Sr.No Project Title Duration Total Amount Client 1 Geotechnical Investigation of Patrind Hydro Power Project.More than 475 meters drilling in metamorphic rock (Hazara Slates) were completed having depth from 30 meters to 150 meters at places including insitu testing, 8 Months 2.8 Million DECON 2 Geotechnical Investigation of Proposed commercial building (City Centre) at Plot No.1&2, Survey 137/A Nusrat Road, Multan 1 Month 0.530 Million Baig Associates 3 Geotecnical Investigation of Syedanwala Farm Kot Radha Kishan 20 Days 0.075 Million Packages,LHR 4 Geotechnical Investigation of underground water tank of walled city Project, Lahore 20 Days 0.1 Million ACE, LHR 5 Drilling of Three (3) Borehole for Coal Exploration at Training Mines Katas, District Chakwal 3 Months 2.4 Million Inspectorate of Mines & Minerals Department, GoP 6 Core Drilling in Limestone and Sandstone of (10) Boreholes having average depth varies from 160 to 200 meters at classified locations of National Development Complex (NDC) in 5 Months 5.75 Million Trisektor 7 Water Supply & Sewerage Project, Mirpur Area, AJK 1.5 Month 0.4 Million ACE, LHR 8 Geotechnical Investigation at River Garden Homes Scheme, Gujrat 2 Month 0.5 Million Baig Associates 9 Geotechnical Investigation at Mohsin Hospital, Gujrat 1 Month 0.475 Million Baig Associates 10 Geotechnical Investigation at Brothers Sugar Mill, Chunian 1.5 Month 0.565 Million Baig Associates 11 Revaluate the Geotechnical parameters at Baigs Apartment, Waris Road Lahore 15 Days 0.215 Million Baig Associates 12 Geotechnial Investigation at Umer Hospital, Toba Tek Singh 25 Days 0.365 Million Baig Associates 13 Geotechnical Investigation of Communication Towers 2 Months 3.75 Million Trisektor 14 Geotecnical Investigation of Govt.College Rajanpur 20 Days 0.25 Million DECON 15 Development of Irrigation System Dams/Barrages of Pakistan Map in GIS 10 Days 0.1 Million Mitsubishi Corporation 16 Development of GIS Maps of Punjab Irrigation System 1 Month 0.2 Million Punjab Irrigation & Power Department 17 Supply of Quick Bird High Resolution Satellite Data 15 Days 3.0 Million Atomic Energy Mineral Centre 18 Development of GIS for Punjab Information Technology Board 3 Months 3.0 Million PIT Board 19 Geotecnical Investigation of Mehmood Textile Mills, Multan 1 Month 0.45 Million DECON List of Few Completed Projects in Last 3 Years / Past

Upload: haroon-pasha-dar

Post on 09-Feb-2017

117 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: List of Completed Projects September  2015

Sr.No Project Title Duration Total Amount Client

1 Geotechnical Investigation of Patrind HydroPower Project.More than 475 meters drilling inmetamorphic rock (Hazara Slates) werecompleted having depth from 30 meters to 150meters at places including insitu testing,

8 Months 2.8 Million DECON

2 Geotechnical Investigation of Proposed commercial building (City Centre) at Plot No.1&2, Survey 137/A Nusrat Road, Multan

1 Month 0.530 Million Baig Associates

3 Geotecnical Investigation of Syedanwala Farm Kot Radha Kishan 20 Days 0.075 Million Packages,LHR

4 Geotechnical Investigation of underground water tank of walled city Project, Lahore 20 Days 0.1 Million ACE, LHR

5 Drilling of Three (3) Borehole for Coal Exploration at Training Mines Katas, District Chakwal

3 Months 2.4 MillionInspectorate of Mines & Minerals Department,

GoP6 Core Drilling in Limestone and Sandstone of

(10) Boreholes having average depth varies from 160 to 200 meters at classified locations of National Development Complex (NDC) in

5 Months 5.75 Million Trisektor

7 Water Supply & Sewerage Project, Mirpur Area, AJK 1.5 Month 0.4 Million ACE, LHR

8 Geotechnical Investigation at River Garden Homes Scheme, Gujrat 2 Month 0.5 Million Baig Associates

9 Geotechnical Investigation at Mohsin Hospital, Gujrat 1 Month 0.475 Million Baig Associates

10 Geotechnical Investigation at Brothers Sugar Mill, Chunian 1.5 Month 0.565 Million Baig Associates

11 Revaluate the Geotechnical parameters at Baigs Apartment, Waris Road Lahore 15 Days 0.215 Million Baig Associates

12 Geotechnial Investigation at Umer Hospital, Toba Tek Singh 25 Days 0.365 Million Baig Associates

13 Geotechnical Investigation of Communication Towers 2 Months 3.75 Million Trisektor

14 Geotecnical Investigation of Govt.College Rajanpur 20 Days 0.25 Million DECON

15 Development of Irrigation System Dams/Barrages of Pakistan Map in GIS 10 Days 0.1 Million Mitsubishi Corporation

16 Development of GIS Maps of Punjab Irrigation System 1 Month 0.2 Million Punjab Irrigation &

Power Department17 Supply of Quick Bird High Resolution Satellite

Data 15 Days 3.0 Million Atomic Energy Mineral Centre

18 Development of GIS for Punjab Information Technology Board 3 Months 3.0 Million PIT Board

19 Geotecnical Investigation of Mehmood Textile Mills, Multan 1 Month 0.45 Million DECON

List of Few Completed Projects in Last 3 Years / Past

Page 2: List of Completed Projects September  2015

Sr.No Project Title Duration Total Amount Client

20 Geotecnical Investigation at Ameen Sons, Kasur 15 Days 0.15 Million DECON21 Geotecnical Investigation of Shainwala Grid

Station, Faisalabad 25 Days 0.385 Million DECON

22 Geotechnial Investigation at Abu Dhabi Palace, Rahimyar Khan 1 Month 0.685 Million DECON

23 Geological Mapping of Patrind Hydro Power Project. 7 Months 7 Million M/s DECON

24 Topographical Survey & Digital Mapping of Rental Power Project At Satiana-Faisalabad Rd. 1 Month 0.1 Million Young Gen Power Ltd.

25 Topographic Survey of Maple Leaf Cement Factory 10 Days 0.441 Million Maple Leaf (Pvt.) Ltd.

26 Geotechnial Investigation of 220 KV Grid Station, Mardan 2 Months 0.850 Million DECON

27 Geotechnical Investigation of Sheranwala Gate Walled City Lahore Project 1 Week 0.0589 Million ACE, LHR

28 Parco Asphalt Blowing Unit (ABU) Project 9 Days 0.332 Million DESCON29 Geotechnical Invst in the Pilot Prj Area_LWCP 9 Days 0.126 Million ACE, LHR30 Improvement and Re-Construction of Central

Prison, Peshawar Geotechnical Investigation 3 Months 0.85 Million NESPAK

31 Seismic Survey of Patrind Hydro Power Project. 7 Months 7 Million M/s DECON32 Geophysical Investigation for Trimmu Barrage 7 Days 0.612 Million PIAIP,(NESPAK, NDC)33 ER Survey Khuirata Azad Kashmir Project 11 Days .360 Million AKMIDC, AJK34 ER Survey Descon J&P - J.V Satpara Dam

Project 13 Days .145 Million DESCON

35 Geotechnical Investigation of Gomal River 2 Months 0.85 Million FWO36 Geotechnical Investigation of Parking Area

Bara Gali and Lower Topa 2 Months 0.75 Million NESPAK

37 Core Drilling for Material Evaluation for Gharibwal Cement Plant Limstone and Gypsum Quarry Areas

6 Months 7.5 Million Gharibwal Cement LTD.

38 Elecrical Resistivity Survey for Groundwater Stuides and execution of two test wells at GCL Piadar Areas

2 Months 1.875 Million Gharibwal Cement LTD.

39 Eexecution of two tubewells having 1 cusec capacity complete in all respect at Piadar Area, GCL.

2 Months 5.4 Million Gharibwal Cement LTD.

40 Geotechnical Investigations of 50 MW Coal Based Power Plant at M3 Faisalabad 1 Months 0.65 Million MM Pakaistan

41 Geotechnical Investigations of 50 MW Coal Based Power Plant at Sundar Industrial Estate Lahore

1 Months 0.55 Million MM Pakaistan

42 Core Drilling for Material Evaluation for Cherat Cement Company Limited Limstone Quarry Areas ( work in progress)

6 Months 7.25 Million Cherat Cement Company LTD, KPK - gfg Group

43 Geotechnical Investigations and topographic survey for Gondlanwala Sanitary Land Fill Site. 1Month 0.71 Million Lean & Green Pvt.

Limited Multan

Page 3: List of Completed Projects September  2015

Sr.No Project Title Duration Total Amount Client

44 Geotechnical Investigations and topographic survey for Chianwali Sanitary Land Fill Site. 1Month 0.71 Million Lean & Green Pvt.

Limited Multan45 Topographic survey of new quarry area of

Gharibwal Cement Plant.(work in progress) 1 Month 1.45 Million Gharibwal Cement LTD.

46 Topographic survey and Geotechnical Investigations for LPG & NGL Recovery Plant -III at Adhi Gas Field, An EPCC project of M/S PDIL, Lahore.

1 Month 2.00 Million Presson Descon International (Pvt.), LTD.

47 Down Hole Seismic Survey for LPG & NGL Recovery Plant -III at Adhi Gas Field, An EPCC project of M/S PDIL, Lahore.

1 Month 0.50 Million Presson Descon International (Pvt.), LTD.

48 Geotechnical Investigations for Rehablitation Design of Khaire Murat Bridge and Access

d

1 Month 0.90 Million MDP, Islamabad

49 Geotechnical Investigations and Topographic survey for Wah Nobel Extension 1 MW Solar

j

1 Month 0.710 Million REON Energy Solution Karachi

50 Geotechnical Investigations for Gambat South GPF - II. 03 Months 2.40 Million Presson Descon

International (Pvt.), LTD.

51Electrical Resistivity Survey for Groundwater delineation for GCL. 01 Month 0.65 Million Gharibwal Cement LTD.

52Additional Electrical Resistivity Survey for Groundwater delineation for GCL near 10 days 0.15 Million Gharibwal Cement LTD.

53Geotechnical Investigations for Gulahmad Wind Farm Project, Jhampir. 03 Months 5.20 Million Presson Descon

International (Pvt.), LTD.

54Geotechnical Investigations and Topographic Survey for 100 MW Solar Power project at Chubara District Layyah

25 days 1.582 Million Renewable Resources (Pvt.) LTD, Islamabad

55Electric Resistivity Survey at Qarshi Knowledge City near Burhan Interchage M-1 Motorway for groundwater exploration.

21 dyas 0.40 Million Qarshi Foundation, Lahore