State-Owned Enterprise Engagement and Reform, Linked Document 4 LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO Table 1: Loans and Grants in 13 Selected Countries (2005–2017) No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing Date Macro-level Approaches Sector governance and SOE- specific Inputs PPP modality, other NSO projects People’s Republic of China (PRC) 1 Loan ENE 2296 Gansu Heihe Rural Hydropower Development Investment Program–Erlongshan Hydropower Project 22.00 18 Dec 06 30 Jun 10 x 2 Loan ENE 2616 Tianjin Integrated Gasification Combined Cycle Power Plant Project 135.00 8 Feb 10 31 Oct 14 x 3 Loan ENE 3218 Low-Carbon District Heating Project in Hohhot in Inner Mongolia Autonomous Region 150.00 9 Dec 14 31 Oct 21 x 4 Loan ENE 3475 Shaanxi Accelerated Energy Efficiency and Environment Improvement 150.00 28 Nov 16 30 Jun 22 x 5 Loan ENE 3504 Air Quality Improvement in the Greater Beijing-Tianjin-Hebei Regi 499.60 12 Dec 16 30 Sep 22 x 6 Grant ENE 0196 Tianjin Integrated Gasification Combined Cycle Power Plant Project 5.00 8 Feb 10 30 Jun 16 x 7 Loan TRA 2181 Central Sichuan Roads Development 600.00 22 Sep 05 31 Dec 12 x 8 Loan TRA 2182 Zhengzhou-Xi'an Railway Project 400.00 22 Sep 05 31 Dec 14 x 9 Loan TRA 2219 Hunan Road Development III (Jishou-Huayuan) 208.00 15 Dec 05 31 Dec 12 x 10 Loan TRA 2274 Taiyuan-Zhongwei Railway Project 300.00 23 Nov 06 31 Dec 12 x x 11 Loan TRA 2339 Eastern Sichuan Roads Development Project 200.00 17 Jul 07 31 Dec 12 x x 12 Loan TRA 2390 Railway Safety Enhancement Project 100.00 12 Dec 07 30 Jun 14 x 13 Loan TRA 2471 Lanzhou-Chongqing Railway Development Project 300.00 18 Nov 08 31 Dec 18 x x

Upload: others

Post on 18-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

State-Owned Enterprise Engagement and Reform, Linked Document 4

LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO

Table 1: Loans and Grants in 13 Selected Countries (2005–2017)

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

People’s Republic of China (PRC)

1 Loan ENE 2296

Gansu Heihe Rural Hydropower

Development Investment

Program–Erlongshan Hydropower

Project 22.00 18 Dec 06 30 Jun 10 x

2 Loan ENE 2616

Tianjin Integrated Gasification

Combined Cycle Power Plant

Project 135.00 8 Feb 10 31 Oct 14 x

3 Loan ENE 3218

Low-Carbon District Heating

Project in Hohhot in Inner

Mongolia Autonomous Region 150.00 9 Dec 14 31 Oct 21 x

4 Loan ENE 3475

Shaanxi Accelerated Energy

Efficiency and Environment

Improvement 150.00 28 Nov 16 30 Jun 22 x

5 Loan ENE 3504

Air Quality Improvement in the

Greater Beijing-Tianjin-Hebei Regi 499.60 12 Dec 16 30 Sep 22 x

6 Grant ENE 0196

Tianjin Integrated Gasification

Combined Cycle Power Plant

Project 5.00 8 Feb 10 30 Jun 16 x

7 Loan TRA 2181

Central Sichuan Roads

Development 600.00 22 Sep 05 31 Dec 12 x

8 Loan TRA 2182 Zhengzhou-Xi'an Railway Project 400.00 22 Sep 05 31 Dec 14 x

9 Loan TRA 2219

Hunan Road Development III

(Jishou-Huayuan) 208.00 15 Dec 05 31 Dec 12 x

10 Loan TRA 2274

Taiyuan-Zhongwei Railway

Project 300.00 23 Nov 06 31 Dec 12 x x

11 Loan TRA 2339

Eastern Sichuan Roads

Development Project 200.00 17 Jul 07 31 Dec 12 x x

12 Loan TRA 2390

Railway Safety Enhancement

Project 100.00 12 Dec 07 30 Jun 14 x

13 Loan TRA 2471

Lanzhou-Chongqing Railway

Development Project 300.00 18 Nov 08 31 Dec 18 x x

Page 2: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

2 Linked Document 4

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

14 Loan TRA 2481

Chongqing-Lichuan Railway

Development Project 150.00 8 Dec 08 30 Jun 15 x

15 Loan WUS 2175

Jilin Water Supply and Sewerage

Development 100.00 18 Jul 05 13 Jul 12 x

16 Loan WUS 2360

Jilin Urban Environment

Improvement Project 100.00 29 Oct 07 15 Oct 13 x

17 Loan WUS 2388

Kunming Qingshuihai Water

Supply Project 80.00 12 Dec 07 30 Jun 13 x

18 Loan WUS 2487

Songhua River Basin Water

Pollution Control and

Management 200.00 11 Dec 08 27 Oct 14 x

PRC Total (18) 3,699.60

India

* Loan IND 2452

Khadi Reform and Development

Program

105.00

2 Oct 08 9 Jan 18

19 Loan ENE 2323

Madhya Pradesh Power Sector

Investment Program: Tranche 1 106.00 4 Apr 07 31 Jan 13 x

20 Loan ENE 2324

Madhya Pradesh Power Sector

Investment Program: Tranche 2 45.00 4 Apr 07 15 Jul 13 x

21 Loan ENE 2346

Madhya Pradesh Power Sector

Investment Program: Tranche 3 144.00 21 Aug 07 16 Sep 13 x

22 Loan ENE 2347

Madhya Pradesh Power Sector

Investment Program: Tranche 4 90.00 21 Aug 07 1 May 14 x

23 Loan ENE 2520

Madhya Pradesh Power Sector

Investment Program: Tranche 5 166.00 13 Apr 09 22 Jul 15 x

24 Loan ENE 2732

Madhya Pradesh Power Sector

Investment Program: Tranche 6 69.00 21 Dec 10 26 Jun 15 x

25 Loan ENE 2787

National Grid Improvement

Project 500.00 30 Sep 11 30 Jun 18 x

26 Loan ENE 2788

National Grid Improvement

Project 250.00 30 Sep 11 30 Sep 17 x

27 Loan ENE 3052

Rajasthan Renewable Energy

Transmission Investment Prog–

Tranche 1 62.00 22 Oct 13 30 Jun 18 x

28 Loan ENE 8275

Rajasthan Renewable Energy

Transmission Investment

Program–Tranche 1 88.00 22 Oct 13 30 Jun 18 x

Page 3: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 3

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

29 Loan ENE 3140

Assam Power Sector Investment

Program–Tranche 1 50.00 11 Jul 14 30 Jun 19 x

30 Loan ENE 3327

Assam Power Sector Investment

Program–Tranche 2 48.00 23 Nov 15 31 Dec 19 x

31 Loan ENE 3482

Rajasthan Renewable Energy

Transmission Investment

Program–Tranche 2 238.00 5 Dec 16 31 Dec 21 x

32 Loan ENE 8312

Rajasthan Renewable Energy

Transmission Investment

Program–Tranche 2 110.00 5 Dec 16 31 Dec 21 x

33 Loan FIN 2281

Rural Cooperative Credit

Restructuring and Development

Program 1,000.00 8 Dec 06 30 Jun 13 x x

34 Loan FIN 3048

Accelerating Infrastructure

Investment Facility in India–

Tranche 1 400.00 21 Oct 13 31 Dec 16 x

34 Loan FIN 3186

Clean Energy Finance Investment

Program–Tranche 1 200.00 17 Nov 14 30 Apr 19 x x

36 Loan FIN 3307

Accelerating Infrastructure

Investment Facility in India–

Tranche 2 300.00 30 Oct 15 cancelled x

37 Loan FIN 8309

Solar Rooftop Investment

Program–Project 1 100.00 7 Oct 16 30 Jun 23 x

*

Loan IND 3430

Visakhapatnam-Chennai

Industrial Corridor Development

Program–Project 1 245.00 26 Sep 16 30 Jun 23

*

Grant IND 495

Visakhapatnam-Chennai

Industrial Corridor Development

Program–Project 1 5.00 26 Sep 16 30 Jun 23

38 Loan PSM 2404

India Infrastructure Project

Financing Facility–Project 1 300.00 20 Dec 07 31 Mar 10 x x

39 Loan PSM 2442

Assam Governance & Public

Resource Management–

Subprogram II 100.00 17 Sep 08 31 Mar 12 x

40 Loan PSM 2509

India Infrastructure Project

Financing Facility–Project 2 200.00 24 Feb 09 30 Nov 11 x x

Page 4: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

4 Linked Document 4

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

41 Loan PSM 2536

Mizoram Public Resource

Management Program 94.00 18 Aug 09 31 Jan 15 x x

42 Loan PSM 2537

Developing Public Resource

Management in Mizoram 6.00 18 Aug 09 31 Jan 15 x x

43 Loan PSM 2586

Second India Project Financing

Facility–Project 1 210.00 27 Nov 09 31 Dec 14 x

44 Loan PSM 2717

Second India Infrastructure

Project Financing Facility–Tranche

2 250.00 7 Dec 10 31 Dec 14 x

45 Loan PSM 2822

Second India Infrastructure

Project Financing Facility–Tranche

3 240.00 1 Dec 11 14 Dec 14 x

46 Loan PSM 2926

West Bengal Development

Finance Program 400.00 30 Oct 12 24 Jul 14 x

47 Loan PSM 3187

Punjab Development Finance

Program 200.00 19 Nov 14 30 Jun 18 x

48 Loan PSM 3563

Second West Bengal

Development Finance Program 300.00 20 Sep 17 30 Sep 19 x x x

49 Loan TRA 3276

Second Jharkhand State Road

Project 200.00 9 Sep 15 30 Jun 20 x

50 Loan WUS 3053

Kolkata Environmental

Improvement Investment

Program–Tranche1 100.00 22 Oct 13 30 Jun 19 x

51 Loan WUS 3413

Kolkata Environmental

Improvement Investment

Program–Tranche 2 200.00 16 Aug 16 30 Apr 22 x

52 Loan WUS 3528

Madhya Pradesh Urban Services

Improvement Project 275.00 18 May 17 31 Dec 22 x

53 Loan WUS 3612

Bihar Urban Development

Investment Program–Tranche 2 84.00 4 Dec 17 31 Dec 21 x

India Total (35) 7,125.00

Papua New Guinea

54 Loan ENE 2713

Town Electrification Investment

Program–Tranche 1 40.90 6 Dec 10 31 Dec 19 x

55 Loan ENE 2714

Town Electrification Investment

Program–Tranche 1 16.40 6 Dec 10 31 Dec 19 x

Page 5: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 5

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

56 Loan ENE 3544

Town Electrification Investment

Program–Tranche 2 55.90 4 Jul 17 30 Jun 20 x

57 Loan ENE 3545

Town Electrification Investment

Program–Tranche 2 5.00 4 Jul 17 30 Jun 20 x

*

Grant HLT 9113

Lae Port Livelihood and Social

Improvement Project 1.50 18 Dec 07 4 Dec 15

58 Loan TRA 2398 Lae Port Development Project 60.00 18 Dec 07 30 Jun 16 x

59 Loan TRA 2399 Lae Port Development Project 40.00 18 Dec 07 30 Jun 16 x

60 Loan TRA 8237 Lae Port Development Project 6.00 18 Dec 07 30 Jun 14 x

61 Loan TRA 2588

Civil Aviation Development

Investment Program–Project 1 25.00 1 Dec 09 15 Jul 16 x

62 Loan TRA 2589

Civil Aviation Development

Investment Program–Project 1 50.00 1 Dec 09 15 Jul 16 x

63 Loan TRA 2590

Civil Aviation Development

Investment Program–Project 1 20.00 1 Dec 09 15 Jul 16 x

64 Loan TRA 2803

Lae Port Development Project–

Additional Financing 85.00 10 Nov 11 30 Jun 16 x

65 Loan TRA 2804

Lae Port Development Project–

Additional Financing 4.12 10 Nov 11 30 Jun 16 x

66 Loan TRA 3069

Civil Aviation Development

Investment Program–Project 2 115.00 25 Nov 13 31 Dec 18 x

67 Loan TRA 3496

Civil Aviation Development

Investment Program–Project 3 213.00 8 Dec 16 31 Dec 18 x

68 Loan TRA 3497

Civil Aviation Development

Investment Program–Project 3 35.00 8 Dec 16 31 Dec 18 x

69 Grant TRA 0102 Lae Port Development Project 0.75 18 Dec 07 25 Feb 16 x

Papua New Guinea Total (16) 772.07

Uzbekistan

70 Loan ENE 8244 Talimarjan Power Project 300.00 21 Dec 09 30 Jul 19 x

71 Loan ENE 2629 Talimarjan Power Project 340.00 20 Apr 10 31 Dec 17 x

72 Loan ENE 2630 Talimarjan Power Project 10.00 20 Apr 10 30 Sep 18 x

73 Loan ENE 3058 Samarkand Solar Power Project 101.10 20 Nov 13 30 Sep 19 x

74 Loan ENE 3059 Samarkand Solar Power Project 8.90 20 Nov 13 30 Sep 19 x

75 Loan ENE 3141

Takhiatash Power Plant Efficiency

Improvement Project 300.00 15 Jul 14 30 Apr 21 x

Page 6: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

6 Linked Document 4

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

76 Loan ENE 3285

Northwest Region Power

Transmission Line Project 150.00 22 Sep 15 30 Jun 20 x

77 Loan ENE 3621

Power Generation Efficiency

Improvement Project 450.00 12 Dec 17 30 Jun 23 x

78 Loan FIN 3535

Affordable Rural Housing

Program 500.00 1 Jun 17 30 Jun 22 x

79 Loan TRA 2781

CAREC 6 (Marakand-Karshi)

Railway Electrification Project 100.00 28 Sep 11 31 Dec 17 x

80 Loan WUS 3275

Djizzak Sanitation System

Development Project 81.00 8 Sep 15 31 Oct 21 x

Uzbekistan Total (11) 2,341.00

Viet Nam

* Loan ANR 2223

Central Region Water Resources

Project 74.30 19 Dec 05 30 Jun 12

*

Loan ANR 2269

Forests for Livelihood

Improvement in the Central

Highlands 45.00 26 Oct 06 30 Jun 16

*

Loan ANR 2636

Strengthening Water

Management & Irrigation

Systems Rehabilitation Project 100.00 20 Apr 10 31 Dec 16

*

Loan ANR 2828

Development of the Northern

Chu and Southern Ma Rivers

Irrigation System Project 110.00 12 Dec 11 31 Dec 17

*

Loan ANR 3032

Productive Rural Infrastructure

Development Project in the

Central Highlands 80.00 25 Sep 13 30 Jun 19

*

Grant ANR 0060

Forests for Livelihood

Improvement in the Central

Highlands 8.00 26 Oct 06 31 Oct 14

81 Loan ENE 2848

Power Transmission Investment

Program–Tranche 1 120.50 29 Dec 11 31 Dec 16

x

82 Loan ENE 2959

Power Transmission Investment

Program–Tranche 2 110.19 5 Dec 12 30 Nov 16

x

83 Loan ENE 3374

Power Transmission Investment

Program–Tranche 3 231.31 18 Dec 15 30 Jun 20

x

84 Loan FIN 2377

Third Financial Sector Program–

Subprogram 1 75.00 6 Dec 07 31 Dec 09

x

Page 7: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 7

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

85 Loan FIN 2707

Third Financial Sector Program–

Subprogram 2 60.00 29 Nov 10 15 Jul 11

x

86 Loan FIN 2877

Microfinance Development

Program–Subprogram 1 40.00 5 Jul 12 31 Mar 13

x

87 Loan FIN 3081

Financial Sector Deepening

Program – Subprogram 1 45.00 6 Dec 13 31 Jul 14

x

88 Loan FIN 3213

Microfinance Development

Program – Subprogram 2 50.00 9 Dec 14 30 Sep 15

x

89 Loan FIN 3335

Financial Sector Deepening

Program–Subprogram 2 100.00 26 Nov 15 31 Mar 16

x

90 Loan PSM 2194 Poverty Reduction Program II 15.00 3 Nov 05 31 Dec 06 x x

91 Loan PSM 2262

Support the Implementation of

the Poverty Reduction Program III 15.00 5 Oct 06 31 Dec 07

x x

92 Loan PSM 2352

Support the Implementation of

the Poverty Reduction Program IV 15.00 2 Oct 07 31 Dec 08

x x

93 Loan PSM 2490

Support for the Implementation

of the Poverty Reduction Program

V–Subprogram 1 25.00 8 Dec 08 31 Dec 09

x x

94 Loan PSM 2570

Support for the Implementation

of the Poverty Reduction Program

V–Subprogram 2 100.00 15 Oct 09 31 May 10

x x

95 Loan PSM 2613

SOE Reform & Corporate

Governance Facility Program–

Project 1 120.00 14 Jan 10 30 Jun 15

x

96 Loan PSM 2614

SOE Reform and Corporate

Governance Facility Program–

Project 1 10.00 14 Jan 10 31 Dec 17

x

97 Loan PSM 2827

Support for the Implementation

of the Poverty Reduction Program

V 24.80 9 Dec 11 30 Jun 12

x x

98 Loan PSM 8273

Public-Private Partnership

Support Project–Additional

Financing 10.00 11 Jul 12 30 Jun 18

x x

99 Loan PSM 2920

Public-Private Partnership

Support Project 20.00 25 Oct 12 31 Dec 20

x x

100 Loan PSM 3227

Improving Competitiveness

Program 140.00 28 Nov 14 30 Sep 15

x

Page 8: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

8 Linked Document 4

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

101 Loan PSM 3228

Improving Competitiveness

Program 90.00 28 Nov 14 30 Sep 15

x

102 Loan PSM 3240

SOE Reform & Corporate

Governance Facilitation Project–

Tranche 2 310.00 16 Dec 14 14 Dec 19 x

103 Loan PSM 3242

SOE Reform & Corporate

Governance Facilitation Program–

Tranche 2 10.00 16 Dec 14 14 Dec 19 x

104 Loan TRA 2302

GMS: Kunning-Haiphong

Transport Corridor Yen Vien-Lao

Cai Railway Upgrading 60.00 19 Dec 06 31 Dec 15 x

105 Loan TRA 8227

GMS: Kunning-Haiphong

Transport Corridor Yen Vien-Lao

Cai Railway Upgrading 40.00 21 Dec 06 30 Apr 14 x

106 Loan TRA 2374

Ho Chi Minh City Long Thanh

Dau Giay Expressway 10.00 28 Nov 07 30 Jun 11 x

107 Loan TRA 2730

GMS Ben Luc-Long Thanh

Expressway Project–Tranche 1 350.00 22 Dec 10 30 Jun 19 x

108 Loan WUS 2272

Central Region Small and

Medium Towns Development

Project 53.22 17 Nov 06 30 Jun 14 x

109 Loan WUS 2754

Water Sector Investment

Program–Tranche 1 138.00 7 Jun 11 31 Dec 20 x

110 Loan WUS 2961

Water Sector Investment

Program–Tranche 2 212.00 7 Dec 12 30 Jun 20 x

111 Loan WUS 3251

Water Sector Investment

Program– Tranche 3 142.50 27 Mar 15 31 Dec 20 x

112 Loan WUS 3373

Water Sector Investment

Program– Tranche 4 205.00 16 Dec 15 cancelled x

113 Grant WUS 0365

Energy Efficiency for Ho Chi Minh

City Water Supply Project 2.00 17 Oct 13 30 Jun 18 x

Viet Nam Total (33) 2,949.52

Total for the Five Countries Selected for Case Assessments (113) 16,887.19

Bangladesh

* Loan ANR 3302

Southwest Area Integrated Water

Resources Planning and 45.00 30 Sep 15 31 Dec 22

Page 9: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 9

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

Management Project–Additional

Financing

*

Grant ANR 0441

Southwest Area Integrated Water

Resources Planning and

Management Project–Additional

Financing 7.00 30 Sep 15 31 Dec 22

114 Loan ENE 2188

Gas Transmission and

Development Project 225.00 27 Oct 05 31 Dec 16 x

115 Loan ENE 2189

Gas Transmission and

Development Project 5.00 27 Oct 05 4 Jun 13 x

116 Loan ENE 2332

Sustainable Power Sector

Development Project 400.00 26 Jun 07 22 Oct 14 x

117 Loan ENE 2333

Sustainable Power Sector

Development Project 5.00 26 Jun 07 31 Dec 13 x

118 Loan ENE 2334

Sustainable Power Sector

Development Program 60.00 26 Jun 07 30 Jun 08 x

119 Loan ENE 2661

Bangladesh-India Electrical Grid

Interconnection Project 100.00 31 Aug 10 30 Jun 14 x

120 Loan ENE 2966

Power System Expansion &

Efficiency Improvement

Investment Prog–Tranche 1 185.00 12 Dec 12 31 Dec 18 x

121 Loan ENE 3031

SASEC Bangladesh-India Electrical

Grid Interconnection Project–

Additional Financing 12.00 25 Sep 13 30 Jun 15 x

122 Loan ENE 3298

SASEC Second Bangladesh-India

Electrical Grid Interconnection

Project 35.00 29 Sep 15 31 Dec 18 x

123 Loan ENE 3299

SASEC Second Bangladesh-India

Electrical Grid Interconnection

Project 85.00 29 Sep 15 31 Dec 18 x

124 Loan ENE 3522

Bangladesh Power System

Enhancement & Efficiency

Improvement Project 600.00 29 Mar 17 31 Dec 20 x

125 Loan ENE 3523

Bangladesh Power System

Enhancement & Efficiency

Improvement Project 16.00 29 Mar 17 31 Dec 20 x

Page 10: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

10 Linked Document 4

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

126 Grant ENE 9190

Bangladesh Power System

Enhancement & Efficiency

Improvement Project 2.00 29 Mar 17 31 Dec 20 x

127 Grant ENE 0019 Gas Transmission & Development 5.00 27 Oct 05 10 Oct 13 x

128 Grant ENE 0253

Public-Private Infrastructure

Development Facility–Supplement 1.30 17 May 11 31 Dec 14 x

129 Grant ENE 0254

Public-Private Infrastructure

Development Facility–Supplement 2.00 17 May 11 30 Jun 14 x

130 Grant ENE 0320

Power System Expansion and

Efficiency Improvement

Investment Program 7.00 28 Nov 12 31 Dec 18 x

131 Loan FIN 2232

Improvement of Capital Market

and Insurance Governance

Project 3.00 9 Mar 06 19 May 13 x

132 Loan FIN 2453

Public-Private Infrastructure

Development Facility 83.00 2 Oct 08 31 Dec 13 x

133 Loan FIN 2454

Public-Private Infrastructure

Development Facility 82.00 2 Oct 08 31 Dec 14 x

134 Loan FIN 2951

Second Capital Market

Development Program 95.00 28 Nov 12 5 Apr 13 x

135 Loan FIN 2952

Second Capital Market

Development Program 155.00 28 Nov 12 18 Dec 14 x

136 Loan FIN 2953

Second Capital Market

Development Program 50.00 28 Nov 12 18 Dec 14 x

137 Loan FIN 3045

Second Public-Private

Infrastructure Development

Facility 100.00 17 Oct 13 31 Jul 19 x

138 Loan FIN 3554

Third Public-Private Infrastructure

Development Facility–Tranche 1 250.00 11 Aug 17 31 Dec 20 x

139 Loan FIN 3555

Third Public-Private Infrastructure

Development Facility–Tranche 1 10.00 11 Aug 17 31 Dec 20 x

140 Loan PSM 2568

Public Expenditure Support

Facility Program and

Countercyclical Support Facility

Support Program 100.00 13 Oct 09 28 Dec 11 x

141 Loan PSM 2566

Public Expenditure Support

Facility Program and 44.85 13 Oct 09 28 Dec 11 x

Page 11: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 11

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

Countercyclical Support Facility

Support Program

142 Loan PSM 2567

Public Expenditure Support

Facility Program and

Countercyclical Support Facility

Support Program 100.00 13 Oct 09 28 Dec 11 x

143 Loan PSM 2569

Public Expenditure Support

Facility Program and

Countercyclical Support Facility

Support Program 500.00 13 Oct 09 28 Dec 11 x

144 Loan TRA 2316

Railway Sector Investment

Program 100.00 13 Feb 07 4 May 17 x

145 Loan TRA 2317

Railway Sector Investment

Program Reform 30.00 13 Feb 07 4 May 17 x

146 Loan TRA 2862

Greater Dhaka Sustainable Urban

Transp0rt Project 100.00 17 Apr 12 31 Dec 17 x

147 Loan TRA 2863

Greater Dhaka Sustainable Urban

Transp0rt Project 15.00 17 Apr 12 31 Dec 17 x

148 Loan TRA 2864

Greater Dhaka Sustainable Urban

Transp0rt Project 45.00 17 Apr 12 31 Dec 17 x

149 Loan TRA 8270

Greater Dhaka Sustainable Urban

Transport Project 45.00 10 May 12 30 Nov 17 x

150 Grant TRA 0287

Greater Dhaka Sustainable Urban

Transport Project 4.60 17 Apr 12 31 Dec 17 x

151 Loan WUS 2265

Secondary Towns Water Supply

and Sanitation Project 41.00 16 Oct 06 13 Jul 16 x

152 Loan WUS 8225

Secondary Towns Water Supply

and Sanitation Sector Project 9.00 16 Oct 06 13 Jul 16 x

153 Loan WUS 2382

Dhaka Water Supply Sector

Development Program 150.00 10 Dec 07 30 Jun 16 x

154 Loan WUS 2383

Dhaka Water Supply Sector

Development Program 50.00 10 Dec 07 30 Jun 14 x

155 Loan WUS 2756 Khulna Water Supply Project 75.00 14 Jun 11 30 Jun 18 x

Bangladesh Total (42) 3,982.75

Fiji

156 Loan WUS 2603

Suva Nausori Water Supply &

Sewerage Project–Supplementary 23.00 15 Dec 09 14 Apr 15 x

Page 12: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

12 Linked Document 4

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

157 Loan WUS 3512

Urban Water Supply and

Wastewater Management

Investment Program 42.11 20 Dec 16 31 Jan 26 x

Fiji Total (2) 65.11

Georgia

158 Loan PSM 3191

Improving Domestic Resource

Mobilization for Inclusive Growth

Program 59.00 21 Nov 14 31 Dec 14 x

159 Loan PSM 3190

Improving Domestic Resource

Mobilization for Inclusive Growth

Program 16.00 21 Nov 14 31 Dec 14 x

160 Loan PSM 3282

Improving Domestic Resource

Mobilization for Inclusive Growth

Program–Subprogram 2 22.00 22 Sep 15 31 Dec 15 x

161 Loan PSM 3283

Improving Domestic Resource

Mobilization for Inclusive Growth

Program–Subprogram 2 53.00 22 Sep 15 31 Dec 15 x

162 Loan PSM 3417

Improving Domestic Resource

Mobilization for Inclusive Growth

Program–Subprogram 3 50.00 31 Aug 16 31 Dec 16 x

163 Loan PSM 3418

Improving Domestic Resource

Mobilization for Inclusive Growth

Program–Subprogram 3 50.00 31 Aug 16 31 Dec 16 x

164 Loan TRA 2655

Sustainable Urban Transport

Investment Program–Tranche 1 85.00 21 Jul 10 30 Sep 18 x

165 Loan TRA 2879

Sustainable Urban Transport

Investment Program–Tranche 2 64.00 24 Jul 12 31 Dec 18 x

166 Loan TRA 2880

Sustainable Urban Transport

Investment Program–Tranche 2 16.00 24 Jul 12 31 Dec 18 x

167 Loan TRA 3063

Sustainable Urban Transport

Investment Program–Tranche 3 73.00 25 Nov 13 31 Dec 18 x

168 Loan TRA 3273

Sustainable Urban Transport

Investment Program–Tranche 4 20.00 25 Aug 15 30 Jun 20 x

169 Loan WUS 2441

Municipal Services Development

Project 40.00 12 Sep 08 30 Jun 13 x

170 Loan WUS 2534

Municipal Services Development

Project–Phase 2 30.00 28 Jul 09 30 Jun 14 x

Page 13: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 13

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

171 Loan WUS 2749

Urban Services Improvement

Investment Prog–Tranche I 80.00 12 Apr 11 30 Jun 18 x

172 Loan WUS 2807

Urban Services Improvement

Investment Program–Tranche 2 40.00 23 Nov 11 30 Sep 18 x

173 Loan WUS 3078

Urban Services Improvement

Investment Program–Tranche 3 98.00 5 Dec 13 30 Sep 19 x

174 Loan WUS 3238

Urban Services Improvement

Investment Program–Tranche 4 108.00 11 Dec 14 30 Sep 19 x

175 Loan WUS 3291

Urban Services Improvement

Investment Program–Tranche 5 43.00 29 Sep 15 30 Jun 19 x

176 Loan WUS 3292

Urban Services Improvement

Investment Program–Tranche 5 32.00 29 Sep 15 30 Jun 19 x

177 Loan WUS 3441

Urban Services Improvement

Investment Program–Tranche 6 99.00 4 Oct 16 30 Sep 19 x

Georgia Total (20) 1,078.00

Indonesia

*

Loan ANR 2500

Integrated Citarum Water

Resources Management

Investment Program–Project 1 20.00 22 Dec 08 31 May 16

*

Loan ANR 2501

Integrated Citarum Water

Resources Management

Investment Program–Project 1 30.00 22 Dec 08 31 May 16

*

Grant ANR 0216

Citarum Watershed Management

and Biodiversity Conservation

Project 3.75 4 Aug 10 31 May 16

178 Loan ENE 3303

Sustainable and Inclusive Energy

Program–Subprogram 1 400.00 30 Sep 15 31 Dec 15 x x

179 Loan ENE 8293

Sustainable and Inclusive Energy

Program–Subprogram 1 100.00 30 Sep 15 31 Dec 15 x x

180 Loan ENE 3339

Electricity Grid Strengthening

Sumatra Program 575.00 2 Dec 15 30 Jun 20 x

181 Loan ENE 8297

Electricity Grid Strengthening

Sumatra Program 25.00 2 Dec 15 30 Jun 20 x

182 Loan ENE 3560

Sustainable Energy Access in

Eastern Indonesia-Electricity Grid

Development Program 600.00 14 Sep 17 30 Jun 22 x

Page 14: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

14 Linked Document 4

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

183 Loan ENE 3561

Sustainable and Inclusive Energy

Program–Subprogram 2 400.00 14 Sep 17 31 Mar 18 x x

184 Loan ENE 8330

Sustainable and Inclusive Energy

Program–Subprogram 2 100.00 14 Sep 17 31 Mar 18 x x

185 Loan FIN 2379

Capital Market Development

Program Cluster–Subprogram 1 300.00 10 Dec 07 31 Mar 08 x

186 Loan FIN 2516

Indonesian Infrastructure

Financing Facility Company

Project 100.00 31 Mar 09 31 Dec 14 x

187 Loan FIN 2577

Capital Market Development

Program Cluster–Subprogram 2 300.00 16 Nov 09 31 Mar 10 x

188 Loan PSM 2192

Local Government Finance and

Governance Reform Program 300.00 3 Nov 05 29 Dec 05 x

189 Loan PSM 2193

Local Government Finance &

Governance Reform Sector

Development Project 30.00 3 Nov 05 14 Jan 11 x

190 Loan PSM 2263

Infrastructure Reform Sector Dev

Program Cluster 400.00 21 Nov 06 31 Mar 07 x

191 Loan PSM 2264

Infrastructure Reform Sector

Development Program Cluster–

Subprogram I 26.50 21 Nov 06 1 Feb 16 x

192 Loan PSM 2305

Second Development Policy

Support Program Cluster–

Subprogram I 200.00 20 Dec 06 21 Dec 06 x

193 Loan PSM 2394

Third Development Policy

Support Program 200.00 17 Dec 07 20 Dec 07 x

194 Loan PSM 2475

Infrastructure Reform Sector

Development Program–

Subprogram 2 280.00 27 Nov 08 31 Mar 09 x

195 Loan PSM 2478

Second Local Govt Finance &

Governance Reform Program

Cluster–Subprogram 1 350.00 4 Dec 08 31 Dec 08 x

196 Loan PSM 2708

Infrastructure Reform Sector

Development Program–

Subprogram 3 200.00 1 Dec 10 31 Mar 11 x

Page 15: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 15

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

197 Loan PSM 2786

Second Local Govt Finance &

Governance Reform Program–

Subprogram 2 200.00 4 Oct 11 31 Dec 11 x

198 Grant PSM 0064

Infrastructure Project

Development Facility 7.56 21 Nov 06 31 May 11 x

Indonesia Total (21) 5,094.06

Mongolia

199 Loan FIN 2218

Financial Regulation and

Governance Program 10.00 15 Dec 05 30 Jun 10 x

200 Loan FIN 3338

Supporting the Credit Guarantee

System for Economic

Diversification and Employment

Project 60.00 27 Nov 15 31 Oct 21 x

201 Loan FIN 3533

Banking Sector Rehabilitation and

Financial Stability Strengthening

Program 100.00 31 May 17 3 Aug 17 x

202 Loan PSM 3385

Strengthening Institutional

Framework and Management

Capacity 35.00 31 Mar 16 31 Oct 19 x

Mongolia Total (4) 205.00

Pakistan

203 Loan ENE 2289

Power Transmission

Enhancement Investment

Program–Tranche 1 226.00 13 Dec 06 30 Jun 12 x

204 Loan ENE 2290

Power Transmission

Enhancement Investment

Program–Tranche 1 10.00 13 Dec 06 31 Dec 16 x

205 Loan ENE 2286

Renewable Energy Development

Sector Investment Program–

Project 1 90.63 13 Dec 06 31 Dec 17 x

206 Loan ENE 7001

Renewable Energy Development

Sector Investment Program–

Project 1 14.37 13 Dec 06 31 Dec 17 x

207 Loan ENE 2287

Renewable Energy Development

Sector Investment Program–

Project 1 10.00 13 Dec 06 31 Dec 17 x

Page 16: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

16 Linked Document 4

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

208 Loan ENE 2396

Power Transmission

Enhancement Investment

Program–Project 2 220.00 17 Dec 07 29 Feb 16 x

209 Loan ENE 2438

Power Distribution Enhancement

Investment Program–Project 1 242.00 12 Sep 08 30 Jun 12 x

210 Loan ENE 2439

Power Distribution Enhancement

Investment Program–Project 1 10.00 12 Sep 08 31 Dec 18 x

211 Loan ENE 2552

Energy Efficiency Investment

Program–Tranche 1 40.00 22 Sep 09 30 Jun 14 x

212 Loan ENE 2553

Energy Efficiency Investment

Program–Tranche 1 20.00 22 Sep 09 16 Sep 19 x

213 Loan ENE 8246

Energy Efficiency Investment

Program– Tranche 1 25.00 30 Sep 09 31 Dec 14 x

214 Loan ENE 2727

Power Distribution Enhancement

Investment Program–Tranche 2 242.00 14 Dec 10 31 Mar 18 x

215 Loan ENE 2846

Power Transmission

Enhancement Investment

Program–Tranche 3 243.24 22 Dec 11 31 Dec 16 x

216 Loan ENE 2972

Power Distribution Enhancement

Investment Program–Tranche 3 245.00 14 Dec 12 31 Jan 18 x

217 Loan ENE 3096

Power Distribution Enhancement

Investment Program–Tranche 4 167.20 13 Dec 13 30 Jun 18 x

218 Loan ENE 3126

Sustainable Energy Sector Reform

Program 400.00 24 Apr 14 30 Jun 15 x

219 Loan ENE 3321

Sustainable Energy Sector Reform

Program–Subprogram 2 100.00 20 Nov 15 30 Jun 16 x

220 Loan ENE 3322

Sustainable Energy Sector Reform

Program–Subprogram 2 300.00 20 Nov 15 30 Jun 16 x

221 Loan ENE 3328

Second Power Distribution

Enhancement Investment

Program–Tranche 1 380.00 25 Nov 15 30 Jun 19 x

222 Loan ENE 3329

Second Power Distribution

Enhancement Investment

Program–Tranche 1 20.00 25 Nov 15 30 Jun 24 x

223 Loan ENE 3419

Second Power Transmission

Enhancement Investment

Program – Tranche 1 115.00 31 Aug 16 31 Dec 20 x

Page 17: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 17

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

224 Loan ENE 3420

Second Power Transmission

Enhancement Investment

Program–Tranche 1 10.00 31 Aug 16 26 Aug 26 x

225 Loan ENE 3537

Sustainable Energy Sector Reform

Program-Subprogram 3 300.00 15 Jun 17 30 Jun 17 x

226 Loan FIN 2291

Improving Access to Financial

Services Program–Phase 1 300.00 14 Dec 06 31 Dec 08 x

227 Loan FIN 2292

Improving Access to Financial

Services Program–Phase 1 20.00 14 Dec 06 31 Mar 07 x

228 Loan FIN 2340

Second Generation of Capital

Market Reform Program 400.00 31 Jul 07 12 Jul 11 x

229 Loan FIN 3636

Enhancing Public-Private

Partnerships in Punjab Project 100.00 15 Dec 17 30 Jun 23 x

230 Grant FIN 0562

Enhancing Public-Private

Partnerships in Punjab Project 19.62 15 Dec 17 30 Jun 23 x

231 Loan PSM 2178 Infrastructure Development 25.00 18 Aug 05 30 Jun 10 x x

232 Loan PSM 2216

Punjab Resource Management

Program–Subprogram 2 200.00 14 Dec 05 16 Aug 07 x

233 Loan PSM 2270

Private Participation in

Infrastructure Program 400.00 31 Oct 06 28 Jun 10 x x

234 Loan PSM 2385

Punjab Government Efficiency

Improvement Program–

Subprogram 1 250.00 10 Dec 07 30 Jun 08 x

235 Loan PSM 2386

Capacity Building for Punjab

Government Efficiency

Improvement 8.80 10 Dec 07 30 Jun 12 x

236 Loan PSM 2446

Accelerating Economic

Transformation Program–

Subprogram 1 300.00 30 Sep 08 30 Sep 08 x

237 Loan PSM 2447

Accelerating Economic

Transformation Program–

Subprogram 1 200.00 30 Sep 08 30 Sep 10 x

238 Loan PSM 2484

Sindh Growth and Rural

Revitalization Program 100.00 11 Dec 08 22 Jan 09 x

239 Loan PSM 2524

Accelerating Economic

Transformation Program–

Subprogram 2 350.00 25 Jun 09 1 Jul 09 x

Page 18: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

18 Linked Document 4

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

240 Loan PSM 2525

Accelerating Economic

Transformation Program–

Subprogram 2 150.00 25 Jun 09 1 Jul 09 x

241 Loan PSM 2547

Punjab Government Efficiency

Improvement Program–

Subprogram 2 75.00 17 Sep 09 9 Oct 09 x

242 Loan PSM 2548

Punjab Government Efficiency

Improvement Program–

Subprogram 2 75.00 17 Sep 09 9 Oct 09 x

243 Loan PSM 2645

Sindh Growth and Rural

Revitalization Program–

Subprogram 2 120.00 24 Jun 10 30 Jun 10 x

244 Loan PSM 3214

Public Sector Enterprise Reforms

Project 20.00 4 Dec 14 cancelled

245 Loan PSM 3398

Public Sector Enterprises Reform

Program–Subprogram 1 200.00 28 Jun 16 30 Jun 17 x

246 Loan PSM 3399

Public Sector Enterprises Reform-

Subprogram 1 100.00 28 Jun 16 30 Jun 17 x

247 Loan PSM 3469

Supporting Public-Private

Partnership Investments in Sindh

Province Project 100.00 24 Nov 16 31 Dec 22 x

248 Loan PSM 3538

Public Sector Enterprises Reform

Program (Subprogram 2) 300.00 22 Jun 17 30 Jun 18 x x

249 Loan TRA 2210

National Highway Development

Sector Investment Program 3.00 31 Dec 05 31 Mar 11 x x

250 Loan TRA 2231

National Highway Development

Sector Investment Program–

Project 1 180.00 15 Feb 06 19 Apr 11 x x

251 Loan TRA 2400

National Trade Corridor Highway

Investment Program–Project 1 170.00 17 Dec 07 31 Mar 15 x

252 Loan TRA 2540

National Highway Development

Sector Investment Program–

Project 2 230.00 26 Aug 09 31 Dec 14 x x

253 Loan TRA 3543

Peshawar Sustainable Bus Rapid

Transit Corridor Project 335.00 30 Jun 17 31 Dec 21 x x

254 Loan WUS 2229 Megacity Development 10.00 2 Feb 06 30 Apr 09 x

Page 19: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 19

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

255 Loan WUS 2499

Sindh Cities Improvement

Investment Program–Project 1 38.00 19 Dec 08 30 Jun 14 x

256 Loan WUS 2975

Sindh Cities Improvement

Investment Program–Project 2 25.10 18 Dec 12 31 Aug 17 x

257 Loan WUS 2976

Sindh Cities Improvement

Investment Program – Project 2 74.00 18 Dec 12 31 Aug 17 x

Pakistan Total (55) 8,308.96

Philippines

258 Loan ENE 2282

Power Sector Development

Program 450.00 8 Dec 06 30 Jun 09 x

* Loan

HLT 2515

Credit for Better Health Care

Project 50.00 25 Mar 09 19 Aug 15

*

Grant HLT 0148

Enhancing Midwives'

Entrepreneurial and Financial

Literacy 0.40 25 Mar 09 30 Jun 13

*

Loan IND 3233

Increasing Competitiveness for

Inclusive Growth Program–

Subprogram 2 350.00 15 Dec 14 10 Nov 15

259 Loan PSM 2450

Development Policy Support

Program–Subprogram 2 250.00 30 Sep 08 20 Nov 08 x

260 Loan PSM 2545

Development Policy Support

Program - Subprogram 3 250.00 15 Sep 09 31 Dec 09 x

261 Loan PSM 2872

Increasing Competitiveness for

Inclusive Growth Program–

Subprogram 1 350.00 26 Jun 12 7 Dec 12 x

262 Grant WUS 0477

Water District Development

Sector Project 2.00 22 Apr 16 31 Oct 22 x

Philippines Total (5) 1,302.00

Tonga

* Grant ICT 0256

Tonga-Fiji Submarine Cable

Project 9.70 23 Aug 11 31 Dec 18

263 Grant ENE

0347

0348

Outer Island Renewable Energy

Project 2.00 x

264 Grant ENE

0444

0445

0446

Outer Island Renewable Energy

Project – Additional Financing 1.44 x

Page 20: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

20 Linked Document 4

No. Modality Sector No.

Loan

Title

Amount

($ million)

Approval

Date

Closing

Date

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

265 Grant ENE 0528

Outer Island Renewable Energy

Project – Additional Financing 2.50 x

266 Loan ENE 3509

Outer Island Renewable Energy

Project – Additional Financing 2.50 x

267 Loan PSM 3531

Building Macroeconomic

Resilience Program–Subprogram

2 2.75 29 May 17 11 Sep 17 x

268 Grant PSM 0185 Economic Support Program 10.00 3 Dec 09 30 Jun 11 x

269 Grant PSM 0359

Strengthening Public Financial

Management Program 4.50 24 Sep 13 31 Dec 13 x

270 Grant PSM 0479

Building Macroeconomic

Resilience Program–Subprogram1 3.00 30 May 16 30 Jun 16 x

271 Grant PSM 0532

Building Macroeconomic

Resilience Program–Subprogram

2 2.25 29 May 17 30 Sep 17 x

272 Grant WUS 0264

Nuku'alofa Urban Development

Sector Project 6.06 17 Oct 11 31 Jan 19 x

273 Grant WUS 0265

Nuku'alofa Urban Development

Sector Project 6.44 17 Oct 11 31 Jan 19 x

Tonga Total (11) 43.44

Total for the Eight Countries Not Selected for Case Assessments (160) 20,079.32

Grant Total (273) 36,966.51

ANR = Agriculture, Natural Resources and Rural Development, ENE = Energy, FIN = Finance, HLT = Health, ICT = Information and Communication Technology, IND = Industry and Trade,

PSM = Public Sector Management, TRA = Transport, WUS = Water and Other Urban Infrastructure and Services.

Note: * Not included in the studied portfolio.

Source: Asian Development Bank (Independent Evaluation Department).

Page 21: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 21

Table 2: Technical Assistance in 13 Selected Countries (2005–2017)

Sector Type No.

Project

Title

Approval

Date

Closing

Date

Amount

($ ‘000)

Related

Loan/Grant

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

People’s Republic of China (PRC)

1 ENE ADTA 4706

Energy Conservation and

Resource Management 2 Dec 05 31 May 09 600 L2296 x

2 ENE PATA 7963

Enhancing the Energy

Regulation System for

Low-Carbon Development 9 Dec 11 6 Jul 15 400 x

Enhancing the Energy

Regulation System for

Low-Carbon Development

(Supplementary) 25 Oct 12 6 Jul 15 120 x

Enhancing the Energy

Regulation System for

Low-Carbon Development

(Supplementary) 3 Mar 14 6 Jul 15 200 x

3 FIN ADTA 4618

Development of Asset-

Backed Securities Market

and Restructuring of

Asset Management

Companies 19 Jul 05 9 Nov 11 1,000 x

4 FIN ADTA 4746

Bank of China Ltd. for

Improving Corporate

Governance 16 Dec 05 25 May 10 300 x

5 FIN PATA 9091

Supporting the Reform of

the Role of the People's

Bank of China 8 Apr 16 31 Mar 18 300 x

6 PSM ADTA 4604

Nanjing Water Utility

Long-Term Capital

Finance in Commercial

Markets 28 Jun 05 30 Apr 08 550 x

Nanjing Water Utility

Long-Term Capital

Finance in Commercial

Markets (Supplementary) 26 Oct 05 30 Apr 08 50 x

Nanjing Water Utility

Long-Term Capital 26 Jun 07 30 Apr 08 10 x

Page 22: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

22 Linked Document 4

Sector Type No.

Project

Title

Approval

Date

Closing

Date

Amount

($ ‘000)

Related

Loan/Grant

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

Finance in Commercial

Markets (Supplementary)

7 PSM ADTA 4824

Strengthening the Legal

and Implementation

Framework for Anti-

Money Laundering 7 Aug 06 26 Oct 09 400

x

8 PSM ADTA 7095

Supporting Fiscal Reforms

in High Priority Sectors 10 Jul 08 30 Apr 13 1,000

x

9 PSM ADTA 7192

Fiscal Policy Support for

Economic Development in

Henan 10 Dec 08 25 Oct 11 400

x

10 PSM PATA 7568

Supporting Reforms in

Taxation and Budget

Management 26 Jul 10 16 May 13 1,200

x

11 PSM PATA 8192

Improvement of Fiscal

Management and

Accounting Services

Supervision 15 Oct 12 29 Apr 16 750

x x

12 PSM CDTA 8505

Leadership in Public–

Private Partnerships 13 Nov 14 15 Nov 15 225

x

13 PSM PATA 8895

Promoting the Decisive

Role of the Market in

Resource Allocation 11 May 15 30 Sep 18 500

x

14 PSM PATA 8940

Municipality-Level Public-

Private Partnership

Operational Framework

for Chongqing 11 Aug 15 31 Oct 16 350

x x

15 PSM PATA 9163

Mobilizing Pension Fund

Financing for Public-

Private Partnerships 31 Aug 16 31 Aug 19 400

x

16 PSM PATA 9196

Enhancing Competition in

Public Service Delivery 5 Oct 16 30 Sep 18 600

x

17 TRA ADTA 4701

Railway Passenger and

Freight Policy Reform

Study 28 Nov 05 23 Jul 08 400

L2274/

L2605 x

Page 23: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 23

Sector Type No.

Project

Title

Approval

Date

Closing

Date

Amount

($ ‘000)

Related

Loan/Grant

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

18 TRA ADTA 4724

Application of Public-

Private Partnerships in

Urban Rail-Based

Transportation Project 9 Dec 05 31 Mar 10 500

x

19 TRA ADTA 4877

Resource Optimization in

the Road Sector 29 Nov 06 31 Oct 09 400 x

Resource Optimization in

the Road Sector

(Supplementary) 20 Dec 06 31 Oct 09 200

20 TRA ADTA 7174

Transport Efficiency

through Logistics

Development Policy Study 18 Nov 08 11 Dec 12 500 x

21 TRA ADTA 7171

Railway Sector Energy

Efficiency Strategy 18 Nov 08 22 Jul 11 800 L2471 x

22 TRA CDTA 7403

Institutional and Capacity

Development 8 Dec 09 16 May 13 600 L2605 x

23 WUS ADTA 7083

Urban Wastewater Reuse

and Sludge Utilization

Policy Study 26 May 08 21 Dec 11 1,000 L7375 x

PRC Total (23) 13,755

India

24 ENE CDTA 7688

Innovative Financial

Instruments for Power

Grid 26 Nov 10 31 Oct 11 225

x

25 FIN ADTA 4887

Capacity Building for

Rural Cooperative Credit

Structure Reform 8 Dec 06 29 Mar 11 2,000

x

26 FIN CDTA 8279

Preparing the Bond

Guarantee Fund for India 17 Dec 12 29 Sep 15 800

x

27 FIN CDTA 9133

Strengthening Financial

Inclusion through

Responsible Finance

Practices 8 Jul 16 30 Nov 19 750

x

28 PSM ADTA 4890

Mainstreaming Public-

Private Partnerships at

State Level 11 Dec 06 31 Oct 12 3,000

L2404/

L2509/

L2586/

L2787/ x x

Page 24: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

24 Linked Document 4

Sector Type No.

Project

Title

Approval

Date

Closing

Date

Amount

($ ‘000)

Related

Loan/Grant

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

L2822

Mainstreaming Public-

Private Partnerships at

State Level

(Supplementary) 8 Aug 08 31 Oct 12 2,000

L2404/

L2509/

L2586/

L2787/

L2822 x x

29 PSM ADTA 4993

Mainstreaming Public-

Private Partnerships at

Central Line Ministries of

the Government of India 16 Nov 07 30 Mar 12 2,000

L2404/

L2509/

L2586/

L2787/

L2822 x x

30 PSM ADTA 7030

Capacity Development for

India Infrastructure

Finance Company Limited 14 Dec 07 31 Dec 11 500 L2404 x

31 PSM ADTA 7129

Supporting the Assam

and Public Resource

Management Sector

Development Program

(Subprogram II) 17 Sep 08 29 Feb 12 600 x

32 PSM CDTA 7342

Supporting an Initiative

for Mainstreaming Public-

Private Partnerships for

Providing Urban

Amenities in Rural Areas 11 Sep 09 20 Oct 15 1,500

L2586/

L2787/

L2822 x

33 PSM CDTA 7463

Sustaining the

Government of India -

ADB Initiative for

Mainstreaming Public-

Private Partnerships 10 Dec 09 28 Feb 17 800 x

Sustaining the

Government of India -

ADB Initiative for

Mainstreaming Public-

Private Partnerships

(Supplementary) 21 Apr 14 28 Feb 17 500 x

34 PSM PATA 7441

Assisting in Framework

Development for 11 Dec 09 27 Jun 14 1,000 x

Page 25: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 25

Sector Type No.

Project

Title

Approval

Date

Closing

Date

Amount

($ ‘000)

Related

Loan/Grant

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

Mainstreaming Public-

Private Partnerships

35 PSM CDTA 7625

Deepening Capacity

Building for

Mainstreaming Public-

Private Partnerships 22 Oct 10 30 Jun 14 3,000 L2926 x

36 PSM CDTA 8203

Supporting West Bengal

Development Finance

Program

30 Oct 12

24 Jul 14 700 x

37 PSM CDTA 8759

Supporting the Punjab

Development Finance

Program 19 Nov 14 30 Jun 18 500 L3187 x x

38 PSM CDTA 9378

Supporting the Second

West Bengal Development

Finance Program 20 Sep 17 31 Oct 19 500 L3536 x

39 TRA ADTA 4989

Deploying Innovative

Information and

Communication

Technology for

Supporting e-Governance

in Assam 15 Nov 07 23 Dec 11 500 x

40 TRA CDTA 7785

Capacity Building for

Road Safety and Public-

Private Participation

Support 10 Mar 11 30 Sep 14 1,000 x

41 WUS CDTA 8799

Supporting Public-Private

Partnerships for

Infrastructure

Development 15 Dec 14 30 Jun 19 1,500 x x

42 WUS CDTA 9318

Capacity Development of

Institutions in the Urban

Sector of Madhya Pradesh 18 May 17 30 Jun 20 1,000 L3528 x

India Total (19) 24,375

Papua New Guinea

43 ENE PATA 8264

Implementation of the

Electricity Industry Policy 10 Dec 12 21 Dec 16 1,000

L2713/

L2714 x

Page 26: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

26 Linked Document 4

Sector Type No.

Project

Title

Approval

Date

Closing

Date

Amount

($ ‘000)

Related

Loan/Grant

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

44 FIN PATA 8515

Supporting Anti-Money

Laundering and

Combatting the Financing

of Terrorism 14 Nov 13 1 Dec 15 225 x

45 PSM ADTA 4947

Support for Public

Expenditure Review and

Rationalization 29 Jun 07 30 Jun 09 500 L1703 x

46 PSM CDTA 7427

Supporting Public

Financial Management 10 Dec 09 25 Jan 12 1,000 L1703 x

47 PSM CDTA 7782

Facilitating Public-Private

Partnerships 23 Feb 11 5 Apr 16 800 L1889 x

48 PSM CDTA 8213

Supporting Public

Financial Management,

Phase 2 12 Nov 12 31 Dec 16 1,000 L1703 x

49 TRA PATA 7420

Improving Road User

Charges and Private

Sector Participation in

Road Development 8 Dec 09 27 Jan 14 800 x

Papua New Guinea Total (7) 5,325

Uzbekistan

50 ENE PATA 9459

Power Sector Reform and

Sustainability Support

Program 12 Dec 17 31 Mar 19 2,000

Attached

to L6321 x

51 FIN ADTA 4565

Financial Sector

Infrastructure

Development 10 Feb 05 30 Apr 08 400 x

52 FIN CDTA 8247

Insurance Sector

Development 10 Dec 12 18 Nov 16 500 x

53 PSM PATA 8260

E-Government for

Effective Public

Management 12 Dec 12 31 Dec 17 1,100 x

E-Government for

Effective Public

Management

(Supplementary) 20 Aug 14 31 Dec 17 400 x

Page 27: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 27

Sector Type No.

Project

Title

Approval

Date

Closing

Date

Amount

($ ‘000)

Related

Loan/Grant

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

54 WUS CDTA 9481

Water and Sanitation

Development and

Capacity Building 21 Dec 17 28 Feb 21 1,000 x

Uzbekistan Total (5) 5,400

Viet Nam

55 ENE ADTA 4768 Power Market Design 1 Mar 06 25 Aug 09 500 L2225 x

56 ENE CDTA 7668

Increasing Efficiency of

NPT through Targeted

Capacity Building 12 Nov 10 30 Sep 15 600 x

57 ENE PATA 8302

Electricity Transmission

Pricing Review in the

Context of Power Sector

Restructuring 11 Dec 12 2 May 17 800 x

Electricity Transmission

Pricing Review in the

Context of Power Sector

Restructuring

(Supplementary) 1 Aug 15 2 May 17 225 x

58 ENE CDTA 8851

Establishing the

Wholesale Electricity

Market 19 Dec 14 31 Mar 18 750 x

59 ENE PATA 9012

Power Sector Reform

Program 8 Dec 15 31 May 19 1,000 x

60 ENE CDTA 9306

Enhancing Readiness for

Solar Power Deployment

in Viet Nam 31 Mar 17 30 Jun 18 225 x

61 FIN ADTA 4731

Support to Implement the

Anti-Money Laundering

Decree 13 Dec 05 30 Sep 08 500 x

62 FIN ADTA 7087

Support for Developing

Capital Markets and

Building Capacity in the

Financial Sector 5 Jun 08 26 Sep 11 1,000 L2490 x

63 FIN PATA 8538

Enhancing Financial

Stability (Scoping) 4 Dec 13 31 Jul 15 225 x

64 FIN CDTA 8793

Strengthening Financial

Markets 12 Dec 14 31 Jan 18 600 x

Page 28: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

28 Linked Document 4

Sector Type No.

Project

Title

Approval

Date

Closing

Date

Amount

($ ‘000)

Related

Loan/Grant

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

65 PSM CDTA 7759

Support for Public-Private

Partnership in Viet Nam 7 Dec 10 31 Aug 12 225

L2920/

L8273 x

66 PSM CDTA 8016

Strengthening Support

for State-Owned

Enterprise Reform and

Corporate Governance

Facilitation Program 22 Dec 11 30 Jan 15 1,200 x

67 PSM CDTA 8387

Strengthening Support

for State-Owned

Enterprise Reform and

Corporate Governance

Facilitation Program 19 Jun 13 3 Oct 16 800 x

68 PSM PATA 8980

Supporting Public

Financial Management in

Viet Nam 14 Oct 15 31 Oct 17 225 x

Supporting Public

Financial Management in

Viet Nam

(Supplementary) 29 Apr 16 31 Oct 17 225 x

69 TRA ADTA 4695

Expressway Network

Development Plan Project 23 Nov 05 30 Nov 09 850 x x

Expressway Network

Development Plan Project

(Supplementary) 20 Dec 05 30 Nov 09 300 x x

Expressway Network

Development Plan Project

(Supplementary) 30 Apr 07 30 Nov 09 600 x x

Expressway Network

Development Plan Project

(Supplementary) 3 Dec 07 30 Nov 09 200 x x

Expressway Network

Development Plan Project

(Supplementary) 8 Jul 09 30 Nov 09 215 x x

70 TRA ADTA 4981

Infrastructure Policy

Reform Support 15 Oct 07 28 Feb 11 1,000 x

Page 29: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 29

Sector Type No.

Project

Title

Approval

Date

Closing

Date

Amount

($ ‘000)

Related

Loan/Grant

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

71 TRA ADTA 7018

Strengthening Operations

and Business Processes in

Viet Nam Railways 12 Dec 07 27 Dec 11 980 x

72 TRA PATA 7611

Strengthening

Institutional and Financial

Arrangements, Operation

and Maintenance, and

Governance in Road

Transport 24 Sep 10 21 Dec 12 1,000 x

Viet Nam Total (18) 14,245

Total for the Five Countries Selected for Case Assessments (72) 63,100

Bangladesh

73 ENE ADTA 4626

Corporatization of the

Bangladesh Power

Development Board 2 Aug 05 17 Feb 09 800

L2332/

L2334 x

74 ENE ADTA 4953

Tendering Process for

Independent Power

Producer Plants 16 Jul 07 28 Feb 11 600 x

75 ENE CDTA 7542

Bangladesh–India

Electrical Grid

Interconnection Project 1 Jun 10 31 May 15 225

L2661/

L3031 x

76 ENE PATA 7758

Tariff Reform and Inter-

Sectoral Allocation of

Natural Gas 8 Dec 10 12 Jul 13 225 x

77 FIN CDTA 8228

Enhancing Efficiency of

the Capital Market 28 Nov 12 28 Aug 15 750 x

78 FIN CDTA 9344

Capacity Development in

Infrastructure

Development Company

Ltd 18 Jul 17 31 Mar 20 750

L3554/

L3555 x

79 PSM CDTA 7691

Public-Private Partnership

Program

Operationalization 6 Dec 10 11 Jul 14 1,000

L2566/

L2567/

L2568/

L2569 x

Public-Private Partnership

Program 14 Dec 12 11 Jul 14 225

L2566/

L2567/

L2568/ x

Page 30: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

30 Linked Document 4

Sector Type No.

Project

Title

Approval

Date

Closing

Date

Amount

($ ‘000)

Related

Loan/Grant

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

Operationalization

(Supplementary)

L2569

80 PSM CDTA 8553

Road Map to Good

Governance 12 Dec 13 15 Nov 17 225 x

81 TRA ADTA 4847

Institutional Support for

Railway Reforms 10 Oct 06 31 Dec 17 2,000 L2317 x

82 WUS CDTA 7820

Supporting the Khulna

Water Supply Project 14 Jun 11 29 Jun 16 700 L2756 x

83 WUS PATA 8320

Establishing a Regulatory

Framework for Urban

Water Supply and

Sanitation 28 Jan 13 31 Dec 15 750 x

84 WUS ADTA 7001

Management Support for

Dhaka Water Supply and

Sewerage Authority 10 Dec 07 31 Aug 11 2,500 x

Bangladesh Total (12) 10,750

Fiji

85 PSM ADTA 4704

Private Sector

Development Roadmaps 29 Nov 05 21 Dec 09 300 x

86 PSM CDTA 8059

Implementing Reforms of

State-Owned Enterprises 16 Mar 12 28 Jan 14 500 x

87 PSM PATA 9427

Supporting Public

Financial Management

Reform 24 Nov 17 31 Jan 20 750 x

Fiji Total (3) 1,550

Georgia

88 FIN CDTA 8218

Promoting Financial

Sector Resilience 9 Nov 12 26 May 16 150 x

89 FIN PATA 8716

Strengthening Domestic

Resource Mobilization 11 Sep 14 31 Dec 18 500

L3191/

L3190/

L3282/

L3283 x x

Strengthening Domestic

Resource Mobilization

(Supplementary) 1 Mar 16 31 Dec 18 780 x x

Page 31: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 31

Sector Type No.

Project

Title

Approval

Date

Closing

Date

Amount

($ ‘000)

Related

Loan/Grant

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

90 WUS PATA 7492

Developing an Urban

Water Supply and

Sanitation Sector Strategy

and Regulatory

Framework 2 Feb 10 17 Jun 11 863 x

91 WUS PATA 9019

Development of Public-

Private Partnerships 10 Dec 15 31 Aug 18 500

x

Georgia Total (4) 2,793

Indonesia

92 FIN ADTA 7000

Strengthening Regulation

and Governance 10 Dec 07 30 Sep 12 1,200 L2379 x

93 FIN CDTA 7466

Strengthening Indonesia's

Capital Market 4 Dec 09 30 Apr 15 1,500 x

94 FIN CDTA 8326

Enhancing Financial

Sector Governance, Risk

Management, and Depth 24 Jan 13 29 Apr 16 1,000 x

95 FIN PATA 9054

Enhancing the Regulatory

Framework of Financial

Sector Development and

Oversight 16 Dec 15 31 Jan 19 1,500 x

96 PSM ADTA 4682

Supporting an Effective

Institutional Framework

for Fiscal Decentralization 3 Nov 05 27 Jan 09 500

L2192/

L2193 x

97 PSM ADTA 4872

Enhancing Private Sector

Participation in

Infrastructure Provision 21 Nov 06 30 Nov 15 2,000

L2394/

L2708 x

98 PSM ADTA 7184

Local Government

Finance and Governance

Reform 4 Dec 08 31 Oct 12 1,500 x

99 PSM PATA 7452

Support for Local

Government Finance and

Governance Reform 2 10 Dec 09 27 Dec 12 1,000 x

100 PSM CDTA 7729

Capacity Development

Assistance for Public-

Private Partnerships 10 Dec 10 26 Sep 14 500 x x

Indonesia Total (9) 10,700

Page 32: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

32 Linked Document 4

Sector Type No.

Project

Title

Approval

Date

Closing

Date

Amount

($ ‘000)

Related

Loan/Grant

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

Mongolia

101 FIN ADTA 4737

Capacity Building for

Financial Sector Reforms 15 Dec 05 30 Apr 10 900 L2218 x

102 FIN ADTA 7112

Capital Markets

Development 11 Aug 08 23 Aug 11 500 x

103 FIN PATA 7397

Policy and Institutional

Support for Banking

Sector Systemic Risk

Management 27 Nov 09 30 Jan 15 2,000 L3338 x

104 FIN PATA 7577

Public-Private Partnership

Development 17 Aug 10 30 Nov 13 500 x x

105 FIN CDTA 9180

Supporting Financial

Sector Development and

Stability 26 Sep 16 30 Jun 19 1,550 x

106 FIN CDTA 9320

Banking Sector

Rehabilitation and

Financial Stability

Strengthening 30 May 17 31 Jul 19 1,500 L3533 x

107 PSM PATA 7291

Support Public-Private

Partnerships 3 Jun 09 30 Jun 11 200 x

108 PSM PATA 8236

Developing a Conducive

Environment for Public-

Private Partnerships 3 Dec 12 23 Mar 16 750 x x

109 PSM CDTA 8255

Strengthening the Anti-

Money Laundering

Regime 11 Dec 12 21 Aug 17 360 x

Strengthening the Anti-

Money Laundering

Regime (Supplementary) 11 Dec 14 21 Aug 17 360 x

110 TRA PATA 8985

Public-Private Partnership

in Urban Public Transport

Sector of Ulaanbaatar 5 Nov 15 21 Jul 16 350 x

Mongolia Total (10) 8,970

Page 33: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 33

Sector Type No.

Project

Title

Approval

Date

Closing

Date

Amount

($ ‘000)

Related

Loan/Grant

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

Pakistan

111 ENE PATA 9357

Update on Energy Sector

Plan 21 Aug 17 15 May 18 500 x

112 FIN ADTA 4861

Supporting the Private

Participation in

Infrastructure Program 31 Oct 06 11 Apr 11 1,000

L2439/

L2727 x

113 FIN ADTA 4956

Supporting Second

Generation of Capital

Market Reform Program 31 Jul 07 29 Dec 10 1,000 x

114 FIN PATA 9467

Strengthening the Federal

Public–Private Partnership

Framework and Enabling

Reforms for Infrastructure

Financing Support 13 Dec 17 31 Dec 20 3,266 x

115 FIN CDTA 9469

Enhancing Public-Private

Partnerships in Punjab

Project 15 Dec 17 31 Dec 22 4,009

L3636/

G0562 x

116 PSM ADTA 7201

Improving Private Sector

Participation and Public

Expenditure Management 11 Dec 08 16 May 14 800 x x x

117 PSM PATA 8443

Support for Efficient

Structuring of Public-

Private Partnership in

Punjab and Sindh

Provinces 5 Sep 13 31 May 15 225 x

118 PSM CDTA 9239

Enhancing Public Private

Partnerships in Pakistan 24 Nov 16 30 Jun 22 4,751

L3469/

G0518 x

Pakistan Total (8) 15,551

Philippines

119 FIN ADTA 4809

Government-Owned and

Controlled Corporations

Reform 29 Jun 06 31 Oct 08 750 L2282 x

120 PSM ADTA 4601

Strengthening the Anti-

Money Laundering

Regime (Phase II) 24 Jun 05 24 Apr 08 400 x

121 PSM ADTA 4717

Debt and Risk

Management Project 7 Dec 05 13 Nov 07 720 L2186 x

Page 34: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

34 Linked Document 4

Sector Type No.

Project

Title

Approval

Date

Closing

Date

Amount

($ ‘000)

Related

Loan/Grant

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

122 PSM ADTA 4778

Local Governance and

Fiscal Management

Project 3 Apr 06 16 Mar 10 1,800 L2186 x

123 PSM ADTA 4920

Strengthening Investment

Climate and

Competitiveness 8 Feb 07 28 Feb 11 800 x

124 PSM ADTA 7138

Improving Public

Expenditure Management 30 Sep 08 28 Feb 13 800 x

125 PSM PATA 7346

Improving Public

Expenditure Management

2 15 Sep 09 10 Nov 11 800 x

126 PSM CDTA 7796

Strengthening Public-

Private Partnerships in the

Philippines 24 Mar 11 31 Mar 21 9,700 L3233 x x

Strengthening Public-

Private Partnerships in the

Philippines

(Supplementary) 1 Mar 12 31 Mar 21 15,500 x x

Strengthening Public-

Private Partnerships in the

Philippines

(Supplementary) 1 Dec 12 31 Mar 21 3,000 x x

127 PSM CDTA 8650

Strengthening Evaluation

and Fiscal Cost

Management of Public-

Private Partnerships 15 May 14 30 Nov 17 2,000 x x

128 PSM CDTA 9041

Support to Local

Government

Accountability Systems 10 Dec 15 30 Sep 18 500 x

129 PSM PATA 9250

Strengthening Tax and

Fiscal Policy Capacity for

Inclusive Growth 29 Nov 16 31 Dec 19 2,000 x

130 TRA CDTA 7434

Strengthening

Transparency and

Accountability in the

Road Subsector 10 Dec 09 31 May 16 1,000 L2836 x

Philippines Total (12) 39,770

Page 35: LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO · Loans, Grants and Technical Assistance Portfolio 3 No. Modality Sector No. Loan Title Amount ($ million) Approval Date Closing

Loans, Grants and Technical Assistance Portfolio 35

Sector Type No.

Project

Title

Approval

Date

Closing

Date

Amount

($ ‘000)

Related

Loan/Grant

Macro-level

Approaches

Sector

governance

and SOE-

specific

Inputs

PPP

modality,

other NSO

projects

Tonga

131 PSM ADTA 4899

Rationalization of Public

Enterprises Phase 3 18 Dec 06 15 May 09 400 G0185 x

132 PSM PATA 7271

Reforming Public

Enterprises 14 Apr 09 31 Aug 10 500 G0185 x

Tonga Total (2) 900

Total for the Eight Countries Not Selected for Case Assessments (60) 90,984

Grand Total (132) 154,084

ADTA = advisory technical assistance, ANR = Agriculture, Natural Resources and Rural Development, CDTA = capacity development technical assistance, EDU = education, ENE = Energy,

FIN = Finance, IND = Industry and Trade, PATA = policy and advisory technical assistance, PSM = Public Sector Management, TRA = Transport, WUS = Water and Other Urban

Infrastructure and Services.

Source: Asian Development Bank (Independent Evaluation Department).