITE E
STORAGESUITE C
MAIL ROOMSUITE G
LOADING DOCK
BANK TENANTSUITE H
BANK TENANTSUITE D
FCC124
CONFERENCEBREAKOUT AREA
101
MENS109
RETAIL TENANTSUITE A-1
STORAGE110
WOMENS108
AV ROOM107
UNISEXRESTROOM
111
UNISEXRESTROOM
112
1875 VESTIBULE116
A10.00
1
(N) PARTITION
(N) DOOR AND STOREFRONT GLAZING
(N) DOOR AND FRAMELESS GLAZING
(E) DOOR TO REMAIN
(N) RATED PARTITION
(E) PARTITION
U.O.N., SEE PARTITION TYPE LEGEND FOR WALL TYPES
INDICATES NEW MILLWORK - SEE FINISH PLANS AND ELEVATIONS
AREA NOT IN SCOPE
N
41
ALL PARTITIONS TO BE
PARTITION PLAN - LEGEND
1100 Glendon Ave #1753, Los Angeles, CA 90024 ~ (310) 385-1550
N
P R O J E C T N O.
DATE:ISSUED FOR:
C O P Y R I G H T © 2 0 1 4 b y S T U D I O S a r c h i t e c t u r e
1/11/2019 9:56:07 PMC
:\User s\bkracke\D
ocu ments\W
ATT P LAZA_2017_CEN
TRAL_50%
CD
_bkracke.r vt
A2.01
PARTITION PLAN -LEVEL 1 KEY PLAN
17522.00
WATT PLAZA
17522.00
1875 & 1925 Century Park E, LosAngeles, CA 90067
SCALE:
1/16" = 1'-0"
1 PARTITION PLAN - LEVEL 1 SCHEMATIC DESIGN 02.05.18
DD PROGRESS ISSUANCE 03.30.18
50% DD SET 05.18.18
100% DD SET 06.12.18
50% CONSTRUCTION DOCUMENTS 01.11.19
11' 8"
WALK WAY 6' WIDE
Scaffolding Plan
7 Day Install In Use 17 Weeks
Legend
Temp 12' barricade studs and plywood painted gray to receive possible graphics
Temp fencing with green screen, construction access and stocking
Full height barricade
Area off limits to public the entire duration
Scaffolding
Pedestrian Travel / Tunnel, studs and corrugated plastic around entire tunnel. Tunnel will have temp lights, exit signs, sprinklers, fls devices, etc.
19
CENTRALPLANT ACCESS
VAULT
A A A
A A A
A
A
A
AA
A
A
A
BU
S S
TO
PS
HE
LT
ER
H/C
RA
MP
ELE
VA
TO
RS
ST
AIR
SO
FF
ICE
EXHAUSTGRATE
PLANT ACCESS
EX. VENT
VENT
CENTRAL
EX. MH
EX.SDMH
VAULT
EX
PA
NS
ION
JO
INT H
/C R
AM
PH/C
RAM
P
EXISTING SIDEWALK
EXISTING SIDEWALK
EXISTING SIDEWALK
EXISTING SIDEWALK
EX
IST
ING
SI D
EW
AL
KE
XIS
TIN
G S
IDE
WA
LK
CO
NS
TE
LL
AT
ION
BL
VD
.
PA
RK
ING
ST
RU
CT
UR
E (
E)
CENTURY PARK EAST
CO
NS
TE
LL
AT
ION
BL
VD
.
ALLEYALLEY
PA
RK
ING
ST
RU
CT
UR
E
EN
TR
AN
CE
& E
XIT
LOADIN
G D
OCK (E
)
LOADIN
G D
OCK (E
)
RAM
P (E)
DOW
N
RAM
P (E)
DOW
N
TRASH
COM
PACTO
R
EXISTINGEXHAUST
GRATE
WALK
(E)
EX
ISIT
ING
ST
AIR
S
EX.
VENT
EX.
VENT
EX.
VENT
EX.
VENT
EX.
VENT
NEWVENT
RETAINING WALL BELOW (E)
(E) RETAINING WALL BELOW
RETA
ININ
G W
ALL B
ELOW
(E)
ATM
STA
IR (E
)
(E) CANTILEVER EDGE
UP
18.4 18.6 18.8 1918.218
1.A2.A
1.B
1.C
1.D
1.D.5
1.E
1.F
1.G
1.H
1.4.5
1.5
1.6
1.7
1.8
1.4
1.3
1.2
1.1
2.D.5
2.E
2.F
2.G
2.H
2.D
2.C
2.B
2.4.5
2.4
2.3
2.2
2.1
2.5
2.6
2.7
2.8
PA.5
PA.8
PB.1
A2.02
2
A2.03
2
DN
A2.03
1
LOBBY LOUNGE100
NOOK102
PANTRY103
COURTYARD104MEDIUM CONF
RM105
LARGE CONF RM106
1875 ENTRYLOBBY
113
1875 ELEVATORLOBBY
114
1875 CORRIDOR115
ENTRY LOBBY117
1925 CORRIDOR118
1925 VESTIBULE119
1925 ELEVATORLOBBY
120
1925 ENTRYLOBBY
121
RETAIL TENANTSUITE K
RETAIL TENANTSUITE J
BANK TENANTSUITE B
NIC NIC
ELEC ROOM123
RETAIL TENANTSUITE I
RETAIL TENANTSUITE A
RETAIL TENANTSUITE G
RETAIL TENANTSUITE M
FEDEX SHIPPINGSUITE L
STORAGESUITE P
LOADING DOCKSUITE Q
DRY CLEANINGSUITE F
RETAIL TENANTSUITE E
STORAGESUITE C
MAIL ROOMSUITE G
LOADING DOCK
BANK TENANTSUITE H
BANK TENANTSUITE D
FCC124
CONFERENCEBREAKOUT AREA
101
MENS109
RETAIL TENANTSUITE A-1
STORAGE110
WOMENS108
AV ROOM107
UNISEXRESTROOM
111
UNISEXRESTROOM
112
1875 VESTIBULE116
A10.00
1
(N) PARTITION
(N) DOOR AND STOREFRONT GLAZING
(N) DOOR AND FRAMELESS GLAZING
(E) DOOR TO REMAIN
(N) RATED PARTITION
(E) PARTITION
U.O.N., SEE PARTITION TYPE LEGEND FOR WALL TYPES
INDICATES NEW MILLWORK - SEE FINISH PLANS AND ELEVATIONS
AREA NOT IN SCOPE
N
41
ALL PARTITIONS TO BE
PARTITION PLAN - LEGEND
1100 Glendon Ave #1753, Los Angeles, CA 90024 ~ (310) 385-1550
N
P R O J E C T N O.
DATE:ISSUED FOR:
C O P Y R I G H T © 2 0 1 4 b y S T U D I O S a r c h i t e c t u r e
1/11/2019 9:56:07 PMC
:\User s\bkracke\D
ocu ments\W
ATT P LAZA_2017_CEN
TRAL_50%
CD
_bkracke.r vt
A2.01
PARTITION PLAN -LEVEL 1 KEY PLAN
17522.00
WATT PLAZA
17522.00
1875 & 1925 Century Park E, LosAngeles, CA 90067
SCALE:
1/16" = 1'-0"
1 PARTITION PLAN - LEVEL 1 SCHEMATIC DESIGN 02.05.18
DD PROGRESS ISSUANCE 03.30.18
50% DD SET 05.18.18
100% DD SET 06.12.18
50% CONSTRUCTION DOCUMENTS 01.11.19
11' 8"
Walk way divided inhalf
Topping SlabPhases
Duration Friday,Saturday, Sunday
17 Weeks
Install plywood overconcrete forms for suite
egress Install plywood overconcrete forms for
suite egress
Legend
Temp 12' barricade studs and plywood painted gray to receive possible graphics
Temp fencing with green screen, construction access and stocking
Full height barricade
Area off limits to public the entire duration
Pour 1 area
Pedestrian walk way on raised floor, coned walk way
Areas Clune is thinking do not need a concrete topping slabs.
2
CENTRALPLANT ACCESS
VAULT
A A A
A A A
A
A
A
AA
A
A
A
BU
S S
TO
PS
HE
LT
ER
H/C
RA
MP
ELE
VA
TO
RS
ST
AIR
SO
FF
ICE
EXHAUSTGRATE
PLANT ACCESS
EX. VENT
VENT
CENTRAL
EX. MH
EX.SDMH
VAULT
EX
PA
NS
ION
JO
INT H
/C R
AM
PH/C
RAM
P
EXISTING SIDEWALK
EXISTING SIDEWALK
EXISTING SIDEWALK
EXISTING SIDEWALK
EX
IST
ING
SI D
EW
AL
KE
XIS
TIN
G S
IDE
WA
LK
CO
NS
TE
LL
AT
ION
BL
VD
.
PA
RK
ING
ST
RU
CT
UR
E (
E)
CENTURY PARK EAST
CO
NS
TE
LL
AT
ION
BL
VD
.
ALLEYALLEY
PA
RK
ING
ST
RU
CT
UR
E
EN
TR
AN
CE
& E
XIT
LOADIN
G D
OCK (E
)
LOADIN
G D
OCK (E
)
RAM
P (E)
DOW
N
RAM
P (E)
DOW
N
TRASH
COM
PACTO
R
EXISTINGEXHAUST
GRATE
WALK
(E)
EX
ISIT
ING
ST
AIR
S
EX.
VENT
EX.
VENT
EX.
VENT
EX.
VENT
EX.
VENT
NEWVENT
RETAINING WALL BELOW (E)
(E) RETAINING WALL BELOW
RETA
ININ
G W
ALL B
ELOW
(E)
ATM
STA
IR (E
)
(E) CANTILEVER EDGE
UP
18.4 18.6 18.8 1918.218
1.A2.A
1.B
1.C
1.D
1.D.5
1.E
1.F
1.G
1.H
1.4.5
1.5
1.6
1.7
1.8
1.4
1.3
1.2
1.1
2.D.5
2.E
2.F
2.G
2.H
2.D
2.C
2.B
2.4.5
2.4
2.3
2.2
2.1
2.5
2.6
2.7
2.8
PA.5
PA.8
PB.1
A2.02
2
A2.03
2
DN
A2.03
1
LOBBY LOUNGE100
NOOK102
PANTRY103
COURTYARD104MEDIUM CONF
RM105
LARGE CONF RM106
1875 ENTRYLOBBY
113
1875 ELEVATORLOBBY
114
1875 CORRIDOR115
ENTRY LOBBY117
1925 CORRIDOR118
1925 VESTIBULE119
1925 ELEVATORLOBBY
120
1925 ENTRYLOBBY
121
RETAIL TENANTSUITE K
RETAIL TENANTSUITE J
BANK TENANTSUITE B
NIC NIC
ELEC ROOM123
RETAIL TENANTSUITE I
RETAIL TENANTSUITE A
RETAIL TENANTSUITE G
RETAIL TENANTSUITE M
FEDEX SHIPPINGSUITE L
STORAGESUITE P
LOADING DOCKSUITE Q
DRY CLEANINGSUITE F
RETAIL TENANTSUITE E
STORAGESUITE C
MAIL ROOMSUITE G
LOADING DOCK
BANK TENANTSUITE H
BANK TENANTSUITE D
FCC124
CONFERENCEBREAKOUT AREA
101
MENS109
RETAIL TENANTSUITE A-1
STORAGE110
WOMENS108
AV ROOM107
UNISEXRESTROOM
111
UNISEXRESTROOM
112
1875 VESTIBULE116
A10.00
1
(N) PARTITION
(N) DOOR AND STOREFRONT GLAZING
(N) DOOR AND FRAMELESS GLAZING
(E) DOOR TO REMAIN
(N) RATED PARTITION
(E) PARTITION
U.O.N., SEE PARTITION TYPE LEGEND FOR WALL TYPES
INDICATES NEW MILLWORK - SEE FINISH PLANS AND ELEVATIONS
AREA NOT IN SCOPE
N
41
ALL PARTITIONS TO BE
PARTITION PLAN - LEGEND
1100 Glendon Ave #1753, Los Angeles, CA 90024 ~ (310) 385-1550
N
P R O J E C T N O.
DATE:ISSUED FOR:
C O P Y R I G H T © 2 0 1 4 b y S T U D I O S a r c h i t e c t u r e
1/11/2019 9:56:07 PMC
:\User s\bkracke\D
ocu ments\W
ATT P LAZA_2017_CEN
TRAL_50%
CD
_bkracke.r vt
A2.01
PARTITION PLAN -LEVEL 1 KEY PLAN
17522.00
WATT PLAZA
17522.00
1875 & 1925 Century Park E, LosAngeles, CA 90067
SCALE:
1/16" = 1'-0"
1 PARTITION PLAN - LEVEL 1 SCHEMATIC DESIGN 02.05.18
DD PROGRESS ISSUANCE 03.30.18
50% DD SET 05.18.18
100% DD SET 06.12.18
50% CONSTRUCTION DOCUMENTS 01.11.19
Night Work WallFinishes and Floor
Finishes
8 week phase
LEGEND
Temp 12' barricade studs and plywood painted gray to receive possible graphics
Temp fencing with green screen, construction access and stocking
Drywall barricades
Area off limits to public the entire duration
Full height barricades constructed out of studs and corrugated plastic
Pedestrian Travel
Night wall finishes, areas delineated off and removed nightly
Floor finishes done Friday night - Saturday, Sunday grout and dry time
Floor finishes done at night and delineated for the next business day for dry time
FAQ:ARCHITECTURE ( ENTRIES )Q: Why has the renovation been scheduled at this time when otherCentury City construction projects are underway? Though we understand that many areas of Century City are currently underconstruction, the 1st floor of Watt Plaza has not undergone a renovation since 2004and many of the finishes are original from the time the buildings were built. Theownership is invested in keeping this project modernized and up to the Class Abuilding standards being set within the market. As many of the projects in the areawill be under construction for several years, there will be no ideal time to schedule aproject of this magnitude in the coming years. We also feel this project is overdue fora better utilization of the 1st floor space, including the multitude of requests we’vereceived over the years for additional conference room space. Construction will beunderway from July 2019 to approximately March 2020.
Q: How noisy will construction be during the renovation? Constructionwill take place Monday – Friday 4:00 am – 6:00 p.m. with portions of the projecttaking place after hours on weekdays and on weekends. Major noisy work such asdemolition and drilling will take place in the mornings before 8:00 a.m. and after 6:00p.m. But construction will be underway during business hours and you will hear noiseand activity on the 1st floor during much of the project’s duration.
Q: Will tenants be able to access the 1st floor at all times? Access tothe 1st floor will be available through the construction tunnel and platform for theentire duration of the project during business hours, including the mailroom. Asdiscussed during the construction presentation, there will be periods of time where thelst floor elevator lobbies will be shut down after hours and on the weekends in orderto conduct work in those areas. Memos will be sent out and signage will be postedaccordingly for access to your floor.
Q: Will retail tenants be accessible during the duration of the projectand what retail is still available? Yes the retail tenants will be accessibleduring business hours during the entire duration of the project. Note that Trimanaand Legal Vision Consulting Group will be closed permanently. Mystic Flowers &Gardens will be temporarily relocated to another location (TBD) in the building duringconstruction. They will reopen in their new suite once construction is complete in the1925 Building next to Mickey Fine.
Q: Now that Trimana is closed will another restaurant open in itsplace? Trimana will be permanently closed. Please note that our Leasingdepartment is actively pursuing additional food service options for the remainingretail space located in the 1925 Building in the old Chase Bank space. Taco Limon,Let’s Roll Sushi, Mickey Fine Sundry & Starbucks will remain open.
Q: How will parking be affected including the valet area? The Center Lobby between 1875/1925 Buildings will be closed the entire durationof the project and will not reopen until construction is complete. Therefore tenantsand visitors that park in the valet will enter the building either through the 1875 &1925 entrances. The 1925 entrance will be an entrance and an exit open 6:00a.m. – 7:00 p.m. and will remain so permanently.
Q: What are the conference room sizes and will there be a costrelated to renting them out? We are opening up two conference rooms,one large and one small. The large conference room is 900 square feet and willhold a maximum of 75 people. The small conference room is 400 square feet andwill hold a maximum of 30 people. There is also an opportunity to rent out theentire conference room center for events. There will be fee schedule set to rentout the individual conference rooms as well as the conference center as a whole. The fee schedule and rental instructions will be forthcoming in the months prior tothe opening of the conference room center.
Q: Who should I contact if I have an issue with anything relatedto the renovation project? Please enter a workorder through Angus underInquiry with any issues you may have or call the Building Management Office at(310) 789-2179.