list of ps division notes 1999 - cernbilan des "points a suivre" accumules pendant les...

14
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION EUROPEENNE POUR LA RECHERCHE NUCLEAIRE CERN - PS DIVISION PS/DR/Note 2000-001 (Info) 6 January 4000 List of PS Division Notes 1999 Beam Diagnostics Group PS/ BD/Note 99-01 (MD) PS/ BD IN ote 99-02 PS/ ED/Note 99-03 (Tech.) PS/ BD IN ote 99-04 AD Note048 PS/ BD IN ote 99-05 (Info.) PS/ ED/Note 99-06 (MD) PS/ BD IN ote 99-07 PS/ BD IN ote 99-08 PS/ BD IN ote 99-09 PS/ ED/Note 99-10 Compte Rend,u du MD au PS Test d'un detecteur de Profil f. Bosser, E. Chevallay, G. Ferioli, H. Klette, R. Maccaferri, G. Metral Mains-Synchronous Clock for DC Beam Transformers F. Jensen The Synchronisation for the PS Closed Orbit Measurement System: Real Time Software Development and Implementation M. Ludwig AD Transverse Dampers L. Seby DSC Software for MWPCs - Technical Information Sheet M. Ludwig Etalonnage des generateurs de train B du PS f.-C. Thomi Ion Profilometer for the SPS and LHC Accelerators f. Bosser, A. Feschenko, R. Maccaferri An Approach to the Measurement of the Charge of Individual Bunches in a Bunch Train G. Gelato A Four-Decade Bandwidth Hybrid Coupler f. Belleman New Hardware of the Tune Measurement System for the Proton Synchrotron Booster Accelerator M. Gasior, J. L. Gonzalez 1

Upload: others

Post on 21-Apr-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: List of PS Division Notes 1999 - CERNBilan des "Points a suivre" Accumules pendant les Reunions EXM de 1998 G. Daems EXM99-02 G. Daems Section PS/CO Applications & Bureautique -Reunion

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION EUROPEENNE POUR LA RECHERCHE NUCLEAIRE

CERN - PS DIVISION

PS/DR/Note 2000-001 (Info)

6 January 4000

List of PS Division Notes 1999

Beam Diagnostics Group

PS/ BD/Note 99-01 (MD)

PS/ BD IN ote 99-02

PS/ ED/Note 99-03 (Tech.)

PS/ BD IN ote 99-04

AD Note048

PS/ BD IN ote 99-05 (Info.)

PS/ ED/Note 99-06 (MD)

PS/ BD IN ote 99-07

PS/ BD IN ote 99-08

PS/ BD IN ote 99-09

PS/ ED/Note 99-10

Compte Rend,u du MD d~18decerribre1998 au PS Test d'un detecteur de Profil

f. Bosser, E. Chevallay, G. Ferioli, H. Klette, R. Maccaferri, G. Metral

Mains-Synchronous Clock for DC Beam Transformers

F. Jensen

The Synchronisation for the PS Closed Orbit Measurement System: Real Time Software Development and Implementation

M. Ludwig

AD Transverse Dampers

L. Seby

DSC Software for MWPCs - Technical Information Sheet

M. Ludwig

Etalonnage des generateurs de train B du PS

f.-C. Thomi

Ion Profilometer for the SPS and LHC Accelerators

f. Bosser, A. Feschenko, R. Maccaferri

An Approach to the Measurement of the Charge of Individual Bunches in a Bunch Train

G. Gelato

A Four-Decade Bandwidth Hybrid Coupler

f. Belleman

New Hardware of the Tune Measurement System for the Proton Synchrotron Booster Accelerator

M. Gasior, J. L. Gonzalez

1

Page 2: List of PS Division Notes 1999 - CERNBilan des "Points a suivre" Accumules pendant les Reunions EXM de 1998 G. Daems EXM99-02 G. Daems Section PS/CO Applications & Bureautique -Reunion

PS/ BD/Note99-11

PS/ BD IN ote 99-12

PS/ BD/Note99-13 (Tech.)

PS/ BD/Note 99-14 (Tech.)

PS/ BD/Note 99-15

PS/ BD IN ote 99-16 (Tech.)

Circular Rings and Areas

PS/ CA/Note99-01

PS I CA/Note 99-02

PS/ CA/Note 99-03

PS/ CA/Note 99-04 (Tech.)

PS/ CA/Note 99-05

PS/ OP /Note 99-08

PS/ CA/Note 99-06 (Tech.)

PS/OP Note 99-09 (Tech)

PS/ CA/Note99-07

SL Note 99-003 (MD)

PS/ CA/Note 99-08

SL/ Note 99-013 MD

06/01/2000

DSP Software of the Tune Measurement System for the Proton Synchrotron Booster Acceleraotr

M. Gasior, J.L. Gonzalez

Neutral Probe-Beam Profilometer

C. Dimopoulou

The Scraper Companion for the AD Operator

T. Spickermann

Application Software for the AD Scrapers

T. Spickermann

Ion Curtain Profilometer

]. Bosser, E. Chevallay, C. Dimopoulou, A. Feschenko, R. Maccaferri

Beam Measurement Systems for the Antiproton Decelerator

Edited by V. Chohan

The AUSTRON 500 kW /10 Hz Option: Addition of a 10 Hz Storage Ring to the AUSTRON 50 Hz Rapid Cycling Synchrotron

H. SchOnauer

Operation des Lignes F61, F61S, F61N et TS

0. Ferrando

Orbit Growth in the PS at High Energy - Identification of the Source and Scenarios for Correction

C. Carli, M. Martini

Design of a New Oil Distribution System for the New Booster EK and TK Kicker Generators

S. de Man

Simultaneous Matching of Dispersion Function and Twiss Parameters in a Transfer Line

M. Giovannozzi, A. Jansson, M. Martini

Magnetic Field Measurements of the LEIR Electron Cooling Device

R. Brown, G. Tranquille

Betatron and Dispersion Matching of the TT2/TT10 Transfer Line for the 26 GeV /c Fast Extraction

G. Arduini, G. Crockford, C. Despas, M. Giovannozzi, K. Hanke, D. Manglunki, M. Martini, G. Metral, C. Niquille

TT2/TT10 Transfer Line Studies for the 14 GeV /c Continuous Transfer

G. Arduini, G. Crockford, C. Despas, M. Giovannozzi, K. Hanke, D. Manglunki, M. Martini, G. Metral, C. Niquille

2

Page 3: List of PS Division Notes 1999 - CERNBilan des "Points a suivre" Accumules pendant les Reunions EXM de 1998 G. Daems EXM99-02 G. Daems Section PS/CO Applications & Bureautique -Reunion

PS/ CA/Note 99-09

SL/ Note 99-018 MD

PS/ CAIN ote 99-10

PS/ CA/Note 99-11

PS/ CA/Note 99-12

PS/ CA/Note 99-13

PS/ CA/Note99-14

SL Note 99-32 (MD)

PS/ CA/Note 99-15

PS/ CA/Note 99-16

PS/ CA/Note 99-17

PS/ CA/Note 99-18 (Tech.)

PS/ CA/Note 99-19

PS/ CA/Note99-20

06/01/2000

Betatron and Dispersion Matching of the TT2/TT10 Transfer Line for the Fixed-Target Lead Ion Beam

G. Arduini, G. Crockford, C. Despas, M. Giovannozzi, K. Hanke, D. Manglunki, M. Martini, G. Metral, C. Niquille

Representation Schematique de l'Anneau et des Lignes de la Machine PSB

B. Dumas

Comparison of Amplitude Profiles from BeamScope and Wire Scanner Measurements for the Vertical Plane in the PSB

C. Carli, M. Lindroos, H. Schonauer

Sweeping Magnet for the Time of Flight Facility at the CERN PS

M. Giovannozzi, M. Sassowsky

Initial Measurements of the Vertical Booster Transfer Magnetic Septum 10 (BTSMV 10)

J. Borburgh

Mismatch Measurement and Correction Tools for the PS-SPS Transfer of the 26 Ge VI c LHC Beam

G. Arduini, J. Colchester, G. Ferioli, M. Giovannozzi, J-J. Gras, K. Hanke, D.J. Hopkins, R. Jung, D. Manglunki, M. Martini

The Influence of the Shape and Position of a Magnetic Screen for a DC Septum Magnet

J. Borburgh

Coupled Landau Damping considering both non-linear Space-charge forces and Octupoles

E. Metral

Alternative Layout of the Transfer Line for the Time-of-Flight Neutron Facility at CERN-PS

M. Giovannozzi

Preliminary Feasibility Study and cost Evaluation for an Experiment of Neutrino Oscillations at CERN-PS

A. Ball, R. Bonzano, J. Buttkus, R. Cappi (Ed.), G. Daems, T. Dobers, D. Dumollard, L. Durieu, D. Forkel-Wirth, M. Giovannozzi, J. Gruber, G. Kowalik, L. Linssen, R. Magnin, E. Mahner, J.M. Maugain, S. Peraire, U. Raich, M. Zanolli

Protons Availability for 1216 and for the Other Protons Users of the PS Complex

J.P. Riunaud

General Specifications for Manufacture of Vacuum Tanks for Electrostatic Septum SES23

M. Hourican

3

Page 4: List of PS Division Notes 1999 - CERNBilan des "Points a suivre" Accumules pendant les Reunions EXM de 1998 G. Daems EXM99-02 G. Daems Section PS/CO Applications & Bureautique -Reunion

PS/ CA/Note99-21 (Spec.)

Repl. 91-5 (Rev.)

PS/ CA/Note99-22

PS/ CA/ Note 99-23

PS/ CA/Note99-24

PS/ CA/Note99-25

PS/ CA/Note99-26

PS/ CA/Note99-27

PS/ CA/Note 99-28

AD Note 99-54

Controls Group

PS/ CO/Note99-01 (Tech.)

PS/ CO/Note 99-02 (Tech.)

PS/ CO/Note 99-03 (Tech.)

PS/ CO/ Note 99-04 (Tech.)

PS/ CO/Note 99-05 (Tech.)

PS/ CO/Note 99-06 (Tech.)

PS/ CO/Note 99-07 (Tech.)

06/01/2000

Technical Specification for Carbon-Mass Resistor Discs for Fast Pulse Terminators

L. Sermeus

The PSB Ejection Bumper Sytem for LHC

T. Fowler

Construction of an ElectroStatic Analyzer (ESA) for Energy Loss Measurements at the CERN AD

H. Knudsen, U. Mikkelsen, S.P. Moller, R. Thompson, E. Uggerhoj

A 60KV Modulator for Electrostatic Lens Excitation

A. Fowler, K.-D. Metzmacher

Charge Control Unit (CCU)

B. Bleus

PS Kicker Modules G64 Control Interface

B. Bleus, J. Schipper

Design of an Extension of the T9 Beam Line for the Hadron Production Study

L. Durieu, M. Giovannozzi, M. Martini, L. Zani

Proposal of a new Optics for the FT A Transfer Line

M. Giovannozzi, D. Manglunki

Mise en Route du Systeme de Controle du AD pour le Commissioning

G.-H. Hemelsoet

Performing Frequency Measurements with the HP5335A Universal Counter

J. Serrano

VD 71 Sampling Module - Hardware Description and Software Interface Specification

V. Adorni, A. Gagnaire, A. Risso, J. Serrano

Standard VME Modules in the PS Control System

W. Heinze

Descriptiojn of the Equipment Module DIGIO

W. Heinze

ACCIS - A System to manage all your Objects

J. Schinzel

Evolutionary Database Development using an Object Approach

J. Schinzel

4

Page 5: List of PS Division Notes 1999 - CERNBilan des "Points a suivre" Accumules pendant les Reunions EXM de 1998 G. Daems EXM99-02 G. Daems Section PS/CO Applications & Bureautique -Reunion

PS/ CO/ Note 99-08 (Min.)

PS/ CO/Note 99-09 (Info.)

PS/ CO/Note99-10 (Min.)

PS/ CO/Note 99-11 (Min.)

PS/ CO/ Note 99-12 (Tech.)

PS/ CO/Note99-13 (Min.)

PS/ CO/Note99-14(Tech.)

PS/ CO/Note99-15 (Min.)

PS/ CO/Note 99-16 (Min.)

PS/ CO/Note 99-17 (Tech.)

PS/ CO/ Note 99-18 (Min.)

PS/ CO/Note 99-19

PS/ CO/Note 99-20 (Min.)

PS/ CO/Note99-21 (Min.)

PS/ CO/Nate 99-22 (Tech.)

PS/ CO/Nate 99-23 (Tech.)

PS/ CO/Note 99-24 (Tech.)

EXM 99-01

G. Daems

06/01/2000

Bilan des "Points a suivre" Accumules pendant les Reunions EXM de 1998

G. Daems

EXM99-02

G. Daems

Section PS/CO Applications & Bureautique - Reunion du 21.04.1999

C. Serre

MTG99 (Main Timing Generator) - Comprendre son Comportement

J.-C. Bau, J. Lewis

EXM99-03

G. Daems

Sampling with the VD 71 Board. Equipment Module Specification and Real-Time Task Design

A. Risso

EXM99-04

G. Daems

EXM99-05

G. Daems

Database Sign Convention tor Optics Definition

J. Schinzel

EXM99-06

G. Daems

PS/CO Java Day- 24 juin 1999

B. Frammery

EXM99-07

G. Daems

EXM99-08

G. Daems

The PS Controls for Newcomers

J. Serrano

Timing Pulse Transmission in the PS

W. Heinze

VME, Timing, GDAC Crates and their Power Supplies

W. Heinze

5

Page 6: List of PS Division Notes 1999 - CERNBilan des "Points a suivre" Accumules pendant les Reunions EXM de 1998 G. Daems EXM99-02 G. Daems Section PS/CO Applications & Bureautique -Reunion

PS/ CO/ Note 99-25 (Min.)

PS/ CO/Note 99-26 (Min.)

PS/ CO/Note99-27(Min.)

PS/ CO/Note 99-28 (Tech.)

Direction

PS/ DI/Note99-01 (Min.)

PS/ DI/Note 99-02 (Info.)

PS/ DI/Note 99-03 (Min.)

Tech. Mtg N° 104

PS/ DI/Note 99-04

PS/ DI/Note 99-05 (Min.)

Tech. Mtg N° 105

PS I DI/Note 99-06

AD Note047

PS/ DI/Note 99-07 (Min.)

PS I DI/Note 99-08

PS I DI/Note 99-09 (Min.)

Tech. Mtg N° 106

PS/ DI/Note 99-10 (Tech.)

PS/ DI/Note99-ll (Tech.)

PS/ DI/ Note 99-12 (Tech.)

EXM99-09

G. Daems

EXM 99-10

G. Daems

06/01/2000

Section PS/CO/ AP - Compte Rendu de la Reunion du 8.12.1999

C. Serre

Le Systeme de Controle de ISOLDE et REX

F. Locci

Minutes of the ABS Meeting held on 10th December 1998

M. Lindroos

PS Division Notes, 1998

Edited by S.L. Neboux

The PS-SL Controls Convergence Project

B. W. Allardyce

A Review of Management Training in the PS Division during the Period 1993 to 1998.

P. Pearce, OTO, PS Division

Organisation des ressources humaines pour le demarrage et operation de AD

B. W. Allardyce

Beam Evolution in the Antiproton Decelerator (AD) under the Influence of Residual Gas and Intra Beam Scattering

N. Madsen

Minutes of the ABS Meeting held on 9th February 1999

M. Pace

MOAS 1999 (Confidential)

M. Boutheon

Status of the RFQD project for ASACUSA

B. W. Allardyce

Main Quadrupole of the CNAO Synchrotron (Based on the PIMM Study)

G. Borri

The Sextupole of the CNAO Synchrotron (Based on the PIMM Study)

S. Rossi

An Air Core Quadrupole for the PIMMS Synchrotron

S. Rossi

6

Page 7: List of PS Division Notes 1999 - CERNBilan des "Points a suivre" Accumules pendant les Reunions EXM de 1998 G. Daems EXM99-02 G. Daems Section PS/CO Applications & Bureautique -Reunion

PS/ DI/Note 99-13 (Tech.)

PS/ DI/Note 99-14 (Tech.)

PS/ DI/Note99-15 (Min.)

Tech. Mtg N° 107

PS/ DI/Note99-16(Min.)

PS/ DI/Note 99-17

PS/ DI/Note 99-18 (Min.)

Tech. Mtg N° 108

PS/ DI/Note99-19 (Min.)

Tech. Mtg N° 109

PS/ DI/Note99-20

PS/ DI/Note 99-21 (Tech.)

PS/ DI/Note99-22 (Tech.)

PS/ DI/Note99-23 (Tech.)

PS/ DI/Note99-24 (Min.)

Tech. Mtg N° 110

Hadron Production Group

PS/ HP/Note99-01

AD Note046

PS/ HP IN ote 99-02 (Tech.)

PS/ HP/Note99-03 (Tech.)

06/01/2000

Mechanical Design of the RF Cavity for TERA/PIMMS Medical Synchrotron

M. Crescenti, G. Primadei, A. Susini

Preliminary Design of the RF Amplifier for TERA/PIMMS Medical Synchrotron

M. Crescenti, G. Primadei, A. Susini

Future CLIC Studies and CTF3

B. W. Allardyce

Minutes of the ABS Meeting held on 20th May 1999

M. Lindroos

PS Training Plan 1998

P. Pearce

Analyse du demarrage des accelerateurs et bilan des premiers mois d'operation en 1999

M. Boutheon

Mise en route du AD

B. W. Allardyce

Simulations of Electron Cooling Using 'BETACOOL' ·

N. Madsen

Vacuum Changes During Accumulation of Pb54+ in LEIR

N. Madsen

Accumulation with a Hollow Electron Beam

N. Madsen

Design of the Dipole Vacuum Chamber for the CNAO Synchrotron (Based on the PIMM Study)

G. Brianti, V. Chimenti, A. Clozza, G. Delle Monache, S. Rossi, C. Sanelli, F. Sgamma

Review of LIS

B. W. Allardyce

Analysis of the Electron Beam Line for the Test of the RFQ Decelerating System for the AD Antiproton Decelerator

A. Variola

Experimental Characterisation of Solenoid LEBT for the LIS Source: Short Solenoid to Extraction Distance

P. Fournier, N. Lisi, C. Meyer, R. Scrivens, F. Varela Rodriguez

PATH Simulations of a Solenoid LEBT

M.B.H. Breese, J.C. Schnuriger

7

Page 8: List of PS Division Notes 1999 - CERNBilan des "Points a suivre" Accumules pendant les Reunions EXM de 1998 G. Daems EXM99-02 G. Daems Section PS/CO Applications & Bureautique -Reunion

PS/ HP /Note 99-04 (Tech.)

PS/ HP/Note99-05

PS/ HP IN ate 99-06

PS/ HP IN ate 99-07

PS/ HP/Note99-08

PS/ HP IN ate 99-09

PS/ HP/Note99-10

PS/ HP/Note99-ll

NF Note008

PS/ HP IN ate 99-12

NF NoteOll

PS/ HP IN ate 99-13

Lepton Production Group

PS/ LP I Note 99-01 (Tech.)

PS/ LP/Note 99-02 (Tech.)

PS/ LP /Note 99-03 (Tech.)

PS/ LP IN ate 99-04 (MD)

LIS LEBT on the Base of Electrostatic Gridded Lenses

P. Ostroumov

Shidy of the Capacitance of ASACUSA RFQ

R. Tracz

Stepping Emulator by PC

P. Caminos

06/01/2000

Beam Simulations and Measurements of a Helium Beam accelerated by the LIS-RFQ

E. Tanke

Ion Production from Fs laser produced plasma. Travel Report to the Institut f!ur Optik und Quantenelektronik (IOQ) der Friedrich-Schiller-Universitat Jena

P. Fournier, N. Lisi, W. Theobald, S. Duesterer, L. Veisz, H. Schillinger, R. Sauerbrey

Design Proposal for an EBIS as Lead Ion Source for the LHC

F. Wenander

Experimental Characterisation of Gridded Electrostatic Lens (GEL) Low Energy Beam Transport (LEBT) for the Laser Ion Source (LIS) and Effect of a Wire Grid on the Extraction Electrode

?.Fournier, N. Lisi, C. Meyer, P. Ostroumov, R. Scrivens

Transverse Collection of Pions

B. Autin, Ph. Royer

Solenoidal Optics

Ph. Royer

Comparison Between Mode-Locked, Free-Running and Single Longitudinal Mode Laser Beams. Master Oscillator Power Amplifier C02 Laser Ior1 Source

N. Lisi, C. Meyer , R. Scrivens

Notes of a visit to the EEV Ltd Chelmsford UK plant in connection with Pulsed Klystron contracts

P. Pearce

An Isochronous Optics for EPA

T. Risselada

First Micro-Bunch Measurements in EPA as Isochronous Ring at 500 Me V

L. Rinolfi

Report of the EPA MD of 01.06.1999

R. Corsini, L. Rinolfi, T. Risselada, J.C Thomi

8

Page 9: List of PS Division Notes 1999 - CERNBilan des "Points a suivre" Accumules pendant les Reunions EXM de 1998 G. Daems EXM99-02 G. Daems Section PS/CO Applications & Bureautique -Reunion

PS/ LP/ Note 99-05 (Min.)

PS/ LP/Note 99-06 (Min.)

Operation Group

PS/ OP/Note 99-01 (Tech.)

PS/ OP /Note 99-02 (Tech.)

PS/ OP/Note 99-03 (Tech.)

PS/ OP/Note 99-04

PS/ OP /Note 99-05

PS/ OP/Note 99-06 (Tech.)

PS/ OP/Note 99-07 (Min.)

PS/ OP/Note 99-08

PS/CA/ Note

PS/ OP/Note 99-09 (Tech.)

PS/CA/ Note (Tech.)

PS/ OP IN ote 99-10

Rev. PS/OP 96-31

PS/ OP/Note 99-11 (Spec.)

AD Note 050

PS/ OP /Note 99-12 (Tech.)

AD Note 051

PS/ OP /Note 99-13 (Tech.)

AD Note 052

06/01/2000

Notes of a Visit to the EEV Plant at Chelmsford UK for Thyratron Problems and on Klystron Acceptance Testing

P. Pearce, G. McMonagle

Test results for an EEV (old Valvo) klystron made at CERN on the 4th and 5th November 1999

P. Pearce, G. McMonagle, J. Kerr (EEV Ltd)

Aimant PS - Controle de l'Etat des Sertissages Internes de 22 PFW. Mesures effectuees pendant le grand arret 98/99.

J. Ottaviani

Controle des Circuits Auxiliaires des PFW (Arret 1999)

J. Ottaviani

Mesures du Champ PS clans le Systeme de Controle PS par une Sonde Ferrimagnetique (FMR)

G. Adrian

Operation of the PS Complex in 1998

J. Boillot

PS-Booster Ejection Correction Dipoles: ppm-Operation at 1and1.4 GeV

M. Benedikt

The Dual Quadrature Direct Digital Synthesizer Technical Manual

R.R. Steerenberg

Tests Partiels

A. Nicoud, J. Ottaviani

Simultaneous Matching of Dispersion Function and Twiss Parameters in a Transfer Line

M. Giovannozzi, A. Jansson, M. Martini

Magnetic Field Measurements of the LEIR Electron Cooling Device

R. Brown, G. Tranquille

Les Chames de Securite du Complexe PS

J. Ottaviani

AD Cycle : Specification and Implementation

H. Mulder, G. Segura-Millan

AD Cycle Editor : User Manual

H. Mulder, G. Segura-Millan

AD Cycle Editor : System Overview

H. Mulder, G. Segura-Millan

9

Page 10: List of PS Division Notes 1999 - CERNBilan des "Points a suivre" Accumules pendant les Reunions EXM de 1998 G. Daems EXM99-02 G. Daems Section PS/CO Applications & Bureautique -Reunion

PS/ OP I Note 99-14 (Min.)

Rev. le 07.05.99

PS/ OP/Note 99-15 (MD)

PS/ OP /Note 99-16 (Min.)

PS/ OP/Note99-17

PS/ OP/Note99-18

PS/ OP/Note 99-19 (Tech.)

PS/ OP /Note 99-20 (Min.)

PS/ OP IN ote 99-21

PS/ OP/Note 99-22 (Min.)

PS/ OP/Note 99-23 (Min.)

PS/ OP/Note99-24

PS/ OP/Note99-25

Power Group

PS/ PO/Note 99-01 (Proc.)

PS/ PO/Note 99-02 (Tech.)

PS/ PO/Note 99-03 (Min.)

Compte Rendu de la Reunion COPA 3, 22 Avril 1999

M. Pace

Compte Rendu de la Seance d'Etude du 28 Avril 1999: Struch1re B.F. du deversement SE61

Ch. Steinbach

Compte Rendu de la Reunion COPA 4, 5 juillet 1999

M. Pace

New ABS Programs for the PS Machine

M. Pace

06/01/2000

Proposal for a Quadrupole Correction Magnet in the Booster Recombination Section

M. Benedikt, A. Jansson, M. Sassowsky

PSB 'Simple Cycle' Application

S. Jacobsen

Compte rendu de la Reunion COPA 5, 8 Septembre 1999

M. Pace

Emittance Preservation for the Large Hadron Collider - Correction of Static and Dynamic Blow-up Sources Between the PS Booster and the CPS Ring

A. Jansson

Minutes of the Meetings held on 4 & 11October1999

M. Pace

Compte rendu de "briefing " - 13 octobre 1999

D. Gueugnon

Operation Statistics of the PS Accelerator Complex for 1999

D. Dagan

Review of Instruments for Emittance Measurements in the PS Booster

M. Lindroos

Procedure de Consignation et Deconsignation - Consignes d'Exploitation et de Securite pour les Alimentations de PR.RWI, PR.RWO, PR.DH15MD, PR.DHZ60, PR.ODE

M. Lamidon

Travaux d'Entretien sur le Groupe Convertisseur de l'Alimentation du PS - Pour les Arrets de Courte Duree (1a3 jours)

D. Rivalli

AD No. 24 - Compte Rendu de la Reunion du 27.01.1999

J. Buttkus

10

Page 11: List of PS Division Notes 1999 - CERNBilan des "Points a suivre" Accumules pendant les Reunions EXM de 1998 G. Daems EXM99-02 G. Daems Section PS/CO Applications & Bureautique -Reunion

PS/ PO/Note 99-04 (Tech.)

PS/ PO/Note99-05

PS/ PO/ Note 99-06 (Info.)

PS/ PO/Note 99-07

PS/ PO/Note 99-08 (Tech.)

PS/ PO/Note 99-09 (Proc.)

PS/ PO/Note 99-10 (Min.)

PS/ PO/Note 99-11 (Proc.)

PS/ PO/Note 99-12 (Tech.)

PS/ PO/Note 99-13 (Tech.)

PS/ PO/Note 99-14 (Min.)

PS/ PO/Note 99-15 (Proc.)

PS/ PO/Note 99-16 (Min.)

PS/ PO/Note 99-17 (Min.)

PS/ PO/Note 99-18 (Min.)

06/01/2000

Un Nouveau Chargeur Haute Tension pour les Modulateurs du CTF

f. Lahaye

Service de Piquet du Groupe PS/PO

f. Gruber

Listes d'Appel du Groupe PS/PO en 1999 (revised 04.06.99)

f. Buttkus, J. Gruber, J.-P. Royer, H. Ullrich

LPI and CTF Modulators -High Voltage Charging and D'Qing System

f. Lahaye

Bending Magnets D-Trim Power Suplies for the Antiproton Decelerator (AD)

f. Lahaye

Procedure de Consignation et de Deconsignation - Consignes d'Exploitation et de Securite pour l'Alimentation PE.SMH57 (SPGI) et pour l'Alimentation PE.SMH61 (SPGII)

f.-P. Scheffre

Arret et Consignation des Equipements PS/PO du PSB et d'ISOLDE

J.-M. Cravero, H. Fiebiger, F. Gendre, M. Georges, J. Lahaye, G.Simonet

Procedure d'exploitation des alimentations a decharge de condensateurs avec corbeille electronique C20189 (D)

J-L Blanc

Disturbances on Analog Signals

T. Salvermoser

Status of the B-train Project - Remaining Tasks, Responsibilities and Questions

J. Morales Arostegui

Analyse des Demandes de Fabrication Electronique au PO pour 1999 -Compte Rendu de la Reunion du 10 juin 1999

J.-P. Royer

Procedure de Consignation, de Deconsignation et d'Utilisation des Generateurs Haute Tension 300 kV des Septa Electrostatiques PE.SS23 et PE.SS31

B. Hugot, M. Seguin

Compte Rendu de la Reunion du 30 juillet 1999 en Prevision des Differents Tests RFQ.AD

f.-P. Royer

AD No. 25 (Compte Rendu de la reunion du 04.08.99)

J. Buttkus

AD No. 26 (Compte rendu de la reunion du 17.08.99)

J. Buttkus

11

Page 12: List of PS Division Notes 1999 - CERNBilan des "Points a suivre" Accumules pendant les Reunions EXM de 1998 G. Daems EXM99-02 G. Daems Section PS/CO Applications & Bureautique -Reunion

PS/ PO/ Note 99-19 (Min.)

PS/ PO/Note 99-20 (Min.)

PS/ PO/Note99-21 (Tech.)

PS/ PO/Note 99-22 (Tech.)

CO Note??

PS/ PO/Note 99-23 (Spec.)

PS/ PO/Note 99-24 (Tech.)

PS/ PO/Note 99-25 (Tech.)

PS/ PO/ Note 99-26 (Tech.)

PS/ PO/Note 99-27 (Info.)

PS/ PO/Note 99-28 (Min.)

Radio-Frequency Group

PS/ RF/Note99-01 (MD)

PS/ RF IN ote 99-02

PS/ RF IN ote 99-03

PS/ RF IN ote 99-04

CUC Note409

06/01/2000

Suivi des Interventions sur les Equipements PS/PO - Compte Rendu de la Reunion du 1.9.99

J.P Royer

Alimentations Dipoles de la Ligne BTP du Booster- Compte Rendu de la Reunion du 15.09.99

J.-P. Royer

Upgrade of the Booster for LHC - Main Magnet Supply and Reactive Power Compensator

F. Mamarella, J. Pedersen, T. Salvermoser, H. Ullrich,

A New B-Train System for the Booster

P. Dreesen, J. Morales, T. Salvermoser, J. Serrano

Technical Specification for the Mains Distribution Cabinet for the New CTF Modulators

J. Lahaye

Liste des Convertisseurs PS/PO (mise a jour 1999)

Editeur : J. Buttkus

Calcul du Refroidissement d'une Charge de Test (1 Ohm 500 A)

M. Georges

Improvements for the new B Train Systems

P. Dreesen, J. Morales Arostegui

Classification des Convertisseurs sous la Responsabilite du Groupe PS/PO

J. Gruber

Reunion TOF No. l

J. Buttkus

PS Machine Development Report: Preparation of the Nominal Production Beam for the AD

R. Garoby (Author), S. Hancock, A. Ozturk, J.C. Perrier, J.L. Vallet

A Test of the Phase Pick-Ups used in the PSB, and a Suggested Modification

J. Bento, A. Blas, A. Findlay (ed.)

Update of Transfer Timing Survey Module (TTSM)

J. Boucheron

Beam Dynamics in the Accelerating RF Structures of the CTF2 Drive Beam Simulated with PARMELA Particle Tracking Program

M. Chanudet-Cayla

12

Page 13: List of PS Division Notes 1999 - CERNBilan des "Points a suivre" Accumules pendant les Reunions EXM de 1998 G. Daems EXM99-02 G. Daems Section PS/CO Applications & Bureautique -Reunion

PS/ RF IN ote 99-05

PS/ RF/Note 99-06

PS/ RF/Note 99-07

PS/ RF /Note 99-08

Distribution

B.W. Allardyce J. Boillot J.P. Delahaye K. Schindl PS Group Leaders PS Secretaries

Multi-Harmonic RF Source Delayed Outputs

A. Ozturk, T. Anguelov, J-L. Vallet, R. Garoby

RF Tagging and Distribution

A. Ozturk

Spare Cavity Group Selection

A. Ozturk, f-L. Vallet

06/01/2000

Proposal for a 5 kW, 0.1-50 MHz Amplifier for the PS Transversal Damper

M. Paoluzzi

Edited by Susan L. Neboux

13

Page 14: List of PS Division Notes 1999 - CERNBilan des "Points a suivre" Accumules pendant les Reunions EXM de 1998 G. Daems EXM99-02 G. Daems Section PS/CO Applications & Bureautique -Reunion