lixil asia performance management program (pmp) mid-year review … · 2019-10-24 · contents 2 1....

48
Copyright © LIXIL Group Corporation. All rights reserved. Human Resources September 2019 LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW USER GUIDE

Upload: others

Post on 26-May-2020

24 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

Copyright © LIXIL Group Corporation. All rights reserved.

Human Resources

September 2019

LIXIL ASIA Performance Management Program (PMP)

MID-YEAR REVIEW USER GUIDE

Page 2: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

CONTENTS

2

1. Performance Management Program (PMP)

2. ePMP System Access

3. Mid-Year Review Process Guide:

• Employee’s Self Mid-Year Review

• Solid Line Manager’s Approval of Mid-Year Review

• Dotted Line Manager’s Confirmation of Mid-Year Review

4. Useful Tips

Page 3: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

3

Section 1 Performance Management Program (PMP)

Page 4: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

4

PERFORMANCE MANAGEMENT PROGRAM

- Evaluate each KPI to confirm annual performance

- Assess LIXIL Behaviors demonstrated in one year

- Evaluate final performance result

- Review annual performance and get alignment(+calibration of results)

- Track mid year performance against annual objectives

- Adjust the objectives as per business needs

- Evaluate 1st half year’s achievement and strengthen 2nd

half year’s focus

- Set annual objectives

- Confirm working priority and focus by setting weightage

- Align Objective between employees and managers & dotted line managers

- Set Individual Development Plan

Objective SettingMid-Year

Performance ReviewAnnual Year-End

Performance Review

1 2 3

Note: New employees are required to set their Objectives within 1st month of employment.

April-June October March-April

Page 5: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

5

PERFORMANCE MANAGEMENT PROGRAM - PROCESS

Ind

ivid

ual Employee

input annual

Objectives and IDP

Submit

Employee

self-evaluate progress

& update Objectives

Submit

Employee

self-evaluation

Submit

So

lid

/Do

tted

Lin

e M

an

ag

er Review & approved

by Solid Line

Manager 1

Review & approved

by Solid Line

Manager 2

Review the progress

and approved by

Solid Line Manager 1

Review and approved by

Solid Line Manager 2

Review & approved by

Solid Line Manager 1 (Performance & LIXIL Behaviors)

Review & approved by

Solid Line Manager 2(Performance & LIXIL Behaviors)

Close Objective

Setting & IDPClose Mid-Year Review

Input

comment

by

Dotted

Line

Manager

Evaluate

progress

and input

comment

by Dotted

Line

Manager

Evaluate

annual

performance

and LIXIL

Behaviors,

and input

comments by

Dotted Line

Manager

Calibration

by management(Annual Performance Rating)

Close Year-End review

Objective Setting Mid-Year Review Year-End Review

Page 6: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

6

Section 2 ePMP System

Page 7: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

7

Key Features

ePMP SYSTEM~ an online system for objective setting and performance review

System prompt is text-based; shows the status, or remind Usersto complete a requiredaction step.

Secured Access - login via User ID & Password;- “Reset Password” upon

User request.

Support Multi-Browser such as Chrome, IE, Microsoft Edge etc.

No Time-Outsystem will keep the login status until User closes the browser.

Easy To Key In from different devices, screen size auto-fit for easy readability.

Poka Yoke – “mistake-proofing” features to prevent missing information or mistake.

Pop-out window when User selects an option, to input/edit data for an objective.

Page 8: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

8

ePMP SYSTEM

Click to select the

Performance periodeg. PMP for FY2020

(2019.4.1 – 2020.3.31)

Page 9: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

9

To access ePMP System as:

� LIXIL/AS users - http://cnshhqweb11.lixil.lan/AsiaPortal/PMP

� Grohe Users - http://www.ascc.com.cn/AsiaPortal/PMP

Note: This also applies to a specific group of LIXIL users who access the ePMP website using personal laptop via internet (without VPN) outside the office.

ePMP SYSTEM – USER ACCESS

Page 10: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

10

ePMP SYSTEM - LIXIL/AS USERS

Web link: http://cnshhqweb11.lixil.lan/AsiaPortal/PMP

Performance Management Program

Page 11: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

11

ePMP SYSTEM - GROHE USERS

Input your Grohe ID& Password

Web link: http://www.ascc.com.cn/AsiaPortal/PMP

G******

Page 12: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

12

ePMP SYSTEM - TO RESET PASSWORD

InputUser ID and click“Reset Password”

Mailbox

Click “OK”Click “OK”

Page 13: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

13

ePMP SYSTEM - TO RESET PASSWORD

When employee clicks on URL LINK from the email:

Input new password& click on “Change” button

Click on “OK” button

Login with User ID & new password

Page 14: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

14

Process Steps:

• Employee’s Self Mid-Year Review• Solid Line Manager’s Approval of Mid-Year Review• Dotted Line Manager’s Confirmation of Mid-Year Review

Section 3 Mid-Year Review

Page 15: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

15

Click on “2020 Mid Year Performance Review”

EMPLOYEE’S SELF MID-YEAR REVIEW

Page 16: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

16

EMPLOYEE’S SELF MID-YEAR REVIEW

Click “Edit”

2

Select the Objective to review, by a tickin the box.

1

Input the update:- 1H Achievement*- 2H Focus - Status Self Evaluated*

3

Complete the mid-year self-evaluation for all the objectives.

Click “Save” and “Close” for this objective

4

Page 17: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

17

EMPLOYEE’S SELF MID-YEAR REVIEW

Click to select the traffic light status:- Green, Yellow or Red

5

Input “Employee Comments”

6

Click “Submit” to Solid Line Manager 1for approval

8

Click “Save” tosave the input

7

System prompton successfulsubmission.

9

Page 18: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

18

EMPLOYEE’S SELF MID-YEAR REVIEW

TIP:• If any objective is not evaluated, system prompt will

remind User to complete the review.• User can click “Edit” to complete the self-evaluation.

Page 19: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

19

Process Steps:

• Employee’s Self Mid-Year Review• Solid Line Manager’s Approval of Mid-Year Review• Dotted Line Manager’s Confirmation of Mid-Year Review

Section 3 Mid-Year Review

Page 20: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

20

SOLID LINE MANAGER’S APPROVAL OF MID-YEAR REVIEW

Click on “2020 Mid Year Performance Review”

Page 21: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

21

SOLID LINE MANAGER’S APPROVAL OF MID-YEAR REVIEW

Tip: Solid Line Manager can “search” for employee and “export” the data into excel spreadsheet.

Select the employee, by a tick in the box.

1

Click on:“Solid Line Status Waiting for Solid-LineManager 1 Approve”.

2

Page 22: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

22

SOLID LINE MANAGER’S APPROVAL OF MID-YEAR REVIEW

Click “Edit”

2

Click “Save” and “Close” for this objective

Select the Objective to review, by a tickin the box.

1

5

Select “Status Evaluation”.

4

Complete the mid-year review for all the objectives.

Input any change (if necessary).

Otherwise, no update is needed

3

Page 23: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

23

SOLID LINE MANAGER’S APPROVAL OF MID-YEAR REVIEW

Click to select the traffic light status:- Green, Yellow or Red

6

Input “Solid Line Manager 1 Comments”

7

Click “Approve”

9

Click “Save”

8

System prompton successfulsubmission.

10

Page 24: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

24

SOLID LINE MANAGER 2 - APPROVAL OF MID-YEAR REVIEW

Solid Line Manager 2 can click“Edit” to view all informationrelating to the objectives, andadd input (if necessary).

Separate text box for “SolidLine Manager 2 Comments”

Page 25: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

25

Process Steps:

• Employee’s Self Mid-Year Review• Solid Line Manager’s Approval of Mid-Year Review• Dotted Line Manager’s Confirmation of Mid-Year Review

Section 3 Mid-Year Review

Page 26: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

26

DOTTED LINE MANAGER’S CONFIRMATION OF MID-YEAR REVIEW

Click on “2020 Mid Year Performance Review”

Page 27: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

27

DOTTED LINE MANAGER’S CONFIRMATION OF MID-YEAR REVIEW

Tip: Dotted Line Manager can “search” for employee and “export” the data into excel spreadsheet.

Select the employee, by a tick in the box.

1

Click on:“Dotted Line Status Waiting for Confirmation”

2

Page 28: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

28

DOTTED LINE MANAGER’S CONFIRMATION OF MID-YEAR REVIEW

Click “Edit”

2

Input any update (if necessary).

Otherwise, no update is neededSelect the Objective to review, by a tickin the box.

1

Select “Status Evaluation”,then click “Save” and

“Close” for this objective.

4

3

Complete the mid-year review for all the objectives.

Page 29: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

29

DOTTED LINE MANAGER’S CONFIRMATION OF MID-YEAR REVIEW

Input “Dotted Line Manager Comments”

5

Click “Save”

6

System prompton successfulsubmission.

8

Confirm

Click “Confirm”

7

Confirm

Page 30: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

30

SUCCESSFUL COMPLETION OF MID-YEAR REVIEW

Once Employee has completed self-evaluation of all the Objectives, that are approved by Solid Line Managers, and confirmed by Dotted Line Manager, the status will be “closed”.

Page 31: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

31

1. To add a New Objective during performance review

2. To edit Existing Objective/Weightage during performance review

3. To set IE Browser

4. To load webpage faster

5. To delete browsing history

6. To include ePMP webpage as trusted site

7. To access ePMP webpage when out of the office

8. To request support

USEFUL

TIPS

Page 32: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

32

(1) TO ADD A NEW OBJECTIVE DURING PERFORMANCE REVIEW

After all objectives are set, and if there is a need to add new objective during Mid-Year Review:

Step 1: Employee shall click on ‘2020 Mid Year Performance Review’

Page 33: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

33

(1) TO ADD A NEW OBJECTIVE DURING PERFORMANCE REVIEW

Step 2: At Mid-Year Review page, click on “Add Goal”. The system will auto route to Objective Setting page for adding new objective(s).

Click “OK” to proceed

Page 34: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

34

Click “Add New”

1

* InputWeightage

4* Choose Imperative

2

Input:- Initiative/Objective*- Targets & Metrics*- Stretch Target & Metrics*

3

(1) TO ADD A NEW OBJECTIVE DURING PERFORMANCE REVIEW

Step 3: At Objective Setting page, click on “Add New”, and follow the steps below:

Click “Save” and Close” for this objective

5

Page 35: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

35

(1) TO ADD A NEW OBJECTIVE DURING PERFORMANCE REVIEW

Step 4: Once the new Objective is added, click on “Save” and “Return Mid Year” in orderto return to Mid-Year Review page to continue with the mid-year self-evaluation process.

Click “Save” and “Return Mid Year”

6

Page 36: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

36

(2) TO EDIT EXISTING OBJECTIVE/WEIGHTAGE DURING PERFORMANCE REVIEW

During the Mid-Year Review, if there is a need to edit existing objectives, such as:

• update an objective that is no longer valid (by changing weightage to 0%)• edit the scope of an objective• edit the percentage weightage

Step 1: Employee shall click on ‘2020 Mid Year Performance Review’

Page 37: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

37

(2) TO EDIT EXISTING OBJECTIVE/WEIGHTAGE DURING PERFORMANCE REVIEW

Step 2: At Mid-Year Review page, click on “Add Goal”. The system will route to Objective Setting page to edit existing objective(s).

Click “OK” to proceed

Page 38: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

38

(2) TO EDIT EXISTING OBJECTIVE/WEIGHTAGE DURING PERFORMANCE REVIEW

Step 3: At Objective Setting page, select the objective, click on “EDIT” and updatethe necessary changes:

Click “Edit”

2

Select the Objective to

edit, by a tick in the box.

1 Lead the design and implementation

of XYZ Project.

abcde123 fghijk456

Click “Save” and “Close” for this objective

5

The following sections can be edited:- Imperatives*- Weightage*- Initiative/Objective*- Targets & Metrics*- Stretch Target & Metrics*

3

Tip:For an objective that is no longer valid, change the weightage to 0% and click “Save”.(Objective cannot be deleted).

Page 39: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

39

Step 4: Once the Objective has been updated, click on “Save” and “Return Mid Year”in order to return to the Mid-Year Review page, to continue with the mid-yearself-evaluation process.

Click “Save” and “Return Mid Year”

6

(2) TO EDIT EXISTING OBJECTIVE/WEIGHTAGE DURING PERFORMANCE REVIEW

Page 40: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

40

(3) TO SET IE BROWSER

Step 1:

• Go to “Internet Options” � ‘Advanced’ tab

• In ‘Settings’, look for ‘Security” drop down list � Uncheck ‘Enable integration Windows Authentication’

• Click “OK”

Page 41: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

41

(3) TO SET IE BROWSER

Step 2:

• In ‘Security’ tab � click on ‘Custom Level’• Under “User Authentication” � select ‘Automatically logon with current username & password’• Click “OK”.

Page 42: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

42

Step 3:

• In ‘Security’ tab � click ‘Trusted sites’• Click on “Sites” �”Add” URL require SSO to ‘Trusted Site’ list (https://support.microsoft.com)• Click “Close” and “OK”.

(3) TO SET IE BROWSER

Page 43: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

43

(4) TO LOAD WEBPAGE FASTER

1) Go to Internet Options � ‘General’ tab � Click “Settings”

2) Click “Every time I visit the webpage” to check for newer version, and click ‘OK’.

Click “Settings1 Check ‘Every time I visit the webpage’2

Page 44: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

44

(5) TO DELETE BROWSING HISTORY

1) Go to Internet Options � ‘General’ tab� Browsing History

2) Click to activate ‘Delete browsing historyon exit’ and click ‘OK’.

Page 45: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

45

Go to Internet Options � ‘Security’ tab � click ‘Sites’

(6) TO INCLUDE WWW.ASCC.COM.CN AS THE TRUSTED SITES

Click ‘Sites’ to enter the ‘Trusted Sites’

1Add this website as a trusted site

2

Page 46: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

46

(7) UNCHECK ALL IF YOU ARE OUT OF THE OFFICE AND

ACCESSING THE WIRELESS INTERNET

Go to Internet Options � ‘Connections’ tab � click ‘LAN Settings’

Click ‘LAN Settings’1Uncheck these boxes – also applicable if you are accessing the website using your personal laptop outside the office.

2

Page 47: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process

47

(8) TO REQUEST SUPPORT

Page 48: LIXIL ASIA Performance Management Program (PMP) MID-YEAR REVIEW … · 2019-10-24 · CONTENTS 2 1. Performance Management Program (PMP) 2. ePMP System Access 3. Mid-Year Review Process