load response program
DESCRIPTION
LOAD RESPONSE PROGRAM. Robert B. Burke Presented to: Markets Committee January 23-24, 2001. OP & MRP CHANGES. Operating Procedure 4 Operating Procedure 14 Market Rules & Procedures 5 Market Rules & Procedures 9 Market Rules & Procedures 14 Appendix H Market Rules & Procedures 20. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/1.jpg)
LOAD RESPONSE PROGRAM
Robert B. BurkePresented to: Markets Committee
January 23-24, 2001
![Page 2: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/2.jpg)
OP & MRP CHANGES
Operating Procedure 4Operating Procedure 14Market Rules & Procedures 5Market Rules & Procedures 9Market Rules & Procedures 14
Appendix HMarket Rules & Procedures 20
![Page 3: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/3.jpg)
TIMELINE
Interruptions Available for June 1Commence Signing Up Participants
May 1Receive FERC Approval May 1File at FERC by March 1NPC Approval Prior to February 15MRP and OP Changes Recommended
to NPC by January 31
![Page 4: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/4.jpg)
WHAT KIND OF LOAD RESPONSE
Price Responsive Interruptible Load - Curtail Consumption Based Upon ECP
Click and Respond to ISO Request for Interruption within < 30 minutes Meet Second Contingency Loss OP 4 After Voltage Reduction & Prior to
Shedding Firm Load
![Page 5: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/5.jpg)
BASIS FOR PAYMENTS
Performance Based - (Actual Interruption)
Reserve Payment at TMOR Clearing Price Capable & Willing to Respond to ISO
Order to Interrupt < 30 MinutesInterruption Paid at ECP
![Page 6: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/6.jpg)
NEW TYPE 6 INTERRUPTIBLE LOAD
Uses Internet Based CommunicationTelemetering Not RequiredGrouped in Settlement by Participant and
AreaReceives ECP For Interrupted EnergyCLASS 1 - ISO Controlled For 2nd
Contingency CoverageCLASS 2 - Purely Price Responsive
Interruptible Load
![Page 7: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/7.jpg)
TYPE 6 INTERRUPTIBLE LOAD - CLASS 1
Willing And Capable Of Interruption Within 30 Minutes
Interrupted For Second Contingency Coverage
Receives ICAP Credit
![Page 8: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/8.jpg)
TYPE 6 - CLASS 1 (Cont.)
Interruption Could Last Up To 2 Hours (2nd Contingency Coverage)
Interrupted In OP-4 After Voltage Reduction & Before Firm Load
Receives TMOR Clearing Price When Available To Provide Reserves
![Page 9: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/9.jpg)
TYPE 6 INTERRUPTIBLE LOAD - CLASS 2
Willing To Curtail Load Based Upon ECP
Response Is Purely Voluntary
![Page 10: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/10.jpg)
VERIFICATION / AUDITING
Type 6 - Class 1 Compare actual interruption with
contract amount ICAP Credit = Response If response of 0 would forfeit TMOR
payments back to beginning of monthType 6 - Class 2
None
![Page 11: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/11.jpg)
ELIGIBILITY
No Unit Presently Modeled In The EMS
Type 4 Dispatchable Loads (only 2 in system)
Must Have Interval MeteringMust Use ISO Certified Internet
Based Communication Supplier
![Page 12: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/12.jpg)
ELIBIGIBILITY (Cont.)
For Class 1 - Must Be Capable of Interruption Within 30 Minutes of Request
Can Be Generation Brought On-Line or Load Reduction
Eligibility Very Similar To Summer 2000 Load Response Program
Any Customer in New England Capable of at Least 100 Kw/hour Interruption
![Page 13: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/13.jpg)
Asset Id # 1701
Standard Offer Load
Proposed Changes - Step 1
Participant A
Participant B
Participant C
50 % 20%
30 %
Before Interruption:Hour 1400ECP = $80Load for Asset 1701 1000 Mwh
Part. B signs upLoad for interruption 100 Mw @ ECP > $75
Part. C signs upLoad for interruption 100 Mw@ ECP > $100
-450 Mwh-270 Mwh
-180 Mwh
-900 Mwh
Asset # 1705
Interrupt Load B
Asset # 1706
Interrupt Load C
+100 Mwh
+0 Mwh
![Page 14: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/14.jpg)
Asset Id # 1701
Standard Offer Load
Proposed Changes - Step 2
Participant A
Participant B
Participant C
50 % 20%
30 %
-500 Mwh-300 Mwh
-200 Mwh
-900 Mwh
Asset # 1705
Interrupt Load B
Asset # 1706
Interrupt Load C
+100 Mwh
+0 Mwh
Meter Reader involvement in data incorporation of 1705 & 1706
Participant B -300 Mwh (1701)
+100 Mwh (1705)
-200 Mwh
-100 Mwh
1705& 1706Before Interruption:Hour 1400ECP = $80Load for Asset 1701 1000 Mwh
Part. B signs upLoad for interruption 100 Mw @ ECP > $75
Part. C signs upLoad for interruption 100 Mw@ ECP > $100
![Page 15: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/15.jpg)
SETTLEMENT TREATMENT
Meter Readers Would Provide Information on Load Asset Association
Interrupted Load Would Act As an Energy Resource
ISO Would Read Interrupt Data For Settlement
Interrupted Load Calculated By Internet Based Software
![Page 16: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/16.jpg)
Retx Load Management Dispatcher
Retx.com Network Price
Usage
Dispatch
Reconcile
Enabler
Usage
Dispatch
Prices
Usage
Dispatch
![Page 17: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/17.jpg)
Market Price Agent
• Retx develops price interface to market price source(s)for monitoring by the Load Serving Entity and System Operator
Prices are
updated based on
the market
![Page 18: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/18.jpg)
Retx LMD
Threshold prices defined and monitored by the LSE
Based upon contract with customer
Settlements completed daily by Retx based upon
price,contract and amount curtailed
Threshold and Reconciliation Calculations
![Page 19: LOAD RESPONSE PROGRAM](https://reader036.vdocuments.us/reader036/viewer/2022062408/568143ee550346895db0732e/html5/thumbnails/19.jpg)
Retx LMD
Data Gathering
Usage information is gathered
from the facility and hosted on the
LMD site for monitoring by the
facility, the LSE and the
System Operator