NAME OF COMPLETION DATE ACTUAL 1 Meningkatkan Taraf Cerun di Bukit Gedung & Bukit Penang Mr. Khor Yee Hsiang 381,760.00 6-Jun-97 21-Feb-98 24-Jan-98 Jambul, P.Pinang (Design & Build) Development Engineer 2 Meningkatkan Taraf Cerun di Bkt Bendera (KM146) JKR Pulau Pinang Tn. Hj. Samsuddin Bakar 103,000.00 1-Sep-98 30-Sep-98 30-Sep-98 P.Pinang (Design & Build) District Engineer 3 Membaikpulih Struktur Penahan Hakisan Ombak, JKR Tn. Hj. Samsuddin Bakar 114,750.00 22-Dec-98 10-May-99 15-Jan-99 dan Kerja-kerja Berkaitan di Bangunan Lembaga Buruh Pulau Pinang District Engineer Pelabuhan Pulau Pinang (Design & Build) 4 Meningkatkan Taraf Cerun di Bkt Bendera JKR Tn. Hj. Samsuddin Bakar 76,742.00 1-Jan-99 1-Feb-99 1-Feb-99 ( Richmond Bungalow) P.Pinang (Design & Build) Pulau Pinang District Engineer 5 Meningkatkan taraf Cerun di Bukit Bendera JKR Tn. Hj. Samsuddin Bakar 180,848.00 1-Feb-99 15-Mar-99 15-Mar-99 ( Top Station ) Pulau Pinang (Design & Build) Pulau Pinang District Engineer 6 Menstabil Tebing Batu di Bkt Saujana, Paya Terubong, JKR Tn. Hj. Samsuddin Bakar 165,000.00 1-Sep-99 30-Sep-99 30-Sep-99 Pulau Pinang (Design & Build) Pulau Pinang District Engineer 7 Menstabil & Memperkukuhkan Kaw Tebing Runtuh JKR Tn.Hj. Samsuddin Bakar 405,000.00 9-Feb-00 9-Apr-00 9-Apr-00 di KM 19.8 Jln Tun Sardon, P.Pinang (Design & Build) Pulau Pinang District Engineer 8 Cadangan Pemasangan 'Rock Netting' dan Kerja-kerja JKR Tn. Hj. Samsuddin Bakar 1,600,000.00 16-Oct-00 15-Jan-01 15-Jan-01 Berkaitan Menstabil Tebing Batu di Bukit Saujana Paya Pulau Pinang District Engineer Terubong, Pulau Pinang (Design & Build) LIST OF COMPLETED SLOPE PROJECTS NO. PROJECT TITLE CLIENT CONTRACT (RM) CONTRACT PERIOD RESPONSIBLE ENGINEER SITE POSSESSION COMPLETION

Upload: others

Post on 23-Oct-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

  • NAME OF COMPLETION

    DATE

    ACTUAL

    1 Meningkatkan Taraf Cerun di Bukit Gedung & Bukit Penang Mr. Khor Yee Hsiang 381,760.00 6-Jun-97 21-Feb-98 24-Jan-98

    Jambul, P.Pinang (Design & Build) Development Engineer

    2 Meningkatkan Taraf Cerun di Bkt Bendera (KM146) JKR Pulau Pinang Tn. Hj. Samsuddin Bakar 103,000.00 1-Sep-98 30-Sep-98 30-Sep-98

    P.Pinang (Design & Build) District Engineer

    3 Membaikpulih Struktur Penahan Hakisan Ombak, JKR Tn. Hj. Samsuddin Bakar 114,750.00 22-Dec-98 10-May-99 15-Jan-99

    dan Kerja-kerja Berkaitan di Bangunan Lembaga Buruh Pulau Pinang District Engineer

    Pelabuhan Pulau Pinang (Design & Build)

    4 Meningkatkan Taraf Cerun di Bkt Bendera JKR Tn. Hj. Samsuddin Bakar 76,742.00 1-Jan-99 1-Feb-99 1-Feb-99

    ( Richmond Bungalow) P.Pinang (Design & Build) Pulau Pinang District Engineer

    5 Meningkatkan taraf Cerun di Bukit Bendera JKR Tn. Hj. Samsuddin Bakar 180,848.00 1-Feb-99 15-Mar-99 15-Mar-99

    ( Top Station ) Pulau Pinang (Design & Build) Pulau Pinang District Engineer

    6 Menstabil Tebing Batu di Bkt Saujana, Paya Terubong, JKR Tn. Hj. Samsuddin Bakar 165,000.00 1-Sep-99 30-Sep-99 30-Sep-99

    Pulau Pinang (Design & Build) Pulau Pinang District Engineer

    7 Menstabil & Memperkukuhkan Kaw Tebing Runtuh JKR Tn.Hj. Samsuddin Bakar 405,000.00 9-Feb-00 9-Apr-00 9-Apr-00

    di KM 19.8 Jln Tun Sardon, P.Pinang (Design & Build) Pulau Pinang District Engineer

    8 Cadangan Pemasangan 'Rock Netting' dan Kerja-kerja JKR Tn. Hj. Samsuddin Bakar 1,600,000.00 16-Oct-00 15-Jan-01 15-Jan-01

    Berkaitan Menstabil Tebing Batu di Bukit Saujana Paya Pulau Pinang District Engineer

    Terubong, Pulau Pinang (Design & Build)

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    9 Cadangan Pembaikan Cerun di Lot 9.8 Jeep Track, JKR Tn.Ir Zabidi Hamid 348,406.00 28-Nov-00 27-Jan-01 27-Jan-01

    Penang Hill (Design & Build) Pulau Pinang District Engineer

    10 Design Construction & Completion of Remedial Works JKR Tn.Ir Zabidi Hamid 469,037.00 2-Apr-01 22-Jul-01 22-May-01

    on Slope at SM Bkt Jambul,Penang (Design & Build) Pulau Pinang District Engineer

    11 Kerja-kerja Pembaikan Cerun di Bkt Berhampiran Apmt JKR Tn. Ir Zabidi Hamid 2,240,000.00 8-May-01 8-Nov-01 4-Oct-01

    Sun Moon City, Paya Terubong, Penang Pulau Pinang District Engineer

    (Design & Build)

    12 Slope Stabilisation & Mitigation Works at Desa I & P En. Mohd Hisham Kasim 657,000.00 5-Feb-02 5-May-02 22-Apr-02

    Mutiara II, Phase 5A Jln Yeap Chor Ee, Penang Setiawangsa Senior Project Engineer

    (Design & Build)

    13 Kerja-kerja Merekabentuk Dan Membaikpulih Cerun En. Ishak Abd Rahman 805,418.30 9-Dec-02 9-Mar-03 9-Mar-03

    Runtuh Di Tangki Air Ulu Kenderong, Gerik, Engineer

    Perak Darul Ridzuan. (Design & Build)

    14 Kerja-kerja Membaikpulih Tebing Runtuh Dan JKR Tn. Ir. Mohd Jabil Bakri 2,850,000.00 4-Dec-02 4-May-03 4-May-03

    Kerosakan Jalan Di Genting Peras (B32) Dalam Daerah Selangor District Engineer

    Hulu Langat, Selangor Darul Ehsan (Design & Build)

    15 Menaiktaraf Jalan Paya Terubong dari Jalan Air Itam / JKR En. Adena Mamat 3,732,500.00 5-Jun-03 29-Oct-03 29-Oct-03

    Bandar Baru Air Itam ke Jalan Paya Terubong / Jalan Pulau Pinang District Engineer

    Relau, Pulau Pinang - Kerja-kerja Penstabilan Cerun

    Majestic Height, Pulau Pinang (Design & Build)

    Lembaga Air Perak

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    16 Kerja-kerja Membaiki Cerun Runtuh di Beberapa Lokasi JKR En. Mohd Zein Mohd Nor 3,100,000.00 10-Nov-03 9-Feb-04 29-Jan-04

    Di Antara Seksyen 15.0 Hingga Seksyen 30.0 Laluan Selangor District Engineer

    Persekutuan 55, Jalan KKB - Gap, Daerah Hulu Selangor

    Selangor Darul Ehsan (Design & Build)

    17 Stablisation of Rock Slope & Earth Slope at Desa I & P En. Mohd Hisham Kasim 332,930.20 1-Feb-04 2-May-04 12-Mar-04

    Mutiara II - Phase 7, Jln Yeap Chor Ee, Penang Setiawangsa Senior Project Engineer

    (Design & Build)

    18 Proposed Rectification and Completion of A 2.9 Mil. Perbadanan Bekalan Tn. Ir. Jaseni Maidinsa 124,900.00 2-Mar-04 10-May-04 5-May-04

    Gal. R.C Reservoir and Associated Works at Genting, Air Pulau Pinang Development Manager

    Balik Pulau, Penang (Proposed Slope Stabilisation) Sdn Bhd

    (Design & Build)

    19 Kerja-kerja Kecemasan Untuk Pembaikan Cerun di Jabatan Perhutanan En. Zulkifli Ahmad 420,000.00 26-Aug-04 25-Nov-04 30-Sep-04

    Kawasan Ibu Pejabat Perhutanan Semenanjung Semenanjung Pengarah Industri Hutan

    Malaysia, Jln Sultan Salahuddin, 50660 K.Lumpur Malaysia

    (Design & Build)

    20 Kajang Traffic Dispersal Ring Road (Package 3 - Mr. Liew Kok Wing 761,736.00 24-Sep-04 7-Nov-04 7-Nov-04

    Section 2C) Rock Stabilisation & Protection Work, Sr. Project Manager

    Selangor (Design & Build)

    21 Kerja Menyiasat, Merekabentuk, Membina & JKR En Ilhami Mohd Idrus 1,831,665.20 5-Nov-04 3-Feb-05 3-Feb-05

    Menyiapkan Pembaikan Cerun Runtuh Di Sebelah Selangor K.P.P. Bangunan

    Bangunan Annex, Dewan Undangan Negeri Selangor

    (Design & Build)

    Sunway Construction

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    22 Proposed Slope Remedial Work At Ch 67+500, PPES Works En. Norazman Abd. Latip 690,000.00 13-Dec-04 18-Jan-05 18-Jan-05

    (Federal Road Code: 1 - 7), Sg. Topah - Bau/Tondong Sdn. Bhd. Project Manager

    Junction, Sarawak (Design & Build)

    23 Proposed Rectification and Completion of A 2.9 Mil. Perbadanan Bekalan Tn. Ir. Jaseni Maidinsa 199,960.00 15-Jan-05 14-Mar-05 14-Feb-05

    Gal. R.C Reservoir and Associated Works at Genting, Air Pulau Pinang Development Manager

    Balik Pulau, Penang (Proposed Slope Stabilisation) Sdn Bhd

    (Design & Build)

    24 Proposed Slope Remedial Works at PBA Water Perbadanan Bekalan Tn. Ir. Jaseni Maidinsa 199,716.20 1-Apr-05 31-May-05 22-Apr-05

    Treatment Plant, Batu Feringghi, Pulau Pinang Air P.Pinang Sdn Bhd Development Manager

    (Design & Build)

    25 Membina 'Rockfall Fence' dan kerja-kerja Berkaitan Majlis Perbandaran 130,486.80 13-Jun-05 17-Jul-05 4-Jul-05

    di Kawasan Lereng Bukit, Taman Perbandaran, Pulau Pinang

    Persiaran Kuari, P.Pinang (Design & Build) Engineer

    26 Kerja-kerja Pengukuhan dan Penstabilan Cerun bagi Penang Development Nor Azman Abu Bakar 431,609.00 10-Aug-05 10-Oct-05 5-Sep-05

    Kerja Cadangan Jalan dan Parit untuk Jeti Batu Musang, Corporation / Managing Director

    Batu Musang, Batu Kawan, Seberang Perai Selatan Puncak Mekar Bina

    (Design & Build)

    27 Memperbaiki Cerun di Jalan Baling ke Pengkalan Hulu JKR Hj Abd Halim H. Raman 200,000.00 8-Nov-05 5-Jan-06 23-Nov-05

    KM52, Daerah Baling, Kedah Darul Aman Kedah District Engineer

    (Design & Build)

    Tn Ir Mohd Mokhtar Mohd

    Murad

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    28 Proposed Slope Remedial Works Between KM 42 JKR 419,144.80 19-Apr-06 15-Aug-06 29-May-06

    to KM 43, Jalan Muar - Labis, Muar, Johor Darul Takzim. Johor

    (Design & Build) Jurutera Jalan

    29 Proposed Slope Remedial Works Along The Access JKR Pahang Tn Hj Rahim Goon 610,000.00 19-Apr-06 19-Jul-06 2-Jun-06

    Road To Kea Farm Off Jalan Brinchang, Cameron KPP Jalan

    Highland, Pahang Darul Makmur (Design & Build)

    30 Merekabentuk dan Membaik Pulih Cerun Tangki Air Syarikat Air Tn Hj Fakrurazi Ismail 547,703.40 24-Apr-06 23-Jul-06 8-Jun-06

    Dan Kerja-kerja Berkaitan di Bukit Gajah, Besut, Terengganu Pengurus Rekabentuk &

    Terengganu. (Design & Build) Pembangunan

    31 Merekabentuk dan Membaikpulih Cerun Tangki Air Syarikat Air Tn. Hj. Fakrurazi Ismail 688,698.70 1-Aug-06 27-Nov-06 10-Sep-06

    dan Kerja-kerja Yang Berkaitan di Bukit Losong, Terengganu Pengurus Rekabentuk &

    Kuala Terengganu, Terengganu. (Design & Build) Pembangunan

    32 Kerja-kerja Pembaikan Cerun di Jalan Baling ke JKR Hj.Abd Halim H. Raman 121,000.00 10-Aug-06 9-Oct-06 7-Sep-06

    Pengkalan Hulu (FT076) Bagi Daerah Baling, Kedah Kedah District Engineer

    Darul Aman. (Design & Build)

    33 Proposed Slope Remedial Works at Institut Keselamatan JKR En. Abu Bakar b. 1,409,531.67 21-Aug-06 10-Oct-06 10-Oct-06

    dan Kesihatan Pekerjaan Negara (NIOSH), Johor Bahru Johor Abd. Aziz

    Branch, Johor Bahru, Johor Darul Takzim

    (Design & Build)

    Tn Hj Hanafiah B Mohd

    Sharif

    Penolong Pengarah

    Bangunan

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    34 Remedial Works Along Eastern Bank of Sungai Buloh, Johor Port Berhad En Mohamed Abd. Wahab 2,539,034.00 7-Oct-06 20-Jan-07 20-Jan-07

    Johor Port, Pasir Gudang, Johor Darul Takzim Jurutera Jabatan

    (Design & Build) Kejuruteraan Awam

    35 Slope Rectification For Proposed Housing Development Koperasi Polis Diraja Ir. Wan Abdul Rahim 600,000.00 11-Dec-06 10-Mar-07 15-Feb-07

    At Lot 2699, Mukim Sik, Sik, Kedah Darul Aman Pulau Pinang Berhad bin Wan Sulaiman

    (Design & Build) Principal

    36 Merekabentuk Dan Membaikpulih Cerun Syarikat Air Tn. Hj. Fakrurazi Ismail

    Bunded Storage' dan Lain-Lain Kerja Yang Berkaitan di Terengganu Pengurus Rekabentuk & 279,057.40 25-Feb-07 5-May-07 21-Mar-07

    Loji Air Bukit Bauk, Dungun, Terengganu Pembangunan

    (Design & Build)

    37 Kerja-Kerja Membaik Pulih Cerun Runtuh Dan JKR Selangor Prem Kumar A/L

    Kerja-kerja Berkaitan Di KM 37.60 Laluan Persekutuan Kaliappan 600,000.00 7-Feb-07 6-May-07 5-Apr-07

    FT068 Jalan Kuala Lumpur-Bentong, Gombak, Pen. Pengarah Jalan

    Selangor Darul Ehsan. (Design & Build) JKR Selangor

    38 Kerja-Kerja Membaik Pulih Cerun Runtuh Di KM2.1, JKR Selangor Prem Kumar A/L 4,260,000.00 12-Jun-07 11-Oct-07 11-Oct-07

    KM5.5 (2 Lokasi) Di Laluan Negeri B62, Jalan Kaliappan

    Ampang Hulu Langat Dan di KM36.5,KM36.7 & Pen. Pengarah Jalan

    KM38.9 (3 Lokasi) Di Laluan Negeri B32 Jalan JKR Selangor

    Klawang-Bukit Peras, Di Dalam Daerah Hulu,

    Selangor Darul Ehsan. (Design & Build)

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    39 Cadangan Kerja-Kerja Merekabentuk Dan Membaik- Tenaga Nasional Ir. Zulkifli Mohd Yusof 1,647,612.00 11-Sep-07 10-Jan-08 27-Nov-07

    pulih Cerun Di Sekitar Menara No 7A, 7B & 7C Talian Berhad Ketua Talian Hidup &

    275KV, Segari-Air Tawar (Design & Build) Kejuruteraan Awam,

    40 Membaiki Tebing Yang Runtuh di Bukit Raja, Lenggong, Pej Daerah & Tanah Meor Syaharizan 170,800.00 14-Nov-07 7-Dec-07 7-Dec-07

    Perak Darul Ridzuan. (Design & Build) Lenggong, Perak Penolong Jurutera

    41 Slope Stabilisation Works at PLC/MS-Myanmar Total E&P Myanmar Martine Valex 879,639.30 1-Apr-08 30-Jun-08 6-May-08

    (Design & Build) General Manager

    42 Membina Benteng di Lereng Bukit Depan Rumah Majlis Daerah Ishak Md Napis 165,000.00 16-May-08 29-Aug-08 10-Jun-08

    No. 9-16, Taman Bukit Senyum, Lenggong, Perak Lenggong Yang DiPertua

    (Design & Build)

    43 Kerja-Kerja Membaikpulih Cerun Runtuh Dan Kerja- JKR Selangor 1,830,000.00 15-Sep-08 15-Dec-08 25-Nov-08

    Kerja Berkaitan Di KM 33.30 dan KM 35.06, Laluan

    Persekutuan FT068, Jalan Kuala Lumpur-Bentong Lama,

    Daerah Gombak, Selangor Darul Ehsan

    (Design & Build)

    44 Kerja-kerja Menbaikpulih Cerun Di Kawasan Universiti Sains 931,449.20 20-Sep-08 20-Dec-08 18-Dec-08

    Desasiswa Restu, Universiti Sains Malaysia, Penang Malaysia, Penang

    (Design & Build)

    Ketua Penolong Pengarah

    Jalan Negeri Selangor

    Tn.Ir Hj Mohamad Sofian

    Ahmad

    Pengarah Jab.

    Pembangunan USM,

    Penang

    Tn Hj Jalalonmuhali B.

    Abd Rahman

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    45 Merekabentuk, Membina dan menyiapkan Kerja-kerja JKR Pahang / En Shuib Ahmad 9,280,869.86 27-May-08 2-Jun-09 16-Mac-09

    kecemasan (AP 55) akibat cerun runtuh di KM 4-5, Bee Eye Engineering Managing Director

    Laluan FT 148, Jalan Baru naik ke Bukit Fraser, Raub,

    Pahang Darul Makmur (Design & Build)

    46 Merekabentuk dan Membaikpulih Cerun Tangki Air Syarikat Air Tn. Hj. Fakrurazi Ismail 1,167,625.00 1-Jan-09 1-Apr-09 13-Mar-09

    Dan Lain-lain Kerja Yang Berkaitan di Bukit Pepari, Terengganu Pengurus Rekabentuk &

    Setiu, Terengganu (Design & Build) Pembangunan

    47 Provision of Materials, Machineries and Skilled Total E&P Myanmar Nicolas Terraz 1,883,424.00 13-Jan-09 13-Apr-09 27-Mar-09

    Manpower for Slope Stabilization Works at PLC/MS, General Manager

    Phase II (LSMS-1&4), Myanmar (Design & Build)

    48 Penstabilan Cerun Rumah No. 25 Hingga 32, Taman Perniagaan Masoha / Md Kassim Hanafi 226,554.00 8-Jun-09 7-Aug-09 6-Jul-09

    Bukit Senyum, Lenggong, Perak. (Design & Build) Maj Daerah Lenggong Manager

    49 Kerja-Kerja Pengerudian Tanah di Salak Tinggi Untuk Tenaga Nasional Nur Irfah Bt Mohd Pauzi 6,806.00 24-Aug-09 1-Sep-09 1-Sep-09

    Kajian "Rock Mass Characterization", Berhad Pensyarah Kejuruteraan

    Universiti Tenaga Nasional

    50 Removing and Scaling of Loose and Fractured Rock Perdana Parkcity 16,380.00 14-Oct-09 24-Oct-09 15-Oct-09

    Works in Sector E (1st Stage) at Desa Parkcity, Sdn Bhd Site Engineer

    Kuala Lumpur (Design & Build)

    Ahmad Syazwan B Mohd

    Sukarno

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    51 Cadangan Merekabentuk, Membina, Menyiapkan dan Pembinaan I & R Pn Maznah Binti Salamin 1,264,338.30 1-Feb-10 12-Sep-10 6-Apr-10

    Menyelenggara Kerja-Kerja Penstabilan Cerun Dan Sdn Bhd/ Jurutera Awam

    Kawalan Hakisan Serta Kerja-kerja Berkaitan Di UiTM Segamat, Johor UiTM Segamat, Johor

    Universiti Teknologi Mara Malaysia (UiTM) Segamat,

    Johor (Design & Build)

    52 Kerja-Kerja Penstabilan Cerun Di Dalam Kawasan Majlis Perniagaan Masoha 209,510.80 8-Apr-10 18-Jun-10 7-May-10

    Daerah Lenggong, Perak Sdn Bhd/

    (Design & Build) Maj. Daerah Penolong Jurutera

    Lenggong Majlis Daerah Lenggong

    53 Slope Treatment Near Old Batching Plant Site At Lembaga Air Perak Hj Idris Bin Hj Ibrahim 153,480.00 7-Apr-10 8-Jun-10 8-Jun-10

    Empangan Sultan Azlan Shah, Ulu Kinta, Ipoh, Perak Senior Engineer

    (Design & Build)

    54 Slope Protection Works For Casa Damansara 3 For The Mr Yee Sin Min 479,968.40 15-Apr-10 29-Jul-10 1-Jul-10

    Execution And Constructions Of Superstructure Works Timbalan Pengurus

    To Proposed Mixed Development (Tropicana City) At Petaling Jaya, Besar

    Lot PT7, Jalan SS20/27, Petaling Jaya, Selangor Selangor

    (Design & Build)

    55 Kerja-Kerja Membaiki Cerun di K.M 1.5, Bukit Bendera, JKR Timur Laut/ Tn Hj Ibrahim Bin Ahmad 179,517.50 19-Jul-10 11-Oct-10 21-Aug-10

    Daerah Timur Laut, Pulau Pinang Ramli Bin Husin Engineer

    (Design & Build)

    Meor Syaharizan Meor

    Mohd Hariri

    Tropicana City Sdn

    Bhd

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    56 Kerja-Kerja Kecemasan Bagi Penstabilan Cerun Di Loji Lembaga Air Perak Hj Ishak B. Abdul Rahman 483,000.00 5-Aug-10 5-Nov-10 11-Oct-10

    Pembersihan Air, Bukit Larut, Taiping, Perak Senior Engineer

    (Design & Build)

    57 Proposed Soil Nail With Grid Beam at CH 41800 - MMC-GAMUDA JV Maslan Othman 495,128.40 1-Aug-10 1-Dec-10 16-Nov-10

    CH 42025 for electrified doubled track project Gurun, Project Manager

    Kedah (Design & Build)

    58 Membaikpulih Dan Menstabil Cerun Runtuh Di Taman Perniagaan Masoha 456,240.70 1-Oct-10 29-Nov-10 16-Nov-10

    Lenggong Majlis Daerah Lenggong, Perak Sdn Bhd /

    (Design & Build) Maj. Daerah Penolong Jurutera

    Lenggong Majlis Daerah Lenggong

    59 Membaikpulih Dan Menstabilkan Cerun Runtuh Di Kg. Sykt Agro Bina 430,000.00 1-Oct-10 9-Dec-10 9-Dec-10

    Tersusun Bukit Raja, Majlis Daerah Lenggong, Perak Maj. Daerah

    (Design & Build) Lenggong Penolong Jurutera

    Majlis Daerah Lenggong

    60 Proposed Development On Lots 27, 31 And 32, Plenitude Sdn Bhd / Mr Ir Cheah Siew Wai 122,911.00 16-Dec-10 9-Feb-11 27-Jan-11

    Seksyen 2, Bandar Batu Feringghi, Daerah Timur Laut, G & P Geotechnics Project Manager

    Pulau Pinang - Award of Rock Slope Strengthening Sdn Bhd

    Works (Design & Build)

    61 Kerja-Kerja Kecemasan Membaikpulih Cerun Runtuh Lembaga Air Perak Hj Idris Bin Hj Ibrahim 380,000.00 20-Dec-10 18-Feb-11 27-Jan-11

    Dan Kerja Berkaitan Di Loji Taiping Headworks, Senior Engineer

    Taiping Perak - Cerun 2 (Design & Build)

    Meor Syaharizan Meor

    Mohd Hariri

    Meor Syaharizan Meor

    Mohd Hariri

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    62 Gunite Slope & Soil Nail Works Di Atas Lot 27,31 Dan 32, Plenitude Sdn Bhd / Mr Ch'ng Beng Chye 474,619.00 16-Dec-10 2-Mar-11 10-Feb-11

    Seksyen 2, Bandar Batu Feringghi, Daerah Timur Laut, Choongcons Sdn Bhd Project Manager

    P.Pinang (Design & Build)

    63 Cadangan Kerja-Kerja Penstabilan Cerun Di Dalam 179,521.00 9-Feb-11 21-Apr-11 22-Feb-11

    Kawasan Majlis Daerah Lenggong, Perak - Cerun 3

    (Design & Build) Daerah Lenggong Penolong Jurutera

    64 Kerja-Kerja Membaikpulih Dan Menstabilkan Cerun di JKR Terengganu Che Lah Bin Che Endut 460,350.00 23-Mar-11 2-May-11 30-Apr-11

    Jalan Bomba-Kg Paya Besar Serta Lain-Lain Kerja Yang JD Hulu Terengganu

    Berkaitan Dengannya Di Kuala Berang, Daerah Hulu

    Terengganu. (Design & Build)

    65 Proposed Slope Rehabilitation Works At KM 0.5, Berjaya Hills Berhad Mr. Chin Chean Fui 230,718.00 18-Apr-11 15-May-11 12-May-11

    Priority 'X', (Design & Build) Project Director

    66 Guniting Works at Horizon Towers, No. 1 Tanjung Horizon Towers Mr David Docker 42,600.00 7-May-11 23-May-11 19-May-11

    Bungah Park, 11200 Penang. (Design & Build) Management Council Project Manager

    67 Kerja-Kerja Kecemasan Membaikpulih Cerun Perbadanan Bekalan Ir. Ismail Hj Ishak 357,940.10 11-May-11 28-Jun-11 27-Jun-11

    Berdekatan Persiaran Taman Cantik, Bukit Bendera, Air Pulau Pinang Project Engineer

    Pulau Pinang. (Design & Build) Sdn Bhd

    Koperasi Pekebun

    Kecil, / Majlis

    Meor Syaharizan Meor

    Mohd Hariri

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    68 Kerja-Kerja Membaikpulih Cerun Di Kawasan Kompleks Universiti Ir.Mohd Nizam b. 768,000.00 3-May-11 2-Sep-11 28-Jun-11

    Desasiswa Restu, Saujana Dan Tekun (RST)- Sains Mohd Razak

    (Slope 1, 2 & 3), Universiti Sains Malaysia,Pulau Pinang Malaysia Project Engineer'

    (Design & Build)

    69 Penstabilan Cerun Secara Reka dan Bina Di Sekolah JKR Melaka En Onni Dzasman 2,752,132.30 2-Aug-11 27-Feb-12 6-Jan-12

    Menengah Arab Al -Asraf, Bukit Merchat, Daerah Alor Nasruddin

    Gajah, Melaka (Design & Build) Jurutera Daerah

    70 Proposed Execution And Completion of Slope Protection Setia Promenade Ir. Tang Song Teik 555,439.00 17-Oct-11 16-Jan-12 15-Jan-12

    and Stabilization Works To 54 Units 3 Storey Semi- Sdn Bhd Project Manager

    Detached (Phase 3C), On Part Of Lot 12025, Mukim 12, Pulau Pinang

    D.B.D, Persiaran Kelicap, Pg (Design & Build)

    71 Rock Slope Strengthening Works at Sector B: Mr Khoo Wei Kiat 920,000.00 5-Dec-11 4-Mac-12 10-Apr-12

    Zone B1 & Sector D: Zone D3 (Design & Build) Project Manager

    72 Kerja-Kerja Kecemasan Membaikpulih Cerun Runtuh Lembaga Air Perak Hj Idris Bin Hj Ibrahim 305,000.00 9-Jan-12 8-Mar-12 22-Feb-12

    Dan Kerja Berkaitan Di Loji Taiping Headworks, Taiping, Ipoh, Perak Jurutera Kanan

    Perak - Cerun 3 (Design & Build)

    73 Kerja-kerja Segera Membaikpulih Cerun Berdekatan Ir. Ismail Hj Ishak 197,201.40 19-Mar-12 18-May-12 26-Apr-12

    Reservoir Cresent, Air Itam, Pulau Pinang Jabatan Kejuruteraan

    (Design & Build) Awam

    Perdana Parkcity Sdn

    Bhd

    Perbadanan Bekalan

    Air Pulau Pinang Sdn

    Bhd

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    74 Proposed Slope Mitigation Works At Taman Sri Bukit Ir. Ismail Hj Ishak 187,380.20 17-May-12 16-Jul-12 6-Jun-12

    Indah, Bukit Mertajam, Pulau Pinang (Design & Build) Jabatan Kejuruteraan

    Awam

    75 Kerja-Kerja Segera Membaikpulih Cerun Di Jalan Ir. Ismail Hj Ishak 199,753.30 3-Jul-12 2-Sep-12 2-Aug-12

    Menuju Air Itam, DAM, D.T.L, Pulau Pinang. Jabatan Kejuruteraan

    (Design & Build) Awam

    76 Kerja-Kerja Kecemasan Membaikpulih Cerun Runtuh Di Lembaga Air Perak Hj Idris Bin Hj Ibrahim 4,918,000.00 24-Apr-12 23-Apr-13 23-Nov-12

    Loji Rawatan Air Gerik V, Gerik, Perak Darul Ridzuan. Ipoh, Perak Jurutera Kanan

    (Design & Build)

    77 Cadangan Pembaikan Kegagalan Cerun Di Laluan Jabatan Kerja Raya Mohd Izainudin 11,100,000.00 15-Jul-12 14-Sep-13 3-Jul-13

    FT185, Seksyen 65.1, Jalan Simpang Pulai/Lojing/ Malaysia Bin Ibrahim

    Gua Musang, Kelantan (Design & Build) Jurutera Jajahan

    78 Projek Kerja-Kerja Pembaikan Cerun Sekolah Kementerian Ir. Hiew Vun Heng 13,370,023.11 3-Dec-12 3-Oct-14 3-Oct-14

    Menengah Kebangsaan Sapulut, Nabawan, Sabah. Pelajaran Malaysia Koordinator Projek

    (Pergerakan Cerun Baru Berdekatan Slope 1)

    (Design & Build)

    79 Cadangan Kerja-Kerja Baik Pulih Cerun Runtuh Di Jabatan Bekalan Air Kholib Bin Hanafi 1,683,858.38 1-Mar-13 2-May-14 25-Apr-14

    Tangki Air Bukit Besar, Wilayah Persekutuan Labuan Project Manager

    (Design & Build)

    Perbadanan Bekalan

    Air Pulau Pinang Sdn

    Bhd

    Perbadanan Bekalan

    Air Pulau Pinang Sdn

    Bhd

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    80 Tender Design and Build Bagi Kerja-Kerja Kepakaran Majlis Perbandaran 286,337.00 4-Jul-13 3-Oct-13 13-Sep-13

    Untuk Membaikpulih Cerun Menggunakan Kaedah Pulau Pinang

    Soil Nailing' Dan 'Guniting', Untuk Kerja-Kerja Jurutera Geoteknikal (1)

    Menstabilkan Tebing Cerun Di Belakang Rumah

    No. 410-I,410-J & 410-K, Lrg Taman Cantik 3, Seksyen 1,

    Bandar Air Itam, Pulau Pinang (Design & Build)

    81 Tawaran Melaksanakan Kerja-kerja Pembaikan Cerun Perniagaan Sinar Khalid Bin Abd Rahman 246,446.60 2-Dec-13 11-Feb-14 11-Feb-14

    Runtuh Dan Kerja-Kerja Berkaitan Di K.M 2.1 Juta / JKR Timur Laut Project Manager

    Bukit Bendera, Pulau Pinang (Design & Build)

    82 Tawaran Melaksanakan Kerja-kerja Pembaikan Cerun Sazrin Saidin/ Sazrin Bin Saidin 250,446.60 2-Dec-13 11-Feb-14 11-Feb-14

    Runtuh Dan Kerja-Kerja Berkaitan Di K.M 4.0 JKR Timur Laut Project Manager

    Bukit Bendera, Pulau Pinang (Design & Build)

    83 Reka dan Bina Bagi Kerja-Kerja Menstabilkan Cerun Frise Ace 362,191.50 14-Jul-14 13-Oct-14 3-Sep-14

    Berhampiran Rumah No. 17 di Taman Bukit Senyum Enterprise /

    (Slope 5), Lenggong, Perak Majlis Daerah Penolong Jurutera

    (Design & Build) Lenggong

    84 Rundingan Terus Bagi Kerja-Kerja Segera Membaik- USM Zairil Azhar Zainol 675,000.00 15-Oct-14 14-Jan-15 25-Nov-14

    pulih Dan Menyenggara Cerun Di Kompleks Desasiswa Jurutera Awam

    Restu, Saujana Dan Tekun (RST) Universiti Sains

    Malaysia, Pulau Pinang (Design & Build)

    Mohd Mokhtar Bin Hj

    Mohd Murad

    Meor Syaharizan Meor

    Mohd Hariri

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    85 Kerja-kerja Pembaikan Saliran Utama Dari Stesen Atas PDC/ Pembinaan 213,862.00 3-Nov-14 2-Jan-15 12-Dec-14

    Sehinga Stesen Viaduct, Bukit Bendera, Air Itam, DTL, Ceria Sdn Bhd

    Pulau Pinang (Design & Build) Pengurus

    86 Tender Design And Build Bagi Kerja-Kerja Kepakaran Majlis Perbandaran 440,299.00 27-Nov-14 26-Feb-15 16-Feb-15

    Untuk Membaikpulih Cerun Mengunakan Kaedah Pulau Pinang

    Soil Nailing' Dan 'Guniting', Untuk Kerja-Kerja Jurutera Geoteknikal (1)

    Menstabilkan Tebing Cerun Di Atas Tanah Majlis,

    Lot 3812, Mukim 18,Lorong Air Terjun, Daerah

    Timur Laut, Pulau Pinang (Design & Build)

    87 Kerja Pemulihan Cerun Di Tapak Kolam Air Seri Lembaga Air Perak Hj Ishak B Abdul Rahman 5,727,999.70 31-Dec-14 30-Jun-15 15-Jun-15

    Manjung Kampung Padang Pundut, Mukim Lumut, Senior Engineer

    Daerah Manjung, Perak Darul Ridzuan

    (Design & Build)

    88 Cadangan Pembaikan Cerun di Genting Highlands, NCT Building & Mr Ong Sea Jem 4,300,000.00 9-Jun-14 8-Sep-15 8-Sep-15

    Pahang untuk Tetuan Galeri Tropika Sdn Bhd. Civil Engineering Project Manager

    (Design & Build) Sdn Bhd

    89 Cadangan Kerja - Kerja Membaikpulih Struktur Tanah Universiti Sains Zairil Azhar Zainol 142,087.00 19-Oct-15 2-Nov-15 23-Oct-15

    Berhampiran Bangunan D04 & D05, Universiti Malaysia Jurutera Awam

    Sains Malaysia, Kampus Induk, Pulau Pinang

    (Design & Build)

    Mohd Yahaya Mohd

    Hassan

    Mohd Mokhtar Bin Hj

    Mohd Murad

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    90 Turnkey Project - Kerja - Kerja Kecemasan Membaik- Lembaga Air Perak Kunasekaram A/L 4,000,000.00 18-Nov-15 17-Apr-16 21-Mar-16

    pulih Cerun Runtuh Di Loji Rawatan Air Pulau Banding, Suppiah Raman

    Gerik, Perak Darul Ridzuan (Design & Build) Jurutera Operasi

    91 Kerja Merekabentuk Dan Bina (Design & Build) Universiti Sains Zairil Azhar Zainol 2,094,091.48 30-Mar-16 16-Aug-16 27-May-16

    membaikpulih Cerun Runtuh Bersebelahan Jalan Utama Malaysia Jurutera Awam

    Hadapan Bangunan M07, Kompleks Desasiswa Restu,

    Saujana, Tekun (RST), Kampus Induk, Universiti Sains

    Malaysia, Pulau Pinang (Design & Build)

    92 Cadangan Bagi Kerja-Kerja Pembaikan Tapak Asas Teras Waja Mohd Fauzi Hashim 200,000.00 7-Jun-16 5-Jul-16 5-Jul-16

    Konkrit Di PMU Kota Sarang Semut Dan Kerja-Kerja Construction Pengarah

    Berkaitan Untuk Pejabat Peng. Negeri (Kedah & Perlis)

    (Design & Build)

    93 Remaining Works To Soil Nailing And Rock Slope Pantai Kok Ir. Khoo Lai Peng 2,786,997.00 25-Aug-16 24-Dec-16 24-Dec-16

    Strengthening Works For Main Road Realigment Development

    Works To Proposed Resort Development At Lot PT374 Sdn Bhd

    & 375, Mukim Padang Mat Sirat, Daerah Langkawi,Kedah Darul Aman

    94 Cadangan Membina Dan Menyiapkan Kerja-Kerja D'Utama Noriza Binti Omar 360,200.00 1-Nov-16 15-Jan-17 13-Dec-16

    Penstabilan Cerun (Cerun Di Belakang Blok B) Projek Development Pengarah Urusan

    Seri Bayu Fasa 2, Di Atas Lot 1032 - 1040, Jalan Sdn Bhd

    Kampung Bukit, Mukim 11, Daerah Barat Daya,

    Bayan Lepas, Pulau Pinang

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    95 Tender Design and Build Bagi Kerja-Kerja Kepakaran Majlis Bandaraya Mohd Hanafi Bin Mohd 230,020.00 19-Dec-16 18-Feb-17 14-Feb-17

    Untuk Membaikpulih Cerun Menggunakan Kaedah Pulau Pinang Yaakob

    Soil Nailing' Dan 'Guniting', Untuk Kerja-Kerja Jurutera Geoteknikal (3)

    Menstabilkan Tebing Cerun Di Belakang Rumah

    No. 410-I,410-J Dan 410-K, Lorong Taman Cantik 3,

    Seksyen1, Bandar Air Itam, Pulau Pinang

    (Design & Build)

    96 Slope Stabilisation & Slope Protection At Batu Ferringhi Perbadanan Bekalan Pn. Mariam Abdul Kadir 1,529,246.50 15-Mar-17 14-Nov-17 25-Jul-17

    Aqueduct Air Pulau Pinang Ketua Jabatan

    (Design & Build) Pengeluaran

    97 Kerja-Kerja Kecemasan Untuk Membaiki Cerun Perbadanan Bukit En. Muhammad Sahrizan 147,573.20 20-Mar-17 11-Jun-17 27-Apr-17

    Runtuh Di Kawasan 'J Plate 580' Landasan Sistem Bendera Pulau Sepiai

    Funikular Bukit Bendera, Pulau Pinang (Mitigation Pinang Penolong Pengurus

    Works ) (Design & Build)

    98 Cadangan Merekabentuk, Membaiki, Menyiapkan Pembinaan I & R Ibrahim Hanafi 2,039,600.65 16-May-17 15-Jan-18 15-Sep-17

    Cerun Di Fakulti Seni Lukis & Seni Reka (FSSR) Dan Sdn Bhd Pengarah Projek

    Kerja - Kerja Berkaitan Di UiTM Shah Alam, Selangor

    (Design & Build)

    99 Kerja-Kerja Kecemasan Akibat Tanah Runtuh Pada Perbadanan Bekalan Pn. Mariam Abdul Kadir 791,220.20 16-Oct-17 15-Dec-17 7-Dec-17

    15 September 2017 - Kerja-Kerja Penstabilan Cerun Air Pulau Pinang Ketua Jabatan

    Di 3 Lokasi Di Aquaduct, Batu Ferringhi Pengeluaran

    (Design & Build)

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    100 Kerja-Kerja Kecemasan Akibat Tanah Runtuh Pada Perbadanan Bekalan Pn. Mariam Abdul Kadir 254,370.60 16-Oct-17 15-Dec-17 15-Dec-17

    15 September 2017 - Kerja-Kerja Penstabilan Cerun Air Pulau Pinang Ketua Jabatan

    Di 2 Lokasi Di Jalan Empangan Air Itam Pengeluaran

    (Design & Build)

    101 Kerja-Kerja Kecemasan Akibat Tanah Runtuh Pada Perbadanan Bekalan Pn. Mariam Abdul Kadir 531,625.00 24-Oct-17 23-Dec-17 23-Dec-17

    19 September 2017 - Kerja-Kerja Penstabilan Cerun Air Pulau Pinang Ketua Jabatan

    Di Kawasan Loji Rawatan Air Itam, Air Itam Pengeluaran

    (Design & Build)

    102 Kerja-Kerja Kecemasan Akibat Tanah Runtuh Pada Perbadanan Bekalan Pn. Mariam Abdul Kadir 594,333.80 24-Oct-17 23-Dec-17 23-Dec-17

    29 September 2017 - Kerja-Kerja Penstabilan Cerun Air Pulau Pinang Ketua Jabatan

    Di Cerun No.15A Dan Cerun 15B Di Aquaduct, Pengeluaran

    Batu Ferringhi (Design & Build)

    103 Kerja Segera Untuk Rawatan Dan Pembaikan Cerun Jabatan Kerja Raya En Samsulnizam Bin 539,016.00 28-Oct-17 27-Jan-18 18-Dec-17

    Dan Lain-Lain Kerja Berkaitan Di Antara 1.4KM - Negeri Pulau Pinang Zulkepli

    1.5KM Jalan Tun Sardon, Daerah Barat Daya, JKR Daerah Barat Daya

    Pulau Pinang (Design & Build)

    104 Kerja Segera Untuk Pembersihan Sisa Runtuhan Jabatan Kerja Raya En Samsulnizam Bin 345,520.00 8-Nov-17 27-Nov-17 13-Nov-17

    Debris', Boulders, Pokok Tumbang Dan Kerja-Kerja Negeri Pulau Pinang Zulkepli 0.00

    Berkaitan Untuk Runtuhan Cerun Di Jalan Tun Sardon, JKR Daerah Barat Daya

    Daerah Barat Daya, Pulau Pinang (Design & Build)

    105 Kerja-Kerja Kecemasan Penstabilan Cerun Di Tangki Perbadanan Bekalan Pn. Mariam Abdul Kadir 914,821.00 11-Dec-17 10-Apr-18 23-Jan-18

    Air Taman Tanah Aman, Bukit Mertajam, Seberang Air Pulau Pinang Ketua Jabatan

    Perai Tengah Akibat Kejadian Tanah Runtuh Pada Pengeluaran

    05 November 2017 (Design & Build)

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    106 Kerja-Kerja Kecemasan Akibat Tanah Runtuh Pada Perbadanan Bekalan Pn. Mariam Abdul Kadir 199,981.90 14-Dec-17 13-Feb-18 18-Jan-18

    15hb September 2017 - Kerja-Kerja Pengukuhan Air Pulau Pinang Ketua Jabatan

    Cerun Di Cerun No. 5A(KM0.8) Jalan Empangan Air Pengeluaran

    Itam (Design & Build)

    107 No. Rundingan : - Perolehan Untuk Kerja-Kerja Baik- Universiti Sains Zairil Azhar Zainol 1,058,940.00 14-Nov-17 31-Mar-18 14-Feb-18

    pulih Hakisan Cerun Di Kawasan Bukit, Bersebelahan Malaysia Jurutera Awam

    Jalan Utama Bertentangan Bangunan M01, Kompleks

    Desasiswa Restu, Saujana Dan Tekun, Universiti Sains

    Malaysia, Pulau Pinang (Design & Build)

    108 Kerja-Kerja Pembersihan di Middle Station, Perbadanan Bukit En. Muhammad Sahrizan 70,000.00 27-Nov-17 29-Nov-17 29-Nov-17

    Pulau Pinang Bendera Pulau Sepiai

    Pinang Penolong Pengurus

    109 Kerja-Kerja Kecemasan Akibat Tanah Runtuh Pada Perbadanan Bekalan Pn. Mariam Abdul Kadir 450,614.40 11-Dec-17 10-Mar-18 10-Mar-18

    5hb November 2017 - Kerja-Kerja Pengukuhan Air Pulau Pinang Ketua Jabatan

    Cerun Di Cerun No. 17,18 & 19, Aquaduct Batu Pengeluaran

    Ferringhi (Design & Build)

    110 Kerja-Kerja Kecemasan Akibat Tanah Runtuh Pada Perbadanan Bekalan Pn. Mariam Abdul Kadir 572,421.40 21-Nov-17 20-Mar-18 20-Mar-18

    5hb November 2017 - Kerja-Kerja Pengukuhan Air Pulau Pinang Ketua Jabatan

    Cerun Di Cerun No. 13, Aquaduct Batu Ferringhi Pengeluaran

    (Design & Build)

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    111 Kerja-Kerja Kecemasan Penstabilan Cerun Di KM 0.6 Perbadanan Bekalan Pn. Mariam Abdul Kadir 219,796.40 21-Feb-18 20-Feb-19 31-Mar-18

    Jalan Empangan Air Itam (Slope No.5) Air Pulau Pinang Ketua Jabatan

    (Design & Build) Pengeluaran

    112 Kerja -Kerja Kecemasan Penyiasatan Tapak, Analisa, Perbadanan Bekalan Pn. Mariam Abdul Kadir 591,484.10 29-Jun-18 28-Aug-18 6-Aug-18

    Rekabentuk Dan Melaksanakan Kerja-Kerja Kawalan Air Pulau Pinang Ketua Jabatan

    Hakisan Dan Mendapan Di Lot 218, Mukim 18, DTL, Pengeluaran

    Sungai Kelian, Tanjung Bungah, Pulau Pinang

    (Design & Build)

    113 Design And Construct Slope Stabilisation On 3 Slopes Perbadanan Bekalan Yeap Cheng Soon 1,521,151.90 23-Jul-18 22-Nov-18 7-Nov-18

    At Air Itam Dam (Slope No 6, 9 & 17) (Design & Build) Air Pulau Pinang Pen. Pengurus

    Jab. Pengeluaran

    114 Cadangan Merekabentuk, Membina Dan Kerja-Kerja Perniagaan Masoha Md Kasim Bin Hanafi 759,888.53 23-Jul-18 22-Nov-18 7-Nov-18

    Perlindungan Cerun Di Jalan Air Itam Pengurus

    115 Tawaran Bagi Kerja-Kerja Penstabilan Cerun Di Perbadanan Bukit En. Muhammad Sahrizan 2,738,122.00 12-Sep-18 11-Mar-19 12-Feb-19

    Kawasan Downslope Bangunan Masjid, Kuil Dan Banglo Bendera Pulau Sepiai

    Bel Retiro Di Atas Bukit Bendera, Daerah Timur Laut, Pinang Penolong Pengurus

    Pulau Pinang (Design & Build)

    116 Emergency Work To Construct Erosion And Siltation Perbadanan Bukit En. Muhammad Sahrizan 144,992.10 29-Oct-18 28-Dec-18 9-Nov-18

    Control On Additional Landslide On Lot 218, DTL Bendera Pulau Sepiai

    Sg Kelian, Tanjung Bungah. (Design & Build) Pinang Penolong Pengurus

  • NAME OF COMPLETION

    DATE

    ACTUAL

    LIST OF COMPLETED SLOPE PROJECTS

    NO. PROJECT TITLE CLIENT CONTRACT

    (RM)

    CONTRACT PERIOD

    RESPONSIBLE

    ENGINEER

    SITE

    POSSESSIONCOMPLETION

    117 Emergency Work To Design And Repair Erosion On Perbadanan Bekalan Yeap Cheng Soon 1,602,583.20 28-Mar-19 27-Sep-19 13-May-19

    Left Landslide Abutment At Air Itam Dam Air Pulau Pinang Pen. Pengurus

    (Design & Build) Jab. Pengeluaran

    118 Project Turnkey : Kerja-Kerja Kecemasan Penstabilan Lembaga Air Perak Kunasakaram A/L Suppiah 460,000.00 1-Aug-19 1-Nov-19 5-Aug-19

    Dan Mitigasi Cerun Di Trong, Taiping, Perak Darul Raman

    Ridzuan (Design & Build) Penolong Jurutera

    119 Kerja-Kerja Pentabilan Cerun Di Kawasan Upslope Perbadanan Bukit En. Muhammad Sahrizan 7,450,781.50 1-Aug-19 1-Aug-20 18-Mar-20

    Dan Downslope Jalan Viaduct West, Bukit Bendera

    Daerah Timur Laut, Pulau Pinang Bendera Pulau Sepiai

    (Design & Build) Pinang Penolong Pengurus

    120 Slope Stabilisation Works At Guillemard Water Pembinaan I & R/ Kholib Bin Hanafi 2,018,493.00 7-Oct-19 6-Apr-20 21-Feb-20

    Treatment Plant (Kerja Semasa) Perbadanan Bekalan Pengurus Projek

    Air Pulau Pinang

    TOTAL 146,051,980.18