LMS RFP Process to Choose Canvas

Washington State Board for Community and Technical Colleges

May 22, 2012

Page 2: Lms rfp process may 23, 2012

The Washington System

Private Colleges

4-year Colleges & Universitie

s

Governor

Appointed Board

SBCTC

29 Community &5 Technical Colleges

Page 3: Lms rfp process may 23, 2012

System Highlights

• 34 community and technical colleges in Washington

• In 2010-11 – 161,000 FTEs – 330,000 headcount– 96,600 students who took an online class– 34,000 students who took a hybrid class– 37 percent of all graduates earn 15 or more credits

online or hybrid• Total eLearning FTES increased by 25 percent

from 2007-08 to 2008-09. 

Page 4: Lms rfp process may 23, 2012

Strategic Technology Plan

Strategy I: Create a single, system-wide suite of online teaching and learning tools that provides all Washington students with easy access to “anywhere, anytime” learning.

• http://www.sbctc.edu/general/a_strategictechplan.aspx

Page 5: Lms rfp process may 23, 2012

WashingtonOnline (WAOL)

Page 6: Lms rfp process may 23, 2012

WAOL supports• Single ANGEL license for 22 colleges,

plus pooled enrollment system• Blackboard Collaborate for all colleges• Tegrity for all colleges• NW eTutoring Consortium• Professional development for all tools• The Open Course Library …..saving our system $6 million/year

Page 7: Lms rfp process may 23, 2012

Purpose of LMS RFP• Replace ANGEL• Work toward a common LMS

– Students learn one system– Shared programming and professional

development– Lower vendor cost

Page 8: Lms rfp process may 23, 2012

The RFP Committee•SBCTC Staff•ELC (eLearning directors)•LMDC (librarians)•ITC (chief IT officers)•Instruction Commission (chief academic officers)•WSSSC (chief student services officers)•ADA Council•Faculty association•Six public universities

Page 9: Lms rfp process may 23, 2012

The Search

• Sept 2011 – Committee Formed• Oct 2011 – Faculty Surveyed• Nov 2011 – RFP Out• Jan 2012 – RFPs scored, Finalists Chosen• Feb 2012 – Sandboxes Open to Faculty Testers• Mar 26th & 27th – Onsite Demos, Successful

Vendor Chosen

Page 10: Lms rfp process may 23, 2012

User Feedback• 567 faculty responded to survey on

technical requirements• Over 1000 faculty and staff

provided feedback on the three top vendors

• More info: http://www.sbctc.edu/college/_e-elearningprojects.aspx

Page 11: Lms rfp process may 23, 2012

Why Canvas?• First choice of faculty testers• Highest score on technical response• Highest score on vendor references• Hosts in the cloud• Great use of mobile and social

media• Integration and sharing/trust

relationships

Page 12: Lms rfp process may 23, 2012

What Happens Next

Timeline• July 2012 – Contract begins• Summer 2012 – Integration and set up• Fall 2012 – Pilots and scaled up training• Winter 2013 – Colleges transition on their

schedule• June 2014 – ANGEL contract ends

• Currently statewide group working on professional development and implementation tools

Page 13: Lms rfp process may 23, 2012

Cost Model• Based on FTE • Single fee includes platform,

hosting, mobile technology, etc.• Additional fee for premium tech

support (optional)

Page 14: Lms rfp process may 23, 2012

Connie BroughtonDirector, eLearning and Open Resources360-704-4334 / [email protected]