Report No.3624CO List of Projects for External Financing 1981-1984 Colombia t COpy October 6, 1981 Latin America and the Caribbean Regional Office FOR OFFICIALUSEONLY Document of the World Bank Thisdocument hasa restricted distribution and may be used by recipients only in the performance of their official duties. Its contentsmaynot otherwise be disclosed without World Bank authorization. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 21-Nov-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: List of Projects for External Financing 1981-1984 Colombia

Report No. 3624CO

List of Projects forExternal Financing 1981-1984Colombia t COpy

October 6, 1981

Latin America and the Caribbean Regional Office

FOR OFFICIAL USE ONLY

Document of the World Bank

This document has a restricted distribution and may be used by recipientsonly in the performance of their official duties. Its contents may not otherwisebe disclosed without World Bank authorization.

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: List of Projects for External Financing 1981-1984 Colombia

CURRENCY EQUIVALENTS

Currency Unit: Peso

Exchange Rate Effective August 3, 1981

US$1.00 = Col$55.77

Col$1.00 = US$0,0179

Average Exchange Rate (Buying)

1977 1978 1979

US$1.00 = Col$36.775 US$1.00 = Col$39.095 US$1.00 = Col$42.550Col$1.00 = US$0.0272 Col$1.00 = US$0.0256 Col$1.00 = US$0.0235

1980

US$1.00 = Col$47.280Col$1.00 = US$0.0212

Page 3: List of Projects for External Financing 1981-1984 Colombia

FOR OFFICIAL USE ONLY

CONSULTATIVE GROUP FOR COLOMBIA: PROJECT LIST

TABLE OF CONTENTS

Page

Abbreviations Used i - ii

Introduction iii-iv

Table 1 - Summary of Projects by Sector, Total Cost andExternal Financing Requested, 1981-1984 ........... 1 ......

Table 2 - Summary of External Loans Signed, 1979-1980 ......... ......2Table 3 - External Loans Signed, 1979-1980 ........................... 3Table 4 - Projects Deleted from the 1979-1982 Project

List: Report No. 2536-CO .......................... .. .... 10Table 5' Energy Projects, 1981-1984 .......................... .....12Table 6 - Transportation Projects, 1981-1984 ....................... 14Table 7 - Communications Projects, 1981-1984 ........................ 15Table 8 - Agriculture and Rural Development Projects,

1981-1984 . 16Table 9 - Industry and Mining Projects, 1981-1984 .17Table 10 - Water Supply and Sewerage Projects, 1981-1984 .18Table 11 - Education Projects, 1981-1984 .. 19Table 12 - Nutrition and Health Projects, 1981-84 .20Table 13 - Urban and Regional Development Projects,

1981-1984 .21Table 14 - Preinvestment Studies Projects, 1981-1984 .22

Individual Project Descriptions

I. EnergyIa. Electrical Power .................................. 23lb. Coal .................................. 53Ic. Petroleum and Natural Gas ........................... 56

II. Transportation .................................. 59III. Communications . 80IV. Agriculture and Rural Development . 89V. Industry and Mining . 103VI. Water Supply and Sewerage . 109VII. Education . 118VIII. Nutrition and Health . 124IX. Urban and Regional Development . 132X. Preinvestment Studies . 140

This document has a restricted distribution and may be used by recipients only in the perfortnance otheir official duties. Its contents may not otherwise be disclosed without World Bank authorization.

Page 4: List of Projects for External Financing 1981-1984 Colombia
Page 5: List of Projects for External Financing 1981-1984 Colombia

ABBREVIATIONS USED

ACUAMANGA Acueducto Metropolitano de BucaramangaBCH Banco Central HipotecarioCAF Corporacion Andina de FomentoCAR Corporacion Autonoma Regional de la Sabana de Bogota

y de los Valles de Ubate y ChinquinquiraCARBOCOL Carbones de Colombia S.A.CFP Corporacion Financiera PopularCFT Corporacion Financiera del TransporteCHEC Central Hidroelectrica de Caldas S.A.CIDA Canadian International Development AgencyCOFIAGRO Corporacion Financiera de Fomento Agropecuario

y de ExportacionesCOLPUERTOS Puertos de ColombiaCORELCA Corporacion Electrica de la Costa AtlanticaCVC Corporacion Autonoma Regional del Valle del CaucaDAAC Departamento Administrativo de Aeronautica CivilDAINCO Departamento Administrativo de Intendencias y CoraisariasEAAB Empresa de Acueducto y Alcantarillado de BogotaECOMINAS Empresa Colombiana de MinasECONIQUEL Empresa Colombiana de Niquel Ltda.ECOPETROL Empresa Colombiana de PetroleosEDIS Empresa Distrital de Servicios (Bogota)EEEB Empresa de Energia Electrica de BogotaELECTRIBOL Electrificadora de BolivarEMCALI Empresas Municipales de CaliEMPOMARTA Empresas Publicas de Santa MartaEMTB Empresas Municipales de Telefonos de BucaramangaEPM Empresas Publicas de MedellinETB Empresa de Telefonos de BogotaETMVA Empresa de Transporte Masivo del Valle de AburraFAN Fondo Aeronautico NacionalFNC Ferrocarriles Nacionales de ColombiaFNCV Fondo Nacional de Caminos VecinalesFNH Fondo Nacional HospitalarioFONADE Fondo Nacional de Proyectos de DesarrolloFVN Fondo Vial NacionalHIMAT Instituto Colombiano de Hidrologia, Meteorologia

y Adecuacion de TierrasIBRD International Bank for Reconstruction and DevelopmentICEL Instituto Colombiano de Energia ElectricaICFES Instituto Colombiano para el Fomento de la Educacion

SuperiorICT Instituto de Credito TerritorialIDB Inter-American Development BankIDEMA Instituto de Mercadeo AgropecuarioIFI Instituto de Fomento IndustrialINCORA Instituto Colombiano de la Reforma AgrariaINDERENA Instituto de Desarrollo de los Recursos Naturales RenovablesINRAVISION Instituto Nacional de Radio y TelevisionINS Instituto Nacional de SaludINSFOPAL Instituto de Fomento MunicipalISA Interconexion Electrica S.A.KfW Kreditanstalt fur Wiederaufbau

Page 6: List of Projects for External Financing 1981-1984 Colombia

-ii-

MEN Ministerio de Educacion NacionalMOPT Ministerio de Obras Publicas y TransporteNPD/DNP National Planning Department/Departamento Nacional de

PlaneacionSENA Servicio Nacional de AprendizajeTELECOM Empresa Nacional de TelecomunicacionesZFIC Zona Franca Industrial y Comercial de Cartagena

Page 7: List of Projects for External Financing 1981-1984 Colombia

INTRODUCTION

1. This document contains: a list of external loans signed during1979-80; a list of projects for 1979-82 originally included in, but subse-quently deleted from, the 1979-82 Project List (World Bank Report No. 2536-CO); and a list of projects for which the Colombian Government seekingexternal financing during the period 1981-84, in the form of summary tablesand in detailed project-by-project descriptions.

2. The proposed 1981-84 investment projects were identified andelaborated by the Colombian Government. The Colombian authorities expectto initiate the construction of all these projects during 1981-84. It isquite likely, however, that some schedules will change as a result ofeither cancellation or postponement of projects. Past experience showsthat as time goes on, such changes are substantial, but it is not possibleto identify at this time which of the projects are likely to be affected.

3. The .composition of the 1981-84 Project List reflects theemphasis which the Colombian Government has accorded to the development ofits energy resources, particularly electric power, coal, and petroleum,and to upgrading the country's transport infrastructure.

4. Of the total external borrowing envisaged during 1981-84 (US$9.8billion equivalent), energy accounts for US$6.1 billion, or 62% of thetotal. The 32 energy projects included in the List would significantlyimprove Colombia's overall energy balance by the late 1980s. Investmentsin power generation, transmission and distribution constitute 72% ofinvestments in the energy sector; coal development in export-oriented andimport-substitution projects 26%; and the remainder is composed ofpetroleum and natural gas exploration and secondary recovery projects.The single most important project in the energy field is the North Cerrejoncoal exploitation project which will enable Colombia to become animportant coal exporter starting in 1986.

5. Transport infrastructure accounts for 10% of the total financingrequested. The list contains 20 transportation projects with totalexternal financing requirements of US$1.0 billion over the four yearperiod. The objectives of these projects would be to improve the effi-ciency of the railways, ports, and road transport thereby contributing toenergy conservation, lower transport costs, and encouraging regionaleconomic integration. The list also includes telecommunications projectstotalling US$510 million, 5% of the external financing requested, whichare designed to improve the quality and coverage of domestic and interna-tional services.

Page 8: List of Projects for External Financing 1981-1984 Colombia

-iv-

6. Projects in the productive sectors account for 7% of theexternal loans included in the List. Agriculture and rural developmentprojects amount to US$392 million in external financing and include 13projects which emphasize credit, integrated rural development, marketing,irrigation and drainage services, and watershed management. Theseprojects are designed to increase agricultural productivity and raiserural incomes. Industry and mining projects account for another US$315million of external financing, and include five projects which areexpected to increase and diversify industrial and mining production.

7. The social sectors account for US$541 million, or 6% of totalexternal financing requested. Water supply and sewerage projects areintended to increase the quality and coverage of potable water supply andsewerage services in urban and rural areas. Also included, are projects ineducation, nutrition and health which aim at upgrading the quality of theseservices, particularly in rural areas.

8. Urban and regional programs include seven projects accountingfor US$834 million of the external financing. The major portion of thisfigure is to finance mass rapid rail systems in Bogota, Medellin and Cali,Colombia's largest cities. A project for preinvestment studies for US$50million is also included.

9. In line with the growing participation of commercial banks andsuppliers in the external financing contracted during 1979 and 1980 (over60% of total external loans signed), a major portion of external financingunder the List is expected to come from these sources. To accommodate thelarge external financing for the investment projects included in the List,the Government intends to diminish its general purpose external borrowing.

10. Table 1, which follows, provides a summary of the basic infor-mation on total investment costs and external financing by sector for theperiod 1981-84.

Page 9: List of Projects for External Financing 1981-1984 Colombia

Table 1 - COLOMBIA: SUMMARY OF PROJECTS BY SECTOR, TOTAL COST AND EXTERNAL FINANCING REQUESTED, 131-1984

(in US$ million)

1981 1982 1983 1984 Total

Total External Total External Total External Total External Total ExternalCost Financing Cost Financing Cost Financing Cost Financing Cost ( F) Financing (¾) 1/

I. Energy 8,081.8 1,929.7 1,099.1 2,166.4 579.5 1,296.3 1,229.8 713.9 10,990.2 (61.0) 6,106.3 (62.5)

Electrical Power 5,281.8 1,649.7 815.6 1,150.5 579.5 1,016.3 1,229.8 713.9 7,906.7 (43.9) 4,530.4 (46.4)

Coal 2,800.0 280.0 10.0 849.0 - 280.0 - - 2,810.0 (15.6) 1,409.0 (14.4)

Petroleum and Natural Gas - - 273.5 166.9 - - - 273.5 ( 1.5) 166.9 ( 1.7)

IIT Transportation 176.0 136.6 855.1 422.9 709.0 347.0 223.2 111.5 1,963.3 (10.9) 1,018.0 (10.4)

III. Communications 61.1 7.6 620.0 448.2 74.0 54.0 - - 755.1 ( 4.2) 509.8 5.2)

IV. Agriculture and Rural Develop-ment 368.0 147.2 468.7 204.6 70.0 23.0 34.0 20.0 940.7 ( 5.2) 391.8 4.0)

V. Industry and Mining - - 276.1 100.3 378.0 175.0 - 40.0 654.1 ( 3.6) 315.3 ( 3.2)

VI. Water Supply and Sewerage - - 529.6 292.5 30.0 17.8 - - 559.6 ( 3.1) 310. 3 ( 3.2)

VII, Education 60.0 20.0 131.9 68.3 50.0 15.0 - - 241.9 ( 1.3) 103 .3 ( 1.1)

VIII. Nutrition and Health 31.2 22.1 111.3 80.0 61.2 25.0 - - 203.7 ( 1.1) 127.1 ( 1.3)

IX. Urban and Regional Development 541.3 242.6 911.1 556.4 90.0 35.0 - - 1,542.4 ( 8.6) 834.0 ( 8.6)

X. Preinvestment Studies _ _ 181.0 50.0 - - - - 181.0 ( 1.0) 5(.0 ( 0.5)

T 0 T A 1L 9,319.4 _,505.8 5,183.9 4.389.6 2,041.7 1_985.j 1,487.0 885.4 18,032.0 (100.0) 9,765.9 (100.0)

1/ Differences because of rounding,

Source: National Planning Department

Page 10: List of Projects for External Financing 1981-1984 Colombia

Table 2 - COLOMBIA: SUMMARY OF EXTERNAL LOANS SIGNED, 1979-1980

(irn US$ millionl)

External Financing bv Category External Financing by Source

1979 1980 1979 1980

External External External External

Category Financing (M) Financing (%) Source Financing (7.) Financing (%)

A. Projects 664.28 51.8 988.0 59.7 A. Muiltilateral 488.01 38.0 563.0 34,0

I. Energy 363,34 28.3 477.2 28.8 World Bank 250.50 19.5 431.0 26,0

Electrical Power 324.83 25.3 377.2 22.8 IDB 199.0( 15.5 132.0 8.0

Coal - - - - Corporacion Andina 38.51 3.0 - -

Petroleum and Natural 38.51 3.0 100.0 6.0 de Foment:)

Gas

II. Transportation 55.08 4.3 67.7 4.1 B. Bilateral 6.41 (.5 70.9 4.3

III. Communications 59.64 4.6 70.0 4.2 Japan - - 55.0 3.3

IV. Agriculture and Rural 20.00 1.6 - - Holland 5.58 0.4

Development Belgium 0.83 0.1 - -

V. Industry and Mining 30.00 2.3 262.0 15.8 Federal Republic of - - 15.9 1.0

VI, Water Supply and Sewerage 93.5(0 7.3 92.0 5.6 GermanyVII. Education - - - -

VIII. Nutrition and Health 3,36 0.3 3.1 0.2 C. Suppliers Credits and

IX. Urban and Regional 19.36 1.5 16.0 1.0 Commercial 788.41 61.5 1,022.1 61.7

Develo'ment

X. Preinvesi ent Studies 20.00 1.6 - - Groups of Banks 690.50 53.8 650.8 39.3

Sweden 32.30 2.5 22.5 1.3

B. Central Governme 348,55 27.2 624.4 37.7 France 25.14 2.0 6.7 0.4

U.S.A. 20.54 1.6 56,8 3.4C. General Purpose -00 7.8 - - Canada 13.90 1.1 10.0 0.6

Holland 3.36 0.3 - -

D. Refinancing 170.00 13.2 43.6 2.6 Switzerland 2.67 0.2 - -

Brazil - - 4.2 0.3

Federal Republic of - - 235.6 14.3

GermanyJapani - - 22.8 1.3

U.K. - - 3.1 0.2Belgium - - 9.6 0.6

T 0 T A L 1,282.83 100.0 1,656.0 100.0T O T A L 1,282,83 100.0 1X656.0 100.0

1/ Loans reported are only those which after hiaving been signed have been duly registered at the Ministry of Finance.

Therefore, some loans reported only at this time have been signed in 1978.

Source: National Planning Department

Page 11: List of Projects for External Financing 1981-1984 Colombia

1 of 7

Table 3 - COLOMBIA: EXTERNAL LOANS SIGNED, 1979-1980

External InterestFinancing Rate Amortization Grace Date

Category Name and Borrower (US$ million) Source (Percent) (Years) (Years) Signed

A. PROJECTST. ENERGY

Electrical Power1~97

Control Center - Electribol 0.15 Brown Boveri 6 6 1 January 15Cospique Station - Electribol 0.25 Banco Internacional I over 3 - January 18

Colombia LiborLas Flores Substation - Electrificadora 1.90 Royal Bank of Canada 1 1/4 over 7 1/2 2 1/2 January 31Atlantico Libor

Electric Power Transmission and Distri- 3.50 Royal Bank of Canada 1 1/2 over 7 2 February 9bution Systemn for Guajira - ICEL Libor

Electric Power Transmission and Distri- 8.50 Export Dev. Co. 8.5 and 1/2 7 1/2 March 9bution System for Guajira - ICEL Canada over Libor

Mesitas II - EEEB 84.00 IBRD 7.35 16 4 April 9Jaguas Hydroelectric Plant - ISA 69.50 IDB 7.5 20 5 May 30Jaguas Hydroelectric Plant - ISA 30.00 IDB 3/4 over 12 6 May 30

LiborSan Carlos II - ISA 72.00 IBRD 7.9 17 4 November 30Mesitas II - EEEB 55.03 Group of Banks 7.5 11 3 December 22

Subtotal 324.83

1980

Expansion of the Po-er Generation, '52.00 Bank of America, 5/8 + Libor 9 1/2 4 February 22Transmission and Distribution System - National Trust & (2 yrs.) &EPM in Medellin Savings Assn. 3/4 + Libor

(for rest)Cauca River Regulation (Salvajina) - CVC 55.00 DECF - Japan 4 1/2 20 7 March 3Thermo Power Plants in Barranquilla and 15.30 Bank of America 3/4 over 8 3 March 31Cartagena (CORELCA) Libor

Thenno Power Plants in Barranquilla and 5.50 EXIMBANK, USA 8.3 10 2 April 1Cartagena (CORELCA)

Expansion Plan - National Government, 4.20 Banque de Paris et 7 1/2 7 2 March 4ICEL des Pays Bas

Third Unit Pipa Thennal - ICEL 13.20 EXIMBANK, Japan 7 3/4 12 2 November 11Fifth Expansion Program - EEEB 22.90 Group of Banks 3/4 + Libor 10 5 1/2 September 26Expansion of the Power Generation, Trans- 125.00 IBRD 8 1/4 17 4 December 19mission and Distribution System inMedellin (Guadalupe IV) EPM

Ca.ca River Regulation (Salvajina) - CVC 44.00 IDB 7.9 20 5 1/2 December 17San Carlos I - ISA 9.60 EXIMBANK - Japan 7 3/4 13 3 August 10Diversion of the Negro, Rucio and Tunjita 47.40 Group of Banks 3/4 over 10 4 September 22Rivers - Chivor II - ISA Libor

7/8 overLibor

Chinu Thermal Power Plant - ISA 3.10 Montagu, U.K. 3/4 over 10 5 December 24Libor

Subtotal 377.20

Page 12: List of Projects for External Financing 1981-1984 Colombia

2 of 7

Table 3 - COLOIMI8A: EXIERNAL LOANS SIGNED, 1979-198(

External InterestFinancing Rate Amortizatiou Grace Date

Ca tec:rv Name and Borrower (US$ million) Source (Percent) (Yeilrs) (Yee-is, Signed

AP PROJECTS., ENERGY

Petroleum and Gas1979

Expansion of Cartagena Oil Refinery - 38.51 Corporacion Andina 9.5 12 3 february

ECOPETRlL de Fomento

Subtotal 38.51

'9P0

lrvestun-t Program. - EC1)PETRGL 100.00 Group of Sanks 3/4 over 10 5 December 2Libor (6yrs.) &7/8 over_Iibor (forrest)

Subtotal 100.00

I . IRANSPORTATION

1979

Ports Equip.-et - CJLPl'ERT(S 2.52 Eaton Internatio-al 8.5 7 1/2 2 1/2 January 25Switzet land

Canal de Dique and Magdalena River 47.00 IDB 7.5 20 4 1/2 May 24Navigation - Colootmbia Government

Fire Extinction Equipreial - FA'l 4.2 9 usl-A,s' Av I aicos, 8.5 10 1 March 12USA

PorLs Equtpmear - CI2USSTOS 1.36 Praco S.A. 8.5 7 1/2 2 1/2 December 27

Subtotal 55.08

1980

Construction of Bridges in 13 Inter- 55.82 Group of Banks 5/8 over 10 4 January 4sections - l)istrito Especial Bogota Libor (4

yrs.) &3/4 overLibor (forrest)

Constroction of Bridges - Distrito 4.18 Mendes Junior 7.5 10 2 January 30Especial Bogota Banco Real S.A.

BrasilTraffic Control Equipment - Direccion 0.63 Banco de los Traba- I over Libor 3 2 1/2 December 26

Transito Bucaramanga jad-resStreet Paving - Municipalidad de Cali 6.60 Group of Banks 7/8 over 6 1/2 3 1/2 December 10

LiborStreet Construction Equipment - Munici- 0.49 General Electric 8.5 5 1 August 2

palidad de Cali Colombia

Subtotal 67.72

111. COIMMt!NICATIONS979

Expansion of Medellin Telephone System -EPM 6.05 Banque Francaise de 7.5 8 1/2 2 December 6, 1978

coosserce EererieureFrance

Expansion of the Medellin Telephone 5.50 Ericsson, Sweden 8.5 10 1/2 2 1/2 December 26, 1978

System - EPMExpansion of tEe Medellin Telephone 0.39 Ericsson, Sweden 8.5 10 1/2 2 1/2 May 15

System - EPMExpansion of the Armenia Telephone 1.33 Ericsson, Sweden 8 2 April 25

System - Empresas Publicas de ArmeniaChoconta Station - TELECOM 3.19 Banque de Paris et 11 8 3 September 13

des Pays Bas andBanque Nationalede Paris, France

Page 13: List of Projects for External Financing 1981-1984 Colombia

3 of 7

Table 3 - COLOMBIA: EXTERNAL LOANS SIGNED, 1979-1980

External InterestFinancing Rate Amortization Grace Date

Category Name and Borrower (US$ million) (Percent) (Years) (Years) Signed

A. PROJECTSIII. COMMUNICATIONS

1979

Choconta Station - TELECOM 8.40 Banque de Paris et 7 1/2 8 1 1/2 September 13des Pays Bas andBanque Nationalede Paris, France

Expansion of the Bucaramanga Telephone 10.49 Ericsson, Sweden 8 8 2 October 11System - Empresas Publicas deBucaramanga

Expansion of the Calarca Telephones - 0.47 Ericsson, Sweden 8 7 2 August 28Empresas Publicas de Caralca

Color TV Equipment - INRAVISION 2.64 Equipe Traco 7 6 1 1/2 October 4Expansion of the Bogota Telephone System - 4.86 C.G.C.T. 8.5 10 2 August 23ETB

Expansion of the Bogota Telephone System - 14.12 Ericsson, Sweden 8.5 10 2 August 23ETB

Expansion of the Bogota Telephone System - 2.20 ITT - USA 7.5 7 1/2 September 11ETB _

Subtotal 59.64

1980

Expansion of the Palmira Telephone System - 0.99 Siemens, Germany 8 7 2 August 30Empresas Municipales de Palmira

Expansion of the Medellin Telephone System - 44.00 IBRD 8 1/4 17 4 December 19EPM

Expansion of the Bogota Telephone System - 5.53 Bell Telephone, 8 9 2 July 23(20,000 Transmission Channels) - ETB Belgium

Expansion of the Bogota Telephone System - 1.68 Ericsson, Sweden 8 1/2 8 1/2 2 June 22(20,000 Transmission Channels) - ETB

Expansion of the Bogota Telephone System - 4.05 Bell Telephone, 8 9 2 November 19(19,935 Transmission Channels) - ETB Belgium

Expansion of the Bogota Telephione System - 1.89 Siemens, Gernany 8 1/2 5 1 1/2 February 12ETB

Second Telephone Expansion Plan - Empresa 2.46 Jeumont Schneider, 8 7 2 October 17Departamental Antioquia France

Second Telephone Expansion Plan - Empresa 0.19 Siemens, Germany 8 8 2 October 24Departamental Antioquia

Expansion of the Medellin Telephone System - 9.03 Ericsson, Sweden 8 1/2 10 2 August 4EPM

Expansion of the Chinchina Telephone System - 0.21 Siemens, Germany 8 7 2 September 27Municipio de Chinchina

Subtotal 70.03

Page 14: List of Projects for External Financing 1981-1984 Colombia

4 of 7

Table 3 - COLOMBIA: EXTERNAL LOANS SIGNED, 1979-1980

External InterestFinancing Rate Amortization Grace Date

Category Name and Borrower (US$ million) Souirce (Percent) (Years) (Years) Signed

A. PROJECTSIV. ACRICUITURE AND RURAL DEVELOPMENT

1979

Incora Credit - INCORA 20.00 IBRD 7.9 17 4 1/2 November 30

Subtotal 20.00

V. INDUSTRY AND MlNlNG1979

Cerro Matoso - IFI 30.00 Group of Banks 1 1/4 and 10 4 April 61 3/4 Libor

Subtotal 30.00

1980

Cerro Matoso - Cerro Matoso S.A. 80.00 IBRD 7.9 13 4 December 20, 1979 9'Small Scale Industry Credit - Banico 32.00 IBRD 8 1/2 16 3 1/2 December 10

de la RepublicaDevelopment Finance Companies VII - 150.00 IBRD 8 1/4 16 1/2 4 December 10

Banco de la Republica

Subtotal 262.00

VI. WATER SUPPLY AND SEWERAGE1979

Water and Sewerage for Small and Inter- 32.50 IDB 2 30 7 1/2 May 30mediate Cities - INSFOPAL

Water and Sewerage Master Plan for 30.00 IBRD 2 16 1/2 4 November 30Bogcta - EAAB

Water and Sewerage for Intermediate 31.00 IBRD 7.9 16 1/2 4 November 30Cities - INSFOPAL

Subtotal 93.50

1980

Complementary Financing for the Chingaza 20.00 Group of Banks 3/4 over 12 3 march 24Project - EAAB Libor

Water Supply and Sewerage in Bucanamanga 9.30 IDB 7.9 20 5 February 1- ACUAMANGA 12.30 IDB 2 30 7 1/2 February I

Water Supply and Sewerage in Medellin - 23.70 IDB 2 30 7 1/2 February I- EPM 2.00 IDB 4 20 4 1/2 February 1

24.70 IDB 7.9 20 4 1/2 February 1

Subtotal 92.00

Page 15: List of Projects for External Financing 1981-1984 Colombia

5 of 7

Table 3 - COLOMBIA: EXTERNAL LOANS SIGNED, 1979-1980

External InterestFinancing Rate Amortization Grace Date

Category Name and Borrower (US$ million) Source (Percent (Years) (Years) Signed

A. PROJECTSVII. EDUCATION 1/

VIII. NUTRITION AND HEALTH1979

Hospital Equipment - Colombian Government 3.36 Phillips, Holland 8 Il 1/2 2 December 28, 1978

Subtotal 3.36

1980

Medical Equipment - Instituto de Seguros 3.09 Siemens, Germany 8.5 8 2 May 20Sociales

Subtotal 3.09

I/ No loans signed i chis sector in 1979-80.

Page 16: List of Projects for External Financing 1981-1984 Colombia

6 of 7

Table 3 - COLOMBIA: EXTERNAL LOANS SIGNED, 1979-1980

External Interest

Financing Rate Amortization Grace Date

Category Name and Borrower (US$ million) Source (Percent) (Years) (Years) 'igoneG

A. PROJECTSIX. URBAN AND REGIONAL DEVELOPMENT

1979

Uraba Regional Development - Colombian Government 5.58 Government of Holland 3.75 20 8 March 13

Fire Control Equipment - Municipality of Ibague 0.28 Engineering Eg. Co. 8.5 5 - April 6USA

Urban Development in Cartagena - Colombian Government 13.50 lBRD 7.9 16 1/2 4 August 31

Subtotal 19.36

1980

Narino and Cauca Regional Urban Plan - National 16,00 IDB 2 30 7 1/2 December 17

Government - CVC

Subtotal 16.00

X. PREINVESTMENT STUDIES1979

Preinvestment Studies - FONADE 20.00 IDB 2 20 4 1/2 May 30

Subtotal 20,00

Page 17: List of Projects for External Financing 1981-1984 Colombia

7 of 7

Table 3 - COLOMBIA: EXTERNAL LOANS SIGNED, 1979-1980

External InterestFinancing Rate Amortization Grace Date

Category Name and Borrower (US$ million) Soorce (Percent) (Years) (Years) Signed

B. CENTRAL GOVERNMENT BORROWINC1979

Public Investment Program Financing 330.00 Group of Banks 5/8 & 3/4 10 5 April 6Over Libor

Equipment for the Ministry of Defense 12.50 Federal Financing 8.5 7 1 1/2 September 22Bank

Equipment for the Ministry of Defense 5.22 Group of Banks 1/2 over 1 1/2 November 31Libor

Importation of Belgian Goods and Services 0.83 Belgian Government 2 31 1/2 11 1/2 August 8

Subtotal 348.55

1980

Purchase of Two Oceanographic Vessels by 15.88 KIfW Germany 5 1/4 15 3 1/2 February 19the National Navy

Public Investment Program Financing 350.00 Group of Banks 3/4 over 10 5 March 3Libor

Military Equipment 1.37 Ferrostal A.G., 7.9 7 2 May 5Germany

Military Equipment 222.10 Ferrostal A.G., 8 11 1/2 1 1/2 December 11Germany

Military Equipment 4.00 First Wisconsin 1/2 over 1 1/2 February 26National Bank Libor

Military Equipment 5.84 Union Bank of 1/2 over 1 1/2 August 11Bavaria, Germany Libor

Military Equipment 25.23 Group of Banks 1/2 over 1 1/2 June 4Libor

Subtotal 624.42

C. GENERAL PURPOSE LOANS1979

ECOPFTROL 100.00 Group of Banks 5/8 & 3/4 10 5 April 9over Libor

Subtotal 100.00

D. REFINANCINC1979

Colombian Government 70.00 Group of Banks 5/8 & 3/4 10 5 April 9over Libor

ECOPETROL 100.00 Group of Banks 5/8 & 3/4 10 5 April 9over Libor

Subtotal 170.00

1980

CVC 10.00 Royal Bank, Canada 3/4 over 8 2 November 16, 1979Libor

ETB 11.82 Ericsson, Sweden 8 10 1 1/2 June 30EMCALI 21.80 Group of Banks 3/4 & 7/8 8 1/2 3 1/2 February 6

over Libor

Subtotal 43.62

Page 18: List of Projects for External Financing 1981-1984 Colombia

-10-

1 of 2

Table 4 - COLOMBIA: PROJECTS DELETED FROM THE 1979-1982PROJECT LIST: REPORT NO. 2536-CO

(US$ million)

Total ExternalSector and Project Cost Financing

1979TRANSPORTATIONBogota-Medellin Highway 105.0 75.0Guapa-Palo de Letras Road 173.1 40.4

COMMUNICATIONSExpansion of the Tulua Telephone System 1.2 0.9

AGRICULTURE AND RURAL DEVELOPMENTPilot Livestock Farms 29.4 15.0El Retorno Colonization 37.7 16.6

EDUCATIONLibraries of Official Higher Education Institutes 38.5 29.2

POWERMocoa Hydroelectric Plant 10.0 6.0

T 0 T A L 394.9 183.1

1980TRANSPORTATION

Bosconia-El Carmen, Puerto Olaya, Puerto Amauyo,La Lizama and Belen-Capitanejo Roads 63.2 31.6

AGRICULTURE AND RURAL DEVELOPMENTAgriculture and Livestock Credit III 160.0 50.0Agriculture Rehabilitation Boyaca and Rio Prado 37.0 16.4

EDUCATIONLaboratories for Official Higher Education Institutions 20.7 15.0National Network of Higher Education Institutes 55.6 22.4Center for Development of Basic Education 20.5 10.3

URBAN AND REC-IONAL DEVELOPMENTIndustrial Parks 60.0 30.0

INDUSTRY AND MININGLine of Credit for Economic Integration Projects 86.0 30.0Paper Industry Project 179.0 30.0

WATER SUPPLY AND SEWERAGEMedellin Solid Waste Disposal 12.0 10.0

T O T A L 694.0 245.7

Page 19: List of Projects for External Financing 1981-1984 Colombia

-ll-

2 of 2

Table 4 - COLOMBIA: PROJECTS DELETED FROM THE 1979-1982PROJECT LIST: REPORT NO. 2536-CO

(US$ million)

Total ExternalSector and Project Cost Financing

1981TRANSPORTATIONSogamoso-Aguazul, La Lejia-Malaga, Florencia andPampona-Saravena 77.9 38.9

AGRICULTURE AND RURAL DEVELOPMENTDevelopment of the Sierra and Ceinaga de Santa Marta 30.0 15.0Regional Agricultural Products Storage andMarketing Program 32.0 15.0

Agricultural Rehabilitation Nechi-San Jacinto 30.2 12.4Agricultural Rehabilitation Magdalena 85.5 41.9Agricultural Rehabilitation Coello and Saldana 91.6 41.1

URBAN AND REGIONAL DEVELOPMENTDevelopment Plan for Llanos Orientales 50.0 25.0

T 0 T A L 397.3 189.3

1982TRANSPORTATIONBuga-Melgar Highway 76.6 38.3

T O T A L 76.6 38.3

Source: National Planning Department

Page 20: List of Projects for External Financing 1981-1984 Colombia

Table 5 - COLOMBIA: P'ROJECT LIST, ENERGY t981-1984

(ie US$ million)

1981 1982 1983 i') 9. ['at.l1

Total External 'Total External FTtal EI te7rs' 1 'I'oetilI Extcro'e let E :ternIalPage No. Projects Cost Financing Cost F'inan.:ing Cost Fi-ancil,g Cost i tacnfing Cost Fidancing

Electric Power24 Zipaquira Steam Power Plant 6C.0 15.2 'H0 15.2

25 Cerrejon I Thermal Power Plant 153.4 24.1 3.4 24.1

26 Power Transmission & D)istribution, Bogota 205.4 98.9 98.927 Betania Hydroelectric Plant 542.5 325.1 325.0

28 Rural Electrification for the 69.0 36.0 3t.

Atlantic Coast and San Andres Island29 Generation Transmission and Distribo,tion 254.0 24.5 24.5

Distribvition Program - EPM30 Tasajero 'I'hermal Power Plart 110.3 86.0 r1. 3 86.031 Playas Hydroelectric Plant 362.3 222.2 2 222.2

32 complementary Projects - Fifth Expa-sion 107.7 51.677 51.6Prograna

34 Ilydroelectric Development of the Alto 1 ,66o3.5 171.5 343.0 343.2 I ,63 5 857. 7Sine Basin

35 Expansion of tie Transmission and '33.5 11.2 33.5 11.2Distribution System

36 Third Unit for Paipa '[Thermal Plant 61.4 34.1 61.4 !34,1

37 Mamonal Substation 5.3 3.8 9338 Expansion of qao Andres Diesel Pow.er i(. 8.5 L .o 8.5

Plant

39 Chinu Gas Power Plant 27.0 22.0 21 2..040 Guavio Hydroelectric Plant 1,3(3.0 500.0 228.0 200.0 1, 9; Y28.0

41 Complementary Project - VI Expansion 313,5 15.0 3(.0 1(1'.' 915 149.9

Pro>ram

42 Conversion to Coal of Barranquilla 51., 40.0 SOt 40.0

anid Cartagena Thermal Planits43 Cerrejon 0I Thermal Power Plant 155.6 128.0 128.0144 Small Electric Plants Plan 21.9 11.3 1.9 11.3

45 Conventional Steas, Power Plants 235.6 177.7 ),6 177.7

46 Control Station 12.5 12.5 12.5

47 Rio Grande II Multipurpose Hydrolootric 340.0 180.0 180.0

Project48 Calima ITS Hydroelectric Project 214.() 41h. 13 0 141.8

49 La Miel I Hydroelectric Project 265.5 162.4 215)5 162.4

50 Expansion of the Transmission System1 100.10 64.0 10.0 064.0

51 Canafisto Hydroelectric Project 945.? 343.> 1,2.7 143.5

52 La Miel 1I Hydroelectric Project 284.6 15l.o >A S5 170.4

Subtotal 5,281.8 1,649.1 815.6 1 ,150.5 579.5 1,01;. 1,229.8 7 1, 7 .7 4-,530.4

Source: National Planning Department

Page 21: List of Projects for External Financing 1981-1984 Colombia

2 of 2

Table 5 - COLOMBIA: PROJECT LIST, ENERGY, 1981-1984

(in US$ million)

1981 1982 1983 1984 Total

Total External Total External Total External Total External Total External

Page No. Projects Cost Financing Cost Financing Cost Financing Cost Financing Cost Financing

Coal54 Cerrejon Coal 2,800.0 280.0 840.0 280.0 2,800.0 1,400.0

55 Coal Engineering _ 10.0 9.0 10.0 9.0

Subtotal 2,800.0 280.0 10.0 849.0 280.0 2,810.0 1,409.0

Petroleum and Natural Gas57 Casabe Secondary Oil Recovery '

and Seismic Exploration 261.5 156.9

58 Petroleum Exploration of Continental 261.5 156.9 12.0 10.0

Platform 12.0 10.0

Subtotal _ 273.5 166.9 273-5 166.9

T 0 T A L 8,081.8 1,929.7 1,099.1 2,166.4 579.5 1.296.3 1229 7139 10,990.2 6,106.3

Source: National Planning Department

Page 22: List of Projects for External Financing 1981-1984 Colombia

Table 6 - COLOMBIA: PROJECT LIST, TRANSPORTATION, 1981-1984

(in US$ million)

1981 1982 1983 1984 TotalTotal External 'Total External Total External Total External Total External

Page No. Projects Cost Financing Cost Financing Cost Finiancing Cost Financinig Cost Financing

60 Rural Roads 90.0 52.6 90.0 52.661 Air Navigation Aids Projects 20.0 18.0 20.0 18.062 Equipment Acquisition for Public 66.0 66.0 66.0 66.0

Works

63 Railways VII 149.4 70.0 149.4 70.064 Road Improvement Plan 290.0 145.0 290.0 145.065 Ports Modernization 90.0 45.0 90.0 45.066 Guadalupe-Florencia, Medellin- 160.7 80.4 160.7 80.4

Turbo, Zulia-Aguachica Roads67 La Verbena Tumaeo Highway 60.0 30.0 60.0 30.068 Bogota-Villavicencio Highway 15.0 7.5 15.0 7.569 Bridge Rehabilitation Program 30.0 15.0 30,0 15.070 Timbio-Estanquillo Road 60,0 30.0 60.0 30.071 Bogota Airport Runway 200.0 10(.0 200.1) 100.072 Bogota-Armenia Road 165.0 82.5 165.0 82.573 Pitalito-Mocoa Road 57.0 28.5 57.0 28.574 Saboya-Puerto Carrare Railway 150.0 75.0 150.0 75.075 Guateque-Barranca de Upia-Aguazul- 48.0 24.0 48.0 24.0

Yopal Road76 Access Roads Program 75.0 30.0 75.0 30.077 Guapa-Monteria Road 50.2 25.0 50.2 25.078 Pasto-Mocoa Road 62.0 31.0 62.0 31.079 Caucasia-La Gloria Road 125.0 62.5 125.0 62.5

T o t a 1 176.( 136.6 855.1 422.9 70q.0 347.0 223.2 111.5 1,963.3 1,018.0

Source: National Planning Department

Page 23: List of Projects for External Financing 1981-1984 Colombia

Table 7 - COLOMBIA: PROJECT LIST, COMMUNICATIONS, 1981-1984

(in US$ million)

1981 1982 1983 1984 Total

Total External Total External Total External Total External Total External

Page No. Projects Cost Financing Cost Financing Cost Financing Cost Financing Cost Financing

81 Expansion and Equipment

Replacement of the NationalT.V. and Radio 10.7 4.0 10.7 4.0

82 Expansion of the Barranquilla

Telephone System 50.4 3.6 50.4 3.6

83 Expansion of the Urban TelephoneSystem 125.0 75.0 125.0 75.0

84 Cali Telephone Master Plan 180.0 120.0 180.0 120.0

85 Complementary Telecommunications

for National Territories 35.0 22.7 35.0 22.7 7

86 Expansion of the Girardot, Santa

Marta, Palmira and Pereira

Telephone System 80.0 50.5 80.0 50.5

87 Expansion of the Transmission

Network by Satellite 200.0 180.0 200.0 180.0

88 Rural Telephone System - Plan II _ _ 74.0 54.0 74.0 54.0

T 0 T A L 61.1 7.6 620.0 448.2 74.0 54.0 - - 755.1 509.8

Source: National Planning Department

Page 24: List of Projects for External Financing 1981-1984 Colombia

Table 8 - COLOMBIA: PROJECT LIST, AGRICULTURE AND RURAL DEVELOPMENT, 1981-1984

(in US$ million)

1981 1982 1983 1984 Total

Total External Total External Total External Total External Total External

Page No. Projects Cost Financing Cost Financing Cost Financing Cost Financing Cost Financing

90 Arauca Colonization II 32.0 22.0 32.0 22.0

91 Irrigationi Rehabilitation, 86.0 37.0 86.0 37.0

Phase 192 Integr.ated Rural Development 11 250.0 88.2 250.0 88.2

93 Food Marketing 41.0 20.5 41.0 20.5

94 Small Scale Fanner Credit 80.0 40.0 80.0 40.0

95 Maria La Baja Irrigation

improvement - Bolivar Project 44.2 19.0 44.2 19.,)

96 Zu1ia-UreLna Agro-lndustrialComplex 26.9 14.3 26.9 14.3

97 Warehouses and Silos 21.3 12.8 21.3 12.8

98 Small and Mediuim Scale Farmers

Credit 80.0 28.0 80.,0 28.099 Agro-industrial Credit Program 150.0 62.5 15(.( 62.5

100 Watershed Management 25.3 7.5 25.3 7.5

101 Sinu River Basin Development 70.0 20.0 70,() 20.0

102 Food Markets and Storage Centers 34.0 20.0 34,0 20.0

in Medium-Sized Cities

T o t a 1 368.0 147.2 468.7 204.6 70.0 20.0 34.-) 20.0 940.7 391.8

Source: National Planning Department

Page 25: List of Projects for External Financing 1981-1984 Colombia

Table 9 - COLOMBIA: PROJECT LIST, INDUSTRY AND MINING, 1981-1984

(in US$ million)

1981 1982 1983 1984 Total

Total External Total External Total External Total External Total External

Page No. Projects Cost Financing Cost Financing Cost Financing Cost Financing Cost Financing

104 Mining Development Finance

Company 50.4 25.0 50.4 25.0

105 Semi-Integrated Plant for the

Production of Sponge Iron 107.0 70.0 107.0 70.0

106 Small and Medium Scale Industries

Development 118.7 5.3 40.0 118.7 45.3

107 Development of Phosphoric and Rock

Resources, Sardinata and Pesca 250,0 125.0 250.0 125.0

103 Third IDB Development Finance

Credit Line 128,0 50.0 128.0 50.0

T 0 I A L - - 276.1 100.3 378.0 175.0 - 40.0 654.1 315.3

Source: National Planning Department

Page 26: List of Projects for External Financing 1981-1984 Colombia

Table 10 - COLOMBIA: PROJECT LIST, WATER SUPPLY AND SEWERAGE, 1981-1984

(in US$ million)

1981 1982 1983 1984 Total

Total External Total External I'otal External Total External Total ExternalPage No. Projects Cost Financing Cost Financing Cost Financing Cost Financing Cost Financing

110 Water Quality Improvement and

Control 10.8 9.0 10.8 9.0111 Barranquilla Water Supply and

Sewerage 40.0 20.0 40.0 20.0112 Santa Marta Water Supply and

Sewerage 60.0 24.0 60.0 24.0

113 Culcuita Water Supply & Sewerage 36.6 17.7 36.6 17.7 m

114 Small Cities Water Supply andSewerage 130.0 65.0 130.0 65.0

115 Solid Water Disposal in 12 Cities 12.2 8.8 12.2 8.8116 Bogota River Regulation and

Sewerage Treatment 240.0 148.0 240.0 148.0

117 Rural Water Supply _ 30.0 17.8 _ 30.0 17.8

T 0 T A L 529.6 292.5 30.0 17.8 - 559.6 310.3

Source: National Planning Department

Page 27: List of Projects for External Financing 1981-1984 Colombia

Table 11 - COLOMBIA: PROJECT LIST, EDUCATION, 1981-1984

(in us$ million)

1981 1982 1983 1984 TotalTotal External Total External Total External Total External Total External

Page No. Projects Cost Financing Cost Financing Cost Financing Cost Financing Cost Financing

119 Vocational Training 60.0 20.0 60.0 20.0120 Scientific and Technological

Development, Phase I 34.5 20.0 34.5 20.0 @

121 Higher Education Development, Phase I 57.4 33.3 57.4 33.3122 Rural and Village Education

Development, Phase I 40.0 15.0 40.0 15.0123 Private Sector Scientific and Technolo-

gical Development 50.0 15.0 50.0 15.0

T 0 T A L 60.0 20.0 131.9 68.3 50.0 15.0 - _ 241.9 103.3

Source: National Planning Department

Page 28: List of Projects for External Financing 1981-1984 Colombia

Table 12 - COLOMBIA: PROJFCT LIST, NUTRTTION AND HEALTH, 1981-1984

(in US$ million)

1981 1982 1983 1984 Total

Total External Total External Total Exterial Total External Total External

Page No. Projects Cost Financing Cost Financing Cost Financing Cost Financion Cost Financing

125 Transport Equipment for the National 4.7 4.7 4.7 4.7

Health System

126 Slaughterhouses 21.8 12.7 21.8 12.7

127 Telecommunications Networks for the 4.7 4.7 4.7 4.7

National Health System

128 Hospital Equipment 40.0 40.0 40.0 40.0

129 PANCOCER 45.0 25.0 45.0 25.0

130 Integrated Nutrition Program, 61.2 25.0 61.2 25.0

Second Stage

131 Expansion of Biological Laboratories 26.3 15.0 __ _ 2,.3 15.0

T 0 T A L 31.2 22.1 111.3 80.0 61.2 25.0 - - 203.7 127.1

Source: National Planning Department

Page 29: List of Projects for External Financing 1981-1984 Colombia

Table 13 - COLOMBIA: PROJECT LIST, URBAN AND REGIONAL DEVELOPMENT, 1981-1984

(in US$ million)

1981 1982 1983 1984 TotalTotal External Total External Total External Total External Total External

Page No. Projects Cost Financing Cost Financing Cost Financing Cost Financing Cost Financing

133 Medellin Urban Development 100.0 54.0 100.0 54.0

134 Metropolitan Train SystemMedellin 401.3 164.6 401.3 164.6

135 Investment Program for UrbanInfrastructure 40.0 24.0 40.0 24.0

136 Mass Transportation Systemfor Bogota (Phase I) 885.0 535.0 885.0 535.0

137 Mass Transportation Systemfor Cali 26.1 21.4 26.1 21.4

138 Buenaventura IntegratedDevelopment - II Phase 40.0 20.0 40.0 20.0

139 Interurban Passenger Terminals _______ 50.0 15,0 50.0 15.0

T 0 T A L 541.3 242.6 911.1 556.4 90.0 35.0 _ _ 1,542.4 834.0

Source: National Planning Department

Page 30: List of Projects for External Financing 1981-1984 Colombia

Table 14 - COLOMBIA: PROJECT LIST, PREINVESTMENT STUDIES, 1981-1984

(in US$ million)

1981 1982 1983 1984 TotalTotal External Total External Total External Total External Total External

Page No. Projects Cost Financing Cost Financing Cost Financing Cost Financing Cost Financing

141 Preinvestment Studies _ 181.0 50.0 181.0 50.0

T O T A L - - 1 _0.0 - - - - 181.0 50.0

Source: National Planning Department

Page 31: List of Projects for External Financing 1981-1984 Colombia

-23-

Ia. ENERGY: Electrical Power

Page 32: List of Projects for External Financing 1981-1984 Colombia
Page 33: List of Projects for External Financing 1981-1984 Colombia

-24-

I. NAME OF TIHE PROJECT: Zipaquira Steam Power Plant

II. EXECUTING AGENCY: ISA

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$60.0 million

V. EXTERNAL FINANCING. REQUESTED: US$15.2 million

VI. LENDING AGENCY: EXIMBANK of Japan and EXIMBANK of USA,Commercial Banks and Suppliers' Credit.

VII. DESCRIPTION AND JUSTIFICATION: The project consists of the constructionof a 66 MW coal-fired unit in the Zipaquira thermal complex. This expansion,programmed by ISA, will help meet demand that cannot be suppliLed by existinghydro facilities. A deficit in such power generation is envisaged for 1981-1982. The thermal plant can be constructed in a relatively short time andis expected to come on stream in 1983.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Funds External Financing Total

1980 1.6 2.3 3.91981 19.4 26.4 45.81982 4.0 6.3 10.3Total 25.0 35.0 60.0

IX. STATUS: US$8.3 million equivalent of externalfinancing has been signed with the EXIMBANK of Japan, and US$10.5 millionhas been signed with the EXIMBANK of USA.

Page 34: List of Projects for External Financing 1981-1984 Colombia

-25-

I. NAME OF THE PROJECT: Cerrejon I Thermal Power Plant

II. EXECUTING AGENCY: CORELCA

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$153.4 million

V. EXTERNAL FINANCING REQUESTED: US$24.1 million

VI. LENDING AGENCY: Commercial Banks and Suppliers'Credit

VII. DESCRIPTION AND JUSTIFICATION: The project consists of thedesign, furnishing and construction of a 158-MW thermal plant locatedby the coast at Palomino (Guajira department). The plant will burncoal from the central block of the Cerrejon deposit once it becomesavailable; until then it will be natural gas. Its objectives are tomeet the demand for energy of the Atlantic Coast Interconnected Systemstarting in 1982, and to provide the central system with theadequate thermal support during periods of dry weather. The energyproduced is to be utilized in the coal mining development in theCerrejon project, the industrial complex projected for the Guajira,in supplying the market of the Atlantic Coast Electric Corporation,and in the sale of surplus electricity to the central system during1982-85.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Internal Financing ExternalYear National Budget Other Financing Total

1980 1.0 1.5 2.3 4.81981 5.8 8.8 31.2 45.81982 6.9 6.8 26.0 39.71983 6.0 6.0 23.4 35.41984 4.7 4.7 18.3 27.7Total 24.4 27.8 101.2 153.4

IX. STATUS: External financing has been signedEXIMBANK of Japan for Y13,733.6 million, and with KfW for DM 17.3 million.Additional financing has been secured with Bank of Tokyo for US$10 million,EXIMBANK of Japan for US$12.4 million, and US$1.7 million with YASUDA.

Page 35: List of Projects for External Financing 1981-1984 Colombia

-26-

Power Transmission andI. NAME OF THE PROJECT: Distribution, Bogota

II. EXECUTING AGENCY: EEEB

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$205.4 million

V. EXTERNAL FINANCING REQUESTED: US$98.9 million

VI. LENDING AGENCY: IBRD, Suppliers' Credit

VII. DESCRIPTION AND JUSTIFICATION: The project which is part of EEEBtssixth expansion program consists of: expanding the transformation capacityfrom 230/115 KV to 450 MVA; expanding the transformation capacity from 115/34-55/11-4 to 390 MVA; design, construction and installation of 42 KM linesof 115 KV; design and construction of 420 KM and repair of 910 KM of networksof 34.5 KV, 13.2 KV and 11.4 KV; installation of 250 MVA 120/208 V and 66 MVA480 V; installation of voltage regulators with an aggregate capacity of 3 MVAand condensers with a capacity of 200 MVA; purchase and installation of48,000 meters; installation of 33,000 street lights for public illumination.Purchase of 331 service vehicles and 300 mobile radios for operation andmaintenance; studies of distribution and the construction of a controlcenter; training of technical supervisory personnel responsible for operationand maintenance of the distribution system. According to estimates preparedby EEEB, the present system of subtransmission and distribution will beunable to meet the demand in 1981

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

ExternalYear Internal Financing Financing Total

1981 12.5 4.2 16.71982 13.7 26.8 40.51983 24.5 44.4 68.91984 27.4 23.5 50.91985 28.4 - 28.4Total 106.5 98.9 205.4

IX. STATUS: A US$87 million IBRD loan was signedin 1981. Preliminary NPD approval for the remainder of the externalfinancing has been given.

Page 36: List of Projects for External Financing 1981-1984 Colombia

-27-

I. NAME OF THE PROJECT: Betania Hydroelectric Plant

II. EXECUTING AGENCY: ICEL

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$542.5 million

V. EXTERNAL FINANCING REQUESTED: US$325.0 million

VI. LENDING AGENCY: Commercial Banks, Suppliers'Credit and Export Credit

VII. DESCRIPTION AND JUSTIFICATION: The Betania Project is designedto utilize the water flow from the Magdalena River. Project invest-ments include caption of water, pressure tunnels, electro-mechanicalequipment, transmission equipment and power house. The plant willbe connected to the rest of the National System by 220 KV transmissionlines with a substation in Cali. It will be necessary to construct a20 km access road to the dam. The 500 MW plant is expected to initiateoperations in 1986. The sale of fifty percent of plant output is to beguaranteed to ISA, on behalf of its shareholders, in exchange for finan-cing 50% of the local cost.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing 1/ External Financing Total

1981 3.7 1.3 5.01982 15.3 14.9 30.21983 26.6 40.6 67.21984 37.7 64.6 102.31985 53.8 97.5 151.31986 50.4 83.4 133.81987 30.0 22.7 52.7Total 217.5 325.0 542.5

IX. STATUS: Turnkey contracts were awarded in 1981.The total external financing has been secured and is expected to be signedin 1981.

l/ 50% ICEL/Government, 50% ISA

Page 37: List of Projects for External Financing 1981-1984 Colombia

-28-

I. NAME OF THE PROJECT: Rural Electrification for the AtlanticCoast and San Andres Island

II. EXECUTING AGENCY: CORELCA

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$69.0 million

V. EXTERNAL FINANCING REOUESTED: US$36.0 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: This program will utilize theSabanalarga-Fundacion-Valledupar line as well as several lines from theBolivar and Norte de Santander systems, in order to replace the presentlocal generating system based on diesel plants (with high operating andmaintenance costs) with the interconnection to the CORELCA system.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds!nternai rinancing External

Year Own Resources National Budget Financinj Total

1981 0.0 0.1 0.1 0.11982 4.7 1.3 4.8 9.11983 6.6 4.5 12.8 24.61984 6.8 5.5 14.2 27.31985 1.2 2.3 4.1 7.9Total 19.3 13.7 36.0 69.0

IX. STATUS: US$36 million loan approved by theIBRD in 1981.

Page 38: List of Projects for External Financing 1981-1984 Colombia

-29-

I. NAME OF THE PROJECT Generation, Transmission andDistribution Program - EPM

II. EXECUTING AGENCY: EPM

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$254.0 million

V. EXTERNAL FINANCING REQUESTED: US$24.5 million

VI. LENDING AGENCY: IBRD, Suppliers' Credit

VII. DESCRIPTION AND JUSTIFICAITON: The project, whose main componentis the 213-MW Guadalupe IV hydroelectric plant, also includes transmissionlines, a control center, a distribution system and complementary equipmentsuch as meters, etc.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Internal Financing External Financing Total

1980 4.0 4.5 8.51981 11.1 22.6 33.71982 18.8 58.0 76.81983 23.7 62.5 86.21984 12.0 22.6 34.61985 1.9 6.7 8.61986 1.6 4.1 5.7Total 73.1 181.0 254.0

IX. STATUS: A US$125 million IBRD loan and aUS$32 million Bank of America loans were signed in 1980, and a US$24.5million loan was signed with Chase Manhattar Bank in 1981.

Page 39: List of Projects for External Financing 1981-1984 Colombia

-30-

I. NAME OF THE PROJECT: Tasajero Thermal Power Plant

II. EXECUTING AGENCY: ICEL

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$110.3 million

V. EXTERNAL FINANCING REQUESTED: US$86.0 million

VI. LENDING AGENCY: Export Credit Agencies,Commercial Banks

Vii. DESCRIPTION AND JUSTIFICATION: The project consists of theconstruction of a coal fired 150 MW thermal plant on the edge of the ZuliaRiver in Norte de Santander, bordering the coal producing areas of Alto de losCompadres and Morreton. The area has a reserve potential of 52,000 milliontons. The plant has been projected to consume 350,000 tons of coal per year, orabout 9 million tons during a 25 year period. The plant is expected to be inoperation in 1984.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1982 6.0 27.9 33.91982 9.2 24.7 33.91983 7.5 24.9 32.41984 1.6 8.5 10.1TOTAL 24.3 86.0 110.3

IX. STATUS: Total external financing hasbeen signed with EXIMBANKs of Japan and U.S.A. and with Bank of Tokyo in 1981.

Page 40: List of Projects for External Financing 1981-1984 Colombia

-31-

I. NAME OF THE PROJECT: Playas Hydroelectric Plant

II. EXECUTING AGENCY: EPM

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$362.3 million

V. EXTERNAL FINANCING REQUESTED: US$222.2 million

IDB, IBRD, Commercial Banks,VI. LENDING AGENCY: Suppliers' Credit

VII. DESCRIPTION AND JUSTIFICATION: The project consists of theconstruction of a 65-meter earthfill dam and a 200 MW undergroundpower station with three Francis turbines of 67 MW each: a sub-station and 1 km of 230 KV transmission line to link with the SanCarlos-Guatape line; and a studies and technical assistance compo-nent. The facilities are expected to be in operation in early1986.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

ExternalYear Local Financing Financing Total

1981 10.4 3.5 13.81982 13.6 13.0 26.71983 24.8 35.0 59.81984 30.1 63.0 93.11985 34.2 66.9 101.11986 27.0 40.8 67.8Total 140.1 222.2 362.3

IX. STATUS: IDB and IBRD have each approveda US$85 million loan.

Page 41: List of Projects for External Financing 1981-1984 Colombia

I. NAME OF THE PROJECT: Complementary Projects - FifthExpansion Program

II. EXECUTING AGENCY: EEEB

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$107.7 million

V. EXTERNAL FINANCING REQUESTED: US$51.6 million

VI. LENDING AGENCY: Private Banks

VII. DESCRIPTION AND JUSTIFICATION: In addition to the Mesitas IIhydroelectric development which is the main project within the FifthExpansion Program, EEEB has planned to modernize and expand severalancillary facilities under this project which includes the followingcomponents:

- Expansion of the Sesquile Pump Station: The existing unit showsdeficiencies and requires an increase in its pumping capacity.This expansion must be completed at the same time as the Chingazaproject in order to regulate the Bogota river.

- Operations and control center: Includes acquisition of equipmentand implanting organizational changes in order to install and runa control center with vocal and telemetric communications andremote control capacity.

- Central maintenance workshop: Will deal with repair andreconstruction of major equipment.

- Data processing center: Will be used for dealing with the usersas well as in the administrative, operational and engineering areas.

- Santa Ana hydroelectric plant (12 MW)

- Reinforcement of the Sequile Dam: Will ensure the stability ofthe dam with antiseismic reinforcement.

- Raising of the Mufia Dam: the Mesitas project requires the dam tobe raised 3 meters in order to increase its capacity.

Page 42: List of Projects for External Financing 1981-1984 Colombia

-33-

VIII. COSTS AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Funds External Financing Total

1981 15.0 4.8 19.81982 20.2 11.7 31.91983 18.1 17.9 36.01984 2.6 14.6 17.21985 0.2 2.6 2.8Total 56.1 51.6 107.7

IX. STATUS: Studies have been completed.Preliminary DNP approval for external financing has been given.

Page 43: List of Projects for External Financing 1981-1984 Colombia

-34-

I. NAME OF THE PROJECT: Hydroelectric Development of theAlto Sinu Basin

II. EXECUTING AGENCY: CORELCA

III. YEAR CONTRACT TO BE SIGNED: 1981, 1982, 1983

IV. TOTAL ESTIMATED COST: US$1,663.5 million

V. EXTERNAL FINANCING REQUESTED: US$857.7 million

VI. LENDING AGENCY: Commercial Banks, Export CreditAgencies, Suppliers' Credit, USSR, andMulti-Lateral Lending Institutions

VII. DESCRIPTION AND JUSTIFICATION: The project located in Cordoba willdevelop the hydroelectric potential of the Alto-Sinu Basin - that partof the Sinu River between the Urra Canyon and the headwaters of the river.The project involves the construction of two power plants: Urra I andUrra II, with a total installed capacity of 1050 MW, and also involvesthe diversion of the San Jorge and Verde rivers to the Urra II reservoir.The size of this reservoir will facilitate the generation of considerablesecondary power. The project, in addition to generating electric energy,will provide other benefits such as flood control, larger water flows inthe dry season, water storage for irrigation and improvements in rivernavigation.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of FundsExternal

Year Local Financing Financing Total

1980 3.4 - 3.41981 29.9 2.9 32.81982 13.7 12.2 25.91983 78.6 63.6 142.21984 91.6 95.2 186.81985 133.4 212.9 346.31986 183.5 259.2 442.71987 172.0 181.2 353.21988 99.7 30.5 130.2Total 805.8 857.7 1,663.5

IX. STATUS: The feasibility studies werecompleted in 1977. Final engineering should be completed in 1981.

Page 44: List of Projects for External Financing 1981-1984 Colombia

-35-

I. NAME OF THE PROJECT: Expansion of the Transmission andDistribution S.ytem

II. EXECUTING AGENCY: CVC

TII. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$33.5 million

V. EXTERNAL FINANCING REQUESTED: US$11.2 million

VI. LENDING AGENCY: Not Yet Determined

VII. DESCRIPTION AND JUSTIFICATION: The project consists of the expan-sion of the transmission and distribution network and construction of newsubstations in the Valle delCauca electrical system. Such an expansion wouldallow CVC to meet the projected demand for energy during 1981-84.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year own Resources External Financing Total

1981 3.3 1.7 5.01982 7.8 3.9 11.71983 7.8 3.9 11.71984 3.4 1.7 5.1Total 22.3 11.2 33.5

IX. STATUS: Final studies are being prepared.

Page 45: List of Projects for External Financing 1981-1984 Colombia

-36-

I. NAME OF THE PROJECT: Third Unit for Paipa Thermal Plant

II. EXECUTING AGENCY: ICEL

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$ 61.4 million

V. EXTERNAL FINANCING REQUESTED: US$34.1 million

VI. LENDING AGENCY: EXIMBANK of USA, EXIMBANK of Japanand Bank of Tokvo

VII. DESCRIPTION AND JUSTIFICATION: The project is part of the emergencyplan undertaken to avoid energy rationing during 1981-83. The project willexpand the Paipa thermal plant by 66 MW to increase its capacity to 165 MW.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Category Internal Financing External Financing Total

Equipment 4.8 38.2 43.0Civil Works 3.7 1.5 5.2Installation 3.1 1.1 4.2Supervision 2.6 - 2.6Financial Costs - 6.4 6.4Total 1981 14.2 47.2 61.4

IX. STATUS: The equipment contract for US$13.1million was signed with Mitsubishi Corporation and construction investmentshave started. Negotiations with lending agencies are underway.

Page 46: List of Projects for External Financing 1981-1984 Colombia

-37-

NAME OF THE PROJECT: Mamonal Substation

II. EXECUTING AGENCY: Electrificadora de Bolivar

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$5.3 million

V. EXTERNAL FINANCING REQUESTED: US$3.9 million

VI. LENDING AGENCY: Suppliers' Credit

VII. DESCRIPTION AND JUSTIFICATION: The project consists of theconstruction of a substation in the industrial zone of Cartagena.It includes high tension isolation, outdoor power transformersand 13.8 conventional type cells. The works will take 24 monthsto complete. The project is needed to meet the demand for energyby new and expanding industries in the area.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1981 0.5 1.3 1.81982 0.9 2.6 3.5Total 1.4 3.9 5.3

IX. STATUS: The final designs have beencompleted.

Page 47: List of Projects for External Financing 1981-1984 Colombia

-38-

I. NAME OF THE PROJECT: Expansion of San Andres DieselPower Plant

II. EXECUTING AGENCY: CORELCA

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$10.0 million

V. EXTERNAL FINANCING REQUESTED: US$8.5 million

VI. LENDING AGENCY: Not yet determined,

VII. DESCRIPTION AND JUSTIFICATION: The project consists of the purchaseand installation of diesel-fired units for the island of San Andres powerplant. Power demand studies indicate the need to increase power generationby 1981; otherwise, it will be necessary to carry out strict rationing duringpeak hours to avoid power failures.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1981 0.8 4.5 5.31982 0.7 4.0 4.7Total 1.5 8.5 10.0

IX. STATUS: Preliminary DNP approval forexternal financing has been given.

Page 48: List of Projects for External Financing 1981-1984 Colombia

-39-

I. NA.ME OF THiE PROJECT: Chinu Gas Power Plant

Ii. EXECUTING AGENCY: ISA

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$27.0 million

V. EXTERNAL FINANCING REQUESTED: US$22.0 million

VI. LENDING AGENCY: US EXIMBANK, Commercial Banks.

VII. DESCRIPTION AND JUSTIFICATION: The country's electrical power planindicates the need to increase the system's generating capacity to reducethe possibilities of an overall country deficit during 1981-83. ISA willaddress the issue by installing three generating units to be located atBarrancabermeja, Chinu and Zipaquira with an installed capacity of 40 MW,100 MW and 66 MW respectively.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Funding External Financing Total

1981 5.0 22.0 27.0Total 5.0 22.0 27.0

IX. STATUS: Preliminary DNP approval for externalfinancing has been given. US$3.2 million financing has been secured withSamuel Montagu.

Page 49: List of Projects for External Financing 1981-1984 Colombia

-40-

I. NAME OF THE PROJECT: Guavio Hydroelectric Plant

II. EXECUTING AGENCY: EEEB

III. YEAR CONTRACT TO BE SIGNED: 1981, 1982, 1983

IV. TOTAL ESTIMATED COST: US$1,303 million

V. EXTERNAL FINANCING REQUESTED: US$928 million

VI. LENDING AGENCY: IBRD, IDB, Commercial Banks,Suppliers' Credit

VII. DESCRIPTION AND JUSTIFICATION: The Guavio hydroelectric complexis to be located to the east of Bogota, near Mambita, Ubali and Gachala.It will use the water currents of Guavio River as well as those of theChivor and Batatas Rivers with an initial installed capacity of 1,000MW. The project includes the construction of a dam, deviation andspillways works. The impounding created by the dam will be 14 KMslong and 230 mts. deep. The Batatas and Chivor Rivers are to bechannelled through deviation dams and tunnels 3.5 mts. in diameterand 2 KMs long. The investments include: construction oE valvechambers, pressure tunnels, spillway, discharge tunnels, access tunnels,machinery and transformer housing, distributors, collectors,cable well, and 80 KMs of access roads. The project will includefive 200 MW generators. A future expansion contemplates increasinggenerating capacity to a total 1,600 MW for which three additional200 MW generators are required. 40% of energy generated would bemade available to ISA. The plant includes a regional satellitedispatch center.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1981 44.1 62.3 106.41982 46.2 63.0 109.21983 56.4 114.2 170.61984 67.8 153.6 221.41985 97.8 287.9 385.71986 48.2 173.9 222.11987 14.5 73.1 87.6Total 375.0 928.0 1,303.0

IX. STATUS: The designs for bidding of civilworks were concluded in 1979. The project has been appraised by IBRDand IDB, and loans in the amount of US$459 million are expected to besigned in 1981. The main civil works contracts were awarded in 1981.

Page 50: List of Projects for External Financing 1981-1984 Colombia

-41-

I. NAME OF THE PROJECT: Complementary Project - SixthExpansion Program

II. EXECUTING AGENCY: EEEB

III. YEAR CONTRACT TO BE SIGNED: 1981, 1982, 1983

IV. TOTAL ESTIMATED COST: US$313.5 million

V. EXTERNAL FINANCING REQUESTED: US$149.9 million

VI. LENDING AGENCY: Suppliers' Credit, KfW

VII. DESCRIPTION AND JUSTIFICATION: The purpose of the project is tocontinue the expansion of the rural distribution system and of the urbantransmission and distribution program of EEEB. The investments proposedin the rural areas include the construction of 133 KMs of 34.5 KW trans-mission lines, 42 MVA substations, 1,461 kilometers of primary distributioncircuits, the installation of 5,200 distribution transformers, 23,230 newenergy meters and 2,520 street lights. EEEB currently services 470,000customers in the rural areas.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Rural Electrification Transmission and DistributionExternal External

Year Own Funds Financine Own Funds Financine Total

1981 1.1 1.4 - - 2.51982 3.2 4.7 - - 7.91983 4.2 6.4 - - 10.61984 11.4 5.5 5.4 9.9 32.21985 12.6 3.5 32.3 24.6 73.01986 - - 44.6 53.5 98.11987 - - 48.8 40.4 89.2Total 32.5 21.5 131.1 128.4 313.5

IX. STATUS: EEEB has completed the feasibilityand design studies for the project. KfW of Germany is to participate inthe financing of investments in the rural areas. US$15.0 million isrequested for 1981; US$30.0 million in 1982 and US$104.9 million in 1983.

Page 51: List of Projects for External Financing 1981-1984 Colombia

-42-

I. NAME OF THE PROJECT: Conversion to Coal of Barranquillaand Cartagena Thermal. Plants

II. EXECUTING AGENCY: CORELCA

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$50.0 million

V. EXTERNAL FINANCING REQUESTED: US$40.0 million

VI. LENDING AGENCY: Export Credit Agencies, Suppliers'Credit

VII. DESCRIPTION AND JUSTIFICATION: The project will convert a total of5 gas fired 66 MW thermal units to coal in Barranquilla and Cartagena thermalplants in order to substitute natural gas consumption.

VII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1982 5.0 10.0 15.01983 5.0 30.0 35.0TOTAL 10.0 40.0 50.0

IX. STATUS: CORELCA will be contracting thedesigns for the respective installations during 1981.

Page 52: List of Projects for External Financing 1981-1984 Colombia

-43.-

I. NAME OF THE PROJECT: Cerrejon II Thermal Power Plant

II. EXECUTING AGENCY: CORELCA

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$155.6 million

V. EXTERNAL FINANCING REQUESTED: US$128.0 million

VI. LENDING AGENCY: Commercial Banks, Suppliers' Credit

VII. DiSCRYiTI0N AND JUSLIFICATIUN: The project consists of the purchase andinstallation of a 160 MW coal-fired thermal unit. The thermal plant willuse coal originating from the Cerrejon central block mine. The projectis expected to fill the power demand requirements and firm up CORELCA'sgenerating capacity by 1984. The plant is likely to be located near the'errejon T plant.

VIII. COST ARD AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Public Sector Budget External Financing Total

1982 9.5 44.1 53.61983 11.4 53.0 64.41984 6.7 30.9 37.6Total 27.6 128.0 155.6

IX. STATUS: Preliminary DNP approval for externalfinancing has been given.

Page 53: List of Projects for External Financing 1981-1984 Colombia

-44-

I. NAME OF THE PROJECT: Small Electric Plants Plan, Phase I

II. EXECUTING AGENCY: ICEL

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$21.9 million

V. EXTERNAL FINANCING REQUESTED: US$11.3 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The purpose of the projectis to install small hydropower plants in the national territoriesand in remote areas where the supply of energy is produced fromdiesel powered plants.

VII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1982 3.7 4.3 8.01983 5.6 7.0 12.61984 1.3 - 1.3Total 10.6 11.3 21.9

IX. STATUS: Preliminary feasibilitystudies have been concluded including those for the followingprojects: Santa Rosa Argelia, El Calvario, Altaquer, Penas Blancasand Puerto Carreno.

Page 54: List of Projects for External Financing 1981-1984 Colombia

-45-

1. NAME OF THE PROJECT: Conventional Steam Power

Plants

II. EXECUTING AGENCY: ISA, EEEB, CORELCA

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$235.6 million

V. EXTERNAL FINANCING REQUESTED: US$177.7 million

VI. LENDING AGENCY: Suppliers'Credit, Export Credit Agencies

VII. DESCRIPTION AND JUSTIFICATION: The purpose of the project is toinstall three new 150 MW coal-fired thermal units in the interconnectedthermal system, in order to guarantee the supply of electric power duringthe 1985-1988 period.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Finacing Total

1982 9.0 21.5 30.51983 14.4 28.9 43.31984 18.5 50.3 68.81985 11.5 55.4 66.91986 4.5 21.6 26.1Total 57.9 177.7 235.6

IX. STATUS: Pre-feasibility studies ofseveral alternatives in the Atlantic Coast and the interior of thecountry are being prepared.

Page 55: List of Projects for External Financing 1981-1984 Colombia

-46-

I. NAME OF THE PROJECT: Control Station

II. EXECUTING AGENCY: CVC

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$12.5 million

V. EXTERNAL FINANCING REQUESTED: US$12.5 million

VI. LENDING AGENCY: Not yet determined

VII. DESCRIPTION AND JUSTIFICATION: The project consists of theinstallation of two and possibly three fully equipped computers,software and other supporting equipment. The technological ad-vance and complexity of the power system's expansion requiresundertaking investments that will ensure safe, reliable and econo-mic operations. This is to be achieved through the operation of acontrol station to monitor and coordinate the systems' generation,transmission and distribution operations.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year External Financing Total

1982 1.0 1.01983 2.0 2.01984 6.0 6.01985 2.5 2.51986 1.0 1.0Total 12.5 12.5

IX. STATUS: CVC has contracted consultingservices to prepare studies, designs, bidding documents and undertakethe supervision of the project.

Page 56: List of Projects for External Financing 1981-1984 Colombia

-47-

I. NAME OF PROJECT: Rio Grande II MultipurposeHydroelectric Project

II. EXECUTING AGENCY: EPM

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$340 million

V. EXTERNAL FINANCING REQUESTED: US$180 million

VI. LENDING AGENCY: IBRD, IDB, Suppliers' Credit,Commercial Banks

VII. DESCRIPTION AND JUSTIFICATION: The proposed project, to be locatedin the Antioquia Department, will have an installed capacity of 360 MW.It includes the construction of the following: (a) deviation by gravityof the waters of the Rio Grande River to the Medellin water supply system;(b) Rio Grande II hydroelectric complex; and (c) a dam which will createa reservoir with a capacity of 120 million cubic meters.

VIII. COSTS AND AVAILABILITY OF FUNDS: Under preparation

IX. STATUS: Design studies are under prepara-tion. Since some basic design features have recently been substantiallymodified, estimated costs are tentative.

Page 57: List of Projects for External Financing 1981-1984 Colombia

-48-

I. NAME OF PROJECT: Calima III Hydroelectric Project

II. EXECUTING AGENCY: CVC

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$214.0 million

V. EXTERNAL FINANCING REQUESTED: US$141.8 million

VI. LENDING AGENCY: Not yet determined

VII. DESCRIPTION AND JUSTIFICATION: The proposed project is to belocated in the Cauca Department, downstream from the Calima Ihydroelectric plant currently in operation. The project consistsof the construction of a rock dam 70 meters high on the CalimaRiver downstream from its confluence with the Bravo River, apressure tunnel 10 kilometers long and 6 meters in diameter; anda semi-superficial power house with a total capacity of 220 MW.

VIII. COSTS AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1984 10.9 21.2 32.11985 25.2 49.7 74.91986 25.2 49.7 74.91987 10.9 21.2 32.1Total 72.2 141.8 214.0

IX. STATUS: Prefeasibility studies arescheduled to be completed in April 1982.

Page 58: List of Projects for External Financing 1981-1984 Colombia

-49-

I. NAME OF PROJECT: La Miel I Hydroelectric Project

II. EXECUTING AGENCY: Not yet determined

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$265.5 million

V. EXTERNAL FINANCING REQUESTED: US$162.4 million

VI. LENDING AGENCY: IDB, Suppliers' Credit,Commercial Banks

VII. DESCRIPTION AND JUSTIFICATION: The first stage of the proposedproject is to be located in the northeast of the Caldas Department.The project consists of the construction of a dam which will createa reservoir with a capacity of 610 million cubic meters and a 225.5meters fall, an underground power house with three 128 MW generatingunits for a total of 384 MW. Annual average generation expected willbe of 1,000 million KWH.

VIII. COSTS AND AVAILABILITY OF FUNDS: Under preparation

IX. STATUS: Final feasibility studies have beencompleted. Final designs are underway.

Page 59: List of Projects for External Financing 1981-1984 Colombia

-50-

I. NAME OF THE PROJECT: Expansion of the Transmission System

II. EXECUTING AGENCY: ICEL

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$100.0 million

V. EXTERNAL FINANCING REQUESTED: US$64.0 million

VI. LENDING AGENCY: IDB, IBRD

VII. DESCRIPTION AND JUSTIFICATION; The purpose of the project is toconstruct 30 substations of varying voltages, 220/110/34.5 KV, and 14transmission lines, 220/110 KV, in order to expand the existing infrastruc-ture of the ICEL System and receive power from the Betania project. Theproject is to be undertaken by ICEL and small power companiea.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1983 6.0 7.4 13.41984 8.7 17.3 26.01985 13.0 23.0 36.01986 5.3 11.5 16.81987 3.0 4.8 7.8Total 36.0 64.0 100.0

IX. STATUS: Designs for the project are beingprepared.

Page 60: List of Projects for External Financing 1981-1984 Colombia

-51-

I. NAME OF PROJECT: Canafisto Hydroelectric Project

II. EXECUTING AGENCY: ISA

III. YEAR CONTRACT TO BE SIGNED: 1984

IV. TOTAL ESTIMATED COST: US$945.2 million

V. EXTERNAL FINANCING REQUESTED: US$543.5 million

VI. LENDING AGENCY: IBRD, IDB, Suppliers' Credit,Commercial Banks

VII. DESCRIPTION AND JUSTIFICATION: The proposed project, located tothe south of Santa Fe de Antioquia in the Department of Antioquia, willhave an installed capacity of 1,500 MW with an average yearly energyoutput of 7,210.6 GWH. It includes the construction of a 110 metershigh earth dam, two deviation tunnels 730 and 913 meters long, a477.5 meters long spillway and a power house which will include5 Francis-type turbines.

VIII. COSTS AND AVAILABILITY OF FUNDS: Under preparation

IX. STATUS: Final feasibility studies havebeen completed.

Page 61: List of Projects for External Financing 1981-1984 Colombia

-52-

I. NAME OF PROJECT: La Miel II Hydroelect:ric Project

II. EXECUTING AGENCY: Not yet determined

III. YEAR CONTRACT TO BE SIGNED: 1984

IV. TOTAL ESTINATED COST: US$284.6 million

V. EXTERNAL FINANCING REQUESTED: US$170.4 million

VI. LENDING AGENCY: IDB, Suppliers' Credit,Commercial Banks

VII. DESCRIPTION AND JUSTIFICATION: The proposed project is to belocated in the Caldas department, by the La Miel River and upstreamof the La Miel I hydroelectric project. The project consists of theconstruction of a rock dam 170 meters high, a deviation tunnel 760 meterslong and 8.4 meters in diameter, spillway tunnels with a total length of8,732 meters and an underground power house which will include 3Pelton turbines witha total capacity of 351 MW to produce an average of1,354 GWH per year.

VIII. COSTS AND AVAILABILITY OF FUNDS: Under preparation

IX. STATUS: Final feasibility studies havebeen completed. Final designs are underway.

Page 62: List of Projects for External Financing 1981-1984 Colombia
Page 63: List of Projects for External Financing 1981-1984 Colombia

-53-

Ib. ENERGY: Coal

Page 64: List of Projects for External Financing 1981-1984 Colombia
Page 65: List of Projects for External Financing 1981-1984 Colombia

-54-

I. NAME OF THE PROJECT: Cerrejon Coal

II. EXECUTING AGENCY: CARBOCOL

III. YEAR CONTRACT TO BE SIGNED: 1981, 1982, 1983

IV. TOTAL ESTIMATED COST: US$2,800.0 million

V. EXTERNAL FINANCING REQUESTED: US$1,400.0 million L/

VI. LENDING AGENCY: IBRD, Private Banks, Suppliers'Credit

VII. DESCRIPTION AND JUSTIFICATION: The purpose of this project is todevelop for export the Northern Cerrejon coal deposits located in theGuajira peninsula. The project includes the development of a surfacemine, construction of a port in Bahia de Portete in the Atlantic Coast,a 150 mile railroad linking the mine and the port, and a community tohouse employees. Production is to start in 1986 with 7 million tonsand rising to 15 million tons by 1989. The project will be developedthrough a joint venture arrangement with INTERCOR, a wholly owned sub-sidiary of EXXON Corp.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year External Financing 2/ Total 2

1981 364.2 364.21982 672.3 672.31983 569.9 569.91984 561.5 561.51985 253.0 253.01986 257.3 257.31987 121.8 121.8Total 2,800.0 2,800.0

IX. STATUS: A contract for engineering pro-curement and construction has been awarded to Morrison-Knudsen. US$280million is requested for 1981; US$840 million for 1982 and US$280 millionfor 1983.

1/ US$280 million is requested for 1981; US$840 million for 1982 and US$280million for 1983.

2/ Includes 50% of financing to be provided by EXXON. Does not includeworking capital and interest during construction.

Page 66: List of Projects for External Financing 1981-1984 Colombia

-55-

I. NAME OF THE PROJECT: Coal Engineering

II. EXECUTING AGENCY: CARBOCOL

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$10.0 million

V. EXTERNAL FINANCING REQUESTED: US$9.0 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: The project would consist offinal exploration and feasibility studies for coal development inselected Colombian coal areas (such as Antioquia) where preliminaryexploration indicates the existence of significant deposits.

Colombia's coal reserves areestimated to be the largest in Latin America but coal productionis still very modest. The project is expected to open up opportunitiesfor the development of the most attractive coal deposits. Coal isexpected to play an increasing role in meeting Colombia's futureenergy requirements.

VIII. COSTS AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Funds External Financing Total

1982 0.2 1.8 2.01983 0.6 5.4 6.01984 0.2 1.8 2.0Total 1.0 9.0 10.0

IX. STATUS: Preliminary explorationwas carried out by INGEOMINAS and CARBOCOL in order to determine themost promising coal areas. On the basis of these studies, financingis being requested from IBRD.

Page 67: List of Projects for External Financing 1981-1984 Colombia

-56-

Ic. ENERGY: Petroleum and Natural Gas

Page 68: List of Projects for External Financing 1981-1984 Colombia
Page 69: List of Projects for External Financing 1981-1984 Colombia

-57-

I. NAME OF THE PROJECT: Casabe Secondary Oil Recoveryand Seismic Exploration

II. EXECUTING AGENCY: ECOPETROL

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$261.5 million

V. EXTERNAL FINANCING REQUESTED: US$156.9 million

VI. LENDING AGENCY: IBRD, Commercial Banks andSuppliers Credit

VII. DESCRIPTION AND JUSTIFICATION: The project consists of the develop-ment of the Casabe oil fields through secondary recovery operations.ECOPETROL has estimated Casabe's secondary oil reserve potential to beabout 100 million barrels, valued at US$3,200 million in 1981 prices.ECOPETROL also proposes to undertake seismic explorations to identifypotential new areas for oil development.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Own ExternalYear Resources Financing Total

1982 36.6 54.9 91.51983 32.0 48.0 80.01984 36.0 54.0 90.0Total 104.6 156.9 261,5

IX. STATUS: Financial and technical aspectsare being evaluated by ECOPETROL and IBRD.

Page 70: List of Projects for External Financing 1981-1984 Colombia

-56-

I. NAME OF THE PROJECT: Petroleum Exploration ofContinental Platform

II. EXECUTING AGENCY: ECOPETROL

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$12.0 million

V. EXTERNAL FINANCING REQUESTED: US$10.0 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: IDB has promoted a regional programfor a joint seismographic exploration of the continental platformby several Latin American countries in order to take advantage ofeconomy of scale and modern exploration techniques. The explorationof 12,000 to 15,000 kms of seismographic lines with a depth of 500meters has been considered. The possibility of financing aninformation processing center has also been considered. For opera-tional purposes the countries have been divided into four groups;Colombia is part of a group along with Ecuador, Peru and Chile.The exploration cost has been estimated at US$630 per kilometer,including information and processing costs. Almost all of the costswould be in foreign currencies. The logistics and personnel costsof information processing would be covered with local resources.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Local ExternalYear Financing Financing Total

1981 0.0 5.0 5.01982 2.0 5.0 7.0Total 2.0 10.0 12.0

IX. STATUS: Preliminary NPD approval forexternal financing has been given.

Page 71: List of Projects for External Financing 1981-1984 Colombia

-59-

II. TRANSPORTATION

Page 72: List of Projects for External Financing 1981-1984 Colombia
Page 73: List of Projects for External Financing 1981-1984 Colombia

-60-

I. NAME OF THE PROJECT: Rural Roads

II. EXECUTING AGENCY: FNCV

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$90.0 million

V. EXTERNAL FINANCING REQUESTED: US$52.6 million

VI. LENDING AGENCY: IBRD, IDB

VII. DESCRIPTION AND JUSTIFICATION: The objective of this program is themaintenance, rehabilitation and construction of about 1,500 kmLs. of ruralroads throughout the country. The project includes roads that; meet thegeometric specifications applying to rural areas, lenghts not exceeding 15kms. Roads to be constructed complement investments in the agriculturalsector.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Funds External Financing Total

1981 9.3 13.2 22.51982 13.1 18.4 31.51983 7.5 10.5 18.01984 7.5 10.5 18.0Total 37.4 52.6 90.0

IX. STATUS: A road inventory has been completed.Road selection is underway in order to proceed with design studies. Theroads that will be started in 1981 have already been identified. A loanof US$33 million equivalent has been approved by IBRD. US$19.6 IDB loanhas been secured.

Page 74: List of Projects for External Financing 1981-1984 Colombia

-61I-

I. NAME OF THE PROJECT: Air Navigational Aids Project

II. EXECUTING AGENCY: DAAC - FAN

III. YEAR CONTRACT TO BE SIGNED; 1981

IV. TOTAL ESTIMATED COST: US$20.0 million

V. EXTERNAL FINANCING REQUESTED: US$18.0 million

VI. LENDING AGENCY: Suppliers'Credit

VII. DESCRIPTION AND JUSTIFICATION: The project, which is part of theNational Air Navigation Plan,consists of the replacement of obsoleteequipment and the acquisition of new equipment to meet the growth inservices. The plan proposes two stages. The first consists of therehabilitation of basic air traffic control installations and the acqui-sition of complementary equipment for investments already underway. Thesecond stage includes the acquisition of the following:

- Radio aids for air navigation.- Aeronautical communication equipment for airports not included in the

first stage.- Visual aids for landing strips for the main airports.- Long reach radars for the eastern plains.- Electrogenerators.- Spare parts.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1981 0.6 5.4 6.01982 0.8 7.2 8.01983 0.6 5.4 6.0Total 2.0 18.0 20.0

IX. STATUS: Navigation aids studies havebeen prepared and are being revised with the assistance of the Inter-national Aviation Organization, ICAO.

Page 75: List of Projects for External Financing 1981-1984 Colombia

-62-

1. NAME OF THE PROJECT: Acquisition of Equipment for Public Works

II. EXECUTING AGENCY: MOPT - FVN

I11. YEAR CONTRACT TO BE SIGNED: 1981

TIV TOTAL ESTIMATED COST: US$66.0 million

I?. EXTERNAL FINANCING REQUESTED: US$66.0 million

VI. LENDING AGENCY: Suppliers' Credit and Export Credit Agencies

VII. DESCRIPTION AND JUSTIFICATION; This project consists of the acquisitionof road maintenance machinery to replace obsolete equipment. Il: is complemen-tary to the project currently in execution by MOPT with IBRD financing. Ahigh percentage of the equipment owned by MOPT has been in service for over10 years with high maintenance costs and limited use. The proposed acquisi-tion is expected to increase the average use of MOPT's equipment and improveits maintenance through a better stock of parts.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year External Financing Total

1981 13.2 13.21982 26.4 26.41983 26.4 16.4Total 66.0 66.0

IX. STATUS: FVN has initiated bidding procedures

and has begun contacting potential sources of financing.

Page 76: List of Projects for External Financing 1981-1984 Colombia

-63-

I. NAME OF THE PROJECT: Railways VII

II. EXECUTING AGENCY: Ferrocarriles Nacionales de Colombia

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$149.4 million

V. EXTERNAL FINANCING REQUESTED: US$70.0 million

VI. LENDING AGENCY: IBRD, Suppliers' Credit

VII. DESCRIPTION AND JUSTIFICATION: The program includes the rehabilitationof sections of the main network, purchase of spare parts, purchase and repairof engines, purchase of locomotives and wagons, improvements of the adminis-tration and operation of the enterprise, and studies on the modernization ofthe railways. The provision of these resources will permit the upgrading ofthe infrastructure and result in improved services to meet the unattendeddemand for railway transportation.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1982 26.6 6.0 32.61983 30.8 37.1 67.91984 22.0 26.9 48.9

Total 79.4 70.0 149.4

IX. STATUS: A UNDP financed study has been completed.The project has been appraised by IBRD. Preliminary NPD approval for externalfinancing has been given.

Page 77: List of Projects for External Financing 1981-1984 Colombia

-64-

I. NAME OF THE PROJECT: Road Improvement Plan

II. EXECUTING AGENCY: National Government - MOPT - FVN

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$290.0 million

V. EXTERNAL FINANCING REQUESTED: US$145.0 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: The project consists of the paving of1,500 km. of roads with an average daily traffic of 650-1,400 vehicles; and ofthe rehabilitation of 1,200 kms. of roads from the main road network. MDPT's main-tenance program includes maintaining 22,706 km. of roads. Of these, only7,742 km. are paved. Of the remaining 14,964 km., 2,985 km. have an averagedaily traffic of more than 300 vehicles. Because of this, an increase inthe paved sections is required. The road improvement plan project includesboth the National Road Paving Program and the Second Road Rehabilitation Program,included in the 1979 project list.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Funds External Financing Total

1982 5.0 - 5.01983 12.5 17.5 30.01984 50.0 50.0 100.01985 42.5 42.5 85.01986 30.0 30.0 60.01987 5.0 5.0 10.0Total 145.0 145.0 290.0

IX. STATUS: The design and feasibility studies willbe finished in the second semester of 1981.

Page 78: List of Projects for External Financing 1981-1984 Colombia

-65-

I. NAME OF THE PROJECT: Ports Modernization

II. EXECUTING AGENCY: COLPUERTOS

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST US$90.0 million

V. EXTERNAL FINANCING REQUESTED: US$45.0 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: The project proposes investments torehabilitate and modernize Colombia's ports and enable them to handlespecialized as well as bulk cargo. Container handling facilities wouldbe provided. The above investments are necessary to improve cargohandling in the port system, both as exports and imports. Thefeasibility studies of possible ports in Bahia de Solano and Turbo arealso included in the project.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1982 9.0 9.0 18.01983 10.7 10.8 21.51984 15.3 15.2 30.51985 10.0 10.0 20.0Total 45.0 45.0 90.0

STATUS: A UNDP financed port study for whichIBRD is the executing agency was concluded in July 1981.

Page 79: List of Projects for External Financing 1981-1984 Colombia

-66-

I. NAME OF THE PROJECT: Guadalupe-Florencia, Medellin-Turbo,Zulia-Aguachica Roads

II. EXECUTING AGENCY: MOPT-FVN

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$160.7 million

V. EXTERNAL FINANCING REQUESTED: US$80.4 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The Altamira-Florencia road project,which consists of improvements in the existing roads, proposes to improvecommunications between the interior of the country and Caqueta. Thisproject is also necessary for INCORA's colonization program. In addi-tion, the possibilities of building a new port in Turbo and constructingthe Darien Road requires the construction of a new Medellin-Turbo roadof higher specifications. The Turbo-Chigordo section is currentlybeing rehabilitated. Studies for the Santa Fe de Antioquia and ChigordoSegment with a length of 175 kms. are underway. In addition, the presentOcana-Astilleros road, 140 kms. long, is also proposed. This road wasconstructed with low specifications and does not guarantee the transitlevel required for commercial traffic.

VIII. COST AND AVAILABILITY OF FUNDS: Under preparation

IX. STATUS: The Phase III Medell:Ln-Turbo andOcana-Astilleros and Zulia-Aguachica studies are expected to beconducted in 1981.

Page 80: List of Projects for External Financing 1981-1984 Colombia

-67-

I. NAME OF THE PROJECT: La Verbena-Tumaco

II. EXECUTING AGENCY: MOPT-FVN

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$60.0 million

V. EXTERNAL FINANCING REQUESTED: US$30.0 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The proposed project would improvethe specifications of the present 196-km road, including widening, pavingand the construction of new variants which would improve communicationsbetween the port of Tumaco and Pasto and with the country's interior.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1981 9.0 9.0 18.01982 10.5 10.5 21.01983 10.5 10.5 21.0Total 30.0 30.0 60.0

IX. STATUS: Designs have been completed. Contractsfor the Tuquenes-La Verbena section have been awarded.

Page 81: List of Projects for External Financing 1981-1984 Colombia

-68-

I. NAME OF THE PROJECT: Bogota-Villavicencio Highway, FirstSection

II. EXECUTING AGENCY: MOPT-FVN

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$15.0 million

V. EXTERNAL FINANCING REQUESTED: US$7.5 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The project would improve specificationsof the first 16 km of the Bogota-Villavicencio highway, including adding of asecond lane to the urban section in Bogota.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1982 1.8 1.8 3.61983 1.9 1.9 3.81984 1.9 1.9 3.81985 1.9 1.9 3.8Total 7.5 7.5 15.0

IX. STATUS: Designs are expected to be completedby the end of 1981.

Page 82: List of Projects for External Financing 1981-1984 Colombia

-69-

I. NAME OF THE PROJECT: Bridge Rehabilitation Program

II. EXECUTING AGENCY: MOPT

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$30.0 million

V. EXTERNAL FINANCING REQUESTED: US$15.0 million

VI. LENDING AGENCY: Not yet determined

VII. DESCRIPTION AND JUSTIFICATION: The program,to be executed over a4-year period,will repair a number of deteriorated road bridges and willimprove specifications of others where traffic is intense.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1982 3.0 3.0 6.01983 3.8 3.8 7.61984 4.5 4.5 9.01985 3.7 3.7 7.4Total 15.0 15.0 30.0

IX. STATUS: Studies are being completed.

Page 83: List of Projects for External Financing 1981-1984 Colombia

-70-

I. NAME OF PROJECT: Tinbio-Estanquillo Road

II. EXECUTING AGENCY: MOPT-FVN

III. YEAR TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$60.0 million

V. EXTERNAL FINANCING REQUESTED: US$30.0 million

VI. LENDING AGENCY: Not yet determined

VII. DESCRIPTION AND JUSTIFICATION: The proposed road will becomepart of the Panamerican Highway and the Andean road system. The currentroad, which connects the southern departments of Narino and Cauca with

the center of Colombia, goes through a geologically unstable zone(Timbio-Rosas) with a propensity for landslides. The Timbio-Estaquillo

road is to be constructed in a stable geological area.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1982 5.0 5.0 10.01983 10.0 10.0 20.01984 10.0 10.0 20.01985 5.0 5.0 10.0Total 30.0 30.0 60.0

IX. STATUS: The design studies have been comr-pleted.

Page 84: List of Projects for External Financing 1981-1984 Colombia

-71-

I. NAME OF PROJECT: Bogota Airport Runway

II. EXECUTING AGENCY: DAAC-FAN

III. YEAR TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$200.0 million

V. EXTERNAL FINANCING REQUESTED: US$100.0 million

VI. LENDING AGENCY: Not yet determined

VII. DESCRIPTION AND JUSTIFICATION: In recent years, the growth ofair traffic has not had a corresponding improvement in airport faci-lities, particularly in the El Dorado Airport in Bogota. The cons-truction of a new runway is proposed to speed up air traffic.

VIII. COST AND AVAILABILITY OF FUNDS: Under preparation

IX. STATUS: A new study has been initiatedand will determine the timing of the proposed investments.

Page 85: List of Projects for External Financing 1981-1984 Colombia

-72-

I. NAME OF PROJECT: Bogota-Armenia Road

II. EXECUTING AGENCY: MOPT-FVN

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$165.0 million

V. EXTERNAL FINANCING REQUESTED: US$82.5 million

VI. LENDING AGENCY: Not yet determined

VII. DESCRIPTION AND JUSTIFICATION: This project is part: of theBuenaventura-Bogota road which carries an important part of thedomestic trade, and of imports hauled from the port of Buenaventura,The proposed project will also improve communications between Caliand Bogota.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Funds External Financing Total

1983 7.5 7.5 15.01984 17.5 17.5 35.01985 27.5 27.5 55.01986 22.5 22.5 45.01987 7.5 7.5 15.0Total 82.5 82.5 165.0

IX. STATUS: The Japan International CooperationAgency (JICA) prepared a feasibility study that was completed in 1981.

Page 86: List of Projects for External Financing 1981-1984 Colombia

-73-

I. NAME OF THE PROJECT: Pitalito-Mocoa Road

II. EXECUTING AGENCY: MOPT-FVN

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$57.0 million

V. EXTERNAL FINANCING REQUESTED: US$28.5 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The project is part of the marginaljungle road program. It will communicate the interior of the country withPutumayo and Ecuador,and permit the development of the Amazonian region andan expansion in foreign trade. In addition, it will provide,jointly withthe Pasto-Mocoa project, an alternative to communicate Narino and theinterior of the country.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1982 4.7 4.7 9.41983 5.0 5.0 10.01984 5.5 5.5 11.01985 6.2 6.2 12.41986 7.1 7.1 14.2TOTAL 28.5 28.5 57.0

IX. STATUS: The design studies for the brideeto be constructed over the Putumayo River have been contracted. MOPT hasundertaken the design studies for the Mocoa-Pitalito Road. The projectrequires further studies.

Page 87: List of Projects for External Financing 1981-1984 Colombia

-74-

I. NAME OF THE PROJECT: Saboya-Puerto Carare Railway

II. EXECUTING AGENCY: FNC

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$150.0 million

V. EXTERNAL FINANCING REQUESTED: US$75.0 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: The project involves the constructionof a new and improved 200 km. railway linking the Ferrocarril del Norte(Bogota-Saboya) with the Atlantic line, thus increasing the capacity ofthe Bogota-Santa Marta line which is now restricted to that of theFacatativa Puerto Salgar section (2,500 tons/day as compared to 10,000tons/day for the rest of the line). The new line will improve efficiencyby lowering operating costs, provide reliable service ancl also providean outlet for coal from Boyaca and Cundinamarca.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1983 20.5 20.5 4:L.01984 24.7 24.7 49.41985 19.0 19.0 383.01986 10.8 10.8 21.6Total 75.0 75.0 150.0

IX. STATUS: The design studies for the Saboya-Carare line are to be completed in 1981. The economic evaluation ofthe project will determine the width of the gauge required and thepossibilities for electrification.

Page 88: List of Projects for External Financing 1981-1984 Colombia

-75-

I. NAME OF THE PROJECT: Guateque-Barranca de Upia-Aguazul-Yopal Road

II. EXECUTING AGENCY: MOPT - FVN

III. YEAR CONTRACT TO BE SIGNED: 1984

IV. TOTAL ESTIMATED COST: US$48.0 million

V. EXTERNAL FINANCING REQUESTED: US$24.0 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: The Barranca de Upia-Aguazul-Yopalroad project is part of the proposed marginal jungle road. Once this project

is constructed, the Piedmont region of Los Llanos Orientales is to be integ-rated with the rest of the area. This project is complementary to the Bogota-

Villavicencio, Sogamoso-Aguazul and Guateque-Barranca de Upia projects. TheGuateque-Barranca road segment, 252 kms. long, is to provide a new route tocommunicate the interior with the Llanos area.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1984 7.0 7.0 14.01985 10.0 10.0 20.01986 7.0 7.0 14.0Total 24.0 24.0 48.0

IX. STATUS:MOPT is currently reviewing the

road studies. Additional studies are required.

Page 89: List of Projects for External Financing 1981-1984 Colombia

-76-

I. NAME OF THE PROJECT: Access Roads Program

II. EXECUTING AGENCY: MOPT - FVN

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$75.0 million

V. EXTERNAL FINANCING REQUESTED: US$30.0 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: The purpose of this project is toconstruct access roads to solve traffic problems in cities and townssuch as Girardot, Bucaramanga, Ibague, El Espinal, Guacari and others.It will also include small investments designed to improve access to themain roads. Past investment programs placed a low priority on buildingaccess roads to the urban centers. As a consequence of this, traffic problemsin the above cities have been increasing with rising flows of interurbantraffic.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1983 1.0 1.0 2.01984 12.5 7.5 20.01985 12.5 7.5 20.01986 14.0 10.0 24.01987 5.0 4.0 9.0Total 45.0 30.0 75.0

IX. STATUS: MOPT will undertake the! selection ofroad projects during 1981 and the first half of 1982. It will also proceedto prepare their final designs.

Page 90: List of Projects for External Financing 1981-1984 Colombia

-77-

I. NAME OF THE PROJECT: Guapg-Monteria Road

II. EXECUTING AGENCY: MOPT - FVN

III. YEAR CONTRACT TO BE SIGNED: 1984

IV. TOTAL ESTIMATED COST: US$50.0 million

V. EXTERNAL FINANCING REQUESTED: US$25.0 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The project consists of the construc-tion of a new road which will connect the Uraba area with the AtlanticCoast. This project, 180 km. long, was given a high priority in theUraba Regional Development study prepared in 1978 in collaboration withthe OAS.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1984 9.0 9.0 18.01985 13.0 13.0 26.0Beyond 1985 3.0 3.0 6.0Total 25.0 25.0 50.0

IX. STATUS: The feasibility study is in progress.

Page 91: List of Projects for External Financing 1981-1984 Colombia

-78-

I. NAME OF THE PROJECT: Pasto-Mocoa Road

II. EXECUTING AGENCY: MOPT-FVN

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$62.0 million

V. EXTERNAL FINANCING REQUESTED: US$31.0 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: Currently, a road of low geometricspecifications connects Mocoa-San Francisco. This road only allows one-waytraffic and thus makes it necessary to establish control points toavoid traffic accidents. The proposed project is part of the Nariffo-Putumayo road and offers an alternative to the Bogota-Narino traffic.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1983 4.0 4.0 8.01984 27.0 27.0 54.0Total 31.0 31.0 62.0

IX. STATUS: MOPT has contract:ed the SanFrancisco-Mocoa studies.

Page 92: List of Projects for External Financing 1981-1984 Colombia

-79-

I. NAME OF THE PROJECT: Caucasia-La Gloria Road

II. EXECUTING AGENCY: MOPT - FVN

III. YEAR CONTRACT TO BE SIGNED: 1984

IV. TOTAL ESTIMATED COST: US$125.0 million

V. EXTERNAL FINANCING REQUESTED: US$62.5 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The investments undertaken in theconstruction of the western and central road systems are to be complementedby the construction of transversal roads. In this connection, MOPT hasidentified the Caucasia-La Gloria project as one of high priority becauseit will connect Santander and Venezuela to the Atlantic Coast and thenorth of Antioquia. This project is also complementary to the proposedGuapa-Monteria project.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1984 13.7 13.7 27.4Beyond 1984 48.8 48.8 97.6Total 62.5 62.5 125.0

IX. STATUS: The feasibility studies of this roadproject are to be awarded.

Page 93: List of Projects for External Financing 1981-1984 Colombia

-80-

III. COMMUNICATIONS

Page 94: List of Projects for External Financing 1981-1984 Colombia
Page 95: List of Projects for External Financing 1981-1984 Colombia

-81-

I. NAME OF THE PROJECT: Expansion and Equipment Replacementof the National TV and Radio

II. EXECUTING AGENCY: Instituto Nacional de Radio yTelevision

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$10.7 million

V. EXTERNAL FINANCING REQUESTED: US$4.0 million

VI. LENDING AGENCY: Suppliers' Credit, Commercial Banks

VII DESCRIPTION AND JUSTIFICATION: The execution of the first phaseof the development plan for the National TV and Radio Institute isabout to be completed. The second phase proposes to replace TV andradio equipment in order to improve service performance. Thetransmission equipment used in the two TV networks is over 20 yearsold and could be rendered useless in a short time. The expansionof the second TV network will carry signals to the same regionspresently covered by the first network, thereby facilitating avaried selection of programs.

The A.M. transmission equipmentof the National Radio was acquired over 15 years ago and its main-tenance has become increasingly difficult and costly. 'With thepurchase of new equipment,it will be possible to cover Valle delCauca, Santander, Narino and the Atlantic Coast. This will givethe necessary support to the educational programs on the NationalRadio. Recording facilities and mobile units for remote controlprograms are also included.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds:

Year Own Resources External Financing Total

1981 1.5 1.1 2.61982 1.4 3.4 4.81983 0.3 3.0 3.3Total 3.2 7.5 10.7

IX. STATUS: US$3.5 million has been securedfrom commercial banks. The remainder is to be obtained in 1981.

Page 96: List of Projects for External Financing 1981-1984 Colombia

-82-

I. NAME OF THE PROJECT: Expansion of the BarranquillaTelephone System

II. EXECUTING AGENCY: Empresa Municipal de Telefonosde Barranquilla

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$50.4 million

V. EXTERNAL FINANCING REQUESTED: US$24.3 million

VI. LENDING AGENCY: Suppliers'Credit and CommercialBanks.

VII. DESCRIPTION AND JUSTIFICATION: The project consists of thepurchase and installation of 80,000 telephone lines. Empresa Municipalde Telefonos de Barranquilla is currently expanding its installed capa-city by 20,000 lines. At the end of 1980, the city had /0,000 linesor an average of seven telephones per 100 inhabitants. However, theaccelerated growth of the city requires a permanent expansion of itsinstalled capacity. Demand projections indicate that 80,000 additionallines are necessary for 1981-83 in order to maintain an acceptable levelof service.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1981 6.1 - 6.11982 10.0 12.3 22.31983 10.0 12.0 22.0Total 26.1 24.3 50.4

IX. STATUS: US$20.7 million out of $24.3million external financing has been secured.

Page 97: List of Projects for External Financing 1981-1984 Colombia

-83-

I. NAME OF THE PROJECT: Expansion of the UIrban TelephoneSystem

II. EXECUTING AGENCY: TELECOM

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$125.0 million

V. EXTERNAL FINANCING REQUESTED: US$75.0 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: The purpose of the project is tomeet the demand for local telephone services in the cities of Buenaventura,

Cucuta, Monteria, Sincelejo, Sogamoso, Valledupar, Honda, Tulua, Tumaco,Zipaquira, Cartagena and Pasto during 1983-86. The project iLncludes thepurchase and installation of 121,500 lines, in addition to the purchase ofcomplementary equipment. It also includes components for outside cable

connections, civil works and the purchase of 100,000 house telephones and5,000 public phones.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1983 20.0 24.0 44.01984 10.0 21.0 31.01985 10.0 15.0 25.01986 10.0 15.0 25.0Total 50.0 75.0 125.0

IX. STATUS: The technical and economic studiesare to be completed during 1981.

Page 98: List of Projects for External Financing 1981-1984 Colombia

-84-

I. NAME OF THE PROJECT: Cali Telephone Master Plan

II. EXECUTING AGENCY: EMCALI

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$180.0 million

V. EXTERNAL FINANCING REQUESTED: US$120.0 million

VI. LENDING AGENCY: Suppliers' Credit

VII. DESCRIPTION AND JUSTIFICATION: The purpose of the project isto meet the local demand for telephone services during the 1983-1986period. The project includes the acquisition and installation of200,000 lines, transmission equipment, construction of correspondingbuildings, acquisition of 200 telephone cabins for local and longdistance calls, of 240,000 phones and 1,000 public pay phones.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds:

Own ExternalYear Resources Financing Total

1983 30.0 20.0 50.01984 10.0 40.0 50.01985 10.0 40.0 50.01986 10.0 20.0 30.0Total 60.0 120.0 180.0

IX. STATUS: EMCALI has completed the technicaland economic studies of the project.

Page 99: List of Projects for External Financing 1981-1984 Colombia

-85-

I. NAME OF THE PROJECT: Complementary Telecommunications forNational Territories

II. EXECUTING AGENCY: TELECOM

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$35.0 million

V. EXTERNAL FINANCING REQUESTED: US$22.7 million

VI. LENDING AGENCY: Government of the Federal Republicof Germany

VII. DESCRIPTION AND JUSTIFICATION: The project seeks to:

- Improve the long distance communications infrastructure in 37municipalities in the eastern part of the country.

- Establish or improve the telephone service in 240 rural communities.

- Furnish 12 of the most important municipalities with automatictelephone services and improved telegraph services,

This telephone plan for theNational Territories, a vast area in eastern Colombia with difficulttopography, scattered population centers and low population density,willcomplement the program that TELECOM is already carrying cut. It isthought to be the most suitable way of integrating these communitieswith the rest of the country.

VIII. COSTS AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Funds External Financing Total

1982 4.9 7.8 12.71983 5.0 10.3 15.31984 2.4 4.6 7.0Total 12.3 22.7 35.0

IX. STATUS: External financing has beenrequested by the Government from the Federal Republic of Germany.

Page 100: List of Projects for External Financing 1981-1984 Colombia

-86-

I. NAME OF THE PROJECT: Expansion of the Girardot, SantaMarta, Palmira and PereiraTelephone System.

II. EXECUTING AGENCY: Empresas Municipales de Pereira,Empresas Publicas Municipales dePalmira and Empresas PublicasMunicipales de Girardot and Empresade Telefonos de Santa Marta.

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$80.0 million

V. EXTERNAL FINANCING REQUESTED: US$50.5 million

VI. LENDING AGENCY: Suppliers'Credit, Commercial Banks

VII. DESCRIPTION AND JUSTIFICATION: The project proposes to meet thedemand for automatic telephone service in Girardot, Santa Marta,Palmira and Pereira during 1983-89. It includes the purchase andinstallation of 85,000 telephone lines and complementary equipment,the construction of buildings to house the telephone exchanges andthe purchase of private and public telephones and other telecommunica-tions equipment.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1983 14.0 15.5 29.51984 6.0 10.0 16.01985 4.0 11.0 15.01986 4.0 9.0 13.01987 0.5 2.0 2.51988 0.5 1.0 1.51989 0.5 2.0 2.5Total 29.5 50.5 80.0

IX. STATUS: Each of the Empresas Municipalesis advancing the technical and economic studies to be presented forNPD approval during 1981.

Page 101: List of Projects for External Financing 1981-1984 Colombia

-87-

I. NAME OF THE PROJECI: Expansion of the TransmissionNetwork by Satellite

II. EXECUTING AGEINCY: TELECOM

1l1. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$200.0 million

V. EXTERNAL FINANCING REQUESTED: US$180.0 million

VI. LENDING AGENCY: Not yet determined

VII. DESCRIPTION AND JUSTIFICATION; The purpose of the project is to

establish a satellite system to improve national communications. The projectincludes the construction and installation of a satellite system consistingof a main satellite and a reserve one, six ground stations to be installedin the largest cities, thirteen medium traffic ground stations and 150 lowtraffic ground stations.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1982 2.0 18.0 20.01983 4.0 36.0 40.01984 5.0 45.0 50.01985 5.0 40.5 45.51986 4.0 40.5 44.5Total 20.0 180.0 200.0

IX. STATUS: TELECOMhas contracted consultingservices in telecommulnications to prepare the nroject.

Page 102: List of Projects for External Financing 1981-1984 Colombia

-88-

I. NAME OF THE PROJECT: Rural Telephone System - Phase II

II. EXECUTING AGENCY: TELECOM

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$74.0 million

V. EXTERNAL FINANCING REQUESTED: US$54.0 million

VI. LENDING AGENCY: Not yet determined

VII. DESCRIPTION AND JUSTIFICATION: TELECOM is currently engaged in theconstruction of Phase I of the rural telephone program which isexpected to provide telephone services to 2200 rural communities. Thesecond phase is envisaged to cover 2000 localities in remote ruralareas currently not serviced.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$million)

Source of Funds

Year Own Resources External Resources Total

1983 4.0 10.8 14.81984 6.0 16.2 22.21985 6.0 16.2 22.21986 4.0 10.8 14.8Total 20.0 54.0 74.0

IX. STATUS: The feasibility and technical studiesare being prepared.

Page 103: List of Projects for External Financing 1981-1984 Colombia

-89-

IV. AGRICULTURE AND RURAL DEVELOPMENT

Page 104: List of Projects for External Financing 1981-1984 Colombia
Page 105: List of Projects for External Financing 1981-1984 Colombia

-90-

I. NAME OF THE PROJECT: Arauca Colonization II

II. EXECUTING AGENCY: INCORA

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$32.0 million

V. EXTERNAL FINANCING REQUESTED: US$22.0 million

VI. LENDING AGENCY: IDB and International Fund forAgricultural Development

VII. DESCRIPTION AND JUSTIFICATION: The Arauca Colonization Phase IIproject, which will cover an area of 652,800 hectares, is envisaged tobe executed during a 5-year period. The project would provide: (a) creditfor 500 families in 800 new parcels of land with technical assistance pro-vided by INCORA; (b) construction of 58 kms. of roads, 4 bridges, andmaintenance of 197 kms. of roads constructed under Phase I; (c) construc-tion of 30 rural schools; (d) expansion of the Saraveria Hospital andthe Tame Health Center,and construction of 5 health centers and 5 healthposts; (d) construction of 40 houses; (e) credit for house constructionto 150 lot owners and 60 loans for house improvements; and (f) technicalassistance for the Libertad and Carimagua farms.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1981 2.0 4.2 6.21982 2.7 5.2 7.91983 2.8 4.9 7.71984 2.5 7.7 10.2TOTAL 10.0 22.0 32.0

IX. STATUS: Road designs are being completed.The loan agreement is expected to be signed this year.

Page 106: List of Projects for External Financing 1981-1984 Colombia

-91-

I. N.!NAME OF THE PROJECT- Irrigation Rehabilitation,Phase I

II. EXECUTING AGENCY: IMAT

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$86.0

V. EXTERNAL FINANCING REQUESTED: US$37.0 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: The principal objective of theproject is to prevent deterioration and prolong the useful life ofexisting physical infrastructure in six irrigation and two drainagedistricts covering 36,000 ha. through a program of rehabilitationand improved maintenance. In addition, the project would maximisethe use of existing investments and water by expanding the facilitiesto a further 11,000 ha. The project also aims at (a) promotingincreased efficiency in the use of water and farm inputs, primarilythrough increased volumetric water charges and the introduction ofbasin irrigation for rice cultivation; (b) introducing improvedcrop and livestock farming practices and increasing yields;(c) strengthening HIMAT's capacity to appraise and supervise irri-gation projects and to manage water; (c) encouraging the districtfarmers to assume increased responsibility for managing districtsthemselves; and (e) preparing a second phase to rehabilitate addi-tional irrigation districts.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1981 4.0 3.0 7.01982 4.7 3,5 8.21983 10. 0 7.5 17.51984 10.3 9.0 19.31985 12.0 8.0 20.01986 8.0 6.0 14.0Total 49.0 37.0 86.0

IX. STATUS: A US$37 million loan has beenapproved by IBRD.

Page 107: List of Projects for External Financing 1981-1984 Colombia

-92-

I. NAME OF THE PROJECT: Integrated Rural Development Program,Phase II

II. EXECUTING AGENCY: Various Governmental Agencies

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$250.0 million

V. EXTERNAL FINANCING REQUESTED: US$88.2 million

VI. LENDING AGENCY: IBRD, IDB

VII. DESCRIPTION AND JUSTIFICATION: The purpose of this project is toexpand the agricultural and livestock production of small farmers,including those that produce in farms of less than 20 hectares. Theproject seeks to increase the production of beans, corn, potatoes, yuca,beef, etc., through the provisions of credit, technical assistance,training, commercial, health, education, and electricity services andthe construction of housing and rural roads.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Agencies' Own National ExternalYear Resource Budget Financing Total

1982 7.0 12.1 9.0 28.11983 10.0 25.3 20.6 55.91984 12.0 42.0 36.0 90.01985 11.0 19.7 14.7 45.41986 10.0 12.7 7.9 30.6Total 50.0 111.8 88.2 250.0

IX. STATUS: IBRD has appraised the project.

Page 108: List of Projects for External Financing 1981-1984 Colombia

-93-

I. NAME OF THE PROJECT: Food Marketing (Phase I)

II. EXECUTING AGENCY: COPIAGRO

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$41.0 million

V. EXTERNAL FINANCING REQUESTED: US$20.5 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: Colombia's food marketingsystem is costly and risky, particularly because of the way it servicestraditional agriculture and medium and low income consumers. Toimprove the system, it is essential to provide adequate infrastructureand services. A plan for the construction of regional storage centershas been prepared which includes financing of such centers in Barranquillaand Bucaramanga and their area of influence.

VIII. COST AND AVAILABILITY OF FUNDS: (US$ million)

Source of Funds

Year Own Resources External Financing Total

1982 7.4 5.5 12.91983 6.6 8.0 14.61984 6.5 7.0 13.5Total 20.5 20.5 41.0

IX. STATUS: The studies for the constructionof storage centers in two cities are being completed.

Page 109: List of Projects for External Financing 1981-1984 Colombia

-94-

I. NAME OF THE PROJECT: Small Scale Farmer Credit

II. EXECUTING AGENCY: Caja de Credito Agrario, Industrial yrMinero

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$80.0 million

V. EXTERNAL FINANCING REQUESTED: US$40.0 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The purpose of this project is toimprove the productivity and welfare of Colombian farmers through anincrease in their capital assets. Funds would be chanelled to fin-ance development, renewal and maintenance of semipermanent and permanentcrops, acquisition of technological inputs, construction and improve-ment of rural housing and livestock,and pastures production and improve-ment. The farmers who are to be included in the program produce about70% of the total food consumption, and nearly 50% of the raw materialsof agricultural origin required by the industrial sector. The bene-ficiaries of this program should have a maximum level of gross assetsof Col$1.5 million (about US$26,000), maximum total farm area of 40hectares and the major part of their income arising from rural activities.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1982 9.5 8.7 18.21983 12.5 12.4 24.91984 18.0 8.9 36.9Total 40.0 40.0 80.0

IX. STATUS: The feasibility studies have been com-pleted. The request for a loan to the IDB is being prepared byCaja de Credito Agrario.

Page 110: List of Projects for External Financing 1981-1984 Colombia

-95-

T. NAME OF THE PROJECT: Maria La Baja IrrigationImprovement - Bolivar Project

II. EXECUTING AGENCY: HIMAT

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$44.2 million

V. EXTERNAL FINANCING REQUESTED: US$19.0 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The Maria La Baja Irrigationwas originally planned for the development of 17,000 hectares. In thisconnection, a large part of the basic irrigation and drainage investmentshave already been constructed. The intensive development of the area requiresa yearly supply of 250 million cubic meters of water. However, the dams atArroyo Grande and Arroyo Maturya can only supply 100 million cubic meters peryear. The proposed investments include the completion of irrigation and drainagesystems,and the infrastructure to provide the necessary facilities to supplythe additional 150 million cubic meters of water. Furthermore, the construc-tion of this project would incorporate new lands for agricultural developmentand increase the area under cultivation. The project also includes a technicalassistance component to study the feasibility of supplying water from theCanal del Dique to another area in the Maria La Baja region, in addition to asugar cane rehabilitation project in Santa Cruz.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1982 0.5 - 0.51983 5.4 3.6 9.01984 7.6 5.7 13.31985 7.7 4.9 12.61986 4.0 4.8 8.8Total 25.2 19.0 44.2

IX. STATUS: Discussions with IDB have beeninitiated. The feasibility studies have been completed. Additional work

is required to assess the ecological impact of the project.

Page 111: List of Projects for External Financing 1981-1984 Colombia

-96-

I. NAME OF THE PROJECT: Zulia-Urena Agro-industr:Lal Complex

IT. EXECUTING AGENCY: IFI-Agrozulia-Azurca

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$26.9 million

V. EXTERNAL FINANCING REQUESTED: US$14.3 million

VI. LENDING AGENCY: Not yet determined

VII. DESCRIPTION AND JUSTIFICATION: Zulia-Urena is a joint Colombia-Venezuela regional integration project for the production and pro-cessing of sugar and its derivatives. The project would be executedby a corporation with capital participation from both governments andCAF. The project would include the cultivation of 9,300 hectares ofsugarcane and the construction of a sugar producing complex in theZulia Valley, Colombia, and the construction of a refining ifacilityby Venezuela. Total Colombian investment consists of US$235.7 millionfor the agriculture component of the project and US$26.9 miLlion forthe industrial plants to be installed by Azurca.

VIII. COST AND AVAILABILITY OF FUNDS: Under preparation

IX. STATUS; The technical and economicfeasibility studies have been completed. Preliminary NPD approvalfor external financing has been given.

Page 112: List of Projects for External Financing 1981-1984 Colombia

-97-

I. NAME OF THE PROJECT: Warehouses and Silos

lII. EXECUTING AGENCY: IDEMA and Other Agencies

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$21.3 million

V. EXTERNAL FINANCING REQUESTED: US$12.8 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The purpose of the project is tofinance storage facilities, silos, and equipment for the dryingand treatment of grains in recently-developed agricultural areas whichlack adequate marketing infrastructure facilities. The project willinclude the northeast zone. Also included would be large urban areas(Barranquilla, Bogota, Cali, Bucaramanga) as well as ports and neighboringareas (Fundacion, Santa Marta, Cartagena). The project is envisaged toreduce product losses and excessive transportation costs, improve thequality of the products, limit the role of the intermediaries, and attaina level of stocks that will allow a continuous supply of products.

VIII. COST AND AVAILABILITY OF FUNDS: (US$ million)

Source of Funds

Year Own Resources External Financing Total

1982 3.7 4.3 8.01983 3.8 3.7 7.51984 1.0 4.8 5.8Total 8.5 12.8 21.3

IX. STATUS: An initial overall study hasbeen prepared. IDEMA is preparing specific projects studies. Otheragencies participating in the project have not been identified yet.

Page 113: List of Projects for External Financing 1981-1984 Colombia

-98-

I. NAME OF THE PROJECT: Small- and Medium-Scale Farmers Credit

II. EXECUTING AGENCY: Caja de Credito Agrario, Industrial yMinero

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$80.0 million

V. EXTERNAL FINANCING REQUESTED: US$28.0 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: The purpose of the project is toincrease the productivity and real incomes of small and medium-sizedfarmers by increasing their captial assets. Funds will be channelled tofinance the acquisition of inputs such as fertilizer and pesticides,construction and improvement of rural housing, renewal and maintenanceof semi-permanent crops,and livestock production and improvement. Thecomponent for small farmers will be executed in the Andean region. Themedium-size farmers conponent is to be undertaken in areas where soilimprovement projects are being executed. Major livestock areas will alsobenefit from the project. Components for training and technologicaltransfer are also included. As many as 6,000 people are envisaged tobenefit from this project.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1982 17.3 9.3 26.61983 17.3 9.3 26.61984 17.4 9.4 26.8Total 52.0 28.0 80.0

IX. STATUS: Caja Agraria has initiated thestudies required to support a request for external financing.

Page 114: List of Projects for External Financing 1981-1984 Colombia

-99-

I. NAME OF THE PROJECT: Agro-Industrial Credit Program

II. EXECUTING AGENCY: Banco de la Republica

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$150.0 million

V. EXTERNAL FINANCING REQUESTED: US$62.5 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: An essential element of the PINis the development of agro-industries. The purpose of the project isto provide financing for small-and medium-scale enterprises that processagricultural and fish products. The borrower will be Banco de laRepublica and the funds will be channelled through financial interme-diaries. Financing will be provided in several areas among which are:fruit processing, installation of cold storage houses and regionalslaughterhouses, chocolate production, fishmeal extraction, plantsfor seed handling, milk refrigeration and pasteurization, yuca starchextraction and banana processing. The project will also include tech-nical assistance and environmental protection.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1982 10.5 7.5 18.01983 24.5 17.5 42.01984 35.0 25.0 60.01985 17.5 12.5 30.0Total 87.5 62.5 150.0

IX. STATUS: The project is being preparedto be presented to IBRD.

Page 115: List of Projects for External Financing 1981-1984 Colombia

-100-

I. NAME OF THE PROJECT: Watershed Management

II. EXECUTING AGENCY: INDERENA

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$25.3 million

V. EXTERNAL FINANCING REQUESTED: US$7.5 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: The project aims at developingviable systems to: (a) slow down the erosion of agricultural landand siltation of hydropower reservoirs; (b) maintain a pernmanentwater supply for irrigation and domestic use; (c) control wraterrun-off to alleviate flooding. To achieve these goals, the projectwould assist farmers in three sub-watershed areas by introc[ucingsoil conserving cropping patterns, changing livestock management,reforesting marginal or extremely vulnerable areas and constructingappropriate structures to slow down erosion. This project is regardedas a first-phase pilot scheme, to form the basis for major watershedprotection projects in the future. A second phase to cover theentire Upper Magdalena Watershed would be prepared under the project.For preparation of Phase II, research and evaluation are importantcomponents of the project.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1982 3.2 2.5 5.71983 4.9 1.9 6.81984 6.5 1.9 8.41985 3.2 1.2 4.4Total 17.8 7.5 25.3

IX. STATUS: The project has been appraised byIBRD.

Page 116: List of Projects for External Financing 1981-1984 Colombia

-101-

I. NAME OF THE PROJECT: Sinu River Basin Development

II. EXECUTING AGENCY: Corporacion Autonoma Regional dee losValles del Sinu y San Jorge

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$70.0 million

V. EXTERNAL FINANCING REQUESTED: US$20.0 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The purpose of the project is to finance

irrigation and water control investments in the Sinu River basin. A master

plan has been prepared for the integrated development of the region. Theplan has identified the area of Betania as good for irrigation with a poten-

tial development of 40,000 hectares. The area is endowed with good soils foragriculture and livestock development,and is rich in natural and mineralresources. The plan also recommends investments in water control and waterproduction for human consumption, in addition to water control investments in

the area of Cienaga Grande de Lanca to prevent ecological losses that mayoccur after the construction of the IJrra I and II darms.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1983 6.4 2.0 8.4

1984 10.0 4.0 14.01985 14.4 8.0 22.41986 12.8 4.0 16.8

1987 6.4 2.0 8.4

Total 50.0 20.0 70.0

IX. STATUS: crS_g-ies for a _..er st cr

initiated in October 1978.

Page 117: List of Projects for External Financing 1981-1984 Colombia

-102-

I. NAME OF THE PROJECT: Food Markets and StorageCenters in Medium-Size Cities

II. EXECUTING AGENCY: COFIAGRO

III. YEAR CONTRACT TO BE SIGNED: 1984

IV. TOTAL ESTIMATED COST: US$34.0 million

V. EXTERNAL FINANCING REQUESTED: US$20.0 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: This project consists of theconstruction of storage centers as part of the second stage of thefood marketing improvement program.

VIII. COST AND AVAILABILITY OF FUNDS:

Source of Funds

Year Own Resources External Financing Total

1984 7.0 3.0 10.01985 4.0 10.0 14.01986 3.0 7.0 10.0Total 14.0 20.0 34.0

IX. STATUS: Preliminary studies have begunin medium-sized cities identified in the National Integration Plan.

Page 118: List of Projects for External Financing 1981-1984 Colombia
Page 119: List of Projects for External Financing 1981-1984 Colombia

-103-

V. INDUSTRY AND MINING

Page 120: List of Projects for External Financing 1981-1984 Colombia
Page 121: List of Projects for External Financing 1981-1984 Colombia

-104-

I. NAME OF THE PROJECT: Mining Development FinanceCompany

II. EXECUTING AGENCY: ECOMINAS

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$50.4 million

V. EXTERNAL FINANCING REQUESTED: US$25.0 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: The purpose of the project isto provide financing to meet credit demand in the small and medium-sized mining subsector. Financing would be available to equip andmodernize mining operations in order to increase production and effi-ciency.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Own ExternalYear Resources Financing Total

1982 5.0 5.0 10.01983 10.0 10.0 20.01984 8.0 8.0 16.01985 2.4 2.0 4.4Total 25.4 25.0 50.4

IX. STATUS: ECOMINAS is updating a fEeasibilitystudy.

Page 122: List of Projects for External Financing 1981-1984 Colombia

-105-

Semi-Integrated Plant for theI. NAMF OF THE PROJECT: Production of Sponge Iron

II. EXECUTING AGENCY: IFI-Ferrominera S.A.

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$107.0 million

V. EXTERNAL FINANCING REQUESTED: US$70.0 million

VI. LENDING AGENCY: Export Credit Agencies,Commercial Banks.

VII. DESCRIPTION AND JUSTIFICATION: The project consists of theconstruction of a sponge-iron plant to meet the demand for rawmaterial from semi-integrated siderurgical industries. The domesticmarket has been estimated to require 350,000 tons of sponge iron peryear which is currently being imported. The project would utilizenatural gas from the Atlantic coast.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1982 7.0 23.5 30.51983 17.0 36.1 53.11984 13.0 10.4 23.4Total 37.0 70.0 107.0

IX. STATUS: The alternative sites for theport and the design of the plant are being studied. The feasibilitystudies were completed in 1981.

Page 123: List of Projects for External Financing 1981-1984 Colombia

-106-

NAME OF THE PROJECT: Small- and Medium-ScaleIndustries Development

II. EXECUTING AGENCY: CFP

III. YEAR CONTRACT TO BE SIGNED: 1982, 1984

IV. TOTAL ESTIMATED COST: US$118.7 million

V. EXTERNAL FINANCING REQUESTED: US$45.3 million

VI. LENDING AGENCY: IBRD, KfW

VII. DESCRIPTION AND JUSTIFICATION: In recent years, the CFP hasbecome an important source of credit for small and medium-scaleindustries. The new line of credit will be used to finance loans forinvestments in fixed assets and technical assistance to small andmedium-scale industries.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

OwnYear Resources External Financing Total

1982 3.6 2.3 5.91983 7.4 4.5 11.91984 16.9 6.8 23.71985 12.4 11.3 23.71986 12.3 9.1 21.41987 11.0 6.8 17.81988 9.8 4.5 14.3Total 73.4 45.3 118.7

IX. STATUS: US$5.3 million is requested

for 1982 and US$40.0 million for 1984, of which DM 10 m:Lllion isbeina negotiated with KfW.

Page 124: List of Projects for External Financing 1981-1984 Colombia

-107-

I. NAME OF THE PROJECT: Development of Phosphoric RockResources, Sardinata and Pesca

II. EXECUTING AGENCY: ECOMINAS

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIIMATED COST: US$250.0 million

V. EXTERNAL FINANCING REQUESTED: US$125.0 million

VI. LENDING AGENCY: IDB, IBRD

VII. DESCRIPTION AND JUSTIFICATION: The project, which consists ofmining operations and fertilizer production, is designed to solvethe problem of inadequate supply of phosphoric fertilizers by usingphosphoric rock to produce sulphuric and phosphoric acid and finalphosphate fertilizers possibly DAP. The domestic supply of phosphoricfertilizers would substitute about US$60 million per year in imports.

VIII. COST AND AVAILABILITY OF FUNDS: Under preparation

IX. STATUS: The feasibility and designstudies are being financed by IDB. They are expected to becompleted in 1982.

Page 125: List of Projects for External Financing 1981-1984 Colombia

-108-

_. NAME OF THE PROJECT: Third IDB Development FinanceCredit Line

II. EXECUTING AGENCY: Banco de la Republica

III. YEAR TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$128.0 million

V. EXTERNAL FINANCING REQUESTED: US$50.0 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The purpose of the project is toincrease the amount of financing resources to development financecompanies through the credit lines of the Banco de la Republica.

VIII. COST AND FINANCING: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1984 25.0 15.0 40.01985 28.0 20.0 48.01986 25.0 15.0 40.0Total 78.0 50.0 128.0

IX. STATUS: Project to be prepared in 1982.

Page 126: List of Projects for External Financing 1981-1984 Colombia
Page 127: List of Projects for External Financing 1981-1984 Colombia

-109-

VI. WATER SUPPLY AND SEWERAGE

Page 128: List of Projects for External Financing 1981-1984 Colombia
Page 129: List of Projects for External Financing 1981-1984 Colombia

-110-

I. NAME OF THE PROJECT: Water Quality Improvementand Control

II. EXECUTING AGENCY: Ministerlio de Saludl, INSFOPAL

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$10.8 million

V. EXTERNAL FINANCING REQUESTED: US$9.0 million

VI. LENDING AGENCY: Suppliers' Credit, BilateralAgencies

VII. DESCRIPTION AND JUSTIFICATION: The purpose of the projectwould be to supply the materials, equipment and physical facilitiesnecessary to improve and control the quality of the water supplied inthe country. It would also include training and monitoring components.The objective of the project would be to eliminate the possibilities ofwater-borne diseases from current water supply sources, increase thecoverage of chemical treatment to systems already constructed, andstrengthen the institutional capability of the National Health Serviceso that it can exercise adequate water quality control.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year National Budget External Financing Total

1982 0.6 3.9 4.51983 0.6 2.6 3.21984 0.6 2.5 3.1Total 1.8 9.0 10.8

IX. STATUS: The Ministry of Hea,lth has cotnpletndall the required studies. The National Health Service will le in charge ofthe designs.

Page 130: List of Projects for External Financing 1981-1984 Colombia

I. NAME OF THE PROJECT: Barranquilla Water Supply and Sewerage

II. EXECUTING AGENCY: Empresas Publicas Municipales deBarranquilla

III. "EAR CONTRACT TO BE SI'GNED 198Z.

IV. TOTAL ESTIMATED COST: US$40.0 million

V. EXTERNAL FINANCING REQUESTED: US$20.0 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: On the basis of population growthprojections, Barranquilla's potable water system needs to be expanded.The following components are included: catchment, caption, presedi-mentation, treatment plant and lines and distribution networks to low-income zones lacking access to potable water. The project would alsoseek to increase the sewerage system coverage to 85% from 48%.

VIII. COST AND AVAILABILITY OF FUNDS: Unider preparation

IX. STATUS: A 1973 study focused on thealternatives for potable water supply. Most of the sewage designs areavailable. The final feasibility studies are under preparation withFONADE financing.

Page 131: List of Projects for External Financing 1981-1984 Colombia

-112-

I. NAME OF THE PROJECT: Santa Marta Water Supply andSewerage

II. EXECUTING AGENCY: EMPOMARTA

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$60.0 million

V. EXTERNAL FINANCING REQUESTED: US$24.0 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION; Santa Marta's rising population growthrequires rapid action to assure the city with an adequate supply of potablewater. The project proposes investments in catchment, channelling, treat-ment and distribution from sources emanating from the Gaira R:Lver. The seweragesystem also requires immediate action. The project would inc:Lude the construc-tion of water collectors,and pumping and household networks. At present thereis a 30% sewerage coverage. The proposed investments would increase it to 75%.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Financing External Financing Total

1982 9.3 6.2 15.51983 19.5 13.0 32.51984 7.2 4.8 12.0Total 36.0 24.0 60.0

IX. STATUS: A Master Plan for the sewerage systemwas completed in 1965, but its technical designs are not aDDlicable tothe present situation. EMPOMARTA has concluded partial studies of water-supplylines. An updating of the Master Plan will be required.

Page 132: List of Projects for External Financing 1981-1984 Colombia

-113-

I. NA.E OF THE PROJECT: Cucuta Water Supply and Sewerage

II. EXECUTING AGENCY: Empresas Municipales de Cucuta.

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$36.6 million

V. EXTERNAL FINANCING REQUESTED: US$17.7 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: The project consists of investmentsin catchment, channelling and treatment of waters from the ZuliaRiver that would permit 95% of the city's population to have accessto potable water in 1993. Thae sewerage system requires investmentsin interceptors, storm water drainage channels, and maintenanceequipment. The proposed investments would increase sewerage covera-ge to 70% in 1995.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1983 5.4 6.2 11.71984 7.5 5.6 13.01985 3.5 3.7 7.21986 2.5 2.2 4.7Total 18.9 17.7 36.6

IX. STATUS: Preliminary designs for thewater supply works exist and final designs will be contractedshortly with financing from FONADE. Final designs for the mainsewerage works have been completed.

Page 133: List of Projects for External Financing 1981-1984 Colombia

-114-

Small-Cities Water SupplyI. NAME OF THE PROJECT: and Sewerage

II. EXECUTING AGENCY: INSFOPAL

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$130.0 million

V. EXTERNAL FINANCING REQUESTED: US$65.0 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: This project would providefinancing for the construction of water supply and sewerage services in

379 localities with populations ranging between 2,500 and 20,000 inhabi-tants. These localities make up 45% of all municipalities. About 3million people would benefit from the project.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Internal Financing External Financing Total

1982 6.5 6.5 13.01983 25.7 19.5 45.21984 13.5 26.0 39.51985 19.3 13.0 32.3TOTAL 65.0 65.0 130.0

IX. STATUS: Project is under preparation.

Page 134: List of Projects for External Financing 1981-1984 Colombia

-115-

Solid Waste Disposal in

I. NAME OF THE PROJECT: 12 Cities

II. EXECUTING AGENCY: INSFOPAL

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$12.2 million

V. EXTERNAL FINANCING REQUESTED: US$8.8 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: Studies by the Ministry of Healthon urban cleanliness indicate serious deficiencies in household handlingand storage of garbage, cleanliness of public roads and trash collectionand disposal. In order to tackle these problems and to establish anintegrated policy with regard to solid waste disposal, a pilot programfor urban cleanliness has been proposed for the following cities:Bucaramanga, Cartagena, Manizales, Ibague, Pereira, Barrancabermeja,Tunja, Riohacha, Armenia, Calarca, Turbaco and Dosquebradas. The projectis also envisaged to improve and strengthen the operations of the enter-prises in charge of providing the above services.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of FundsLocal Financing

Year Budget Other External Financing Total

1982 0.2 --- 0.0 0.21983 1.4 0.2 3.2 4.81984 0.6 0.2 2.2 3.01985 0.6 0.2 3.4 4.2Total 2.8 0.6 8.8 12.2

IX. STATUS: The program is based on the PRONASUstudy elaborated by the Ministry of Health and by INSFOPAL in July, 1976.Most of the specific designs are available and the remaining ones are to

be concluded in 1981.

Page 135: List of Projects for External Financing 1981-1984 Colombia

-116-

I. NAME OF THE PROJECT: Bogota River Regulation andSewerage Treatment

II. EXECUTING AGENCY: EAAB

III. YEAR CONTRACT TO BE SIGNED: 1982, 1984

IV. TOTAL ESTIMATED COST: US$240.0 million

V. EXTERNAL FINANCING REQUESTED: US$148.0 million

VI. LENDING AGENCY: IBRD, IDB

VII. DESCRIPTION AND JUSTIFICATION: The contamination of the BogotaRiver will eventually affect the Magdalena River, polluting a largeand populous area downstream. Two alternatives have been identif ieefor the treatment of sewerage: (a) a single plant to handleall sewerage, which will require the construction of a 26 km.collector parallel to the Bogota River; (b) three smalLer treat-ment plants (Salitre, Fucha and Tunjuelo).

The regulation of ithe BogotaRiver will deepen and widen its course along 60 km. between JuanAmarillo and Alicachin to adapt it to the increased flow of water

from the Chingaza project and to avoid the floods that affectsurroundine areas.

VIII. COSTS AND AVAILABILITY OF FUNDS: Under preparation

IX. STATUS: Feasibility stud:ies for theFogota River regulation component have been completed. Furtherfeasibility and design stiudies are being prepared. US$330 million

is requested for 1982 and US$220 million is requested for 1983.

Page 136: List of Projects for External Financing 1981-1984 Colombia

-117-

I. NAME OF THE PROJECT: Rural Water Supply

II. EXECUTING AGENCY: INS

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$30.0 million

V. EXTERNAL FINANCING REQUESTED: US$17.8 million

VI. LENDING AGENCY: Not yet determined

VII. DESCRIPTION AND JUSTIFICATION: In Colombia, out of a totalpopulation of about 2.6 million living in about 6,000 villages,only 860,000 (or 30%) have access to water supply and 170,000(or 17%) to sewerage services. In the case of dispersed ruralareas, less than 10% of an estimated population of about 6.5 millionhave sanitary disposal services or connections to small supplysystems. The proposed project would provide water supply andsewerage systems to the rural areas with the objective of providing80% of the population with water supply systems and 60% withsewerage systems by 1990.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Financing External Financing Total

1983 2.3 3.7 6.01984 3.5 5.5 9.01985 3.5 5.5 9.01986 2.9 3.1 6.0Total 12.2 17.8 30.0

IX. STATUS: NPD and INS, in coordinationwith the Nacional Food and Nutrition Plan and the Integrated RuralDevelopment Plan, will determine the specific areas where theprogram is to be carried out. INS has some design studies butit will be necessary to contract a credit with FONADE in order tofinance the completion of all designs.

Page 137: List of Projects for External Financing 1981-1984 Colombia

-118-

VII. EDUCATION

Page 138: List of Projects for External Financing 1981-1984 Colombia
Page 139: List of Projects for External Financing 1981-1984 Colombia

-119-

I. NAME OF THE PROJECT: Vocational Training

II. EXECUTING AGENCY: SENA

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$60.0 million

V. EXTERNAI FINANCING REQUESTED: US$20.0 million

VI. LENDING AGENCY: Suppliers'Credit

VII. DESCRIPTION AND JUSTIFICATION: The project consists of the pur-chase of equipment to renew and modernize equipment utilized in profes-sional training centers. It also includes the improvement of the tech-nical and organizational facilities of SENA. The existing equipmentis very deteriorated after 22 years of use in training skilled workers.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1981 9.0 3.0 12.01982 17.0 13.0 30.01983 14.0 4.0 18.0Total 40.0 20.0 60.0

IX. STATUS: The project has received theGovernment's approval to secure external financing. The cost of theproject is under review.

Page 140: List of Projects for External Financing 1981-1984 Colombia

-120-

I. NAME OF THE PROJECT: Scientific and TechnologicalDevelopment, Phase I

II. EXECUTING AGENCY: COLCIENCIAS

III. YEAR TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$34.5 million

V. EXTERNAL FINANCING REQUESTED: US$20.0 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The National Integration Plan hasassigned a high priority to scientific and technological developmentto achieve its sectoral objectives. The project proposes to strengthenthis effort through the following: 1) financing of basic and appliedresearch; 2) financing of technological development; 3) training;4) national information system; 5) development and promotion activi-ties; 6) monitoring and control systems; and 7) technical assistance.

VIII. COST AND FINANCING: (in US$ million)

Source of Funds

Year National Budget External Financing Total Cost

1983 2.0 1.8 3.81984 2.3 3.4 5.71985 3.0 4.5 7.51986 3.2 5.1 8.31987 4.0 5.2 9.2Total 14.5 20.0 34.5

IX. STATUS: The prefeasibility study isbeing prepared.

Page 141: List of Projects for External Financing 1981-1984 Colombia

-121-

I. NAME OF THE PROJECT: Higher Education Development,Phase I

II. EXECUTING AGENCY: ICFES

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$57.4 million

V. EXTERNAL FINANCING REQUESTED: US$33.3 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The purpose of this project isto finance a program comprised of infrastructure, training, research,curriculum development and evaluation with the objective of improvinghigher education in the educational system. The project follows thepriorities set by the National Integration Plan with respect to scienceand technology needs. In this connection, the project seeks not onlyto strengthen professional training but also to improve universityresearch and relate it to the scientific and technological progressrequired. The project covers different educational areas: naturalsciences, health, engineering, architecture, agronomy, and veterinaryscience. It will allow the integration of different forms of training,easier organization, development related to the regional resources andpotential, and a selective orientation of the institutional develop-ment needs of higher education.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing lotal

1982 2.6 0.0 2.61983 10.0 13.0 23.01984 11.5 20.3 31.8Total 24.1 33.3 57'.4

IX. STATUS: The prefeasibility study has beencompleted. A work group established by ICFES has been preparing thecorresponding studies required, with the support of NPD.

Page 142: List of Projects for External Financing 1981-1984 Colombia

-122-

I. NAME OF THE PROJECT: Rural and Village EducationDevelopment, Phase I

II. EXECUTING AGENCY: MEN

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$40.0 million

V. EXTERNAL FINANCING REQUESTED: US$15.0 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: The project emphasizes educationalsystem development related to training needs identified in the ruralareas. The project's objectives are to improve efficiency in primaryeducation in order to achieve five years of required schooling for allchildren, emphasize vocational training and increase adult education.The project components include investments in remodelling, constructionand equipment of schools, teacher training, educational materials,supervision, management at national, departmental and school districtlevels, water supply services, transport and project monitoring.

VIII. COST AND AVAILABILITY OF FUNDS: 'Under preparation

IX. STATUS: Program proposal is underpreparation by the Ministry of Education.

Page 143: List of Projects for External Financing 1981-1984 Colombia

-123-

I. NANE OF THE PROJECT: Private Sector Scientific andTechnological Development

II. EXECUTING AGENCY: Fundaci6n para la Educaci6nSuperior (FES)

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$50.0 million

V. EXTERNAL FINANCING REQUESTED: US$15.0 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The objective of the project isto finance scientific and technological development programs ofprivate sector entities through FES. Financial assistance wouldbe provided to projects in the fields of personal and environmentalhealth, agroindustries, natural resources, mining, industry, basicsciences, and education technology. Private sector entities suchas universities and research centers will benefit from this project.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1984 10.5 4.5 15.01985 12.2 5.3 17.51986 10.5 4.5 15.01987 1.8 0.7 2.5Total 35.0 15.0 50.0

IX. STATUS: Participating institutions arepreparing specific financing proposals for consideration by FES.

Page 144: List of Projects for External Financing 1981-1984 Colombia
Page 145: List of Projects for External Financing 1981-1984 Colombia

-124-

VIII. NUTRITION AND HEALTH

Page 146: List of Projects for External Financing 1981-1984 Colombia
Page 147: List of Projects for External Financing 1981-1984 Colombia

-125-

I. NAME OF THE PROJECT: Transport Equipm,ent for theNational Health System

II. EXECUTING AGENCY: Ministerio de Sa:Lud

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$4.7 million

V. EXTERNAL FINANCING REQUESTED: US$4.7 million

VI. LENDING AGENCY: Suppliers' Credil: and CommercialBanks

VII. DESCRIPTION AND JUSTIFICATION: The project will replace andincrease the transport equipment utilized in the health services. Thisequipment is urgently needed because of the advanced state of deteriorationof a good number of the vehicles in service,and by the inadequate size ofthe fleet. Three hundred and sixty-eight vehicles are to be procured.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year External Financing Total

1981 1.0 1.01982 3.7 3.7Total 4.7 4.7

IX. STATUS: Studies have been completed.

Page 148: List of Projects for External Financing 1981-1984 Colombia

-126-

I. NAME OF THE PROJECT: Slaughterhouses

II. EXECUTING AGENCY: Ministerio de Salud

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$21.8 million

V. EXTERNAL FINANCING REQUESTED: US$12.7 million

VI. LENDING AGENCY: Suppliers'Credit and CommercialBanks.

VII. DESCRIPTION AND JUSTIFICATION: In 1976, the Ministry of Health estab-lished that 95% of the slaughterhouses did not meet the technical andsanitary requirements that guarantee acceptable quality,and did not havethe equipment necessary for utilization and transformation of subproducts.Because of this, a Food Sanitation national plan was initiated in order toreduce the loss of food resulting from deterioration and to avoid food-relateddiseases. The plan is oriented towards the construction and remodelingof slaughterhouses, including the furnishing of technical and sanitaryequipment. Their operational efficiency is to be increased to eliminatelosses and increase subproducts. In addition, the risks of infectious,toxic and parasitic diseases carried by meat are expected to be reduced.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year National Budget Other External Financing Total

1981 0.4 1.2 2.1 3.71982 1.0 3.0 4.8 8.81983 0.8 2.3 3.7 6.81984 0.1 0.3 2.1 2.5Total 2.3 6.8 12.7 21.8

IX. STATUS: The Ministry of Health has completed thepreliminary studies of the sluaghterhouses. Designs for the specificprojects are required.

Page 149: List of Projects for External Financing 1981-1984 Colombia

-127-

I. NAME OF THE PROJECT: Telecommunications Network forthe National Health System

II. EXECUTING AGENCY: FNH

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$4.7 million

V. EXTERNAL FINANCING REQUESTED: US$4.7 million

VI. LENDING AGENCY: Suppliers'Credit

VII. DESCRIPTION AND JUSTIFICATION: The purpose of the project is

to supply the National Health System with a telecommunicationsnetwork that will improve coordination of regional healtlh services.The project will provide telecommunications equipment to 24 sectionalheadquarters, 108 regional hospitals, 389 local hospitals and 140 mobileunits.

VIII. COST AND AVAILABILITY OF FUNDS:

Source of Funds

Year Own Resources External Financing Total

1981 4.7 4.7Total 4.7 4.7

IX. STATUS: The Health Ministry and TELECOMhave undertaken a series of studies since 1974 which indicate a clearneed to establish an efficient communications network. US$4.7 millionhas been secured with AEG Telefunken.

Page 150: List of Projects for External Financing 1981-1984 Colombia

-128-

I. NAME OF THE PROJECT: Hospital Equipment

II. EXECUTING AGENCY: FNH

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$40.0 million

V. EXTERNAL FINANCING REQUESTED: US$40.0 million

VI. LENDING AGENCY: Suppliers' Credit and CommercialBanks

VII. DESCRIPTION AND JUSTIFICATION: The purpose of the project is topurchase urgently needed hospital equipment. A survey of hospitalequipment conducted by the Ministry of Health in 1979 detected con-siderable deficiencies in the following areas: odontology, ortho-pedics, urology, microneurosurgery, endoscopics, advanced radiology,and otorhinolaringology. Local and regional hospitals willreceive the bulk of this equipment. University hospitals will beendowed with advanced radiology units.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds:

Year External Financing Total

1982 14.2 14.21983 12.9 12.91984 12.9 12.9Total 40.0 40.0

IX. STATUS: Preliminary NPD approval forexternal financing has been given.

Page 151: List of Projects for External Financing 1981-1984 Colombia

-129-

I. NAME OF THE PROJECT: PANCOGER

II. EXECUTING AGENCY: Various Government Agencies

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$45.0 million

V. EXTERNAL FINANCING REQUESTED: US$25.0 million

VI. LENDING AGENCY: International Fund for AgriculturalDevelopment

VII. DESCRIPTION AND JUSTIFICATION: The PANCOGER program, which is partof the National Nutrition Plan (PAN), consists in the production of foodfor family consumption in small plots. This program is geared toColombia's poorest families living in rural areas and in lots of notmore than 2 hectares. The project includes the provision of credit,inputs and technical assistance, together with training and nutritioneducation.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year National Budget External Financing Total.

1982 2.8 5.0 7.81983 6.2 6.3 12.51984 7.0 8.7 15.71985 4.0 5.0 9.0Total 20.0 25.0 45.0

IX. STATUS: Project preparation is underway.

Page 152: List of Projects for External Financing 1981-1984 Colombia

-130-

I. NAME OF THE PROJECT: Integrated Nutrition Program,Second Stage

II. EXECUTING AGENCY: Various Government Agencies

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$61.2 million

V. EXTERNAL FINANCING REQUESTED: US$25.0 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: Phase I of the NationalNutrition Program, currently underway, is expected to be extended toother parts of the country. The project components include programsin nutritional education, basic services, sanitation and distributionof subsidized food through the use of coupons.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year National Budget External Financing Total

1983 6.6 3.0 9.61984 13.9 13.0 26.91985 15.7 9.0 24.7Total 36.2 25.0 61.2

IX. STATUS: An assessment of theresults of Phase I to be prepared and will be used in the preparationof the second phase.

Page 153: List of Projects for External Financing 1981-1984 Colombia

-131-

I. NAME OF THE PROJECT: Expansion of BiologicalLaboratories

II. EXECUTING AGENCY: INAS

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$26.3 million

V. EXTERNAL FINANCING REQUESTED: US$15.0 million

VI. LENDING AGENCY: Not yet determined

VII. DESCRIPTION AND JUSTIFICATION: The project consists of the purchaseof equipment in order to effectively meet the demand by public aid inst:itu-tions for laboratory services.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1982 3.7 5.0 8.71983 3.7 5.0 8.71984 3.9 5.0 8.9Total 11.3 15.0 26.3

IX. STATUS: A prefeasibility study is beingprepared.

Page 154: List of Projects for External Financing 1981-1984 Colombia
Page 155: List of Projects for External Financing 1981-1984 Colombia

-132-

IX. URBAN AND REGIONAL DEVELOPMENT

Page 156: List of Projects for External Financing 1981-1984 Colombia
Page 157: List of Projects for External Financing 1981-1984 Colombia

-133-

I. NAME OF THE PROJECT: Medellin Urban Development

II. EXECUTING AGENCY: Municipio de Medellin

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$100.0 million

V. EXTERNAL FINANCING REQUESTED: US$54.0 million

VI. LENDING AGENCY: Bank of America

VII. DESCRIPTION AND JUSTIFICATION: The purpose of this project is to solvethe traffic congestion problems in Medellin. The project irLcludes the connec-tion with the northeast zone of Medellin and its underpasses, terminals forinterurban and railroad transport, road works which include street widening,circles, and Junctions at bridges and side roads. This program is expectedto improve transport efficiency within the context of urban developmentpolicies.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Funds External Financing Total

1981 10.0 14.0 24.01982 21.0 25.0 46.01983 15.0 15.0 30.0Total 46.0 54.0 100.0

IX. STATUS: US$54 million loan was signed with

Bank of America.

Page 158: List of Projects for External Financing 1981-1984 Colombia

-134-

I. NAME OF THE PROJECT: Metropolitan Train System - Medellin

II. EXECUTING AGENCY: ETMVA

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$401.3 million

V. EXTERNAL FINANCING REQUESTED: US$164.6 million

VI. LENDING AGENCY: Commercial Banks, Suppliers' Credit,Export Credit Agencies

VII. DESCRIPTION AND JUSTIFICATION: The purpose of this project is toconstruct a train system in Medellin, 25 km. long, between Machado inthe North and Sabanita in the South. In addition, it includes atransversal line, 3.6 km. long, between Floresta in the west andBerrio Park in the center of the city. Medellin, the second largestcity in the country, is faced with a growing deficiency in the areaof urban transportation, which is envisaged to be resolved byexpanding the city's mass transit systems.

VIII. COST AND AVAILABILITY OF FUNDS: Under Preparation

IX. STATUS: The feasibility studies have beencompleted. Authorization for securing external financing is beingsought.

Page 159: List of Projects for External Financing 1981-1984 Colombia

-135-

I. NAME OF THE PROJECT Investment Program for UrbanInfrastructure

II. EXECUTING AGENCY: BCH-FFDU

III. YEAR CONTRACT TO BE SIGNED: 1981

IV. TOTAL ESTIMATED COST: US$40.0 million

V. EXTERNAL FINANCING REQUESTED: US$24.0 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The objective of this program isto improve the deficient urban infrastructure in cities of less than150 thousand inhabitants and in the poor areas of medium and largesized cities. The program also seeks to strenthen cost recoverymechanisms in the financing of urban development projects. BancoCentral Hipotecario will use the resources of the program to providemedium-term financing to municipalities, departments and theirrespective decentralized agencies for the construction of componentssuch as sewerage and water supply systems, roads, recreatiLonal andcultural centers, market places, electricity networks and slaughterhouses.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1981 4.4 3.6 8.01982 5.2 10.8 16.01983 6.4 9.6 16.0Total 16.0 24.0 40.0

IX. STATUS: Total external finanLcing has

been secured with IDB.

Page 160: List of Projects for External Financing 1981-1984 Colombia

-136-

I. NAME OF THE PROJECT: Mass Transportation System for Bogota(Phase I)

II. EXECUTING AGENCY: Distrito Especial de Bogota

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$2,500.0 million

V. EXTERNAL FINANCING REQUESTED: US$1,500 million

VI. LENDING AGENCY: Commercial Banks and Suppliers'Credit.

VII. DESCRIPTION AND JUSTIFICATION: The purpose of this project is to under-take the construction of a mass transport system for Bogota. Transportationin Bogota is one of Bogota's most serious problems. The city has 36% of allmotor vehicles in the country and 20% of its population. These two factorsresult in traffic with an average speed of 18.9 km. per hour during workinghours.

VIII. COST AND AVAILABILITY OF FUNDS: Under preparation

IX. STATUS: The preparation of feasibilitystudies is underway.

Page 161: List of Projects for External Financing 1981-1984 Colombia

-137-

I. NAME OF THE PROJECT: Mass Transportation System for Cali

II. EXECUTING AGENCY: 1>romiotora de Transport:e Masivodel Valle

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$26.1 million

V. EXTERNAL FINANCING REQUESTED: US$21.4 million

VI. LENDING AGENCY: Suppliers' Credit and Commercial Banks

VII. DESCRIPTION AND JUSTIFICATION: The mass transportaticin system selectedfor Cali, Colombia's third largest city, consists of trolley buses andtheir related power distribution network, to be provided under this project.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1982 1.3 7.6 8.91983 2.5 7.5 10.01984 0.9 6.3 7.2Total 4.7 21.4 26.1

IX. STATUS: Feasibility studies are beingcompleted.

Page 162: List of Projects for External Financing 1981-1984 Colombia

-138-

I. NAME OF THE PROJECT: Buenaventura Integrated Development

Plan - II Phase

II. EXECUTING AGENCY: CVC

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$40.0 million

V. EXTERNAL FINANCING REQUESTED: US$20.0 million

VI. LENDING AGENCY: IDB

VII. DESCRIPTION AND JUSTIFICATION: The purpose of this program is to under-take infrastructure investments designed to attract industrial investments

in Buenaventura and its surrounding areas. The first stage of the programincludes investments in infrastructure development, anid the preparation ofindustrial development studies based on an efficient exploitation of timberand fish resources. These studies are expected to determine the potentialdemand, installed capacity required, possible sites, technical requirementsand potential job creation of new industrial activities.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Own Resources External Financing Total

1983 3.0 3.0 6.01984 7.0 7.0 14.01985 6.0 5.0 11.01986 4.0 5.0 9.0Total 20.0 20.0 40.0

IX. STATUS: The feasibility studies are under prepa-ration.

Page 163: List of Projects for External Financing 1981-1984 Colombia

-139-

I. NAME OF THE PROJECT: Interurban Passenger Terminals

II. EXECUTING AGENCY: CFT

III. YEAR CONTRACT TO BE SIGNED: 1983

IV. TOTAL ESTIMATED COST: US$50.0 million

V. EXTERNAL FINANCING REQUESTED: US$15.0 million

VI. LENDING AGENCY: IBRD

VII. DESCRIPTION AND JUSTIFICATION: The purpose of this project isto finance the construction of a number of interurban passenger ter-minals. In 1972, CFT undertook a master plan for the constructionof terminals and fixed the guidelines for their construction. Atpresent, the Cali, Chiquinquira and Sogamoso terminals are inoperation and the Popayan, Girardot, Pereira and Tulua terminals willbe operating in 1981. CFT would act as financial intermediary andwould provide technical assistance. The execution of the projects andthe operation of the terminals would be the responsibility of thelocal communities.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1983 10.0 3.0 13.01984 10.0 4.0 14.01985 12.0 5.0 17.01986 3.0 3.0 6.0Total 35.0 15.0 50.0

IX. STATUS: A study to select projects is under-way. Project selection and engineering studies will be undertaken during1981.

Page 164: List of Projects for External Financing 1981-1984 Colombia
Page 165: List of Projects for External Financing 1981-1984 Colombia

-140-

X. PREINVESTMENT STUDIES

Page 166: List of Projects for External Financing 1981-1984 Colombia
Page 167: List of Projects for External Financing 1981-1984 Colombia

-141-

I. NAME OF THE PROJECT: Preinvestment Studies

II. EXECUTING AGENCY: FONADE

III. YEAR CONTRACT TO BE SIGNED: 1982

IV. TOTAL ESTIMATED COST: US$181.0 million

V. EXTERNAL FINANCING REQUESTED: US$50.0 million

VI. LENDING AGENCY: IDB, CIDA

VII. DESCRIPTION AND JUSTIFICATION: FONADE will use the resources ofthe program to offer medium-and long-term credit to private, public andmixed enterprises that are interested in carrying out studies of priorityprojects. The program will finance prefeasibility and feasibility studies,on institutional support. More than half of the resource will be used forstudies in the energy and mining sectors, including the installation ofa pilot geothermal power plant in conjunction with CHEC.

VIII. COST AND AVAILABILITY OF FUNDS: (in US$ million)

Source of Funds

Year Local Financing External Financing Total

1982 13.1 5.0 18.11983 39.3 15.0 54.31984 45.9 17.5 63.41985 32.7 12.5 45.2Total 131.0 50.0 181.0

IX. STATUS: FONADE is carrying out a detailedsurvey of financial requirements for preinvestment studies during theperiod 1982-85.