list of languishing projects approved by the high …sims-jk.gov.in/jkidfc/department...

11
LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE FOR FUNDING THROUGH JKIDFC Ltd. (February 25th, 2019) DEPARTMENT: PWD Balance Amount Timelineto LUPCode Name of Project/ Location Dist rict Final Approved AA Accorded Required complete the Decision of the Cost (In Cr.) (Yes/No) (In Cr.) Project HPC LUP184 3 Upgradation of interior roads at Watnard Anantnag 1.50070 Yes 1.41460 Mar-20 Approved LUP1844 Constr.of Khull Brah Kralgund road Anantnag 1.17460 Yes 1.11060 Mar-20 Approved LUP1845 Constr.of Brah Dawoodpora road Anantnag 1.34100 Yes 1.14100 Mar-20 Approved LUP1846 Constr of Arhama Badasgam road Anantnag 1.27880 Yes 0.71630 Mar-20 Approved LUP1847 Construction/Upgradation of waltangoo Vasakanag road Anantnag 4.40510 Yes 1.90510 Mar-21 Approved LUP1848 Upgradation of Mandipora Changoo Chinar links Anantnag 3.45690 Yes 2.99190 Mar-21 Approved LUP1849 Construction of road from Khayar to Boinar via Lawaypora at Bandipora 0.87610 Yes 0.59610 5ep-19 Approved Bandipora LUP1850 Upgradation of Kehnoosa Rajpora road Bandipora 7.52440 Yes 4.09060 Aug-19 Approved LUP1851 Completion of balance works for Construction/upgradation of Baramulla 5.95530 Yes 2.22170 Mar-20 Approved Nawa to Runda road LUP1852 Cosnt of Road from KM 4th Doda Bhaderwah Road to Nai Dangri Doda 2.65540 Yes 2.27040 Dec-20 Approved Total I 18.45830 Annexure-J Approved Project s (KhursM~ PW(R&B) Department Concerned Admin. Secretary Member (HPC) Member (HPC) -~ ,>- (Navin K. Choudhary) Principal Secretary to Govt. Finance Department Chairman (HPC)

Upload: others

Post on 05-Jul-2020

18 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH …sims-jk.gov.in/jkidfc/Department Lists/PWD/6.pdfConst. of Road from National Highway to Sharerna via Shaja Doda 7.36910 Yes 7.13910

LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH LEVEL COMMITTEE FOR FUNDING THROUGH JKIDFC Ltd. (February 25th, 2019)

DEPARTMENT: PWD

Balance Amount Timelineto LUPCode Name of Project/ Location District Final Approved AA Accorded

Required complete the Decision of the Cost (In Cr.) (Yes/No)

(In Cr.) Project HPC

LUP1843 Upgradation of interior roads at Watnard Anantnag 1.50070 Yes 1.41460 Mar-20 Approved

LUP1844 Constr.of Khull Brah Kralgund road Anantnag 1.17460 Yes 1.11060 Mar-20 Approved

LUP1845 Constr.of Brah Dawoodpora road Anantnag 1.34100 Yes 1.14100 Mar-20 Approved LUP1846 Constr of Arhama Badasgam road Anantnag 1.27880 Yes 0.71630 Mar-20 Approved LUP1847 Construction/Upgradation of waltangoo Vasakanag road Anantnag 4.40510 Yes 1.90510 Mar-21 Approved LUP1848 Upgradation of Mandipora Changoo Chinar links Anantnag 3.45690 Yes 2.99190 Mar-21 Approved

LUP1849 Construction of road from Khayar to Boinar via Lawaypora at Bandipora 0.87610 Yes 0.59610 5ep-19 Approved Bandipora

LUP1850 Upgradation of Kehnoosa Rajpora road Bandipora 7.52440 Yes 4.09060 Aug-19 Approved

LUP1851 Completion of balance works for Construction/upgradation of Baramulla 5.95530 Yes 2.22170 Mar-20 Approved Nawa to Runda road

LUP1852 Cosnt of Road from KM 4th Doda Bhaderwah Road to Nai Dangri Doda 2.65540 Yes 2.27040 Dec-20 Approved

Total I 18.45830

Annexure-J Approved Projects

• (KhursM~ PW(R&B) Department

Concerned Admin. Secretary

Member (HPC) Member (HPC)

-~,>- (Navin K. Choudhary)

Principal Secretary to Govt.

Finance Department

Chairman (HPC)

Page 2: LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH …sims-jk.gov.in/jkidfc/Department Lists/PWD/6.pdfConst. of Road from National Highway to Sharerna via Shaja Doda 7.36910 Yes 7.13910

Balance Amount Timelineto

LUP Code Name of Project/ Location

District Final Approved AA Accorded Required

complete the Decision of the

Cost (In Cr.) (Yes/No) (In Cr.) Project HPC

LUP1853 Const. of Chakka to Upper Dandi link road KM 1st RD (0-1000) Doda 1.45000 Yes 0.45500 Dec-19 Approved

District Doda Length lkms

LUP1854 Const. and upgradatin of Shiva Allalbani Link Road from Km 6th to Doda 4.18960 Yes 3.33960 Dec-20 Approved

10th

LUP1855 Const. of Parmaz Link Road Doda 6.00000 Yes 3.86730 Oct-20 Approved

LUP1856 Const. of Road from National Highway to Sharerna via Shaja Doda 7.36910 Yes 7.13910 Dec-20 Approved

LUP1857 Upgradation of Baltal Dumail road by way of Pre-Cast Blocks ( For Ganderbal 9.15850 Yes 7.94850 Sep-20 Approved

Shri Amarnath Ji Yatra) Construction of lx20 Mtr span single lane plate girder bridge

LUP1858 including Development of road approaches at Bala Sathun on Ganderbal 2.50000 Yes 1.41420 Sep-19 Approved

ITulm11II=> ,n,~- ~nr~ road

LUP1859 Const. of internal roads in Gangyal Ekta Vihar Kunjwani and Shanti Jammu 7.74250 Yes 3.15750 Sep-20 Approved

Na1>ar Jammu

LUP1860 Roads in Bathindi area including 4 nos. bridges on bathindi Jammu 9.57870 Yes 2.20260 Dec-19 Approved

Nallah(02 on upstream and 2 no. down stream of Makkah Masjid)

LUP1861 Roads from NHI to Kiryani Talab to Dongian via Kargil colony Jammu 3.94000 Yes 3.70200 Dec-19 Approved

LUP1862 Const. of various links/approach road to Jeevan Nagar Murallian Jammu 3.44790 Yes 2.93790 Mar-20 Approved

Miran Sahib road Jammu

LUP1863 Roads in Chowadi near Rauli Talab Jammu 2.71000 Yes 0.65000 Mar-19 Approved

LUP1864 Roads in Digiana Jammu 8.17000 Yes 2.36030 Sep-19 Approved

Total II 39.17400

' (Khurshid e Shah) ,,,,,,,, PW(R&B) Department

Concerned Admin. Secretary Member (HPC)

.OJ]p;.1'11'1111:>a

pal Secretary to Govt. PD&MD

Member (HPC)

(Navin K. Choudhary) Principal Secretary to Govt.

Finance Department Chairman (HPC)

Page 3: LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH …sims-jk.gov.in/jkidfc/Department Lists/PWD/6.pdfConst. of Road from National Highway to Sharerna via Shaja Doda 7.36910 Yes 7.13910

Balance Amount Timelineto

LUP Code Name of Project / Location District Final Approved AA Accorded Required

complete the Decision of the

Cost (In Cr.) (Yes/No) (In Cr.) Project HPC

LUP1865 Const. of road form Fatwal to chumbian Panditian L=l kms Jammu 0.57600 Yes 0.47600 06-2019 Approved

LUP1866 lmp./Upgradation of link road to Bishnah Ashram W. No 02 upto Jammu 1.03800 Yes 0.86800 06-2019 Approved

to KC Morh Bishnah L=l.20 kms

LUP1867 Const. of Road from Nandpur to Pindi Charkan Via Duali Khui in Jammu 1.54500 Yes 0.81000 06-2019 Approved

Km 3rd Rd 800 -1000 km 4th &5th L=22 mtrs

LUP1868 Const. of Road from Palli to Chak Avtara L=3 kms Jammu 1.56800 Yes 0.99800 12-2019 Approved

LUP1869 Const. of Road at Sarore along Distributory No. 3 L=2.40 kms Jammu 1.22500 Yes 0.83240 12-2019 Approved

LUP1870 Const. of link road from Sai Khurd to Sardari Camp (Birdhipur Jammu 1.49700 Yes 0.86700 12-2019 Approved

Banal L=2 kms

LUP1871 Cosnt. Of Road from Chak Keema to Karyal L=2 kms Jammu 0.79500 Yes 0.54860 09-2019 Approved

LUP1872 Const. of link road from Kalapul Satrayian to Chowala Fattu Chak Jammu 1.35200 Yes 0.85200 12-2019 Approved

L=l.15 kms

LUP1873 Const. of Road form Mana to Shamshan Ghat L=2.10 kms Jammu 1.57500 Yes 1.16500 12-2019 Approved

LUP1874 Const. of Road from Talli Morh to Darsopur Ganda L=l.50 kms Jammu 0.99500 Yes 0.70500 12-2019 Approved

Total Ill 8.12200

.. (Khurshi If..

PW(R&B) Department

Concerned Admin. Secretary

Member (HPC)

u ~

Principal Secretary to Govt.

PD&MD Member (HPC)

~ (Navin K. Choudhary)

Principal Secretary to Govt.

Finance Department

Chairman (HPC)

Page 4: LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH …sims-jk.gov.in/jkidfc/Department Lists/PWD/6.pdfConst. of Road from National Highway to Sharerna via Shaja Doda 7.36910 Yes 7.13910

Balance Amount Timelineto

LUPCode Name of Project/ Location District Final Approved AA Accorded Required

complete the Decision of the

Cost {In Cr.) {Yes/No) {In Cr.) Project HPC

LUP1875 Const. of Road from Gondla to Shamshan Ghat (Village Agwan) Jammu 1.49600 Yes 1.00100 03-2020 Approved

L=l.75 kms

LUP1876 Const. of link rod from Baspur to Samka (Suchetgarh Constituency Jammu 1.87350 Yes 1.23350 Dec-19 Approved

L=l.80 kms

LUP1877 Imp/ Upgradation of link road Nari Khaper L=l.10 kms Jammu 0.71000 Yes 0.50000 Sep-19 Approved

LUP1878 Const. of Internal links at Dhyansar L=2.50 kms Jammu 1.25600 Yes 0.87100 Dec-19 Approved

LUP1879 Imp/ Upgradation of Road from Krishna Nagar to Gazian (Muralian Jammu 0.71850 Yes 0.41850 Sep-19 Approved Upto Shamshan Ghat ) L=l kms

LUP1880 Const. of Road from Salehar to Chak Majra L-3 kms Jammu 1.50850 Yes 1.15850 Dec-19 Approved

LUP1881 Const. of Road from Kothi Morh to Lala Chak Road at RD 2-450 on 1.29500 Yes 0.69500 Dec-19 Approved Bari Brahmana Bishnah Road L=l.90 kms

Jammu

LUP1882 Const. of link road from Biaspur Pariah to Talad road L=l.40 kms Jammu 1.80750 Yes 1.18250 Dec-19 Approved

LUP1883 Const./ Extension of Road from Kotli Charkan to Byepass Road Jammu 1.87550 Yes 1.26550 Dec-19 Approved Bishnah via Dhinday Khurd including links L-2 kms

Total IV 8.32550

'

PW(R&B) Department

Concerned Admin. Secretary

Member (HPC)

PD&MD Member (HPC)

~ (Navin K. Choudhary)

Principal Secretary to Govt.

Finance Department

Chairman (HPC)

Page 5: LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH …sims-jk.gov.in/jkidfc/Department Lists/PWD/6.pdfConst. of Road from National Highway to Sharerna via Shaja Doda 7.36910 Yes 7.13910

Balance Amount Timelineto

Name of Project / Location Final Approved AA Accorded Required

complete the Decision of the

LUPCode District Cost (In Cr.) (Yes/No) (In Cr.) Project HPC

LUP1884 Const. of Road from Tanda to Chowala Fattu Chak L 3 kms Jammu 1.72550 Yes 1.32550 Mar-20 Approved

LUP1885 Const. of link road from Haripur to Dangra L 2.50 kms Jammu 2.39700 Yes 2.02700 Mar-20 Approved

LUP1886 lmp./upgradation and strengthening of Road from Pindi Sarochan Jammu 1.29000 Yes 0.95000 Dec-19 Approved

to Garore Nallah L=0.96 kms

LUP1887 Const. o Road from Deoli Preet Nagar to Shamshan Ghat L=l.80 Jammu 0.91350 Yes 0.66350 Sep-19 Approved

kms

LUP1888 Const. of link road from Devigarh to Jobowal L 2.20 kms Jammu 1.37250 Yes 1.14750 Dec-19 Approved

LUP1889 Const. of Road from Makhanpur to Pasgal L 2.50 kms Jammu 1.33000 Yes 0.97000 Dec-19 Approved

LUP1890 Const. of Road from Palli to Bhatyari via Kanhal L 3 kms Jammu 1.50100 Yes 0.92600 Dec-19 Approved

LUP1891 Const. of Lanes opposite Rajiv Gandhi Hospital Gangyal from Jammu 2.17100 Yes 1.98100 Mar-20 Approved House to Sh Bairam Singh to Biscuit Factory Jammu

LUP1892 Imp./ Upgradation of Road from Sector F Sainik Colony to Lower Jammu 3.87500 Yes 3.35500 Mar-20 Approved

Chowadhi

LUP1893 Const. of road including Bridge at Nagrota Migrant Camp to Jagti Jammu 8.59700 Yes 1.78700 Mar-20 Approved

including Dhammi road

Total V 15.13250

Concerned Admin. Secretary

Member (HPC)

u ~

Principal Secretary to Govt.

PD&MD Member (HPC)

~ (Navin K. Choudhary)

Principal Secretary to Govt.

Finance Department

Chairman (HPC)

Page 6: LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH …sims-jk.gov.in/jkidfc/Department Lists/PWD/6.pdfConst. of Road from National Highway to Sharerna via Shaja Doda 7.36910 Yes 7.13910

Balance Amount Timelineto

Name of Project / Location Final Approved AA Accorded complete the Decision of the

LUPCode District Required Cost (In Cr.) (Yes/No) (In Cr.)

Project HPC

LUP1894 Const. of Road from Kanah Chargal to Dhoon Jammu 3.74650 Yes 3.48650 May-20 Approved

LUP1895 Const. of Road from passenger Shed Badsoo to Upper Badsoo Jammu 8.45700 Yes 8.30700 Mar-21 Approved

LUP1896 Imp./ Upgradation of Road from Jagti to Tanda Jammu 6.32180 Yes 5.89180 Mar-21 Approved

LUP1897 Const. of Road from Jakhari (Peer Baba Ji) to Seoura Jammu 2.34950 Yes 2.14950 Mar-20 Approved

LUP1898 Const. of Road from Nandani to Tara upto Madrasa incl. Vented Jammu 4.89670 Yes 4.23170 Aug-20 Approved Causeway

LUP1899 Const of Tharakalyal to Alna Trapper Uchapind and Link road Kathua 1.44220 Yes 0.93060 Mar-20 Approved Grave Yard to Pongran via Bhudal

LUP1900 Const. of Sulari link Road Kathua 2.13760 Yes 1.26700 Mar-20 Approved

LUP1901 Const.of Bhaddu to Phongal Road Kathua 1.77240 Yes 1.52360 Mar-20 Approved

LUP1902 Const. of Lakhari to Kunoo Road Kathua 1.62000 Yes 1.47000 Mar-20 Approved

LUP1903 Const. of Circular Road to Thantoo Kalai Kathua 1.07130 Yes 0.79360 Mar-20 Approved

Total VI 30.05130

~ (Khurshid Ahmed Shah)

PW(R&B) Department

Concerned Admin. Secretary

Member (HPC)

kl ... , PD&MD

Member (HPC)

(Navin K. Choudhary)

Principal Secretary to Govt.

Finance Department

Chairman (HPC)

Page 7: LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH …sims-jk.gov.in/jkidfc/Department Lists/PWD/6.pdfConst. of Road from National Highway to Sharerna via Shaja Doda 7.36910 Yes 7.13910

Balance Amount Timelineto

LUP Code Name of Project/ Location District Final Approved AA Accorded

Required complete the Decision of the

Cost (In Cr.) (Yes/No) (In Cr.) Project HPC

LUP1904 Const. of Road from Circular Road from Barota via Mohallah Kathua Dec-20 Approved

Galleria 1.91000 Yes 1.74000

LUP1905 Const. of link road from Dhar road to Tarkhan Mohallah Sarmal Kathua 1.15000 0.84500 Oct-19 Approved

Mohallah & SC Mohallah in village Pallan Yes

LUP1906 Const. of Tilla Bather Road Kathua 4.29700 Yes 3.74930 Mar-20 Approved

LUP1907 Const. of Marta Nagrota to Pantair via Bari and Khlow road Kathua 3.33000 Yes 2.48970 Mar-20 Approved

LUP1908 Const. of link road from Dhar Road to Mohallah Lunia Kathua 3.17610 Yes 2.89110 Mar-20 Approved

LUP1909 Const. of 83 mtr causeway on Jandore & Brow via Hote km s" Rd Kathua 3.35700 Yes 3.21700 Dec-19 Approved

850-950 connecting Hatli Manu road.

LUP1910 lmp./Upgradation of Parnalla Seri Mooni Plail Banhore road. Kathua 5.85740 Yes 5.80740 Mar-20 Approved

LUP1911 Double Lanning of Road from National Highway to Sunjwan Kathua 3.22320 Yes 2.41320 Jun-19 Approved

LUP1912 Const. of Ladoli Link road Billawar incl. Mangloor to Ladoli via Kathua 5.70540 Yes 5.29360 Mar-20 Approved

Jambal Dode

LUP1913 Const. of Road from Lokhli PHE Tube Well via Prillan De Maina to Kathua 3.25900 Yes 2.98400 Mar-19 Approved

Jardian De Talaian (Bakerwals Basti)

Total VII 31.43030

Concerned Admin. Secretary Member {HPC) Member {HPC)

{Navin K. Choudhary) Principal Secretary to Govt.

Finance Department Chairman {HPC}

Page 8: LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH …sims-jk.gov.in/jkidfc/Department Lists/PWD/6.pdfConst. of Road from National Highway to Sharerna via Shaja Doda 7.36910 Yes 7.13910

Balance Amount Timelineto

Final Approved AA Accorded complete the Decision of the

LUPCode Name of Project / Location

District Cost (In Cr.) (Yes/No) Required Project HPC

(In Cr.)

LUP1914 Const. of Road from Dungara to Pargan

Kathua 1.26150 Yes

1.14210 Jan-20 Approved

LUP191S 132 mtr span motorable Bridge over Nallah Bheeni including Kathua

7.91000 Yes 6.28500 Dec-19 Approved

approaches at Beril in Billawar

LUP1916 Dadikathwah to Aamraie Road

Kishtwar 1.50000 Yes

1.29000 oec-19 Approved

LUP1917 Approach Road to Polytechnic College Cherhar

Kishtwar 0.95320 Yes

0.64980 Oct-19 Approved

LUP1918 Const. of Atholi link road and its extension upto Gossi

Kishtwar 2.26100 Yes

1.51050 Oct-19 Approved

LUP1919 Const. of Parking Places at Kishtwar Town on NH 244

Kishtwar 1.64640 Yes

1.34640 Oct-19 Approved

LUP1920 Const. of Thal Kwath Beyond km 4th Kishtwar

4.74160 Yes 4.11160 5ep-20 Approved

LUP1921 Const.of Foot bridge over Galwanpora Nallah near Thana

Kishtwar 1.07550 Yes

0.63550 Mar-20 Approved

LUP1922 Const. of Link road from Whythana to Mulchitter

Kishtwar 5.93880 Yes

5.85880 Sep-20 Approved

Total VIII 22.82970

(Khurshid A PW(R&B) Department

Concerned Admin. Secretary

Member (HPC)

(Ro¼.L~ Princip~ary to uovt.

PD&MD Member (HPC)

(Navin K. Choudhary)

Principal Secretary to Govt.

Finance Department Chairman (HPC)

Page 9: LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH …sims-jk.gov.in/jkidfc/Department Lists/PWD/6.pdfConst. of Road from National Highway to Sharerna via Shaja Doda 7.36910 Yes 7.13910

Balance Amount Timelineto

LUPCode Name of Project / Location District Final Approved AA Accorded

Required complete the Decision of the

Cost (In Cr.) (Yes/No) (In Cr.) Project HPC

LUP1923 Upgradation of Langate Hajin Takiya road including Langate Kupwara 6.29890 Yes 3.29390 Aug-19 Approved Panditpora Shailnar link

LUP1924 Upgradation of Geeripora Tumpora road Kupwara 3.03020 Yes 2.71020 Mar-21 Approved

LUP1925 Construction/Upgradation of Challagund Gundisana road Kupwara 5.76910 Yes 4.96910 May-21 Approved

LUP1926 Constructionof lx30 Mtr span steel girder bridge at Gabra ( Kupwara 2.64830 Yes 2.02910 Dec-20 Approved Mudiyan) including approaches road

LUP1927 Construction of link road from Upper Tadda to Qazi Mohalal Kupwara 2.14900 Yes 1.98000 Dec-20 Approved

LUP1928 Construction of Kona Gabra Choorkungi road Kupwara 4.07210 Yes 3.57210 Dec-20 Approved

Construction of 2x25 Mtr double lane steel girder bridge instead

LUP1929 of construction of lx45 Mtr span double lane steel girder bridge Kupwara 6.14980 Yes 1.52480 May-19 Approved including strengthening of existing bridge over nallah Kalarooch in Km 6th of Kupwara Sogam road at Khumriyal

LUP1930 construction of road from Hathi Matha to Devi mang Poonch 2.78000 Yes 1.44700 Dec-19 Approved

LUP1931 Const. of Road from Dharmsal to Kanthole Rajouri 7.14700 Yes 7.08700 Dec-20 Approved

LUP1932 Garan Phalli Road Rajouri 6.72000 Yes 5.41000 Apr-20 Approved

LUP1933 Const. of VIP suit in PWD Oak Bungalow at Koteranka Rajouri 1.08830 Yes 0.91830 Mar-19 Approved

Total IX 34.94150

<l--L (R~

Principal Secretary to Govt. PD&MD

Member (HPC) Concerned Admin. Secretary

Member (HPC)

(Navin K. Choudhary) Principal Secretary to Govt.

Finance Department Chairman (HPC)

Page 10: LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH …sims-jk.gov.in/jkidfc/Department Lists/PWD/6.pdfConst. of Road from National Highway to Sharerna via Shaja Doda 7.36910 Yes 7.13910

Balance Amount Timelineto

LUPCode Name of Project / Location Final Approved AA Accorded Required complete the Decision of the District

Cost (In Cr.) (Yes/No) (In Cr.) Project HPC

LUP1934 Const. of Road from Dhandkote to Sokargali Rajouri 4.48600 Yes 4.20600 Oct-19 Approved

LUP1935 Const. of Ujhan Darhal Kandi Road Rajouri 6.34700 Yes 5.02640 Mar-20 Approved

LUP1936 Patyari to Domel Via Thangiote Rajouri 3.59560 Yes 2.97560 Apr-20 Approved

LUP1937 Panjnara Phalli Road Rajouri 3.09000 Yes 2.35000 Apr-20 Approved

LUP1938 Link road from Kotedhara Bridge to Sanga Sahib Ziarat Rajouri 7.64920 Yes 7.43920 Dec-20 Approved

LUP1939 construction of road from Charyala to chak sarkari via Daryala Rajouri 3.55000 Yes 2.51000 Dec-19 Approved

LUP1940 Const of road from katha Bajaran to Saim samat Rajouri 4.13340 Yes 3.95840 Mar-20 Approved

Const. of road from Govt Medical College to Baba Gu lam Shah LUP1941 Badshah University Rajouri connecting APJ Abdul Kalam Botinical Rajouri 8.75000 Nil 8.60000 Jun-20 Approved

I Park ISn1Pd;ol l;--'·-- .. ··-···-- Drn;ar+I

LUP1942 Const. of Single Lane Motorable Bridge adjacent to Abdulla Bridge Rajouri 7.20000 Nil 6.20000 May-20 Approved Raiouri(Special Infrastructure Proiectl

LUP1943 Const/ Widening of road from rajouri to BGSB University (Special Rajouri 31.52000 Nil 26.70050 Mar-21 Approved Infrastructure Proiectl

LUP1944 Construction of road from Abdullah bridge to Court Complex via Rajouri 5.88100 Yes 5.78100 Aug-20 Approved Anandour Ashram / Maslid Sharief

Construction of 40 mtr span single lane steel girder Motorable LUP1945 bridge including approaches at Tasyala Panjgrain {Under District Rajouri 1.99740 Yes 1.94740 Mar-20 Approved

Planl LUP1946 Construction of Road from Rehan to Dhar Sakri Via Demote Rajouri 2.97400 Yes 2.71950 Jun-20 Approved

Total X 80.41400

(Khurshid PW(R&B) Department

Concerned Admin. Secretary Member (HPC) Member (HPC)

(Navin K. Choudhary) Principal Secretary to Govt.

Finance Department Chairman (HPC)

Page 11: LIST OF LANGUISHING PROJECTS APPROVED BY THE HIGH …sims-jk.gov.in/jkidfc/Department Lists/PWD/6.pdfConst. of Road from National Highway to Sharerna via Shaja Doda 7.36910 Yes 7.13910

I

t

Balance Amount Timelineto

LUP Code Name of Project / Location District Final Approved AA Accorded Required

complete the Decision of the

Cost (In Cr.) (Yes/No) (In Cr.) Project HPC

LUP1947 Const. of Road fromDachan to Ind Via Sasal Road Ramban 2.26560 Yes 1.67560 Dec-19 Approved

LUP1948 Const. of Hewaga Neel Road Ramban 2.20940 Yes 0.60400 Mar-20 Approved

LUP1949 Sangaldan Kanthan Road Ramban 1.62110 Yes 0.99110 Mar-20 Approved

LUP1950 Const.of Bus Stand at Ukhral Ramban 1.80000 Yes 1.70000 Mar-20 Approved

LUP1951 Banihal Lamber Road Ramban 2.81780 Yes 2.66780 Mar-20 Approved

LUP1952 Const. of 50 mtr span Motorable Bridge over Bishlari Nallah & Ramban 2.50000 Yes 1.69000 Mar-20 Approved

Approach Road to Degree College Banihal

LUP1953 lmp./Upgradation of Shiv Khori track at ransoo (L=3 kms) Reasi 2.89400 Yes 2.36900 Mar-20 Approved

LUP1954 Construction of link road from Suchani to Khoo da Talab Samba 2.49010 Yes 2.35010 Dec-19 Approved

LUP1955 Widening/04-lanning of Bemina Budgam road fromT atoo Ground Srinagar 8.96570 Yes 8.69570 Sep-20 Approved

crossing to Bemina Byepass Crossing ( Phase-I)

LUP1956 Const./ upgradation of Road from CEO office Udhampur to Udhampur 0.73460 Yes 0.70470 Mar-20 Approved

Mohalla Dhandyal

LUP1957 Const. of Road to Village Upper Badole via PTC Nalanda Academy Udhampur 1.90030 Yes 1.75650 Mar-20 Approved

Udhamnur

LUP1958 Imp./ Upgradation of Pattangarh to Matloa Road Udhampur 1.70550 Yes 1.38700 Oct-19 Approved

Total XI 26.59150

Grand Total (l+ll+lll+IV+V+Vl+Vll+Vlll+IX+X+XI) 315.47060

(Khurshid Ahmed Shah) _,,,,,- PW(R&B) Department

Concerned Admin. Secretary Member (HPC) Member (HPC)

(Navin K. Choudhary) Principal Secretary to Govt.

Finance Department Chairman (HPC)