list of research application date : september 9, 2015 ... · geologi) is refused to be ... diy...
TRANSCRIPT
1
MINISTRY OF RESEARCH, TECHNOLOGY, AND HIGHER EDUCATION
COORDINATING TEAM OF FOREIGN RESEARCH PERMIT
A. POSTPONED APPLICATION
No a. NAME b. CITIZENSHIP c. INSTITUTION d. FUNDING GUARANTOR e. POSITION
a. RESEARCH PERIOD b. LOCATION c. INDONESIAN COUNTERPART d. FIELD OF RESEARCH e. RESEARCH TITLE
STATUS REMARKS
1 a. Mr. Darius Samuel Culvenor, Ph.D.
b. Australia c. – d. Environmental Sensing
Systems(Self Employed) e. Manager and lead scientist
a. Penelitian lanjutan: 3 month (April 2015 s.d June 2015)
b. Kalteng (kotawaringin timur di Desa terantang hilir)
c. CIMTROP-Universitas Palangkaraya (Dr. Suwido H. Limin, M.S.)
d. Ecology e. Terrestrial LiDAR and 3D tree
modelling for quantification of biomass and characterization of forest structural changes due to selective logging in tropical forest of Central Kalimantan, Indonesia
POSTPONED
SIP Nomor. 235/SIP/FRP/SM/VIII/2014 valid until October 2014 22/4/2015: Researcher need to get recommendation from BIG
2. a. Ms. Kim Boillot-airaksinen b. French c. Universite Paris 1 Pantheon
Sorbonne d. Laboratoire de Géographie
Physique e. Ph.D Student
a. 3 month (24 May – 4 August 2015) b. NTB (Lombok) c. Unram (Imanuela Andilolo) d. Geology dan Vulcanology e. Geomorphological evolution of the
Lombok island after the eruption of the Samalas volcano in 1257
REJECTED
12/8/2015: PVMBG (Pusat Vulkanologi dan Mitigasi Bencana Geologi) is refused to be local counterpart because field of research not relevan with PVMBG and IRD 22/4/2015: Researcher is requested to
LIST OF RESEARCH APPLICATION
Date : September 9, 2015
Nomor: 9/TKPIPA/E5/Dit.KI/IX/2015
2
add local counterpart from PVMBG and ESDM 30/7/2015: PVMBG (Pusat Vulkanologi dan Mitigasi Bencana Geologi) is refused to be local counterpart because field of research not relevan with PVMBG
3 a. Mr. Takashi Hirano b. Japan c. Division in Environmental
Resources, Hokaido University, Japan
d. Japan Society for the Promotion of Science
e. Professor
a. 10 month (June 2015-March 2016) b. Kalteng (Palangkaraya, Sebangau) c. CIMTROP, University of Palangka
Raya (Suwido Limin) d. Ecology e. Field research on the carbon
balance of tropical peat ecosystems in Indonesia
POSTPONED
22/4/2015: Researcher is requested to get formal recommendation from TN Sebangau and coordinating with Balitbang Kementerian Kehutanan
4 a. Mr. Pedro Aparicio Llorente b. Colombia c. Harvard University - Graduate
School of Design d. Harvard University Asia Center e. Graduate Student
a. 2 months (25 June - 25 August 2015)
b. Jakarta c. Rujak Center for Urban Studies
(Dian Tri Irawaty) d. Spatial and Regional Planning e. Scales and Format for Risk
Identification and Resilience Dissemination
POSTPONED
27/5/2015 : Reseacher is requested to add local counterpart from UI
5 a. Mr. Philip Yampolski b. USA c. University of Illinois d. AMINEF e. -
a. October 2015– June 2016 b. NTT (Pulau Timor, Kab. Belu dan
Malaka) c. UPT Museum, Arkeoligi, Sejarah, dan
Nilai Tradisional, Disbudpar, NTT d. Ethnomusicology e. Recording and Documentation of
Music in Kabupaten Belu and Malaka,
APPROVED
29/6/2015: FRP Secretariat is waiting for a copy of IPR Agreement and MoU 2/9/2015: FRP Secretary is received a copy of MoU
3
Pulau Timor, Provinsi NTT
6 a. Betty Jean Lili Laglbauer b. French c. The University of Queensland d. Rufford Foundation e. Research Volunteer
a. 2 month (start from September 2015) b. Jatim (Muncar, Banyuwangi), Jabar
(Cibinong, Bogor), NTB (Tanjung Luar, Lombok), NTT (Lamakera, Kab.Flores, Taman Nasional Komodo)
c. Pusat Penelitian Oseanografi – LIPI (Fahmi, M.Phill)
d. Marine Biology e. Impacts, alternative solutions, and
awareness of mobula fisheries in Indonesia
APPROVED
29/7/2015: Researcher is requested to provide a copy of letter of recommendation from local counterpart that sign by pejabat eselon 2 9/9/2015: FRP Secretariat is received copy of letter of recommendation from local counterpart, MTA and PO
7.A a. Ms. Sophie Jane Hedges b. UK c. University of Exeter d. University of Exeter e. Student
a. 26 July 2015- 15 September 2015 b. Kalteng (Palangkaraya, Hutan
Sabangau) c. CIMTROP, Universitas Palangkaraya
(Suwido Limin) d. Ecology e. Survey of Herpetological Diversity in
Bawan Forest, Kalimantan Tengah
POSTPONED
29/7/2015: Researchers were
requested to provide copy of
MoU and MTA that were
signed by CIMTROP and
University of Exeter
7.B a. Ms. Alice Miranda Rosen b. UK c. University of Exeter d. University of Exeter e. Undergraduate Student
as above
POSTPONED
as above
7.C a. Mr. Daniel Kit Maskrey b. UK c. University of Exeter d. University of Exeter e. Undergraduate Student
as above
POSTPONED
as above
7.D a. Mr. Rhodri Huw Gruffydd b. UK c. University of Exeter
as above POSTPONED
as above
4
d. University of Exeter e. Student
7.E a. Ms. Louise Jeanne Bienfait b. Netherland c. University of Exeter d. University of Exeter e. Student
as above
POSTPONED
as above
7.F a. Mr. Zoe Eleri Hughes b. UK c. University of Exeter d. University of Exeter e. Student
as above
POSTPONED
as above
8. a. Ms. Imke Anna Podbielski b. German c. ZMT Bremen d. ZMT Bremen e. Doctoral Student
a. 12 months (1 August 2015-31 July 2016)
b. NTB (Lombok Utara, Pantai Krakas), DIY (Gunung Kidul, Ngobaran, Drini, Kukup, Sundak), Maluku (Waai, Itapori, Ambon, Maluku Tengah), Bali
c. Pusat Penelitian Oseanografi LIPI (Wawan Kiswara)
d. Marine Ecophysiology e. Effects of submarine Groundwater
Discharge (SGD) on benthic ecosystem around tropical island
POSTPONED
29/7/2015: Researcher is
requested to clarify regarding
methodology and scope
object’s of the research
proposal
9 a. Ms. Lucia von Reusner b. USA c. Green Century Capital
Management d. Fulbright - Aminef e. Shareholder Advocate
a. 12 month (start from 1 September 2015)
b. Jambi (Kab. Batanghari PT. Hum-Pusindo)
c. Fakultas Ekonomi dan Manajemen – IPB (Dr. Nunung Nuryantoro)
d. Economy science and agricultural e. Examining smallholder access to
certification in the regional palm oil value chain
REJECTED
Research is planned for 13 month 12/8/2015: Researcher is requested to deliver a presentation 26/08/2015: Researcher is requested to clarify about MoU between Green Century Capital
5
Management and CRC Research Project 26/8/2015: Local counterpart deliver a presentation
10.A a. Mrs. Nicole Thompson b. Australia c. Sugar Research Australia d. Australian Centre for
International Agricultural Research (ACIAR)
e. Biosecurity Researcher
a. 12 month (start from July 2015) b. Jatim (Pasuruan (ISRI)), Jabar (IPB
Bogor) c. Pusat Penelitian Perkebunan Gula
Indonesia (Ari Kristini) d. Agricultural e. Integrated disease management of
sugarcane streak mosaic in Indonesia
APPROVED
Research is planned for 3 years 10/6/2015: Local counterpart deliver a presentation 17/6/2015: Researcher is requested to provide a copy of MTA 2/9/2015: FRP Secretariat is received a copy of MTA
10.B a. Ms. Elizabeth Jennifer Wilson b. Australia c. Sugar Research Australia d. Australian Centre for
International Agricultural Research (ACIAR)
e. Biosecurity Researcher
as above
APPROVED
10.C a. Mr. Nader Sallam, Ph.D b. Australia c. Sugar Research Australia d. Australian Centre for
International Agricultural Research (ACIAR)
e. Senior Research Officer
as above
APPROVED
10.D a. Dr. Robert Campbell Magarey b. Australia
as above
APPROVED
6
c. Sugar Research Australia d. Australian Centre for
International Agricultural Reseach (ACIAR)
e. Principal Research Scientist
11.A a. Ms. Katharine Elisabeth Currier b. USA c. Biosphere Foundation d. Biosphere Foundation e. Research Associate
a. 12 month (1 July 2015 - 31 August 2016)
b. Bali (Buleleng, Pulau Menjangan, TN Bali Barat, Pemuteran, Sumber Kima, Pejarakan, dan Sumber Klampok)
c. Pusat Penelitian Lingkungan Hidup – Universitas Udayana (Mr. Abd. Rahman As-syakur)
d. Marine Ecology e. The Menjangan Island Coral Reef
Project: Addressing Threats to Reefs
POSTPONED
Research is planned for 14
month
6/5/2015 : Reseacher is
requested to deliver
presentation and explain the
reason of adding member
13/05/2015 :
Researcher/counterpart didn’t
attend to deliver presentation
27/05/2015 : Researcher is
requested to provide a copy of
MoU, MTA, and IPR
Agreement
02/09/2015 : FRP Secretariat
received MoU
09/09/2015 :FRP Secretariat
is waiting for copy of MTA &
IPR Agreement
11.B a. Ms. Abigail Kingsley Alling b. USA c. Biosphere Foundation d. Biosphere Foundation e. Founder and President of
As above
POSTPONED
7
Biosphere
11.C a. Mr. Mark Van Thillo b. Belgium c. Belgia, 18-03-1961 d. EJ445192 e. s.d 17 September 2017 f. Biosphere Foundation g. Biosphere Foundation h. Chief Operation Officer of
Biosphere
As above
POSTPONED
8
B. PRESENTATION
No a. NAME b. CITIZENSHIP c. INSTITUTION d. FUNDING GUARANTOR e. POSITION
a. RESEARCH PERIOD b. LOCATION c. INDONESIAN COUNTERPART d. FIELD OF RESEARCH e. RESEARCH TITLE
STATUS REMARKS
1. a. Mr. Mark Guy Winward b. Canada c. University of Toronto d. RBC Financial Group e. Phd. Student
a. 10 month (15 July 2015-15 May 2016) b. Jateng (Grobogan), Jatim (Kediri),
Jakarta, Yogyakarta c. Fakultas Ilmu Budaya UGM (Dr.Pujo
Semedi Hargo) d. Socio-Politic e. Developing Civic Culture: The
Evolution of Civil Association in Indonesia)
REJECTED
27/05/2015 : - Researcher is requested to
add local counterpart form UIN Walisongi Semarang
- Researcher is requested to deliver a presentation
10/6/2015: Researcher/local counterpart didn’t attend to deliver a presentation 17/6/2015: Researcher/local counterpart didn’t attend to deliver a presentation 29/6/2015: Researcher/local counterpart didn’t attend to deliver a presentation 29/7/2015: Researcher/local counterpart didn’t attend to deliver a presentation
2 a. Mr. Ian Nicholas Parker b. USA c. University of California San
Diego d. Fulbright - Aminef
a. 6 month (start from August 2015) b. Papua Barat (Kabupaten Raja Ampat,
Distrik Misool Selatan, Distrik Meos Mansar, Distrik Teluk Mayalibit)
c. Fakultas Ilmu Perikanan dan Ilmu
APPROVED
SIP: 207/SIP/FRP/SM/VII/2014 valid until 14 July 2015 26/08/2015: Researcher is requested to deliver a
9
e. PhD. Student Kelautan - UNIPA (Abdul Hamid A. Toha dan Nurhani Widiastuti, S.Pi, M.Si)
d. Natural Resource Management e. Social and environmental relations in
the seascapes of Raja Ampat, West Papua
presentation about progress report 9/9/2015: Researcher is requested to add young researcher from UNIPA and joint publication
10
C. NEW APPLICATION
No a. NAME b. CITIZENSHIP c. INSTITUTION d. FUNDING GUARANTOR e. POSITION
a. RESEARCH PERIOD b. LOCATION c. INDONESIAN COUNTERPART d. FIELD OF RESEARCH e. RESEARCH TITLE
STATUS REMARKS
1.A a. Mr. Johannes Franciscus Kusters
b. Netherland c. TU Delft d. Self Funding e. Master Student
a. 3 month (start from August 2015) b. Bali c. Puslitbang Sumber Daya Air – PU d. Civil Engineering e. Identification of the Current State
Coastal Structures Performance in Bali
POSTPONED
9/9/2015: Researcher is requested to revise a letter of recommendation from local counterpart
1.B a. Mr. Bernardus Johannes Maria Arntz
b. Netherland c. TU Delft d. Self Funding e. Master Student
as above
POSTPONED
1.C a. Mr. Rickwin Robert Huisman b. Netherland c. TU Delft d. Self Funding e. Master Student
as above
POSTPONED
1.D a. Ms. Kristel Iris Knoppe b. Netherland c. TU Delft d. Self Funding e. Master Student
as above
POSTPONED
2.A a. Dr. Mark Hughes b. UK
a. 12 month (start from January 2016) b. Sumatera Barat (TN. Kerinci Seblat
APPROVED
Research is planned for dua years
11
c. Royal Botanic Garden Edinburgh
d. Royal Botanic Garden Edinburgh
e. Tropical Botanist
(Pesisir Selatan); Cagar Alam Bukit Rimbang (Pesisir Selatan); Cagar Alam Batang Pangean(Sijungjung); Rimbo Panti (Pasaman); Halaban (Limah Puluh Kota); Daerah sekitar Bukittinggi(Bukittinggi & Agam); Sumatera Seletan (Gunung Dempo, Pagar Alam); Lampung: Gunung Tanggamus (Tanggamus), Riau (TN. Bukit Tiga Puluh(Indragiri Hulu)); Jawa Tengah (Comal - Pemalang); Kalimantan Barat (Bukit Baka - TN. Bukit Raya (Sintang), Gunung Saran (Sintang)); Kalimantan Selatan (TN. Kayan Mentarang, Tanah Bumbu); Sulawesi Utara (TN. Tangkoko Batuangus, Bitung), TN. Bogani Nani Wartabone, Bolaang Mongondow), Cagar Alam Gunung Ambang, Minahasa), Gunung Klabat - Minahasa Utara), Cagar Alam Gunung Lokon - Tomohon, Gunung Mahawu - Tomohon, Cagar Alam Gunung Manembo-nembo - Minahasa dan Minahasa Selatan); Sulawesi Tengah (TN. Lore Lindu - Donggala dan Poso).
c. Pusat Penelitian Biologi – LIPI (Dr. Marlina Ardiyani, Deden Girmansyah, M.Si, Abdulrokhman Kartonegori, S.Si, Megawati, dan Susila)
d. Botany e. Discovering biodiversity and
MoU has been made 9/9/2015: Researcher is requested to specify research location roadmap 9/9/2015: Research location in Kab. Poso is not allowed
12
promoting conservation of the Indonesian Flora
2.B a. Ms. Hannah Jane Atkins b. UK c. Royal Botanic Garden
Edinburgh d. Royal Botanic Garden
Edinburgh e. Researcher
as above
APPROVED
2.C a. Ms. Helen Anne Yeats b. UK c. Royal Botanic Garden
Edinburgh d. Royal Botanic Garden
Edinburgh e. Researcher
as above
APPROVED
2.D a. Dr. Peter Wilkie b. UK c. Royal Botanic Garden
Edinburgh d. Royal Botanic Garden
Edinburgh e. Researcher
as above
APPROVED
2.E a. Ms. Sadie Barber b. UK c. Royal Botanic Garden
Edinburgh d. Royal Botanic Garden
Edinburgh e. Researcher
as above
APPROVED
3 a. Mr. Thomas Daniel Wright b. Australia c. University of Queensland d. University of Queensland e. PhD Candidate
a. 12 months (start from August 2015) b. Bali (Kuta Utara dan Badung) c. Fakultas Sastra dan Budaya –
Universitas Udayana (Prof. Dr. I Nyoman Dama Putra, M.Litt)
POSTPONED
9/9/2015: Researcher is
requested to deliver a
presentation
13
d. Environmental anthropology e. Water, tourism and surfing: an
ethnography of marine environments in Bali
4 a. Ms. Ruby Stocklin Weinberg b. USA c. University of British Columbia d. Canadian International
Resources and Development Institute
e. PhD Student
a. 12 months (start from November 2015)
b. Bangka-Belitung (Belitung Timur, Bangka Barat, Bangka, Bangka Tengah, Bangka Selatan, dan Bangka Induk) dan Jawa Tengah (Lebak dan Banyumas)
c. Pusat Teknologi Sumberdaya Mineral – BPPT (Yudi Prabangkara)
d. Natural Resources Management f. Feasibility of Training Centres in
Artisanal Mining
POSTPONED
9/9/2015: Researcher is
requested to add additional
counterpart from PSDR –LIPI
(Dr. Erwiza Herman)
5 a. Dr. Clive Morris Jones b. Australia c. James Cook University d. Australian Centre for
International Agricultural Research (ACIAR)
e. Principal Research Fellow
a. 12 month (start from September 2015)
b. NTB (Kab. Lombok Barat dan Kab. Lombok Tengah: Balai Perikanan Budidaya Laut Lombok, Lombok: Pusat Pengembangan Budidaya Kelautan dan Pusat Pengembangan Budidaya Air Payau), Aceh (Kab. Aceh Besar: Balai Perikanan Budidaya Air Payau Ujung Batee), serta Bali (Kab. Buleleng: Balai Besar Penelitian dan Pengembangan Budidaya Laut serta Gondol: Pusat Penelitian dan Pengembangan Perikanan Budidaya Laut)
c. Balitbang KP – KKP (Dr. Achmad Poernomo)
d. Fishery
APPROVED
Research is planned for 12 month 9/9/2015: Researcher is requested to provide a list of field counterpart
14
e. FIS/2014/059 Expanding spiny lobster aquaculture in Indonesia
6 a. Mr. Hikichi Keita b. Japan c. The Graduate School of Human
Sciences,Waseda University d. Waseda University
Environmental Research Institute
e. Master Student
a. 3 month (start from October 2015) b. Kalimantan Barat (Kec. Sukadana -
Kab. Kayong Utara, Kec. Matan Hilir Utara dan Kec. Nanga Tayap - Kab. Ketapang, TN. Gunung Palung)
c. Magister Ilmu Lingkungan – Universitas Tanjungpura (Prof. Dr. Gusti Zakaria Anshari, MES)
d. Ecology e. Project in Gunung Palung National
Park, West Kalimantan, Indonesia
APPROVED
9/9/2015: Researcher is requested to involve young researcher/student as counterpart
7.A a. Prof. Michael Richard Burton b. UK c. University of Manchester d. European Research Council e. Professor
a. 12 month (start from September 2015)
b. Jawa Barat, Jawa Tengah, dan Jawa Timur
c. Fakultas Geologi – UGM () d. Vulcanology e. CO2Volc; Quantifying the global
volcanic CO2 cycle
APPROVED
9/9/2015: Researcher is requested to add local counterpart from PVMBG and ESDM
7.B a. Dr. Silvia Viciani b. Italy c. National Institute of Optics d. European Research Council e. Researcher
as above
APPROVED
7.C a. Dr. Antonio Chiarugi b. Italy c. National Institute of Optics d. European Research Council e. Researcher
as above
APPROVED
8.A a. Dr. Tim Rixen b. German c. Leibniz-Zentrum fur Marine
a. 4 month (start from September 2015)
b. Makasar (Kep. Spermonde dan
APPROVED
9/9/2015: Researcher is requested to provide a list of field counterpart
15
Tropenokologie (ZMT) GmbH d. Leibniz-Zentrum fur Marine
Tropenokologie (ZMT) GmbH e. Senior Scientist
Selat Makasar) c. Pusat Penelitian dan
Pengembangan Sumber Daya Laut dan Pesisir – Balitbang KP (Dr. Andreas Hutahaean)
d. Climatology e. Climate Change and Coastal
Vulnerability
8.B a. Ms. Francisca Maria Constance Wit
b. Netherland c. Leibniz-Zentrum fur Marine
Tropenokologie (ZMT) GmbH d. Leibniz-Zentrum fur Marine
Tropenokologie (ZMT) GmbH e. Ph.D Candidate
as above
APPROVED
8.C a. Dr. Herbert Guenter Siegel b. German c. Leibniz-Institut Fur
Ostseeforschung Warnemunde d. Leibniz-Zentrum fur Marine
Tropenokologie (ZMT) GmbH e. Senior Scientist
as above
APPROVED
8.D a. Ms. Iris StottMayster b. German c. Leibniz-Institut Fur
Ostseeforschung Warnemunde d. Leibniz-Zentrum fur Marine
Tropenokologie (ZMT) GmbH e. Research assistant
as above
APPROVED
8.E a. Dr. Thomas Walter Peter Pohlmann
b. German c. Center for Earth System
Research and Sustainability
as above
APPROVED
16
(CEN) d. Leibniz-Zentrum fur Marine
Tropenokologie (ZMT) GmbH e. Scientist
8.F a. Dr. Bernhard Andreas Mayer b. German c. University of Hamburg d. Leibniz-Zentrum fur Marine
Tropenokologie (ZMT) GmbH e. Scientist
as above
APPROVED
9.A. a. Dr. Maureen Miller b. USA c. EcoHealth Alliance d. United States Agency for
International Development (USAID)
e. Senior Research Scientist
a. 12 month (start from September 2015)
b. Sulawesi Utara (Manado dan Tomohon) serta Gorontalo (Boalemo)
c. Primatology d. Pusat Studi Satwa Primata – IPB
(Joko Pamungkas) e. PREDICT 2: Qualitative Research
for Behavioral Risk Surveillance and Characterization
POSTPONED
Research is planned for 2 years 9/9/2015: Researcher is requested to deliver a presentation and add local counterpart from Balitbangkes and Eijkman
9.B. a. Dr. Kevin James Olivial b. USA c. Hawaii, 10-08-1975 d. United States Agency for
International Development (USAID)
e. Senior Research Scientist
as above
POSTPONED
10. a. Mr. Adam Bebko b. Canada c. York University d. Self Funding e. PhD Student
a. 5 month (start from September 2015)
b. Kalimantan Timur (TN Kutai) c. Balai Taman Nasional Kutai
(Agustinus Runde Sampe S. Hut) d. Primatology e. Orangutan behavior and
APPROVED
Additional member of Prof. Anne Russon, that research permit has been approved in May 27
17
adaptations in Kutai National Park, East Kalimantan
11. a. Dr. Frank Erwin Rheindt b. German c. National University of
Singapore d. National University of
Singapore e. Assistant Professor
a. 3 month (start from September 2015)
b. Papua Barat (Fakfak), Timor (Gunung Mutis), dan NTT (Pulau Alor)
c. Pusat Penelitian Biologi – LIPI (Hidayat Ashari, M.Sc)
d. Zoology e. Eastern Indonesia as the Source of
Significant Avian Cryptic Diversity
APPROVED
9/9/2015: Research location in Papua is not allowed
12. a. Ms. Kathrin Haßler b. German c. Leibniz Center for Tropical
Marine Ecology (ZMT) GmbH d. German federal ministry of
education and research e. Research assistant
a. 2 month (start from October 2015) b. Jawa: Banteng, Jawa Tengah,
Yogyakarta, dan Jawa Timur serta Kepulauan Sunda: Bali dan NTB (Lombok)
c. Fakultas Teknik – UGM (Dr. Doni Prakasa Eka Putra)
d. Hidrogeology e. eneliti kandungan nutrient air bawah
tanah f. Provenance of nutrient fluxes
associated with submarine groundwater discharge from Java, Indonesia
POSTPONED
9/9/2015: Researcher is requested to add local counterpart from P20-LIPI
13.A a. Ms. Kyoko Taniguchi b. Japan c. Japan Agency for Marine-Earth
Science and Technology (JAMSTEC)
d. Japan Agency for Marine-Earth Science and Technology (JAMSTEC)
e. Engineer
a. 3 month (start from November 2015) b. Perairan Barat Sumatera dan
Selatan Jawa serta stasiun pengamatan BMKG di Provinsi Bengkulu
c. Pusat Teknologi Inventarisasi Sumberdaya Alam – BPPT (Dr. Fadli Syamsudin)
d. Meteorology dan Oseanography
APPROVED
MoU between BPPT and JAMSTEC Researcher will used R/V Mirai Additional member of Dr. Masaki Katsumata, that
18
e. Study on oceanic and atmospheric climate variability in the western Sumatera and southern Jawa waters, and land-based observation in Bengkulu Province
research permit has been approved in August 12, 2015
13.B a. Mr. Kensuke Watari b. Japan c. Japan Agency for Marine-Earth
Science and Technology (JAMSTEC)
d. Japan Agency for Marine-Earth Science and Technology (JAMSTEC)
e. Engineer
as above
APPROVED
13.C a. Mr. Makito Yokota b. Japan c. Japan Agency for Marine-Earth
Science and Technology (JAMSTEC)
d. Japan Agency for Marine-Earth Science and Technology (JAMSTEC)
e. Engineer
as above
APPROVED
13.D a. Ms. Yuki Kaneko b. Japan c. Japan Aerospace Exploration
Agency d. Japan Agency for Marine-Earth
Science and Technology (JAMSTEC)
e. Engineer
as above
APPROVED
13.E a. Mr. Kenichi Sasaki b. Japan c. Japan Agency for Marine-Earth
Science and Technology
as above
APPROVED
19
(JAMSTEC) d. Japan Agency for Marine-Earth
Science and Technology (JAMSTEC)
e. Engineer
13.F a. Mr. Kosei Sasaoka b. Japan c. Japan Agency for Marine-Earth
Science and Technology (JAMSTEC)
d. Japan Agency for Marine-Earth Science and Technology (JAMSTEC)
e. Engineer
as above
APPROVED
13.G a. Mr. Etsuro Ono b. Japan c. Japan Agency for Marine-Earth
Science and Technology (JAMSTEC)
d. Japan Agency for Marine-Earth Science and Technology (JAMSTEC)
e. Engineer
as above
APPROVED
13.H a. Dr. Akiko Makabe b. Japan c. Japan Agency for Marine-Earth
Science and Technology (JAMSTEC)
d. Japan Agency for Marine-Earth Science and Technology (JAMSTEC)
e. Engineer
as above
APPROVED
13.I a. Mr. Kazuhide Yamamoto b. Japan c. Japan Aerospace Exploration
As above
20
Agency d. Japan Agency for Marine-Earth
Science and Technology (JAMSTEC)
e. Engineer
APPROVED
14. a. Mr. Andras Tothmihaly b. Hungaria c. University of Goettingen d. Global Food dan Fiat Panis
Foundation e. PhD candidate
a. 5 month (start from October 2015) b. Sulawesi Tengah c. Fakultas Pertanian – Universitas
Tadulako (Dr. Aiyen Tjoa dan Dr. Yulianti Kalaba)
d. Agricultural e. Poverty and sustainability in the
Indonesian cocoa production
APPROVED
9/9/2015: Research location in Kab. Poso is not allowed Researcher is requested to add local counterpart from Sosial Ekonomi (Sosek)
21
D. RESEARCH PERMIT EXTENSION
No a. NAME b. CITIZENSHIP c. INSTITUTION d. FUNDING GUARANTOR e. POSITION
a. RESEARCH PERIOD b. LOCATION c. INDONESIAN COUNTERPART d. FIELD OF RESEARCH e. RESEARCH TITLE f. REASON FOR EXTENTION
STATUS REMARKS
1 a. Mr. Adam E. Miller b. USA c. Planet Indonesia d. Princeton University, American
Institute for Indonesian Studies (AIFIS)
e. Director and Founder
a. 3 month (start from October 2015) b. Kalimantan Barat (Ketapang,
Kayong Utara, TN Gunung Palung) c. Universitas Tanjungpura (Dr. Siti
Masitoh Karikawati, Msi) d. Natural Resource Management e. Understanding the impacts of The
Wild Bird trade in Gunung Palung National Park, West Kalimantan
f. Researcher need additional data to analizing
POSTPONED
9/9/2015: Researcher is requested to revise a letter of recommendation from local counterpart
2 a. Ms. Lotte Suzanne Woittiez b. Netherland c. Wageningan University d. Wageningan University e. PhD Student
a. 12 month (start from September 2015)
b. Riau (Perkebunan Ds. Dosan di Siak), Sumut (Simalungun), Jambi, Kalbar
c. Pusat Penelitian Kelapa Sawit (Winarna)
d. Agricultural e. Improving oil palm yield on
smallholder peatland plots in Indonesia
f. To collect additional data
POSTPONED
Research is planned for 4 years 9/9/2015: Researcher is requested to deliver a presentation about progress report
3 a. Ms. Melinda Mae Clarke b. USA c. Colorado State University
a. 7 month (start from September 2015)
b. Sulut (Bolaang, Mongondow,
APPROVED
SIP: 60/SIP/FRP/SM/III/2015 valid until 23 September 2015
22
d. Fullbright - AMINEF e. PhD Student
Lembah Dumoga, TN Bogani Nani Wartabone)
c. Fakultas Pertanian - UNSRAT (Dr. John Tasirin)
d. Socio-economical Forestry e. Social-Ecological Modeling of
Health-Environment Interactions in Indonesia
f. Need extra time to explore the data
4 a. Dr. Monica Di Gregorio b. German c. University of Leeds d. Economic and Social Research
Council (ESRC), United Kingdom
e. Lecturer
a. 12 month (start from September 2015)
b. Jakarta, Jawa Barat (Bogor), Jawa Tengah (Semarang dan Wonogiri), Kalimantan Barat (Pontianak dan Kapuas Hulu)
c. Institut Pertanian Bogor (Prof. Dodik Nurrochmat)
d. Forestry e. Multi-level governance, REDD+ and
synergies between climate change mitigation and adaptation
f. Need to discuss about research result and arrange policy with local counterpart based on research result
APPROVED
Research is planned for 2 years 3 month SIP: 279/SIP/FRP/SM/IX/2014 valid until 15 September 2015
5 a. Dr. Susan Hayes b. Australia c. University of Wollongong d. University of Wollongong e. Senior Honorary Research
Fellow
a. 12 month (start from September 2015)
b. Jawa Barat (Bandung: Museum Geologi)
c. Museum Geologi – Pusat Survei Geologi ESDM
d. Palaeo antropology e. Faces of Ancient Indonesia: Facial
Approximation of Indonesian Fossils f. To continue validating about
APPROVED
Research is planned for 3 years
23
research methology
6 a. Dr. Gerrit Dirk Van Den Bergh b. Netherland c. University of Wollongong d. Australian Research Council
dan Pusat Survey Geologi e. ARC Research Fellow
a. 12 month (start from September 2015)
b. NTT (Ngada dan Nage Keo, Kab. Flores) serta Sulawesi Selatan (Watansoppeng)
c. Pusat Survei Geologi – Badan Geologi ESDM (Ir. Agung Pribadi, M.Sc)
d. Paleoantology e. In search of the first hominins:
Sedimentology, palaeontology and dating of Pleistocene fossil vertebrate faunas and open occupation sites in Flores and Sulawesi
f. To continue escavation process in Mata Menge
APPROVED
SIP: 35/EXT/FRP/SM/VIII/2014 valid until 27 September 2015 Research is planned for 5 years Second Extension MoU between Badan Geologi ESDM and University of Wollongong
7 a. Ms. Dominique Bertrand b. USA c. State University of New York d. Fulbright - AMINEF e. PhD Candidate
a. 5 month (start from October 2015) b. Sulawesi Utara (Batuangus: Cagar
Alam Tangkoko-Dua Saudara) c. Fakultas Kedokteran Hewan - IPB
(Dr. drh. Muhammad Agil, MSc.Agr., Dipl.ACCM)
d. Primatology e. The stress factor: Examining
anthropogenic sources of stress in wild M. nigra
f. Need extra time to collect the data
APPROVED