www.tuv.com/consulting List of Criteria developed for Server Room and Data Center Audits. RELIABLE DATA CENTER

Upload: buikhuong

Post on 28-Mar-2018

222 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

www.tuv.com/consulting

List of Criteria developed for Server Room and Data Center Audits.

ReLiAbLe DAtA CenteR

Page 2: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

Preface

The list of criteria was developed for server room and data center audits. It is intended to be used as a guideline for plan-

ning, implementation and acceptance testing of server rooms and data centers. Nowadays, the physical security and

availability of IT is of vital importance to companies as many IT-supported business processes run as real-time applica-

tions. Interruptions would immediately result in inconvenient failures and possibly losses in production. Many banks and

insurance companies include availability results in their risk assessments for loans and premiums.

This new test method from TÜV Rheinland was developed due to growing market demands. It considers the previously

known Basel III requirements for IT availability (effective from 2013).

Pocket Overview of Classes

The list of criteria is based on standards established by the German BSI (Federal Office for Information Security), Uptime

Institute, TIA 942 – (1) (2) and the publications of the German VdS institution (Property Insurers’ Association), in particu-

lar VdS 2007. This list of criteria allows comprehensive testing of IT infrastructure and operation. It is constantly updated.

New rules and regulations are added at regular intervals.

The list of criteria was developed in cooperation with Dr. Braun Consultants GmbH, Frankfurt am Main, Germany.

Server room / data center n n + 1 2 n 2 (n+1)

> 400 kVA / to 320 kW / 200 m2 CAT: 1 1+ 2 2+ 3 3+ 4

Electrical supply

Supply / medium-voltage supply X X X X X X 2

transformers X X X X X 2 2 (n + 1)

Low-voltage main distribution (LVMD) X X X X X 2 2 (n + 1)

Stand-by unit (diesel) – Provision X X X 2 2 (n + 1)

Uninterruptible power supply unit (UPS) X X X X 2 2 2 (n + 1)

Data center power distributions X X n + 1 n + 1 2 2 2 (n + 1)

Rack supply X X 2 2 2 2 2

Air conditioning

Coolers (chillers / cooling system) X X n + 1 n + 1 2 n 2 n 2 (n + 1)

Computer room air conditioners X X n + 1 n + 1 2 n 2 n 2 (n + 1)

Pump system X 2 2 2 2 n 2 n 2 (n + 1)

Piping X X X X Ring Ring Ring

Building management system

Operational threshold value display /indication – X X X X X X

Alarm messages by email, SMS text message, alarm annunciator

– – X X X X X

Data recording – – – – X X X

evaluation option (iSO 50001) optional optional optional optional optional optional optional

Maintenance

Redundancy – – X X X X X

Redundant supply paths – – – – X X X

Maintenance during operation – – – – X X X

Maintenance window X X X X – – –

Page 3: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

PrefaceS

ite

Sel

ecti

on

CA

T I

CA

T II

CA

T II

IC

AT

IV

Arc

hit

ectu

re /

sit

e se

lect

ion

/ r

isks

Prox

imit

y to

flo

od

haz

ard

are

as m

app

ed o

n a

n o

f-fi

cial

or

insu

ran

ce-r

elat

ed m

ap (

dis

tan

ce t

o c

oas

ts

and

wat

erw

ays)

no

req

uir

emen

tsn

ot

in a

flo

od

haz

ard

zo

ne

no

t w

ith

in 1

00-y

ear

flo

od

h

azar

d a

rea

or

less

th

an 1

00 m

fr

om

50-

year

flo

od

haz

ard

are

a

no

t le

ss t

han

100

m f

rom

10

0-ye

ar f

loo

d h

azar

d a

rea

Prox

imit

y to

maj

or

traf

fic

arte

ries

or

traf

fic

rou

tes

wit

h t

ran

spo

rt o

f d

ang

ero

us

go

od

sn

o r

equ

irem

ents

no

req

uir

emen

tsn

ot

less

th

an 1

00 m

no

t le

ss t

han

800

m

Prox

imit

y to

air

po

rts

(en

try

lan

es, m

isse

d a

pp

roac

h

pro

ced

ure

)n

o r

equ

irem

ents

no

req

uir

emen

tsn

ot

less

th

an 1

.6 k

mn

ot

less

th

an 8

km

Prox

imit

y to

larg

e ci

ties

(ca

ble

ro

ute

s)n

o r

equ

irem

ents

no

req

uir

emen

tsn

ot

gre

ater

th

an 5

0 km

no

t g

reat

er t

han

15

km

Dan

ger

ou

s g

oo

ds

loca

tio

ns

(gas

pip

elin

e, r

efin

erie

s,

flam

mab

le li

qu

ids

sto

rag

e ro

om

)n

o r

equ

irem

ents

no

req

uir

emen

tsn

ot

less

th

an 1

.6 k

mn

ot

less

th

an 8

km

Mili

tary

fac

iliti

es a

nd

em

bas

sies

, sta

diu

ms,

pla

ces

o

f as

sem

bly

an

d lo

cati

on

s/ro

ute

s o

f ra

llies

(ex

tern

al

risk

ass

essm

ents

)n

o r

equ

irem

ents

no

req

uir

emen

tsn

ot

less

th

an 1

.6 k

mn

ot

less

th

an 8

km

eM

C a

ctiv

e so

urc

es (

tran

sfo

rmer

, tra

nsf

orm

er

sub

stat

ion

, tra

ck, t

ran

smitt

ing

sta

tio

ns)

chec

kch

eck

mea

sure

men

ts r

eco

mm

end

ed,

con

stru

ctio

nal

mea

sure

sm

easu

rem

ents

rec

om

men

ded

, co

nst

ruct

ion

al m

easu

res

Co

nta

min

atin

g e

mis

sio

n o

f n

oxio

us

sub

stan

ces

(s

hip

un

load

ing

sta

tio

ns,

ag

ricu

ltu

ral p

rod

uct

ion

, st

eel a

nd

gal

van

izin

g w

ork

s)m

ust

be

ob

serv

edm

ust

be

ob

serv

edm

ust

be

ob

serv

edm

ust

be

ob

serv

ed

Sei

smic

are

as, e

arth

qu

ake

zon

e ac

cord

ing

to

Din

, co

nst

ant

gro

un

d v

ibra

tio

n, c

olla

pse

are

as o

f b

uild

-in

gs

mu

st b

e o

bse

rved

mu

st b

e o

bse

rved

mu

st b

e o

bse

rved

mu

st b

e o

bse

rved

th

ird

-par

ty u

sers

in t

he

bu

ildin

g o

r o

n t

he

pre

mis

es

(ho

stin

g c

om

pan

ies)

no

res

tric

tio

ns

po

ssib

le if

co

mp

anie

s ar

e n

on

-haz

ard

ou

sp

oss

ible

if a

ll te

nan

ts a

re it

or

tele

com

mu

nic

atio

ns

com

pan

ies

po

ssib

le if

all

ten

ants

are

it o

r te

leco

mm

un

icat

ion

s co

mp

anie

s

Page 4: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

bu

ildin

g C

on

stru

ctio

n

CA

T I

CA

T II

CA

T II

IC

AT

IV

Arc

hit

ectu

re /

co

nst

ruct

ion

/ D

C &

en

gin

eeri

ng

typ

e o

f co

nst

ruct

ion

acco

rdin

g t

o V

dS

/ D

in 4

102-

4(i

n a

cco

rdan

ce w

ith

ap

plic

able

st

and

ard

s an

d g

uid

elin

es)

acco

rdin

g t

o V

dS

/ D

in 4

102-

4(i

n a

cco

rdan

ce w

ith

ap

plic

able

st

and

ard

s an

d g

uid

elin

es)

acco

rdin

g t

o V

dS

/ D

in 4

102-

4(i

n a

cco

rdan

ce w

ith

ap

plic

able

st

and

ard

s an

d g

uid

elin

es)

acco

rdin

g t

o V

dS

/ D

in 4

102-

4(i

n a

cco

rdan

ce w

ith

ap

plic

able

st

and

ard

s an

d g

uid

elin

es)

Wal

ls e

nco

mp

assi

ng

th

e ro

om

F 30

- R

C 1

F 90

- R

C 1

F 90

- t

C 2

F 90

- R

C 2

Du

cts

F 30

at le

ast:

F 3

0;

reco

mm

end

ed: F

90

F 90

F 90

Flo

ors

an

d c

eilin

gs

F 90

F 90

F 90

F 90

Flo

or

and

cei

ling

load

sat

leas

t 5,

000

n/m

²at

leas

t 5,

000

n/m

²at

leas

t 10

,000

n/m

²at

leas

t 10

,000

n/m

²

Su

spen

ded

cei

ling

sif

sc

exis

t fo

r ai

r co

nd

itio

nin

g,

diff

icu

lt t

o ig

nit

e b

2if

sc

exis

t fo

r ai

r co

nd

itio

nin

g,

diff

icu

lt t

o ig

nit

e b

2if

sc

exis

t fo

r ai

r co

nd

itio

nin

g,

diff

icu

lt t

o ig

nit

e b

2if

sc

exis

t fo

r ai

r co

nd

itio

nin

g,

diff

icu

lt t

o ig

nit

e b

2

Ro

ofs

in a

cco

rdan

ce w

ith

pro

visi

on

sin

acc

ord

ance

wit

h p

rovi

sio

ns

in a

cco

rdan

ce w

ith

pro

visi

on

sin

acc

ord

ance

wit

h p

rovi

sio

ns

Cle

ar c

eilin

g h

eig

ht

app

rox.

2.5

0 m

app

rox.

2.5

0 m

app

rox.

3.0

0 m

to

3.5

0 m

app

rox.

3.0

0 m

to

3.5

0 m

Cle

ar r

aise

d f

loo

r h

eig

ht

reco

mm

end

ed: a

pp

rox.

0.3

0 m

reco

mm

end

ed: a

pp

rox.

0.3

0 m

reco

mm

end

ed: a

pp

rox.

0.6

0 m

reco

mm

end

ed: a

pp

rox.

0.6

0 m

Rai

sed

flo

or

un

der

stru

ctu

reb

on

ded

ped

esta

ls,

susp

end

ed U

-typ

e st

rin

ger

sb

on

ded

ped

esta

ls,

susp

end

ed U

-typ

e st

rin

ger

sb

on

ded

ped

esta

ls,

bo

lted

U-t

ype

stri

ng

ers

bo

nd

ed p

edes

tals

, b

olt

ed U

-typ

e st

rin

ger

s

Rai

sed

flo

or

tile

des

ign

, in

cl. l

abel

ing

an

d li

nki

ng

of

tile

s (s

mo

ke d

etec

tio

n, e

xtin

gu

ish

ing

no

zzle

s, w

ater

, eq

uip

ote

nti

al b

on

din

g)

diff

icu

lt t

o ig

nit

e b

1d

iffic

ult

to

ign

ite

b1

diff

icu

lt t

o ig

nit

e b

1/A

2d

iffic

ult

to

ign

ite

b1/

A2

Vap

or

bar

rier

s fo

r w

alls

an

d c

eilin

g o

f se

rver

ro

om

no

req

uir

emen

tn

o r

equ

irem

ent

no

req

uir

emen

tre

com

men

ded

fo

r d

ata

roo

ms

Do

ors

Fire

res

ista

nce

cla

ssat

leas

t: t

30-R

S;

reco

mm

end

ed: t

30-R

D*

at le

ast:

t30

-RS

; re

com

men

ded

: t30

-RD

at le

ast:

t30

-RS

; re

com

men

ded

: t30

-RD

at le

ast:

t30

-RS

; re

com

men

ded

: t30

-RD

Do

or

dim

ensi

on

ing

at le

ast

1 m

wid

e an

d

2.13

m h

igh

at le

ast

1.20

m w

ide

and

2.

25 m

hig

h

(rec

om

men

ded

hei

gh

t: 2

.50

m)

at le

ast

1.20

m w

ide

and

2.

25 m

hig

h

(rec

om

men

ded

hei

gh

t: 2

.50

m)

at le

ast

1.20

m w

ide

and

2.

25 m

hig

h

(rec

om

men

ded

hei

gh

t: 2

.50

m)

Sin

gle

per

son

sec

uri

ty in

terl

ock

s, t

urn

stile

s, p

ort

als

or

oth

er s

yste

ms

ensu

rin

g t

hat

on

ly o

ne

per

son

can

p

ass

at a

tim

en

o r

equ

irem

ent

no

req

uir

emen

tye

sye

s

no

ext

erio

r w

ind

ow

s in

th

e se

rver

ro

om

are

aif

ew

exi

st, a

dd

itio

nal

mea

sure

s su

ch a

s fo

il o

r au

xilia

ry f

ram

es

and

gri

lles

no

t p

erm

itted

no

t p

erm

itted

no

t p

erm

itted

* t

30: 3

0-m

inu

te f

ire

resi

stan

ce; R

S: s

mo

ke p

rote

ctio

n; R

D: s

mo

ke-p

roo

f

Page 5: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

CA

T I

CA

T II

CA

T II

IC

AT

IV

Arc

hit

ectu

re /

co

nst

ruct

ion

/ D

C &

en

gin

eeri

ng

typ

e o

f co

nst

ruct

ion

acco

rdin

g t

o V

dS

/ D

in 4

102-

4(i

n a

cco

rdan

ce w

ith

ap

plic

able

st

and

ard

s an

d g

uid

elin

es)

acco

rdin

g t

o V

dS

/ D

in 4

102-

4(i

n a

cco

rdan

ce w

ith

ap

plic

able

st

and

ard

s an

d g

uid

elin

es)

acco

rdin

g t

o V

dS

/ D

in 4

102-

4(i

n a

cco

rdan

ce w

ith

ap

plic

able

st

and

ard

s an

d g

uid

elin

es)

acco

rdin

g t

o V

dS

/ D

in 4

102-

4(i

n a

cco

rdan

ce w

ith

ap

plic

able

st

and

ard

s an

d g

uid

elin

es)

Wal

ls e

nco

mp

assi

ng

th

e ro

om

F 30

- R

C 1

F 90

- R

C 1

F 90

- t

C 2

F 90

- R

C 2

Du

cts

F 30

at le

ast:

F 3

0;

reco

mm

end

ed: F

90

F 90

F 90

Flo

ors

an

d c

eilin

gs

F 90

F 90

F 90

F 90

Flo

or

and

cei

ling

load

sat

leas

t 5,

000

n/m

²at

leas

t 5,

000

n/m

²at

leas

t 10

,000

n/m

²at

leas

t 10

,000

n/m

²

Su

spen

ded

cei

ling

sif

sc

exis

t fo

r ai

r co

nd

itio

nin

g,

diff

icu

lt t

o ig

nit

e b

2if

sc

exis

t fo

r ai

r co

nd

itio

nin

g,

diff

icu

lt t

o ig

nit

e b

2if

sc

exis

t fo

r ai

r co

nd

itio

nin

g,

diff

icu

lt t

o ig

nit

e b

2if

sc

exis

t fo

r ai

r co

nd

itio

nin

g,

diff

icu

lt t

o ig

nit

e b

2

Ro

ofs

in a

cco

rdan

ce w

ith

pro

visi

on

sin

acc

ord

ance

wit

h p

rovi

sio

ns

in a

cco

rdan

ce w

ith

pro

visi

on

sin

acc

ord

ance

wit

h p

rovi

sio

ns

Cle

ar c

eilin

g h

eig

ht

app

rox.

2.5

0 m

app

rox.

2.5

0 m

app

rox.

3.0

0 m

to

3.5

0 m

app

rox.

3.0

0 m

to

3.5

0 m

Cle

ar r

aise

d f

loo

r h

eig

ht

reco

mm

end

ed: a

pp

rox.

0.3

0 m

reco

mm

end

ed: a

pp

rox.

0.3

0 m

reco

mm

end

ed: a

pp

rox.

0.6

0 m

reco

mm

end

ed: a

pp

rox.

0.6

0 m

Rai

sed

flo

or

un

der

stru

ctu

reb

on

ded

ped

esta

ls,

susp

end

ed U

-typ

e st

rin

ger

sb

on

ded

ped

esta

ls,

susp

end

ed U

-typ

e st

rin

ger

sb

on

ded

ped

esta

ls,

bo

lted

U-t

ype

stri

ng

ers

bo

nd

ed p

edes

tals

, b

olt

ed U

-typ

e st

rin

ger

s

Rai

sed

flo

or

tile

des

ign

, in

cl. l

abel

ing

an

d li

nki

ng

of

tile

s (s

mo

ke d

etec

tio

n, e

xtin

gu

ish

ing

no

zzle

s, w

ater

, eq

uip

ote

nti

al b

on

din

g)

diff

icu

lt t

o ig

nit

e b

1d

iffic

ult

to

ign

ite

b1

diff

icu

lt t

o ig

nit

e b

1/A

2d

iffic

ult

to

ign

ite

b1/

A2

Vap

or

bar

rier

s fo

r w

alls

an

d c

eilin

g o

f se

rver

ro

om

no

req

uir

emen

tn

o r

equ

irem

ent

no

req

uir

emen

tre

com

men

ded

fo

r d

ata

roo

ms

Do

ors

Fire

res

ista

nce

cla

ssat

leas

t: t

30-R

S;

reco

mm

end

ed: t

30-R

D*

at le

ast:

t30

-RS

; re

com

men

ded

: t30

-RD

at le

ast:

t30

-RS

; re

com

men

ded

: t30

-RD

at le

ast:

t30

-RS

; re

com

men

ded

: t30

-RD

Do

or

dim

ensi

on

ing

at le

ast

1 m

wid

e an

d

2.13

m h

igh

at le

ast

1.20

m w

ide

and

2.

25 m

hig

h

(rec

om

men

ded

hei

gh

t: 2

.50

m)

at le

ast

1.20

m w

ide

and

2.

25 m

hig

h

(rec

om

men

ded

hei

gh

t: 2

.50

m)

at le

ast

1.20

m w

ide

and

2.

25 m

hig

h

(rec

om

men

ded

hei

gh

t: 2

.50

m)

Sin

gle

per

son

sec

uri

ty in

terl

ock

s, t

urn

stile

s, p

ort

als

or

oth

er s

yste

ms

ensu

rin

g t

hat

on

ly o

ne

per

son

can

p

ass

at a

tim

en

o r

equ

irem

ent

no

req

uir

emen

tye

sye

s

no

ext

erio

r w

ind

ow

s in

th

e se

rver

ro

om

are

aif

ew

exi

st, a

dd

itio

nal

mea

sure

s su

ch a

s fo

il o

r au

xilia

ry f

ram

es

and

gri

lles

no

t p

erm

itted

no

t p

erm

itted

no

t p

erm

itted

* t

30: 3

0-m

inu

te f

ire

resi

stan

ce; R

S: s

mo

ke p

rote

ctio

n; R

D: s

mo

ke-p

roo

f

CA

T I

CA

T II

CA

T II

IC

AT

IV

Des

ign

pro

vid

es p

rote

ctio

n a

gain

st e

lect

rom

agn

etic

ra

dia

tio

nn

o r

equ

irem

ent

no

req

uir

emen

tye

sye

s

intr

usi

on

-res

ista

nt

do

ors

RC

1R

C 1

RC

2R

C 2

En

try

lob

by

Phys

ical

ly s

epar

ated

from

oth

er a

reas

of t

he d

ata

cent

ern

o r

equ

irem

ent

yes

yes

yes

Fire

lobb

y se

para

tion

from

oth

er a

reas

of t

he d

ata

cent

erF

30F

30 /

F 90

F 90

F 90

Mu

ltip

le b

uild

ing

en

tran

ces

wit

h s

ecu

rity

ch

ecks

no

req

uir

emen

tn

o r

equ

irem

ent

yes

yes

Sin

gle

per

son

sec

uri

ty in

terl

ock

s, t

urn

stile

s, p

ort

als

or

oth

er s

yste

ms

ensu

rin

g t

hat

on

ly o

ne

per

son

can

p

ass

at a

tim

en

o r

equ

irem

ent

no

req

uir

emen

tye

sye

s

traf

fic

and

tra

nsp

ort

ro

ute

sat

leas

t 1.

00 m

wid

e an

d

2.50

m h

igh

at le

ast

1.00

m w

ide

and

2.

50 m

hig

hat

leas

t 1.

20 m

wid

e an

d

2.50

m h

igh

at le

ast

1.20

m w

ide

and

2.

50 m

hig

h

ele

vato

rs (

if n

eces

sary

)

do

or

wid

th a

t le

ast

1.00

m,

cag

e d

epth

1.6

0 m

, hei

gh

t at

le

ast

2.25

m, c

arry

ing

cap

acit

y at

leas

t 10

00 k

g

do

or

wid

th a

t le

ast

1.00

m,

cag

e d

epth

1.6

0 m

, hei

gh

t at

le

ast

2.25

m, c

arry

ing

cap

acit

y at

leas

t 10

00 k

g

do

or

wid

th a

t le

ast

1.00

m,

cag

e d

epth

1.6

0 m

, hei

gh

t at

le

ast

2.25

m, c

arry

ing

cap

acit

y at

leas

t 10

00 k

g

do

or

wid

th a

t le

ast

1.00

m,

cag

e d

epth

1.6

0 m

, hei

gh

t at

le

ast

2.25

m, c

arry

ing

cap

acit

y at

leas

t 10

00 k

g

Park

ing

Are

vis

ito

r p

arki

ng

an

d s

taff

par

kin

g a

reas

sep

arat

ed

fro

m o

ne

ano

ther

?n

o r

equ

irem

ent

no

req

uir

emen

tye

s, p

hysi

cally

sep

arat

ed

by

fen

ce o

r w

all

yes,

phy

sica

lly s

epar

ated

b

y fe

nce

or

wal

l

Are

vis

ito

r p

arki

ng

an

d s

taff

par

kin

g a

reas

sep

arat

ed

fro

m t

he

rece

ivin

g a

rea?

no

req

uir

emen

tn

o r

equ

irem

ent

yes

yes,

phy

sica

lly s

epar

ated

b

y fe

nce

or

wal

l

Vis

ito

r p

arki

ng

in t

he

pro

xim

ity

of

dat

a ce

nte

r

exte

rio

r w

alls

no

req

uir

emen

tn

o r

equ

irem

ent

10 m

min

imu

m d

ista

nce

20 m

min

imu

m d

ista

nce

, se

par

ated

by

a b

arri

er t

o p

re-

ven

t ve

hic

les

fro

m a

pp

roac

hin

g

Ad

min

istr

atio

n, o

ffice

s, s

ecu

rity

offi

ce, b

uild

ing

ser

vice

s m

anag

emen

t sy

stem

, sta

ff r

oo

ms

Phys

ical

ly s

epar

ated

from

oth

er a

reas

of t

he d

ata

cent

erye

sye

sye

sye

s

Fire

lobb

y se

para

tion

from

oth

er a

reas

of t

he d

ata

cent

erF

30F

30 /

F 90

F 90

F 90

Sec

uri

ty o

ffice

Ded

icat

ed s

ecu

rity

off

ice

for

secu

rity

eq

uip

men

t an

d

mo

nit

ori

ng

, in

cl. p

rote

ctio

n a

gain

st b

reak

-in

or

smal

l ar

ms

fire

no

req

uir

emen

tre

com

men

ded

if s

ecu

rity

off

ice

exis

tsre

com

men

ded

reco

mm

end

ed

bu

ildin

g C

on

stru

ctio

n (

con

tin

ued

)

Page 6: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

CA

T I

CA

T II

CA

T II

IC

AT

IV

Ele

ctri

cal d

esig

n

tota

l po

wer

bal

ance

(co

nsi

der

res

erve

s an

d

exte

nsi

on

s)

yes

yes

yes

yes

Su

pp

ly b

y tr

ansf

orm

er s

ub

stat

ion

s 1

1, b

acku

p b

y g

ener

ato

r 1,

bac

kup

by

gen

erat

or

2 re

com

men

ded

, bac

kup

by

gen

erat

ors

Sys

tem

su

pp

ly /

top

olo

gy

spu

rsp

ur

spu

r, r

ing

rec

om

men

ded

spu

r, r

ing

rec

om

men

ded

Med

ium

-vo

ltag

e sw

itch

gea

r (M

V)

11

1, r

eco

mm

end

ed;

2, p

hysi

cally

sep

arat

ed2,

phy

sica

lly s

epar

ated

Med

ium

-vo

ltag

e sw

itch

gear

(M

V)

tran

sfo

rmer

s1

11,

rec

om

men

ded

: 22

Sta

nd

-by

die

sel g

ener

ato

rs

reco

mm

end

ed1

1, r

eco

mm

end

ed: 2

2

Fuel

sto

ck8

ho

urs

if a

vaila

ble

24 h

ou

rs48

ho

urs

(2

tan

ks, i

ncl

. cr

oss

-co

nn

ecti

on

s; X

-)72

ho

urs

(2

tan

ks, i

ncl

. cr

oss

-co

nn

ecti

on

s; X

-)

term

inal

fo

r re

nta

l un

itye

sye

s, if

no

t av

aila

ble

yes,

fo

r m

ain

ten

ance

yes,

fo

r m

ain

ten

ance

Low

-vo

ltag

e m

ain

dis

trib

uti

on

(LV

MD

) 1

1, r

eco

mm

end

ed; 2

fo

r C

at. 2

+,

mai

nte

nan

ce b

ypas

s 1,

rec

om

men

ded

; 2 f

or

Cat

. 3+,

m

ain

ten

ance

byp

ass

2, m

ain

ten

ance

byp

ass

Sep

arat

ion

of

PS

(se

cure

po

wer

su

pp

ly)

in L

VM

D

(sea

ling

) o

r se

par

ate

roo

m

no

reco

mm

end

edye

sye

s

Sys

tem

typ

et

n-C

/tn

-St

n-C

/tn

-S r

eco

mm

end

ed

tn

-St

n-S

Rea

ctiv

e-cu

rren

t co

mp

ensa

tio

n /

line

filt

erre

com

men

ded

re

com

men

ded

re

com

men

ded

re

com

men

ded

UP

S s

yste

ms,

incl

. ext

ern

al b

ypas

s / r

edu

nd

ancy

nn

+1, p

hysi

cally

sep

arat

ed

wh

ere

nec

essa

ryn

+n, p

hysi

cally

sep

arat

ed2

(n+1

), p

hysi

cally

sep

arat

ed

bat

tery

bac

kup

tim

eat

leas

t 10

min

. (sh

utd

ow

n t

ime)

at le

ast

10 m

in. (

shu

tdo

wn

tim

e)at

leas

t 10

min

.,

phy

sica

lly s

epar

ated

at le

ast

10 m

in.,

p

hysi

cally

sep

arat

ed

bat

tery

mo

nit

ori

ng

/ m

on

ito

rin

gn

on

ore

com

men

ded

yes

Load

ban

k fo

r U

PS

no

no

pro

vid

e co

nn

ecti

on

p

rovi

de

con

nec

tio

n

Su

pp

ly p

ath

s (p

rote

cted

aga

inst

fir

e an

d s

abo

tag

e)si

ng

le, n

o r

equ

irem

ent

sin

gle

, p

rote

ctio

n r

eco

mm

end

ed1

acti

ve a

nd

1 p

assi

ve,

on

e su

pp

ly p

ath

pro

tect

ed2

acti

ve,

at le

ast

1 su

pp

ly p

ath

pro

tect

ed

tran

sfer

sw

itch

es (

St

S)

for

it s

yste

ms

wit

h o

nly

1

po

wer

su

pp

ly u

nit

(d

ual

-po

wer

ed)

no

yes,

rec

om

men

ded

yes

yes

ele

ctri

cal D

esig

n

Page 7: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

ele

ctri

cal D

esig

n (

con

tin

ued

)

CA

T I

CA

T II

CA

T II

IC

AT

IV

Dat

a ce

nte

r su

bd

istr

ibu

tio

ns

(SD

-UP

S),

sep

arat

e su

p-

ply

fro

m L

VM

D1

1, r

eco

mm

end

ed: 2

2

2

Dat

a ce

nte

r su

bd

istr

ibu

tio

ns

(SD

no

rmal

sys

tem

) –

ligh

tin

g –

flu

sh-m

ou

nte

d s

ock

ets

yes

yes

yes

yes

Mea

suri

ng

inst

rum

ents

(re

sid

ual

cu

rren

t m

easu

re-

men

t), n

o r

esid

ual

-cu

rren

t ci

rcu

it b

reak

er in

th

e d

ata

cen

ter

yes,

rec

om

men

ded

yes,

rec

om

men

ded

yes

yes

Rac

k su

pp

ly b

y m

ean

s o

f fi

xed

co

nn

ecti

on

or

inte

r-lo

cked

plu

g-a

nd

-so

cket

co

nn

ecti

on

s (C

ee

)ye

sye

sye

sye

s

Gro

un

din

g /

equ

ipo

ten

tial

bo

nd

ing

yes

yes

yes

yes

Lig

htn

ing

pro

tect

ion

cal

cula

tio

n a

cco

rdin

g t

o

VD

e 0

185

Part

3re

com

men

ded

reco

mm

end

edye

sye

s

Lig

htn

ing

an

d o

verv

olt

age

pro

tect

ion

lig

htn

ing

(c

oar

se, m

ediu

m p

rote

ctio

n)

in d

istr

ibu

tio

n b

oar

ds

o

r te

rmin

al s

trip

s (f

ine

pro

tect

ion

)ye

sye

sye

sye

s

Load

an

d p

ow

er d

ata

mea

sure

men

t / l

og

gin

g /

m

on

ito

rin

g /

sup

ervi

sio

nre

com

men

ded

reco

mm

end

edye

s, m

easu

rem

ent

and

log

gin

gye

s, m

easu

rem

ent

and

h

isto

rica

l val

ues

em

erg

ency

lig

hti

ng

self

-co

nta

ined

lum

inai

res

an

d a

dd

itio

nal

ly a

ccu

mu

lato

r h

and

lam

ps

self

-co

nta

ined

lum

inai

res

an

d a

dd

itio

nal

ly a

ccu

mu

lato

r h

and

lam

ps

self

-co

nta

ined

lum

inai

res

an

d a

dd

itio

nal

ly a

ccu

mu

lato

r h

and

lam

ps

self

-co

nta

ined

lum

inai

res

an

d a

dd

itio

nal

ly a

ccu

mu

lato

r h

and

lam

ps

esc

ape

ligh

tin

gse

lf-c

on

tain

ed lu

min

aire

sse

lf-c

on

tain

ed lu

min

aire

sse

lf-c

on

tain

ed lu

min

aire

s o

r ce

ntr

al b

atte

ry s

yste

mse

lf-c

on

tain

ed lu

min

aire

s o

r ce

ntr

al b

atte

ry s

yste

m

Sel

ecti

vity

cal

cula

tio

n /

sho

rt-c

ircu

it c

urr

ent

calc

ula

tio

n (

net

wo

rk c

alcu

lati

on

an

d s

wit

ch s

etti

ng

s)ye

sye

sye

sye

s

Page 8: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

CA

T I

CA

T II

CA

T II

IC

AT

IV

tota

l po

wer

bal

ance

(u

pd

ate)

ye

s ye

s ye

s ye

s

Gen

erat

or

sup

ply

of

air

con

dit

ion

ing

sys

tem

ye

s, if

gen

erat

or

exis

ts

yes

yes

yes

Arr

ang

emen

t o

f it

eq

uip

men

t h

ot

aisl

e/co

ld a

isle

re

com

men

ded

ho

t ai

sle/

cold

ais

leh

ot

aisl

e/co

ld a

isle

, re

com

men

ded

: ho

t ai

sle

or

co

ld a

isle

co

nta

inm

ent

ho

t ai

sle/

cold

ais

le,

reco

mm

end

ed: h

ot

aisl

e o

r

cold

ais

le c

on

tain

men

t

Cen

tral

ized

/ d

ecen

tral

ized

ch

iller

s

(phy

sica

lly s

epar

ated

if n

eces

sary

) n

n+1

2n2

(n+1

)

Rec

oo

lers

/ co

nd

ense

rs /

coo

ling

to

wer

s / p

um

ps

nn

+12n

2 (n

+1)

Rec

oo

lers

/ co

nd

ense

rs /

coo

ling

to

wer

s

(phy

sica

l pro

tect

ion

) ye

s ye

s ye

s ye

s

Rec

oo

lers

/ co

nd

ense

rs /

coo

ling

to

wer

s (d

esig

n)

ou

tsid

e te

mp

erat

ure

(h

igh

er t

han

32°

C)

yes

yes

yes

yes

Co

mp

ute

r ro

om

air

co

nd

itio

ner

s (C

RA

C)

wit

h

op

erat

or

dis

pla

y p

er li

ne

nn

+12n

2 (n

+1)

inst

alla

tio

n o

f co

mp

ute

r ro

om

air

co

nd

itio

ner

s

(op

tim

um

air

flo

w a

nd

mai

nte

nan

ce)

in t

he

roo

min

th

e ro

om

/ m

esh

par

titi

on

at

leas

t m

esh

par

titi

on

/

eng

inee

rin

g b

lock

at

leas

t m

esh

par

titi

on

/

eng

inee

rin

g b

lock

Au

tom

atic

res

tart

wh

en p

ow

er s

up

ply

is r

esu

med

(c

hill

ers

and

CR

AC

s)

yes

yes

yes

yes

Red

un

dan

t p

ow

er s

up

ply

of

air

con

dit

ion

ing

(2

dis

trib

uti

on

bo

ard

s an

d d

ual

-po

wer

ed)

no

chec

k if

th

is is

nec

essa

ry

yes

yes

Lig

htn

ing

an

d o

verv

olt

age

pro

tect

ion

inst

alle

d

yes

yes

yes

yes

Red

un

dan

t co

ntr

ol o

f al

l pla

nt

com

po

nen

tsn

och

eck

if t

his

is n

eces

sary

ye

sye

s

Man

ual

op

erat

or

con

tro

l lev

el if

co

ntr

ol s

yste

m f

ails

(c

hill

ers

and

CR

AC

s)

no

reco

mm

end

ed

reco

mm

end

ed

reco

mm

end

ed

Au

tom

atic

fai

lure

det

ecti

on

of

a co

mp

ute

r ro

om

air

co

nd

itio

ner

(C

RA

C)

reco

mm

end

ed

yes

yes

yes

top

or

bo

tto

m V

enet

ian

dam

per

s fo

r m

ain

ten

ance

an

d in

th

e ev

ent

of

a fa

ilure

ch

eck

if t

his

is n

eces

sary

ch

eck

if t

his

is n

eces

sary

ch

eck

if t

his

is n

eces

sary

ch

eck

if t

his

is n

eces

sary

Co

nn

ecti

on

to

fau

lt s

ign

alin

g s

yste

m /

bM

S

reco

mm

end

ed

yes

yes

yes

Co

nd

ensa

te d

rain

pan

or

wat

er b

arri

er u

nd

er C

RA

C

reco

mm

end

ed

yes

yes

yes

Ch

illed

wat

er p

ipin

g s

yste

m

nn

n2n

(ri

ng

sys

tem

)

inte

rnal

/ext

ern

al r

eser

ve t

erm

inal

s fo

r m

ob

ile r

eser

ve

un

its

or

exte

nsi

on

s av

aila

ble

n

ore

com

men

ded

reco

mm

end

edye

s

Str

ain

er w

ith

byp

ass

fun

ctio

n

yes

yes

reco

mm

end

ed

reco

mm

end

ed

Air

Co

nd

itio

nin

g

Page 9: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

Leak

det

ectio

n of

pip

ing

syst

em (a

t lea

st p

ress

ure

sens

or)

reco

mm

end

ed

yes

yes

yes

Ch

illed

wat

er p

um

ps

(ph

ase-

seq

uen

ce t

est)

n

n+1

2n2n

Sys

tem

sep

arat

ion

/ hea

t exc

hang

er (p

rimar

y, s

econ

dary

)n

ore

com

men

ded

re

com

men

ded

re

com

men

ded

Co

olin

g w

ater

ref

ill u

nit

n

ore

com

men

ded

ye

sye

s

Ho

t wat

er s

tora

ge

tan

ks /

hyd

rau

lic s

epar

ato

r –

syst

em-d

epen

den

tn

och

eck

if t

his

is n

eces

sary

ch

eck

if t

his

is n

eces

sary

ch

eck

if t

his

is n

eces

sary

Ch

illed

wat

er s

yste

m s

tan

db

y co

olin

g

(mu

nic

ipal

wat

er o

r w

ell w

ater

, ad

iab

atic

co

olin

g)

no

chec

k if

th

is is

po

ssib

le

chec

k if

th

is is

po

ssib

le

chec

k if

th

is is

po

ssib

le

Co

nn

ecti

on

of

chill

ed w

ater

sys

tem

pu

mp

s to

UP

S

no

chec

k if

th

is is

nec

essa

ry

chec

k if

th

is is

nec

essa

ry

chec

k if

th

is is

nec

essa

ry

Lin

es c

arry

ing

med

ia in

th

e D

C a

rea

that

are

no

t al

-lo

cate

d t

o d

ata

cen

ter

equ

ipm

ent

per

mitt

ed b

ut

no

t re

com

-m

end

ed

per

mitt

ed b

ut

no

t re

com

-m

end

ed

no

t p

erm

itted

n

ot

per

mitt

ed

Dra

ins

in t

he

serv

er r

oo

m f

or

con

den

sati

on

wat

er,

hu

mid

ific

atio

n

chec

k if

th

is is

nec

essa

ry

yes

yes

yes

Hu

mid

ity

con

tro

l an

d m

on

ito

rin

g

(in

dic

atio

n a

nd

his

tori

cal v

alu

es)

20 –

80

% R

H a

cco

rdin

g t

o

AS

HR

Ae

20

– 8

0 %

RH

acc

ord

ing

to

A

SH

RA

e

20 –

80

% R

H a

cco

rdin

g t

o

AS

HR

Ae

20

– 8

0 %

RH

acc

ord

ing

to

A

SH

RA

e

Red

un

dan

t ro

om

tem

per

atu

re a

nd

hu

mid

ity

m

on

ito

rin

g (

sep

arat

e se

nso

rs)

reco

mm

end

ed

reco

mm

end

ed

yes

yes

Ou

tdo

or

air

sup

ply

(fi

lter

cla

sses

G4

– F7

)n

oap

pro

x. 0

.25

to 0

.5 x

air

ch

ang

e / h

app

rox.

0.2

5 to

0.5

x a

ir

chan

ge

/ hap

pro

x. 0

.25

to 0

.5 x

air

ch

ang

e / h

Sm

oke

& c

onta

min

atio

n de

tect

ion

of o

utdo

or a

ir s

uppl

yre

com

men

ded

ye

s, a

t le

ast

smo

ke

yes,

tes

t sm

oke

, vic

init

y ye

s, t

est

smo

ke, v

icin

ity

Posi

tive

pre

ssu

re in

th

e se

rver

ro

om

an

d a

lloca

ted

ar

eas

com

par

ed t

o o

utd

oo

r an

d n

on

-DC

are

as

no

req

uir

emen

t ye

sye

sye

s

inte

gra

tio

n o

f ai

r co

nd

itio

nin

g in

to f

ire

mat

rix

(f

ire,

ext

inct

ion

)ye

sye

sye

sye

s

Sys

tem

-wid

e le

ak d

etec

tio

n o

f p

ipin

g s

yste

m /

co

nd

ensa

te (

po

int

det

ecto

r o

r se

nsi

ng

cab

le)

yes

yes

yes

yes

Ven

tila

tio

n, c

oo

ling

of

it in

fras

tru

ctu

re (

stan

d-b

y P

S

syst

em, t

ran

sfo

rmer

, LV

MD

, UP

S, b

atte

ries

, ext

in-

gu

ish

ing

sys

tem

, op

erat

ing

& o

ther

ad

join

ing

ro

om

s)ye

sye

sye

sye

s

Co

nsi

der

atio

n o

f al

tern

ativ

e co

olin

g s

yste

ms

(hig

h

den

sity

), w

her

e ap

plic

able

in-r

ow

co

olin

g, c

oo

l wal

lsre

com

men

ded

re

com

men

ded

re

com

men

ded

re

com

men

ded

Can

the

was

te h

eat o

f the

dat

a ce

nter

be

incl

uded

in

othe

r en

ergy

bal

ance

s? (h

eat p

ump,

hea

ting

syst

em e

tc.)

reco

mm

end

ed

reco

mm

end

ed,

e.g

. die

sel p

reh

eati

ng

reco

mm

end

ed,

e.g

. die

sel p

reh

eati

ng

reco

mm

end

ed,

e.g

. die

sel p

reh

eati

ng

CA

T I

CA

T II

CA

T II

IC

AT

IV

Air

Co

nd

itio

nin

g (

con

tin

ued

)

Page 10: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

CA

T I

CA

T II

CA

T II

IC

AT

IV

IT a

nd

tel

eco

mm

un

icat

ion

s ca

blin

g /

gen

eral

Cab

ling

des

ign

dev

elo

ped

acc

ord

ing

to

en

501

73-1

?re

com

men

ded

re

com

men

ded

ye

sye

s

Req

uir

emen

ts p

lan

nin

g d

evel

op

ed (

en

501

74-n

)?

yes

yes

yes

yes

Cab

ling

, rac

ks, c

abin

ets

and

cab

le t

rays

co

mp

ly w

ith

th

e ap

plic

able

ru

les

and

reg

ula

tio

ns

yes

yes

yes

yes

Red

un

dan

t su

pp

lies

(2-w

ay) t

o th

e b

uild

ing

, sep

arat

ed

at le

ast 2

0 m

fro

m o

ne

ano

ther

, no

n-c

ross

ing

n

oye

sye

sye

s

Red

un

dan

t pro

vid

er c

on

nec

tion

– m

ulti

ple

pro

vid

er

con

nec

tion

, cen

tral

off

ices

, pro

vid

ers

hav

e ri

gh

t of

way

n

on

oye

sye

s

infe

ed p

oin

ts p

rote

cted

aga

inst

sab

ota

ge

(cov

ers

no

t la

bel

ed, s

ign

alin

g c

on

tact

, …)

no

no

reco

mm

end

ed

yes

Sec

on

d t

elec

om

wir

ing

clo

set

no

no

yes

yes

Sec

on

d w

irin

g c

lose

tn

on

on

oo

pti

on

al

Red

un

dan

t b

ackb

on

e n

on

oye

sye

s

Red

un

dan

t h

ori

zon

tal c

ablin

g

no

no

no

op

tio

nal

Ro

ute

rs a

nd

sw

itch

es h

ave

red

un

dan

t p

ow

er s

up

ply

u

nit

s (a

lt. t

ran

sfer

sw

itch

) an

d p

roce

sso

rs

no

yes

yes

yes

Mu

ltip

le r

ou

ters

an

d s

wit

ches

fo

r re

du

nd

ant

op

era-

tio

nn

on

oye

sye

s

Patc

h p

anel

s, o

utl

ets

and

cab

les

hav

e to

be

lab

eled

ac

cord

ing

to

An

Si/t

iA/e

iA-6

06-A

. Cab

inet

s an

d r

acks

h

ave

to b

e la

bel

ed o

n f

ron

t an

d r

ear

yes

yes

yes

yes

Patc

h c

ord

s an

d ju

mp

ers

lab

eled

at

bo

th e

nd

s w

ith

th

e so

urc

e / d

esti

nat

ion

n

oye

sye

sye

s

Patc

h p

anel

an

d p

atch

cab

le d

ocu

men

tati

on

co

mp

lies

wit

h A

nS

i/tiA

/eiA

-606

-A.

no

no

yes

yes

Are

th

e lin

es t

ap-p

roo

f?

yes

yes

yes

yes

Do

th

e ca

ble

len

gth

s m

eet

the

spec

ific

atio

n

(An

Si,

tiA

942

)?

yes

yes

yes

yes

tele

com

mu

nic

atio

ns

/ Cab

ling

Page 11: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

tele

com

mu

nic

atio

ns

/ Cab

ling

(co

nti

nu

ed)

CA

T I

CA

T II

CA

T II

IC

AT

IV

Cab

le b

reak

mo

nit

ori

ng

of

hig

h-a

vaila

bili

ty li

nes

(b

acku

p li

nes

)?

yes

yes

yes

yes

Ove

rvo

ltag

e p

rote

ctio

n f

or

tele

com

mu

nic

atio

ns

sup

-p

ly c

able

s (C

U)

no

no

reco

mm

end

ed

yes

Sig

nal

lin

es o

f en

erg

ized

lin

es in

stal

led

sep

arat

ely

o

r se

par

ated

by

sep

arat

ors

on

th

e ca

ble

tra

ys?

yes

yes

yes

yes

Page 12: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

CA

T I

CA

T II

CA

T II

IC

AT

IV

Saf

ety

and

sec

uri

ty /

fire

ala

rm a

nd

ext

ing

uis

hin

g s

yste

ms

/gen

eral

Fire

pro

tect

ion

co

nce

pt

(in

cl. i

t/in

fras

tru

ctu

re a

reas

)re

com

men

ded

ye

sye

sye

s

Des

ign

co

nfo

rmin

g t

o V

dS

(fi

re a

larm

an

d e

xtin

gu

ish

-in

g s

yste

m),

par

ticu

larl

y re

du

ced

mo

nit

or i

ng

are

as

and

ad

join

ing

ro

om

s (i

n a

cco

rdan

ce w

ith

ap

plic

able

st

and

ard

s an

d g

uid

elin

es)

reco

mm

end

ed

yes

yes

yes

Fire

mat

rix,

incl

. fir

e d

amp

ers

reco

mm

end

ed

yes

yes

yes

Co

nn

ecti

on

to

ala

rm s

ign

alin

g s

yste

m /

bM

S

(bu

ildin

g m

anag

emen

t sy

stem

) re

com

men

ded

ye

sye

sye

s

Forw

ard

ing

to

a p

erm

anen

tly

man

ned

loca

tio

n

(gat

e ke

eper

, lo

bb

y, s

ecu

rity

off

ice,

fir

e d

epar

tmen

t)

reco

mm

end

ed

yes

yes

yes

Fire

det

ecti

on

Cen

tral

fir

e al

arm

sys

tem

co

mp

lies

wit

h a

pp

licab

le

gu

idel

ines

re

com

men

ded

ye

sye

sye

s

Fire

-ala

rm c

all b

oxes

in r

oo

m a

nd

rai

sed

flo

or

(w

her

e ap

plic

able

) an

d it

infr

astr

uct

ure

are

asye

sye

sye

sye

s

ear

ly f

ire

det

ecti

on

sys

tem

s (A

SD

asp

irat

ing

sm

oke

d

etec

tor)

re

com

men

ded

re

com

men

ded

re

com

men

ded

re

com

men

ded

ear

ly f

ire

det

ecti

on

sys

tem

s (l

aser

or

LeD

) re

com

men

ded

re

com

men

ded

re

com

men

ded

re

com

men

ded

Fire

fig

hti

ng

Ap

pro

pri

ate

qu

anti

ty a

nd

typ

e o

f h

and

-hel

d f

ire

exti

ng

uis

her

s (e

xtin

gu

ish

ing

ag

ent)

ye

sye

sye

sye

s

Mo

bile

ext

ing

uis

hin

g u

nit

s, e

.g. 1

0, 2

0, 3

0 kg

C

O2

tro

lleys

n

ore

com

men

ded

re

com

men

ded

re

com

men

ded

Sp

rin

kler

sys

tem

if n

eces

sary

p

re-c

on

tro

lled

(if

nec

essa

ry)

pre

-co

ntr

olle

d (

if n

eces

sary

) p

re-c

on

tro

lled

(if

nec

essa

ry)

Prea

ctio

n s

pri

nkl

er s

yste

m

if n

eces

sary

if

nec

essa

ry

if n

eces

sary

if

nec

essa

ry

Hig

h-p

ress

ure

wat

er m

ist

fire

pro

tect

ion

sys

tem

op

tio

no

pti

on

op

tio

no

pti

on

Gas

ext

ing

uis

hin

g s

yste

m (

chem

ical

ext

ing

uis

hin

g

agen

ts: F

M20

0, n

ovec

123

0; g

aseo

us

exti

ng

uis

hin

g

agen

ts: C

O2,

arg

on

, Arg

on

ite,

nit

rog

en, i

ner

gen

),

incl

. lo

ss m

on

ito

rin

g

reco

mm

end

ed

reco

mm

end

ed

yes

yes

Oxy

gen

red

uct

ion

sys

tem

s o

pti

on

op

tio

no

pti

on

op

tio

n

Saf

ety

and

Sec

uri

ty

Page 13: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

CA

T I

CA

T II

CA

T II

IC

AT

IV

Saf

ety

and

sec

uri

ty /

fire

ala

rm a

nd

ext

ing

uis

hin

g s

yste

ms

/gen

eral

Fire

pro

tect

ion

co

nce

pt

(in

cl. i

t/in

fras

tru

ctu

re a

reas

)re

com

men

ded

ye

sye

sye

s

Des

ign

co

nfo

rmin

g t

o V

dS

(fi

re a

larm

an

d e

xtin

gu

ish

-in

g s

yste

m),

par

ticu

larl

y re

du

ced

mo

nit

or i

ng

are

as

and

ad

join

ing

ro

om

s (i

n a

cco

rdan

ce w

ith

ap

plic

able

st

and

ard

s an

d g

uid

elin

es)

reco

mm

end

ed

yes

yes

yes

Fire

mat

rix,

incl

. fir

e d

amp

ers

reco

mm

end

ed

yes

yes

yes

Co

nn

ecti

on

to

ala

rm s

ign

alin

g s

yste

m /

bM

S

(bu

ildin

g m

anag

emen

t sy

stem

) re

com

men

ded

ye

sye

sye

s

Forw

ard

ing

to

a p

erm

anen

tly

man

ned

loca

tio

n

(gat

e ke

eper

, lo

bb

y, s

ecu

rity

off

ice,

fir

e d

epar

tmen

t)

reco

mm

end

ed

yes

yes

yes

Fire

det

ecti

on

Cen

tral

fir

e al

arm

sys

tem

co

mp

lies

wit

h a

pp

licab

le

gu

idel

ines

re

com

men

ded

ye

sye

sye

s

Fire

-ala

rm c

all b

oxes

in r

oo

m a

nd

rai

sed

flo

or

(w

her

e ap

plic

able

) an

d it

infr

astr

uct

ure

are

asye

sye

sye

sye

s

ear

ly f

ire

det

ecti

on

sys

tem

s (A

SD

asp

irat

ing

sm

oke

d

etec

tor)

re

com

men

ded

re

com

men

ded

re

com

men

ded

re

com

men

ded

ear

ly f

ire

det

ecti

on

sys

tem

s (l

aser

or

LeD

) re

com

men

ded

re

com

men

ded

re

com

men

ded

re

com

men

ded

Fire

fig

hti

ng

Ap

pro

pri

ate

qu

anti

ty a

nd

typ

e o

f h

and

-hel

d f

ire

exti

ng

uis

her

s (e

xtin

gu

ish

ing

ag

ent)

ye

sye

sye

sye

s

Mo

bile

ext

ing

uis

hin

g u

nit

s, e

.g. 1

0, 2

0, 3

0 kg

C

O2

tro

lleys

n

ore

com

men

ded

re

com

men

ded

re

com

men

ded

Sp

rin

kler

sys

tem

if n

eces

sary

p

re-c

on

tro

lled

(if

nec

essa

ry)

pre

-co

ntr

olle

d (

if n

eces

sary

) p

re-c

on

tro

lled

(if

nec

essa

ry)

Prea

ctio

n s

pri

nkl

er s

yste

m

if n

eces

sary

if

nec

essa

ry

if n

eces

sary

if

nec

essa

ry

Hig

h-p

ress

ure

wat

er m

ist

fire

pro

tect

ion

sys

tem

op

tio

no

pti

on

op

tio

no

pti

on

Gas

ext

ing

uis

hin

g s

yste

m (

chem

ical

ext

ing

uis

hin

g

agen

ts: F

M20

0, n

ovec

123

0; g

aseo

us

exti

ng

uis

hin

g

agen

ts: C

O2,

arg

on

, Arg

on

ite,

nit

rog

en, i

ner

gen

),

incl

. lo

ss m

on

ito

rin

g

reco

mm

end

ed

reco

mm

end

ed

yes

yes

Oxy

gen

red

uct

ion

sys

tem

s o

pti

on

op

tio

no

pti

on

op

tio

n

CA

T I

CA

T II

CA

T II

IC

AT

IV

Saf

ety

and

Sec

uri

ty (

con

tin

ued

)

Air

tig

htn

ess

test

(b

low

er d

oo

r te

st)

reco

mm

end

edre

com

men

ded

yes

yes

Saf

e co

ntr

ol o

f fi

re d

amp

ers

yes

yes

yes

yes

Intr

usi

on

det

ecti

on

sys

tem

/ g

ener

al

Sec

uri

ty c

on

cep

t zo

nin

g /

div

isio

n in

to a

reas

(i

ncl

. DC

are

a an

d it

infr

astr

uct

ure

) re

com

men

ded

ye

sye

sye

s

th

e b

uild

ing

is u

sed

as

a d

ata

cen

ter

on

ly

reco

mm

end

ed

reco

mm

end

ed

yes

yes

Des

ign

co

nfo

rmin

g t

o V

dS

(in

tru

sio

n d

etec

tio

n

syst

em a

nd

fie

ld d

evic

es)

– in

acc

ord

ance

wit

h

app

licab

le s

tan

dar

ds

and

gu

idel

ines

reco

mm

end

ed

yes

yes

yes

Ala

rm m

atri

xre

com

men

ded

ye

sye

sye

s

Co

nn

ecti

on

to

ala

rm s

ign

alin

g s

yste

m /

bM

S

(bu

ildin

g m

anag

emen

t sy

stem

)re

com

men

ded

re

com

men

ded

ye

sye

s

Forw

ard

ing

to

a p

erm

anen

tly

man

ned

loca

tio

n

(gat

e ke

eper

, lo

bb

y, s

ecu

rity

off

ice,

po

lice)

re

com

men

ded

re

com

men

ded

ye

sye

s

Op

en/c

lose

d m

on

ito

rin

g o

f d

oo

rs

(win

do

ws,

ch

ann

els,

du

cts)

re

com

men

ded

ye

sye

sye

s

Mo

nit

ori

ng

of

sup

ply

pat

hs

and

pro

tect

ion

ag

ain

st s

abo

tag

ere

com

men

ded

re

com

men

ded

ye

sye

s

Mo

nit

ori

ng

of

corr

ido

rs a

nd

do

ors

(p

assi

ve t

rap

sys

tem

) re

com

men

ded

re

com

men

ded

ye

sye

s

Mo

nit

ori

ng

of

roo

ms

(co

mp

reh

ensi

ve)

reco

mm

end

ed

yes

yes

yes

intr

usi

on

det

ecto

rs a

t se

lect

ed lo

cati

on

s re

com

men

ded

ye

sye

sye

s

ext

ern

al a

cces

s ar

ea s

urv

eilla

nce

(p

erim

eter

pro

tect

ion

) re

com

men

ded

ye

sye

sye

s

Page 14: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

Saf

ety

and

Sec

uri

ty (

con

tin

ued

)

CA

T I

CA

T II

CA

T II

IC

AT

IV

Acc

ess

con

tro

l sys

tem

/ fl

ow o

f m

ater

ial /

gen

eral

Sec

uri

ty c

on

cep

t –

zon

e m

od

el (

incl

. DC

are

a an

d

it in

fras

tru

ctu

re)

reco

mm

end

edye

sye

sye

s

Ass

ign

men

t o

f ac

cess

au

tho

riza

tio

n is

des

crib

ed

in t

he

com

pan

y’s

secu

rity

co

nce

pt

and

mo

nit

ore

d

acco

rdin

gly

th

rou

gh

man

agem

ent

pro

cess

es (

2700

1)re

com

men

ded

yes

yes

yes

Des

ign

co

nfo

rmin

g t

o V

dS

(ac

cess

co

ntr

ol s

yste

m

and

rea

der

s / c

ard

s) –

in a

cco

rdan

ce w

ith

ap

plic

able

st

and

ard

s an

d g

uid

elin

esre

com

men

ded

yes

yes

yes

Acc

ess

auth

ori

zati

on

is is

sued

in a

cco

rdan

ce w

ith

co

mp

any

po

licie

s n

ore

com

men

ded

yes

yes

Log

gin

g o

f ac

cess

req

ues

ts, i

ncl

. rec

ord

ing

of

un

succ

essf

ul a

ttem

pts

/ ac

cess

den

ied

re

com

men

ded

reco

mm

end

edye

sye

s

Ala

rm m

atri

x

Co

nn

ecti

on

to

ala

rm s

ign

alin

g s

yste

m /

bM

S

(bu

ildin

g m

anag

emen

t sy

stem

) re

com

men

ded

yes

yes

yes

Forw

ard

ing

to

a p

erm

anen

tly

man

ned

loca

tio

n

(gat

e ke

eper

, lo

bb

y, s

ecu

rity

off

ice)

re

com

men

ded

reco

mm

end

edye

sye

s

Co

nn

ecti

on

of

do

or

op

enin

g s

yste

ms

(co

ntr

olle

rs,

mo

tor

lock

s, d

oo

r o

pen

ers)

to

a f

ail-

safe

po

wer

su

p-

ply

yes

yes

yes

yes

Pro

tect

ion

of

cen

tral

pro

cess

ing

un

it(s

) / c

on

tro

llers

in

acc

ess

con

tro

lled

or

mo

nit

ore

d a

reas

ye

sye

sye

sye

s

it a

nd

fac

ility

sta

ff h

ave

acce

ss t

o a

uth

ori

zed

are

as

on

ly

no

reco

mm

end

edre

com

men

ded

yes

Do

or

blo

ckin

g /

pas

s-b

ack

/ mu

ltip

le u

se o

f ac

cess

au

tho

riza

tio

n e

xclu

ded

re

com

men

ded

reco

mm

end

edye

sye

s

turn

stile

no

no

yes

yes

Mat

eria

ls a

re u

np

acke

d o

uts

ide

the

it a

rea

and

ch

ecke

d f

or

fore

ign

ob

ject

sn

ore

com

men

ded

yes

yes

Bu

llet

resi

stan

t w

alls

, win

dow

s an

d d

oo

rs

Sec

uri

ty c

ou

nte

r in

th

e lo

bb

y n

/an

/aS

K 3

/niJ

leve

l iii

(min

)S

K 3

/niJ

leve

l iii

(min

)

Sec

uri

ty c

ou

nte

r in

th

e sh

ipp

ing

an

d r

ecei

vin

g a

rea

n/a

n/a

n/a

SK

3/n

iJ le

vel i

ii (m

in)

Page 15: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

Acc

ess

con

tro

l sys

tem

/ fl

ow o

f m

ater

ial /

gen

eral

Sec

uri

ty c

on

cep

t –

zon

e m

od

el (

incl

. DC

are

a an

d

it in

fras

tru

ctu

re)

reco

mm

end

edye

sye

sye

s

Ass

ign

men

t o

f ac

cess

au

tho

riza

tio

n is

des

crib

ed

in t

he

com

pan

y’s

secu

rity

co

nce

pt

and

mo

nit

ore

d

acco

rdin

gly

th

rou

gh

man

agem

ent

pro

cess

es (

2700

1)re

com

men

ded

yes

yes

yes

Des

ign

co

nfo

rmin

g t

o V

dS

(ac

cess

co

ntr

ol s

yste

m

and

rea

der

s / c

ard

s) –

in a

cco

rdan

ce w

ith

ap

plic

able

st

and

ard

s an

d g

uid

elin

esre

com

men

ded

yes

yes

yes

Acc

ess

auth

ori

zati

on

is is

sued

in a

cco

rdan

ce w

ith

co

mp

any

po

licie

s n

ore

com

men

ded

yes

yes

Log

gin

g o

f ac

cess

req

ues

ts, i

ncl

. rec

ord

ing

of

un

succ

essf

ul a

ttem

pts

/ ac

cess

den

ied

re

com

men

ded

reco

mm

end

edye

sye

s

Ala

rm m

atri

x

Co

nn

ecti

on

to

ala

rm s

ign

alin

g s

yste

m /

bM

S

(bu

ildin

g m

anag

emen

t sy

stem

) re

com

men

ded

yes

yes

yes

Forw

ard

ing

to

a p

erm

anen

tly

man

ned

loca

tio

n

(gat

e ke

eper

, lo

bb

y, s

ecu

rity

off

ice)

re

com

men

ded

reco

mm

end

edye

sye

s

Co

nn

ecti

on

of

do

or

op

enin

g s

yste

ms

(co

ntr

olle

rs,

mo

tor

lock

s, d

oo

r o

pen

ers)

to

a f

ail-

safe

po

wer

su

p-

ply

yes

yes

yes

yes

Pro

tect

ion

of

cen

tral

pro

cess

ing

un

it(s

) / c

on

tro

llers

in

acc

ess

con

tro

lled

or

mo

nit

ore

d a

reas

ye

sye

sye

sye

s

it a

nd

fac

ility

sta

ff h

ave

acce

ss t

o a

uth

ori

zed

are

as

on

ly

no

reco

mm

end

edre

com

men

ded

yes

Do

or

blo

ckin

g /

pas

s-b

ack

/ mu

ltip

le u

se o

f ac

cess

au

tho

riza

tio

n e

xclu

ded

re

com

men

ded

reco

mm

end

edye

sye

s

turn

stile

no

no

yes

yes

Mat

eria

ls a

re u

np

acke

d o

uts

ide

the

it a

rea

and

ch

ecke

d f

or

fore

ign

ob

ject

sn

ore

com

men

ded

yes

yes

Bu

llet

resi

stan

t w

alls

, win

dow

s an

d d

oo

rs

Sec

uri

ty c

ou

nte

r in

th

e lo

bb

y n

/an

/aS

K 3

/niJ

leve

l iii

(min

)S

K 3

/niJ

leve

l iii

(min

)

Sec

uri

ty c

ou

nte

r in

th

e sh

ipp

ing

an

d r

ecei

vin

g a

rea

n/a

n/a

n/a

SK

3/n

iJ le

vel i

ii (m

in)

Saf

ety

and

Sec

uri

ty (

con

tin

ued

)

CA

T I

CA

T II

CA

T II

IC

AT

IV

CC

TV m

on

ito

rin

g

bu

ildin

g p

erim

eter

an

d p

arki

ng

no

req

uir

emen

ts

no

req

uir

emen

ts

yes

yes

Gen

erat

ors

n/a

n/a

yes

yes

Acc

ess

con

tro

lled

do

ors

n

o r

equ

irem

ents

n

o r

equ

irem

ents

ye

sye

s

Ser

ver

roo

m

no

req

uir

emen

ts

no

req

uir

emen

ts

yes

yes

UP

S, t

elec

om

mu

nic

atio

ns

and

eq

uip

men

t ro

om

s M

eP

ro

om

s n

o r

equ

irem

ents

n

o r

equ

irem

ents

ye

sye

s

CC

TV

CC

tV

rec

ord

ing

of a

ll ev

ents

on

all

cam

eras

n

o r

equ

irem

ents

n

o r

equ

irem

ents

ye

s, d

igit

alye

s, d

igit

al

th

e o

uts

ide

area

s ar

e m

on

ito

red

by

infr

ared

cam

eras

reco

mm

end

ed

reco

mm

end

ed

yes

yes

Rec

ord

ing

rat

e (f

ram

es p

er s

eco

nd

) n

/an

/a20

fra

mes

/sec

(m

in)

20 f

ram

es/s

ec (

min

)

CC

tV

rec

ord

ing

is s

tore

d

reco

mm

end

ed

reco

mm

end

ed

30 d

ays

30 d

ays

Saf

ety

equ

ipm

ent

and

sec

uri

ty

Wat

er le

ak d

etec

tio

n

no

yes

yes

yes

Pres

sure

dro

p in

ch

iller

s n

ore

com

men

ded

ye

sye

s

Sec

uri

ty s

taff

on

sit

e n

ore

com

men

ded

re

com

men

ded

or

loca

ted

cl

ose

by

yes

Page 16: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

CA

T I

CA

T II

CA

T II

IC

AT

IV

Pre

ven

tati

ve m

ain

ten

ance

pro

gra

m

eff

icie

nt

pre

ven

tati

ve m

ain

ten

ance

pro

gra

m (

PM

/ P

lan

ned

Mai

nte

nan

ce),

incl

. typ

e o

f m

ain

ten

ance

, ex

ecu

tio

n d

ate

and

mai

nte

nan

ce r

epo

rts

yes

yes

yes

yes

PM

pro

gra

m in

clu

des

mai

nte

nan

ce a

ctiv

itie

s re

com

-m

end

ed b

y m

anu

fact

ure

r re

com

men

ded

yes

yes

yes

Det

aile

d d

escr

ipti

on

of

mea

sure

s to

be

imp

lem

ente

d

wh

en s

wit

chin

g f

rom

“re

du

nd

ancy

<_>

ava

ilab

le a

nd

in

use

”n

ore

com

men

ded

yes

yes

Co

mp

lete

des

crip

tio

n o

f m

easu

res

for

pre

ven

tati

ve

mai

nte

nan

ce (

e.g

., “M

eth

od

of

Pro

ced

ure

” m

anu

alre

com

men

ded

reco

mm

end

edye

sye

s

Qu

alit

y co

ntr

ol p

roce

ss in

stal

led

th

at c

on

firm

s th

e im

ple

men

tati

on

of

a) a

ll m

ain

ten

ance

act

ivit

ies

and

b

) th

e q

ual

ity

req

uir

emen

ts o

f P

M

reco

mm

end

edre

com

men

ded

yes

yes

All

PM

s ar

e co

nn

ecte

d t

o a

nd

co

ntr

olle

d b

y a

chan

ge

man

agem

ent

syst

emre

com

men

ded

reco

mm

end

edye

sye

s

Mai

nte

nan

ce c

on

trac

ts f

or

all c

om

po

nen

ts a

nd

th

eir

du

rati

on

an

d s

ervi

ce le

vel m

on

ito

rin

g a

cco

rdin

g t

o

man

agem

ent

syst

em (

2700

1)re

com

men

ded

reco

mm

end

edye

sye

s

Des

ign

ated

mai

nte

nan

ce a

reas

are

ava

ilab

lere

com

men

ded

reco

mm

end

edye

sye

s

Cle

anin

g a

nd

cle

anlin

ess

Co

mp

ute

r ro

om

flo

or

/ rai

sed

flo

or

free

fro

m d

irt

and

w

aste

yes

yes

yes

yes

th

e d

ata

cen

ter

is f

ree

fro

m c

om

bu

stib

le m

ater

ials

, m

ailin

g b

oxes

, per

son

al b

elo

ng

ing

s su

ch a

s co

ffee

m

ug

s, m

icro

wav

es, .

..ye

sye

sye

sye

s

Cle

aner

s p

rovi

de

clea

nin

g r

eco

rds

to e

nsu

re a

cl

ean

sit

e re

com

men

ded

reco

mm

end

edye

sye

s

Mai

nte

nan

ce

Page 17: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

CA

T I

CA

T II

CA

T II

IC

AT

IV

Mai

nte

nan

ce (

con

tin

ued

)

Mai

nte

nan

ce m

anag

emen

t sy

stem

eff

icie

nt

mai

nte

nan

ce m

anag

emen

t sy

stem

(p

aper

o

r el

ectr

on

ic f

orm

at)

to h

ave

a st

atu

s ov

ervi

ew o

f al

l mai

nte

nan

ce a

ctiv

itie

s (c

om

ple

te /

in p

rog

ress

/ sc

hed

ule

d)

yes

yes

yes

yes

Mai

nte

nan

ce li

st o

f al

l co

mp

on

ents

inst

alle

d

(bra

nd

, mo

del

, dat

e o

f m

anu

fact

ure

, dat

e o

f in

stal

la-

tio

n, c

har

acte

rist

ics

in t

erm

s o

f o

per

atio

n, w

arra

nty

in

form

atio

n /

term

s an

d c

on

dit

ion

s, e

tc.)

reco

mm

end

edye

sye

sye

s

Rec

ord

s o

f to

ols

an

d s

par

e p

arts

fo

r p

reve

nta

tive

m

ain

ten

ance

re

com

men

ded

reco

mm

end

edye

sye

s

Pow

er r

eco

rdin

g a

nd

mai

nte

nan

ce t

ren

ds

for:

eq

uip

-m

ent,

his

tory

of

mai

nte

nan

ce a

ctiv

itie

s, c

alib

rati

on

n

eces

siti

es, l

ist

of

crit

ical

sp

are

par

ts a

nd

th

resh

old

fo

r o

rder

ing

sto

ck s

par

e p

arts

reco

mm

end

edre

com

men

ded

yes

yes

Man

ufa

ctu

rer

sup

po

rt

List

of

qu

alif

ied

man

ufa

ctu

rers

fo

r n

orm

al w

ork

an

d

emer

gen

cy m

easu

res

yes

yes

yes

yes

SLA

s d

escr

ibin

g w

ork

pac

kag

e, p

reve

nta

tive

mai

n-

ten

ance

pro

gra

m a

nd

res

po

nse

tim

es f

or

all c

riti

cal

man

ufa

ctu

rers

reco

mm

end

ed

yes

yes

yes

Des

crip

tio

n o

f m

anu

fact

ure

r’s

tech

nic

al s

up

po

rt a

nd

su

pp

ort

fo

r au

tho

rize

d a

nd

qu

alif

ied

tec

hn

icia

ns

rep

ort

ing

a f

ault

reco

mm

end

ed

reco

mm

end

ed

yes

yes

Life

cyc

le p

lan

nin

g

eff

ecti

ve p

roce

ss f

or

pla

nn

ing

, sch

edu

ling

an

d

iden

tify

ing

en

d-o

f-lif

e el

emen

ts o

f im

po

rtan

t in

fra-

stru

ctu

re c

om

po

nen

ts

reco

mm

end

ed

reco

mm

end

ed

yes

yes

Page 18: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

CA

T I

CA

T II

CA

T II

IC

AT

IV

Mai

nte

nan

ce (

con

tin

ued

)

Fau

lt a

nal

ysis

pro

gra

m

Co

mp

ilati

on

of

lists

of

all f

ailu

res,

incl

ud

ing

dat

e,

tim

e, in

fras

tru

ctu

re c

om

po

nen

ts a

nd

sys

tem

s in

volv

ed, c

om

pu

ter

syst

em f

ailu

res,

iden

tifi

cati

on

of

the

un

der

lyin

g p

rob

lem

an

d le

sso

ns

lear

ned

reco

mm

end

ed

yes

yes

yes

Dev

elo

pm

ent

of

a p

roce

du

re t

o a

void

un

der

lyin

g

pro

ble

ms,

eva

luat

ion

of

less

on

s le

arn

ed a

nd

co

rrec

-ti

ve a

ctio

ns

der

ived

fro

m t

his

eva

luat

ion

reco

mm

end

ed

reco

mm

end

ed

yes

yes

est

ablis

hm

ent

of

a tr

end

an

alys

is p

roce

ss

reco

mm

end

ed

reco

mm

end

ed

reco

mm

end

ed

reco

mm

end

ed

Mai

nte

nan

ce p

rog

ram

Prev

enta

tive

mai

nte

nan

ce p

rog

ram

an

d p

lan

ned

m

ain

ten

ance

; im

ple

men

tati

on

rat

e g

reat

er t

han

(>

) 90

%

yes

yes

n/a

n/a

Prev

enta

tive

mai

nte

nan

ce; i

mp

lem

enta

tio

n r

ate:

10

0 %

n

/an

/aye

sye

s

eff

icie

nt,

sch

edu

led

mai

nte

nan

ce p

rog

ram

Do

es a

ser

vice

leve

l ag

reem

ent

wit

h a

mo

bile

g

ener

ato

r su

pp

lier

exis

t an

d a

re t

he

resp

on

se t

imes

ad

equ

ate?

yes

n/a

n/a

n/a

Co

nti

nu

ou

s /

oth

er d

ocu

men

tati

on

All

acce

pta

nce

do

cum

ents

are

ava

ilab

le (

fire

pro

tec-

tio

n a

nal

ysis

, co

mm

issi

on

ing

do

cum

ents

, ap

pro

ved

b

uild

ing

ap

plic

atio

n, a

ttes

tati

on

of

con

form

ity

for

V

Di 6

022/

in a

cco

rdan

ce w

ith

ap

plic

able

sta

nd

ard

s an

d g

uid

elin

es)

yes

yes

yes

yes

Reg

ula

r g

ener

ato

r lo

ad t

akeo

ver

test

s, in

cl. r

epo

rts

reco

mm

end

edye

sye

sye

s

Acc

epta

nce

tes

ts b

efo

re c

om

mis

sio

nin

g t

he

dat

a ce

nte

rye

sye

sye

sye

s

Page 19: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

CA

T I

CA

T II

CA

T II

IC

AT

IV

Sit

e p

olic

y

Do

cum

ente

d p

olic

y an

d p

roce

du

res

for

the

follo

win

g

po

ints

:

- Pe

rfo

rman

ce o

f em

plo

yees

on

sit

e fo

r ov

eral

l on

-si

te o

per

atio

n (

con

fig

ura

tio

n c

han

ges

, op

erat

ion

u

nd

er n

orm

al, e

mer

gen

cy o

r ab

no

rmal

co

nd

itio

ns)

- S

ite

con

fig

ura

tio

n: C

on

fig

uri

ng

sit

e fo

r n

orm

al

con

dit

ion

s –

stan

dar

d o

per

atio

n: C

han

ges

in n

orm

al

op

erat

ion

(e.

g.,

swit

chin

g c

hill

ers)

- e

mer

gen

cy p

roce

du

re: H

avin

g c

on

tro

l ove

r th

e si

te

un

der

ab

no

rmal

co

nd

itio

ns

or

even

ts

- C

han

ge

man

agem

ent:

a)

Co

ntr

ol a

nd

ap

pro

val o

f ch

ang

es w

ith

reg

ard

to

o

per

atio

nal

gu

idel

ines

an

d b

) id

enti

fica

tio

n o

f ri

sks

of

pla

nn

ed c

han

ges

no

reco

mm

end

edye

sye

s

Fin

anci

al m

anag

emen

t

OP

eX

an

d C

AP

eX

pla

nn

ing

to

en

sure

co

mp

lian

ce

wit

h t

ieR

req

uir

emen

ts

yes

yes

yes

yes

OP

eX

an

d C

AP

eX

pla

nn

ing

to

en

sure

co

mp

lian

ce

wit

h t

ieR

req

uir

emen

ts, m

ade

at n

on

-cri

tica

l sit

e an

d n

ot

in r

elat

ion

to

oth

er b

uild

ing

s o

r g

rou

ps

of

bu

ildin

gs

reco

mm

end

edre

com

men

ded

yes

yes

Pla

nn

ing

& C

oo

rdin

atio

n

Page 20: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

CA

T I

CA

T II

CA

T II

IC

AT

IV

Pla

nn

ing

& C

oo

rdin

atio

n (

con

tin

ued

)

Sit

e d

ocu

men

tati

on

th

e fo

llow

ing

do

cum

ents

mu

st b

e av

aila

ble

(o

n s

ite

or

acce

ssib

le)

- W

ork

ing

dra

win

gs

- O

per

atio

nal

an

d m

ain

ten

ance

do

cum

enta

tio

n-

Rec

ord

s o

f so

il sa

mp

les,

sta

tics

, ele

ctri

cal a

nd

m

ech

anic

al d

esig

n-

Sw

itch

es, e

lect

ric

circ

uit

s ...

- D

ocu

men

tati

on

des

crib

ing

th

e sy

stem

set

tin

gs

- W

arra

nty

do

cum

ents

an

d p

re-n

ego

tiat

ed m

ain

ten

-an

ce c

on

trac

ts-

Des

crip

tio

n o

f au

tom

atic

op

erat

ion

al s

equ

ence

s (e

.g.,

CR

AC

sta

nd

by

-> li

ve s

wit

chov

er)

yes

yes

yes

yes

th

e ab

ove-

liste

d d

ocu

men

ts a

nd

rec

ord

s ar

e al

way

s av

aila

ble

on

sit

e n

ore

com

men

ded

yes

yes

Op

erat

ing

do

cum

ents

cen

tral

ly a

vaila

ble

as

a lib

rary

fo

r o

n-s

ite

staf

f n

ore

com

men

ded

yes

yes

Mas

ter

cop

ies

and

ch

ang

es a

re u

pd

ated

an

d a

vail-

able

to

op

erat

ing

sta

ff a

nd

man

ufa

ctu

rers

, mai

nte

n-

ance

co

mp

anie

s an

d p

lan

ner

sre

com

men

ded

reco

mm

end

edye

sye

s

Cap

acit

y m

anag

emen

t

Dat

a ce

nte

r sp

ace

mas

ter

pla

n e

xist

s an

d is

per

ma-

nen

tly

chec

ked

/su

pp

lem

ente

d

reco

mm

end

edre

com

men

ded

yes

yes

Pro

cess

es f

or

pla

nn

ing

fu

rth

er e

xpan

sio

ns

for

spac

e,

po

wer

, co

olin

g f

or,

e.g

., 1/

6/12

/24/

36 m

on

ths

in

adva

nce

reco

mm

end

edre

com

men

ded

yes

yes

Res

ou

rce

man

agem

ent

for

flo

or

spac

e, p

ow

er,

coo

ling

cap

acit

y an

d e

xpan

sio

n (

per

man

entl

y m

on

ito

red

) ye

sye

sye

sye

s

Page 21: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

CA

T I

CA

T II

CA

T II

IC

AT

IV

Em

plo

yees

Full-

tim

e em

plo

yees

(Ft

e)

or

hal

f- o

r fu

ll-ti

me

emp

loye

es o

f m

anu

fact

ure

r w

ho

can

iden

tify

cri

tica

l st

ates

yes

n/a

n/a

n/a

em

plo

yees

or

man

ufa

ctu

rer

sup

po

rt f

or

sin

gle

-sh

ift

op

erat

ion

5 d

ays

a w

eek

no

yes

n/a

n/a

esc

alat

ion

an

d c

all-

ou

t p

roce

du

re in

stal

led

fo

r sp

ecif

ic e

mp

loye

es o

r m

anu

fact

ure

r su

pp

ort

fo

r d

escr

ibed

cri

tica

l sys

tem

s o

r eq

uip

men

tn

ore

com

men

ded

yes

yes

em

plo

yees

on

sit

e 24

x 7

, at

leas

t 1

qu

alif

ied

Ft

en

/an

/aye

sn

/a

em

plo

yees

on

sit

e 24

x 7

, at

leas

t 2

qu

alif

ied

Ft

e

for

stan

dar

d s

up

po

rt p

er s

hift

n

/an

/an

/aye

s

Su

pp

ort

of

tech

nic

al f

ield

s (e

lect

rica

l, co

ntr

ol s

yste

m,

bu

ildin

g m

anag

emen

t sy

stem

, air

co

nd

itio

nin

g)

acco

rdin

g t

o o

per

atio

nal

an

d m

ain

ten

ance

req

uir

e-m

ents

yes

yes

yes

yes

Qu

alifi

cati

on

s

Ap

pro

pri

ate

trai

nin

g o

f em

plo

yees

, req

uir

ed b

y la

w

yes

yes

yes

yes

Do

cum

ente

d o

n s

ite

trai

nin

g in

dat

a ce

nte

r p

roce

sses

an

d e

qu

ipm

ent

reco

mm

end

edye

sye

sye

s

Co

mp

lete

fo

rmal

tra

inin

g o

f al

l em

plo

yees

in

a) c

on

fig

ura

tio

n, o

per

atio

n, h

azar

ds

for

the

spec

ific

te

chn

ical

are

asb

) al

l sit

e re

gu

lati

on

s, p

roce

sses

, pro

ced

ure

s

no

reco

mm

end

edye

sye

s

task

s al

loca

ted

to

rel

evan

t em

plo

yees

fo

r

mai

nte

n an

ce, s

ecu

rity

, tra

inin

g a

nd

co

mp

ute

r ro

om

en

gin

eer i

ng

reco

mm

end

edre

com

men

ded

yes

yes

Sh

ift p

erso

nn

el q

ual

ifie

d f

or

spec

ial s

hift

tas

ks

ind

ivid

ual

ly o

r as

a s

hift

tea

mn

/an

/aye

sye

s

em

plo

yees

& t

rain

ing

Page 22: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

CA

T I

CA

T II

CA

T II

IC

AT

IV

em

plo

yees

& t

rain

ing

(co

nti

nu

ed)

Org

aniz

atio

n

Org

aniz

atio

n c

har

ts s

ho

w th

e re

po

rtin

g r

elat

ion

ship

s b

etw

een

faci

lity,

en

gin

eeri

ng

, it

an

d s

ecu

rity

ye

sye

sye

sye

s

Des

crip

tio

n o

f cr

itic

al f

acili

ty t

asks

is a

vaila

ble

an

d

imp

lem

ente

d

reco

mm

end

edye

sye

sye

s

nu

mb

er o

f Ft

e m

eets

sh

ift r

equ

irem

ents

n/a

n/a

yes

yes

task

s an

d r

esp

on

sib

iliti

es c

har

t in

clu

des

all

dat

a ce

nte

r ac

tivi

ties

an

d is

imp

lem

ente

d

n/a

reco

mm

end

edye

sye

s

Sp

ecif

ic k

ey p

osi

tio

ns

and

flo

wch

arts

are

des

crib

ed

and

imp

lem

ente

d

reco

mm

end

edre

com

men

ded

yes

yes

Un

ifo

rm r

epo

rtin

g li

ne

to o

per

ativ

e m

anag

emen

t w

ith

all

dat

a ce

nte

r o

per

atio

n f

acts

su

ch a

s si

te-r

elat

-ed

mat

ters

, it

an

d s

ecu

rity

reco

mm

end

edre

com

men

ded

reco

mm

end

edre

com

men

ded

Trai

nin

g p

rog

ram

On

-th

e-Jo

b t

rain

ing

(O

Jt)

for

each

new

em

plo

yee

in

a) t

he

syst

em h

e/sh

e is

res

po

nsi

ble

/sch

edu

led

fo

r an

d

b)

the

wo

rkin

g c

on

dit

ion

s/ch

arac

teri

stic

s in

th

e d

ata

cen

ter

yes

yes

yes

yes

no

rmal

inst

ruct

ion

, dem

on

stra

tio

n o

f o

per

atio

n a

nd

/o

r ta

rget

ed s

hift

tra

inin

g w

ith

th

e fo

llow

ing

co

nte

nts

:- A

ll g

uid

elin

es, p

roce

sses

, an

d p

roce

du

res

for

op

er-

atin

g t

he

dat

a ce

nte

r ar

e kn

ow

n- A

ll w

ork

reg

ula

tio

ns

in t

he

dat

a ce

nte

r ar

e kn

ow

n-

Sit

e C

on

fig

ura

tio

n P

roce

du

re (

SC

P);

des

ign

of

the

dat

a ce

nte

r in

fras

tru

ctu

re-

Sta

nd

ard

Op

erat

ing

Pro

ced

ure

(S

OP

); in

fras

tru

ctu

re

con

fig

ura

tio

n in

no

rmal

op

erat

ion

- e

mer

gen

cy O

per

atin

g P

roce

du

re (

eO

P);

co

ntr

ol a

nd

o

per

atio

n o

f th

e si

te u

nd

er a

bn

orm

al c

on

dit

ion

s-

Met

ho

d o

f Pr

oce

du

re (

MO

P);

des

crip

tio

n o

f m

eth

-o

ds

for

imp

lem

enti

ng

pro

ced

ure

s-

Mai

nte

nan

ce M

anag

emen

t S

yste

m

(MM

S p

roce

du

re);

det

ails

of

mai

nte

nan

ce m

anag

e-m

ent

syst

em/m

ain

ten

ance

pro

ced

ure

no

reco

mm

end

edye

sye

s

Page 23: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

em

plo

yees

& t

rain

ing

(co

nti

nu

ed)

CA

T I

CA

T II

CA

T II

IC

AT

IV

trai

nin

g p

rog

ram

, in

clu

din

g s

ched

ule

, tra

inin

g c

on

-te

nts

, req

uir

ed m

ater

ial f

or

op

erat

ion

an

d c

on

firm

a-ti

on

of

par

tici

pat

ion

no

reco

mm

end

edye

sye

s

Cer

tifi

cate

s o

f q

ual

ific

atio

n a

nd

req

ual

ific

atio

n

for

spec

ific

per

son

s re

spo

nsi

ble

fo

r d

ata

cen

ter

op

erat

ion

reco

mm

end

edye

sye

sye

s

Em

plo

yees

& Tr

ain

ing

(co

nti

nu

ed)

Dat

a ce

nte

r p

roce

sses

an

d p

roce

du

res

inst

ruct

ion

, co

nsi

der

ing

th

e w

ork

to

be

per

form

edye

sye

sye

sye

s

Form

al in

stru

ctio

n w

ith

th

e fo

llow

ing

co

nte

nts

:- A

ll p

rin

cip

les,

pro

cess

es a

nd

pro

ced

ure

s fo

r o

per

a-ti

on

an

d m

ain

ten

ance

of

DC

sys

tem

wo

rk r

ule

s fo

r co

mp

ute

r ro

om

s an

d s

up

po

rt a

reas

(e.

g.,

mo

nit

or-

ing

req

uir

ed)

- M

eth

od

of

Pro

ced

ure

(M

OP

) –

des

crip

tio

n o

f m

eth

-o

ds

for

imp

lem

enti

ng

pro

ced

ure

s

no

reco

mm

end

edye

sye

s

Page 24: List of Criteria developed for Server Room and Data Center ... · PDF fileList of Criteria developed for Server Room and Data Center Audits. ... CAT I CAT II CAT III CAT IV ... constant

tÜV Rheinland

Consulting GmbH

Am Grauen Stein

51105 Köln

Free info hotline:

0800 8484006

[email protected]

www.tuv.com/consulting ®TÜ

V, T

UE

V u

nd T

UV

sin

d ei

nget

rage

ne M

arke

n. E

ine

Nut

zung

und

Ver

wen

dung

bed

arf

der

vorh

erig

en Z

ustim

mun

g.

T

RC

-021

_03/

13