Sr. No. Name & Address CI (in Rs.) Applied For Section Page No. Remarks
1 JSW Ispat Steel Ltd., Coke Drying Plant, Vill- Dolvi, Raigad
11.5 Crs 1st operate JD(APC) 1 to 32
2 Kalyani Forge Ltd., Gat no. 611 to 614, 685, Koregaon Bhima, Tal-Shirur, Dist.-Pune
95.17 Crs Renewal JD(APC) 33 - 61
3 Apple Sponge Iron Ltd., Plot no. C-4, MIDC Kagal Five Star Hatkanangle, Dist-Kolhapur.
130.52 Crs. Renewal JD(APC) 62-86
4 Adani Power Mahasrahtra Pvt. Ltd (Phase-II 660 MW) Plot no. A01, Tiroda Growth Centre, Tal-Tiroda, Dist-Gondia
2627.09 Crs. 1st operate JD(APC) 87-117
5 ISMT Ltd., Steel Div., Jejui-Morgaon Road, Vill-Kolvihire, P.O. Jejuri, Tal-Purandar, Dist-Pune.
245.43 Crs. Renewal with 1st operate for expansion
JD(APC) 118-144
6 Volkswagan India P. Ltd., Plot E-1, MIDC Industrial Area Chakan(Phase-III), Village Nigoje Malunge, Kharabwadi, Tal-Khed, Pune.
3778.50 Crs Renewal JD(APC) 145-173
7 Western Coalfields Ltd. Saoner U.G. Coal Mine, Nagpur
89.29 Crs Renewal JD(APC) 174-199
8 BPCL,LPG Botling plant, Tal Uran, Dist Raigad272.33 Crs Renewal RO(HQ) 200-224
9 National Highways Authority of India, Khed-sinnar of NH-50, Dist- Ahmedangar
729.55 Crs Establish RO(HQ) 225-248
10 Igate Computers Systems Ltd., MIDC Knowledge Park, IT,3,IT4, TTC Indil Area, Airoli, Navi Mumbai.
375.6 Crs Establish RO(HQ) 249-274
11 Nirmal Life Styles Ltd. CTS No. c 49A,…, Village Nahur, Mulund, Mumbai
292.4 Crs. Establish RO(HQ) 275-303
12 Sahara Hospitality Ltd.CTS No. 2085, Domestic Airport, Vile Parle (East), Mumbai - 99
1159.45 Crs. Establish (expansion)
RO(HQ) 304-334
13 Indreshwar Sugar Mills Ltd., Bhagwant Nagar, A/p- Upali, Tal.- Barshi, Dist.- Solapur. (Sugar & Co-generation)
85.29 Crs. Renewal JD(WPC) 335-363
14 Parag Milk foods Pvt. Ltd.,Awasari phata, Manchar, Tal-Ambegaon, Pune
205.35 Crs. Renewal JD(WPC) 364-392
15 BILT graphic Paper Products ltd., P.O ballarpur, Chandrapur
600 Crs. 1st operate JD(WPC) 393-426
16 Jay Mahesh Sugar Industries Ltd, Majalgaon,Dist. Beed.
225.3 crs. Renewal with expansion
JD(WPC) 427-440
17 Vaidyanath S.S.K. Ltd (Sugar), Pangri, tal-Parli(V), Dist. Beed
153.68 crs Renewal JD(WPC) 441-466
18 Bombay Rayon Fashion ltd, C-6 & &7 MIDC tarapur,Tal-Palghar, Dist. Thane
791.39 Crs Renewal JD(WPC) 467-492
19 Galaxy Surfactants Ltd, Plot no.V-23, MIDC Taloja and Plot no.1, Vill-Chal, Near MIDC Taloja, Tal-Panvel, Dist-Raigad.
236.21 Crs. Renewal with amalgamation
AS(T) 493-526
List of Cases to be submitted before the 1st Consent Appraisal Committee Meeting of 2013 (PART- I) scheduled on 21.05.2013 at 14:30 hrs.
Fresh Agenda
20 Garware Polyster Ltd, Gat No-374/375 Waluj Aurangabad.
554.18 Crs Establish (expansion)
AS(T) 527-554
21 Balaji Amines Ltd , Gat no. 197, Vill-Tamalwadi, Tal-Tuljapur, Dist-Osmanabad
119.41 Crs. Renewal AS(T) 555-582
22 Mysore Petrochemicals Ltd,Plot no.T-1, MIDC Taloja, Dist-Raigad.
89.29 Crs. 1st operate (expansion) and amalgamation
AS(T) 583-614
23 Shri Tatyasaheb Kore Warana SSK Ltd. (Distillery Unit), Warananagar, Tal-Panhala, Dist-Kolhapur
Renewal JD(WPC) 615-642
1 Clariant Chemical (I) Ltd., 113/114, MIDC Industrial estate, Dhatav, Roha Raigad
191.5 Crs. Change in product mix
AS(T) 643-665
JD(WPC) 7AS(T) 5RO(HQ) 5JD(APC) 7Total 24
Review Item
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 1
RESUBMISSION AGENDA CAC Item No. 01 Name of Industry: M/s. Infosys Ltd.,
Plot No. 1 Rajiv Gandhi Info Tech Park, Phase-I, Hinjewadi, Pune
1. Resubmission: case was placed before CAC dated 08/01/2013; wherein it was decided to keep the case in abeyance and call details from RO pune regarding previous consent applications made and whether EC is obtained.
II. Gross C.I. of the project is 1031.95 Cr. Now applied for Consent tos 1st operate for Plot 1 in part for C.I. 95.82 Crores.
III. RO/SRO reports that; a) Board has granted Consent to Applicant on 25/01/2001 which is valid upto 31/1/2003.
However copy is not submitted. b) Applicant has also applied on 19/09/2009 AND 12/5/2010, jointly for phase-I & II,
but applicant has not received the consent. However applied details are not furnished
c) The project proponent has showed C.I. in the year 2009 of Rs. 875.08 crores the consent fees of Rs. 8,75,080/- is submitted, further the project proponent has paid fees in the year 2010 for same capital investment along with fees with excess consent fees of Rs.19,38,969/- & Rs.1,61,228/-
d) Now they have applied for renewal of consent with expansion by showing C.I. of Rs. 1031.95 Cr hence issued a letter to industry for clarification of increased in CI form 875.08 Cr to 1031.95 crores and payment of additional fees of Rs. 10,90,271/-. In this regard the industry has replied vide letter dtd 29.11.2012, that the capital investment of Rs. 1031.95 Cr is for two phases i.e. Plot No. 01 (Phase-I)& Plot No. 24(Phase-II).
e) The C.I. of the said project for plot No. 1 is Rs. 95.82 crores (Now Applied)for which they have paid consent fees as per revised fee structure of Rs. 1,25,000/- & 100/-.
f) Separate consent is granted for No. 24 for Phase-II which is valid upto 31/8/2014 for
Total plot area of 4,61,264.00 Sq mtrs Total Construction BUA 4,04,897.00.Sq mtrs V. Water Consumption- 225.00 M3. Sewage Generation- 192.00 M3. STP provided - 230.00 M3. (Analysis results not furnished) VI. Solid waste management details , Metal Waste: 18.45 Tons/Annum (By Sale to Authorized Party) Plastic Waste: 0.88 Tons /Annum (By sale to Authorized Party) Paper Waste: 22.86 Tons Annum (By sale to Authorized Party) Food Waste: 7.08 Tons /Annum Vermicomposting.Compost Used as Manure) VII. D.G.Sets – (1250 KVA x 2 Nos &2000 KVA x2), Fuel – Diesel – 505 Ltrs/Hr. VIII. The firm has not submitted Environmental Statement ,CESS details, Environmental Clearance and copies of the previous issued consents, IX. 1. RO Pune recommended Consent to 1st operate for Plot no 1(Phase-I)for Period upto 31.01.2014.
2. Letter written to RO on 03/01/2013 and 22/02/2013. Reply awaited.
3. Submitted before CAC for decision.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 2
FRESH AGENDA CAC Item No. 01 : Name of Industry: Purna SSK ltd (Distillery),
Basmat nagar, Dist. Hingoli.
• Applied for Renewal.(Distillery) • Total Capital Investment is 11.021 Cr. • Capital Investment (Sugar 60.55, COgen 59.89 Crores) . Total C.I is 131.46
crores. • Industrial effluent generated 240 CMD. • Primary treatment system – Reboiler 30 days storage tank HDPE Lined, after
which composting process on 8 acres of Land which is HDPE lined as per CREP Norms..
• Industry has provided 30 days spent wash storage tank with HDPE lining. • Industry has complied CREP guidelines. • Envt statement submitted for Year 2011-12. • SRO, & RO has recommended case for renewal up to 31/12/2014. • Submitted with recommendation to grant consent renewal for three years or as
per fees paid by industry with extension of BG period upto validity of Consent.(B.G of Rs 5.0 lkhs is valid as reported. Submiteed to CAC for Consideration pls.)
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 3
CAC Item No. 02 : Name of industry :- M/s Rena SSk Ltd, Dilip nagar, dist. Latur.
1) Applied for renewal of Consent with out change. Distillery of 30KLPD. 2) Capital investment Sugar 53.69 crores & distiller 29.31 Crores . Total 83 crores. 3) Provided Biodigester followed by 5 stage multiple effect evaporation system to
reduce volume of spent wash upto 60CMD. 4) Provided 30 days storage lagoon followed by compost yard of 5.5 acres as per
CREP guidelines. 5) Provided multicyclone dust collector as an APC to Bagagse fire boiler.However as
per previous consent condition ind was supossed to provided bag filter as APC system.
6) SRO & RO recommended for renewal of consent upto 20.02.14. 7) Recommended for renewal of consent with B.G of Rs 5.0 lakhs with validity up to
31.08.14 on payment of fees.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 4
CAC Item No. 03 :
Name of industry :- M/s Bhairavnath SSK Ltd, A/P sonari, Dist. Osmanabad.
• Applied for renewal sugar industry 2500 TCD. • Effluent generation 250 CMD. CREP Complied. • Provided Secondary & tert, treatment. • JVS results dtd 20.12.2011 & 27.02.12 are exceeding the standards. • Treated effluent used on land for gardening. Land available for disposal of
effluent 100 acres. • Wet Scrubber provided as an APC system. CREP Complied. • Envt. Statement submitted for year 2011-12. • Cess Returns submitted upto Nov.2012. • Bank Guarantee of Rs 5.0 lakhs & 2,o Lakhs submitted by industry with validity
25.06.13 & 06.08.13. • Proposed directions were issued by RO on 21.11.12 for securing compliances
of CREP conditions. ID issued on 16.01.13. • During visit of SRO Latur on 30.01.12 molasses spillage was observed and
being stored in kattcha pit. • RO recommended for renewal of consent with forfeiting bank Guarantee of Rs
1.0 lakh & Top up by Rs 1.0 lakh. • The application is to be placed in CAC asSugar 45 Cr & proposed sugar
expansion 20.80 Crs, proposed Cogen 32 Crores, Distillery 22 Crores . Total capital investment 119.8 crores including Co-gen & Distillery.
• Since we don’ t have JVS reports after July 12 & no information whether the effluent channel is covered or not ,it is recommended for renewal of consent for existing capacity. We may extend above said BG of Rs 5.0 lakhs & 2.0 lakhs till further.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 5
CAC Item No. 04 : Name of industry: Purna SSK td(Sugar),
Basmat nagar, Dist. Hingoli.
• Applied for renewal of Consent sugar and Co-gen Separately. • Capital Investment (Sugar 66.88, COgen 63.15 Crores, distillery 11.02 Crores) .
Total C.I is 141.05 Crores. • Industrial effluent generated 227 CMD & cooling tower discharge 60CMD. • Provided Secondary treatment plant. • JVS results are exceeding the standards. • Treated effluent is used on land for gardening. Land available for disposal of
effluent 61. 70 Hectors. Which is sufficient. • Bagasse fired boiler provided ESP as an APC for Co-gen & Fly Ash arrester
provided as an APC for Sugar Boiler. • Bank Guarantee of Rs 5.0 lakhs was forfeited for non achievement of JVS
results • Ind has submitted B.G of Rs 10 lakhs. • RO issued interim directions to ind on 05.01.2013 & asked industry to extend
bank guarantee of Rs 2.0 Lacs for aperiod of One Year. • SRO & RO recommended for renewal of consent Upto 31/12/2014 . • As per amalgamation Circular issued on 19.01.13 we may club both the
applications & submit the application in CAC as total C.I of ind is more than 100 Crores.
• We may grant renewal of consent upto 31.07.14 with balance fees of Period from 01.08.14 to 31.12.14 & extension of B.G upto validity of Consent i.e upto 31.07.2014
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 6
CAC Item No. 05 : Name of industry :- M/s Tridhara Sugar, Dist. Parbhani.
• Applied for renewal sugar industry 2500 TCD. • Effluent generation 400 CMD. Not complied with CREP as effluent is more than
10 liters per ton of crushing. • Provided Secondary & tert, treatment. • JVS results dtd 31.01.12 & 14.03.12 are exceeding the standards. • Treated effluent used on land for gardening. Land available for disposal of
effluent 300 acres. • Multicyclone with fly ash arrester provided as an APC system. AS per CREP
condition not provided wet scrubber/ESP as an APC system. • Envt. Statement submitted for year 2011-12. • Proposed directions were issued by RO on 21.11.12 for non compliances of
CREP conditions. Ind not attended Personal Hearing. • RO recommended for personal hearing at HQ. • The application is to be placed in CAC as Total C.I of industry is Existing 46.80
crore & proposed 156.97 Crores for Cogen & distillery. Total C.I including distillery & C-gen is Rs.203.77 Crores.
• Recommended for renewal with Bank Guarantee of Rs. 5+ Rs. 2 + Rs. 3 Lakhs as per policy of Board.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 7
CAC Item No. 06 : Name of industry :- M/s Bhaurao SSK Ltd, Laxmi nagar, Dist. Nanded.
• Applied for renewal sugar industry 2500 TCD.
Effluent generation 400 CMD. Not complied with CREP as effluent is more than 10 liters per ton of crushing.
• Provided Secondary & tert, treatment. • JVS results of Jan are within limits however of Feb & March 2012 are
exceeding the standards in respect of BOD & COD. • Treated effluent used on land for gardening. Land available for disposal of
effluent 60 hectres.. • Fly ash arrester provided as an APC system. AS per CREP condition not
provided wet scrubber/ESP as an APC system. • Envt. Statement submitted for year 2011-12. • Cess returns submitted upto Sept.2012 & paid upto oct.2011 • As per CAC decision B. G of Rs 5.0 Lakhs is forfeited for non achievements of
Results. • Proposed directions were issued by RO on 21.11.12 for non compliances of
CREP conditions. • RO recommended for renewal of consent after acquiring B.G. of Rs 10 Lacs. • The application is to be placed in CAC as Total C.I of industry is Sugar 68.48
crores, Distillery 15.08 crores, Co-gen (Proposed) 53.56 Crores Crores. Total 137.02 Crores
• We may renew the consent with Bank Guarantee of Rs. 10 Lacs for Operation and maintenance of PCS & 3.0 lacs for provision of APCS as per CREP guidelines Submitted for CAC for consideration pls.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 8
CAC Item No. 07 : Name of industry :- Maharashtra Shetkari Sugar Ltd., Saikheda ,
Tq. Sonpeth, Dist.Parbhani.
• Applied for First Consent to operate. • Integrated project of sugar, 3500 TCD, Co gen 20MW & Distillery 30KLPD. • Consent to Establish was obtained in year 2010, with condition of
Environmental Clearance. • Obtained EC from MOEF. • Effluent generation 240 CMD. Complied with CREP . • Provided Secondary & tert, treatment for Sugar and co-gen. • Land available for 45 acres. • For Distillery provided reboiler followed by Biodigester, Volume reduction in
triple effect falling film Evaporation system followed by Bio composting. • SRO reported that composting yard will be as per CREP guidelines & RO
communicated that SRO has been asked on 01.01.13 to submit point wise CREP compliance.
• RO reported that as recommended by SRO we may consider Consent to operate with bank guarantee of Rs 5.0 lack & 2.0 lacs towards O & M of ETP & compliance of CREP guidelines.
• The application is to be placed in CAC as Total C.I of industry 139.5 Crores. • Report of RO/SRO for CREP compliance called being first C to O. Submitted to
CAC for consideration.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 9
CAC Item No. 08 :
Name of industry :- M/s Ramgiri sugars ltd, Savargaon, Dist. Osmanabad.
• Applied for Consent to establish. Proposed sugar industry of 3500TCD with Co-gen14.9 MW. Does not attract EC.
• Proposed location from river Terna , A-II class is @ 15 Kms. Satisfy RRZ policy.
• IE generation 205 CMD, Proposed Secondary treatment. Treated effluent will be used on land for gardening. Land available is 30 acres seems to be sufficient.
• Proposed ESP as an APC system to bagasse fired boiler.. • SRO & RO recommended for grant of Consent to establish. • Recommended for Grant of Consent to Establish upto commissioning of
Unit or Five Years whichever is earlier with B.G of Rs 5 lakhs & 2 lakhs.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 10
CAC Item No. 09 : Name of industry :- M/s Jailaxmi Sugar Products (Nitali) Pvt. Ltd,
Gat no 405 to412 &429 Village Nitali, Tq & Dist. Osmanabad.
• Applied for first consent to Operate. • Sugar industry 3500 TCD. • Capital investment 49.43 Crores Sugar, Proposed Gogen 48.31 Crores
Total 97.74 Crores • IE generation 320 CMD. CREP complied. • Provided secondary treatment. Treated effluent will be used on land
for gardening. Land available for disposal 18 acres. • Wet scrubber provided to boiler as an air pollution control
Equipment..CREP complied. • SRO vide letter dtd 10.04.13 reported that work of ETP is completed &
commissioned ETP. • SRO & RO recommended case for grant of Consent to Operate. • We may place application in CAC as total capital investment is 97.74
Crores. (Sugar & Cogen.) • Recommended for First Consent to Operate. Till 31.07.14 if paid fees or
otherwise upto 31.07.13 with B.G of rs 5 lakhs & 2. Lakhs for O & M of PCS & Covering of effluent carrying pipeline.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 11
CAC Item No. 10 Name of Industry : M/s. Pad Dr. V.V. Patil S.S.K. Ltd., (Sugar unit), Pravaranagar Dist. Ahmednagar.
• Applied for renewal of consent to operate with same production qty.. • Category RED/LSI. • Existing consent dated 04.02.2012 valid up to: 31.12.2012. • Previous capital investment Rs. 281.00 Cr. • Enhanced capital investment Rs 29.76 Cr. • Capital Investment of Sugar Unit is Rs. 310.76 Cr. • C.I. of distillery & chemical plant is Rs. 90.35 Cr. • Total C.I. (Sugar + Distillery + chemical plant ) Rs. 401.11 Cr. • Capital investment of sugar unit increased due to replacement of old
machinery/modernization of plant. • I.E generation to the tune of 280.0 CMD. • D.E. generation to the tune of 60.0 CMD. • ETP provided, comprising Screen chamber, O & G trap, equalization tank Bio-
tower, Clarifier, aeration tank, secondary clarifier & SDB provided. • 15 days storage tank provided & covered the effluent collection system to avoid
ingress of bagasses. • JVS results exceeding the limit. • Industry has provided100 hectors land for disposal of treated effluent. • During the visit observed industry was bypassing the effluent without treatment. • ESP/Wet scrubber not provided to the boilers • Direction was issued by RO on 27.12.2012. • Environment statement submitted for the year 2011-2012. • B.G. of Rs. 5.0 Lakhs submitted, valid up to: 31.12.2013, submitted against O &
M of pollution control system. • B.G. of Rs. 2.0 Lakhs submitted valid up to: 31.12.2013 submitted against to
cover the effluent collection system. • B.G of Rs. 3.0 Lakhs not submitted against the direction issued by RO. • SRO recommended to forfeit the BG of Rs. 5.0 Lkahs & renewal of consent
may granted with suitable additional BG.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 12
CAC Item No. 11 : Name of industry :- Manjara SSK Ltd., A/P Vilas Nagar, Chincholi, Dist. Latur.
• Applied for renewal with amalgamation i.e Sugar with Co-gen. • Sugar consent was valid till 31.12.12 & Cogen was valid till COU. • Capital investment 65.84 Crores, Distillery 28.13 crores & Co-gen 75.12
Crores. Total C.I.of industry 169.10 crores. • Obtained Consent to establish for Co-gen, sugar . • Industrial effluent generated 150 CMD sugar & 215 CMD from cogen. • Effluent is treated in Common ETP comprises of Secondary & tert. treatment. • Treated effluent is used on land. Available land for disposal is 60 Hectres,
which is adequate. • JVS results dtd 05.05.12 is exceeding the standards. • Fly ash arrester provided to boiler of sugar industry & ESP provided to Boiler of
Cogen.. • Industry has paid cess returns till Dec-2012 & cess paid upto March 2009. • Environmental statement is submitted for the year 2011-12. • Bank guarantee of Rs 5.0 lakhs is forfeited for non achievement of JVS results • Bank guarantee of Rs 10 lakhs is not submitted by industry . • RO issued Proposed directions on 21.11.12 for compliance of CREP
conditions. • SRO & RO recommended for renewal of Consent. • We May renew the Consent with B.G of Rs 3.0 lakhs for provision of APC
system as per CREP guideline within 4 months period. The consent period can be extended upto 31.07.14 if ind pays the fees or upto 31.07.13 with balance fees of five months
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 13
CAC Item No. 12 Name of Industry : M/s. Kukadi SSK Ltd. (Sugar Unit),
Pimpalgaon Pisa, Tq. Shringonda , Dist. Ahmednagar.
• Applied for renewal of consent. • Category RED/LSI. • Existing consent dtd. 02.08.2012, valid up to: 31.12.2012. • Capacity 2500 TCD. • Earlier C.I. of Rs. 80.96 Cr. • Enhanced C.I. of Rs. 18.32 Cr. • Total C.I. of Rs. 99.28 Cr. • Industry has not given reason for increased C.I. • SRO imparted letter to industry, reply awaited. • I.E. generation to the tune of 105.0 CMD • D.E. generation to the tune of 30.0 CMD. • ETP comprising, oil skimmer, screening, collection tank, lime dosing tank,
equalization tank, aeration tank, Secondary Clarifier, Holding tank, sand filter & SDB provided.
• 15 acres land available for disposal of treated effluent. • JVS result exceeding the prescribed standards. • Air pollution control, Boiler - I & II, chimney height 65.0 mtr. each with fly ash
arrestor provided. • Industry has not provided wet scrubber to boilers. • Industry has not provided 15 days storage tank. • Cess paid up to: Sept. 2012. • Environmental statement submitted for the year 2011-12. • Industry has submitted BG. of Rs. 5.0 Lakh towards O & M of ETP & APC and
BG of Rs. 2.0 Lakh towards compliance of CREP, both BG valid up to: 31.12.2013.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 14
CAC Item No. 13
Name of Industry : M/s. Shri Saikrupa Sugar & Allied Industries Ltd., Hiradgaon Shrigonda Tq. Shrigonda Dist. Ahmednagar.
• Applied for renewal of consent (Sugar+ Co-gen.). • Category RED/LSI. • Capacity 7500 TCD. • Existing consent dtd.16.3.2012, valid up to: 30.11.2012. • C.I. of Rs. 314.09 Cr. • I.E. generation to the tune of 755 CMD. • D.E. generation76.60 CMD. • ETP provided, during the visit of Field officer observed that untreated effluent
was bypassed to ETP. • JVE results are not within limits. • RO issued SCN on 23.11.2012, industry operating without valid consent. • I. D. issued on 26.12.2012. • Air pollution control. • Boiler with chimney height 80.0 mtr, with ESP provided as APC. • Industry has not provided necessary arrangement to cover effluent collection
system to avoid ingress of bagasse. • Cess paid detail not submitted. • Environment statement not submitted. • BG of Rs. 2.0 Lakh submitted, valid up to: 10.08.2013 towards for providing
necessary arrangement to cover the effluent collection system and to avoid the ingress of bagasse.
• BG of Rs. 5.0 Lakhs submitted, valid up to: 10.08.2013 towards O & M of pollution control system.
• BG of Rs. 1.0 Lakh not submitted, towards submission of Environment statement.
• RO/SRO recommended to forfeit BG of Rs. 7.0 Lakh and consent maybe refused or may be granted subject to submission of additional BG of Rs. 15.0 Lakhs.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 15
CAC Item No. 14 :
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 16
CAC Item No. 15: Name of Industry: Gail India Limited (LPG Recovery plant) Malyan at Usar, Alibag Dist-Raigad.
1. Application for Renewal of Consent.
2. LPG recovery Plant-11625 T/M.
3. Application received at SRO on 13/02/13 and at HQ on 10/04/2013.
4. They have shown effluent Nil in the application form and submitted that due to
starving of Natural gas, plant is running seldom and hence no effluent is
generated.
5. SRO/RO’s recommended that Consent may be renewed for one year.
6. We may consider the case for plain renewal of consent by imposing condition
towards provision of STP within six months with B.G of 5 lakh.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 17
CAC Item No.16 Name of Industry: M/s Global Nonwovens Ltd., Gut Nos. 395 to 397, 413, 452 to 454, Village Mundhegaon, Tal. Igatpuri, Dist. Nashik. 1. Application for grant of renewal of Consent to Establish for mfg. of nonwoven
fabrics received at R.O. (Nashik) on 20/11/2012.
2. Case was forwarded at HQ on 9/01/2013. 3. Additional information regarding submission of Local grampanchayat’s NOC, ETP
details, distance certificate etc. were called via mail on 1/03/2013 from the RO/SRO.
4. SRO vide letter dtd. 21/03/13 forwarded industry’s submission dtd. 12/03/13. 5. Firm has proposed to provide ETP consisting of primary, secondary & tertiary
treatment for the treatment of industrial effluent. After treatment, treated sewage will be applied on land for gardening.
6. Site of proposed industry is located at a distance of 3.75 Km from high flood level
(H.F.L.) of Darna Dam, it attracts the provisions of the RRZ Policy dtd. 13/07/2009 and amendments thereof.
7. As per EIA Notification 2006-clause No. 5(d), EC is applicable to “Manmade fibres
mfg.”. Hence, industry’s proposal of microfibre nonwoven fabrics attracts the provision of EIA Notification 2006.
8. SRO/RO have recommended that grant Consent to Establish. 9. Firm has paid CtE fee of Rs. 8,22,000/- as per Env. Dept.’s revised Consent fee
G.R. dtd. 25/08/2011. 10. Consent to Establish may be granted under “Red” Category by imposing condition
towards obtaining of NOC from RRZ Committee, Environmental Clearance from the Competent Authority and submission of B.G. of Rs. 10.0 Lakhs towards compliance of the same within 15 days from issue of the Consent.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 18
CAC Item No. 17 Name of Industry: - M/s. Ordnance Factory Ambernath, Kalyan-Badlapur Road,
Dist. Thane-421 506.
1. Application for renewal of consent. 2. Product- Metal Components. 3. Application received at SRO on 08/01/2012 and at HQ on 30/03/2013. 4. I. E. generation is 600 CMD. DE generation is 3510 CMD. Industry has
provided Primary treatment. Treated effluent is partly used for cooling tower & Gardening and remaining is disposed into sewerage system provided by local body. Industry has not provided STP for treatment of DE.
5. Industry has provided Scrubbers & exhaust system. 6. Additional information w.r.t Env. Statement Report, Water cess details,
JVS results, BG details, etc called from RO/SRO vide letter dtd. 10.4.2013
7. CI of the unit is increased from Rs. 65.48 Crore to Rs. 92.37 Crore. It is new entry to CAC.
In view of above, we may consider the case for renewal by imposing condition towards provision of STP within one year with BGT of Rs. 5 lakh. The condition about requirement of APC for the furnaces shall be confirmed after receipt of reply from RO/SRO.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 19
CAC Item No. 18 Name of Industry: M/s. Vinati Organics Ltd. Plot No. A-20, MIDC Lote, Tal. Khed, Dist. Ratnagiri.
1. Application for 1st consent to operate for expansion along with amalgamation of existing consent.
2. Product- Chemicals. Existing consent is valid up to 31/05/2016. 3. Application received at SRO on 02/11/2012 and at HQ on 01/12/2012. 4. As per existing Consent to Operate CI is Rs. 88.50 Crore. As per
Consent to Establish granted on 28/08/2012 CI for expansion is Rs. 94 Crore. Total CI is Rs. 182.50 Crore.
5. Existing ETP consisting of Primary, secondary & tertiary treatment i.e. Reverse Osmosis, Evaporation & spray dryer. RO permeate utilize for cooling tower & RO reject is recycled for making mixed polymer to achieve the zero discharge. From expansion 30 m3/d effluent generated (20 m3/d from process, 10 m3 from domestic) & same is treated in existing ETP. Analysis results are with in consented limits.
6. Industry vide their letter dtd. 26.02.2013 informed that they have completed the work of installation of plant and machinery and ready to start up. SRO Chiplun has visited the industry on 08.03.2013 and verified that plant is ready for commissioning. SRO Chiplun has also submitted the compliance of C to E conditions. Since the industry is complying with the C to E conditions and ready for commissioning, we may consider the case for grant of 1st consent to operate except additional boiler for expansion with amalgamation of Existing consent.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 20
CAC Item No. 19 Name of Industry: M/s. Hindustan Unilever Ltd.
Plot No. B-7, MIDC Lote Parshuram, Tal. Khed, Dist. Ratnagiri-415 722.
1. Application for amendment in consent for rearranging production Quantities.
2. Product- Detergents. 3. Application received at SRO on 25/02/2013 and
at HQ on 03/04/2013. 4. I. E. generation as per existing consent is 120
CMD. D.E. generation is 20 CMD. There is no change in water consumption as well as effluent generation. Industry has provided ETP consisting of Primary & Secondary treatment. Reverse Osmosis plant provided. Treated effluent is recycled 100%. Industry achieved Zero Discharge. JVS analysis results are within consented limits.
5. Industry has provided Dust collectors and Scrubbers to control air emissions from Boiler as well as process. Industry proposes to provide additional dust collector and wet scrubber.
6. Industry has submitted self assessment of pollution load in Boards prescribed format.
7. CI will be increased by Rs. 14.20 Crore. Total CI after proposed changes will be Rs. 89.87 Crore.
In view of above, we may consider the case for amendment in consent for rearranging production Quantities.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 21
CAC Item No. 20
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 22
CAC Item No. 21 Name of Industry : M/s Maharashtra Airport Development Company , Special Economic Zone At MIHAN Area, Nagpur
1. Applied for consent to 1st Operate.
2. Application Received at SRO on 20/10/2012 and at HQ on 13/12/2012
3. Previous C to E granted vide No. 389dt.19/09/2009 for, Plot are - 2066 Hectares. With C.I. of Rs.125256 lacs. 4. Now applied for consent to 1st operate with C.I. Rs.45251 lacs, with no
explanation for reduction in C.I. 5. The statement of total construction area is not submitted. 6. Water consumption -45000.00 M3 /day Sewage generation -32800.00 M3 /day STP’s provided - 39000.00 M3 /day 7. The Solid Waste generation - Details not furnished 8. SRO reports that,
a) The firm has provided common STP of capacity 39 MLD with tertiary treatment plant of 77 MLD. The treated sewage will be recycled.
b) The firm has not provided ETP c) The firm has reduced the C.I. from 1252.56 to 452.51 Crores. 9. The project proponent has obtained EC of MoEF vide No. 21-197/2007-
IA.III dt. 16/04/2008 for; Total Plot Area - 2066 ha Processing Zone - 1472 .0 ha Non-Processing Zone - 614 ha 10. The case is submitted before CAC for further approvals.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 23
CAC Item No. 22 Name of Industry : M/s. Kalpataru Aura,
CTS No. 168A,168A/1 to 28,168A/31 to 33 Ghatkopar West, Mumbai
1. Application for 1st consent to operate. 2. Application received at SRO on 29/12/2012 and at HQ on 28/01/2013 3. C to E issued vide No.B-17 dt.15/10/2005 for; Plot area of 55034 sq. mtrs. 4. EC obtained vide No. 21-40/2008-IA.III dt. 18/08/2009 for; Plot Area- 55034 sq.mtrs. BUA- - 98272.38 sq. mtrs. 5. Water requirement is 850 CMD Sewage generation is 800CMD STP provided - 800 CMD 6. MSW generation:
Biodegradable-1620 kgs/day- Onsite composting not provided Non- Biodegradable- 1080 kgs/day
7. RO has recommended the case for 1st Operate.
Consent may be granted with Bank Guarantee of Rs. 10 lacs for operation and maintenance of STP and MSW processing Plant and taking undertaking on part construction area.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 24
CAC Item No. 23 Name of Industry: M/s. Sun Infrastructures Pvt. Ltd.,
S. No. 145,148-151,155(2), Makhmalabad, Nashik.
1. Application for C to E for Residential, retail mall, IT and hotel for Total Plot area 432100 M2 Total BUA 628121 M2
2. Application received at SRO 11/12/12 and at HQ on 25/02/2013 3. Water aspects:
Consumptions- - 2186 CMD Sewage generation - 1749 CMD STP proposed - 2000 CMD
4. Solid Waste generation Biodegradable -5968 kgs/days Composting proposed Non Biodegradable -7497 kgs/day STP sludge - 200 Kgs/day
5. As per SROs report that, The building construction activity has not yet started, however the firm has started leveling work and road construction work was started. Proposed directions issued on 12/02/2013
6. Firm vide its letter dt. 22/02/2013 has communicated that it has stopped road construction activity.
7. RO has recommended the case for C to E 8. Letter written to firm regarding clarification of Distance from River.
Reply awaited. 9. Submitted before CAC for decision.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 25
CAC Item No. 24 Name of Industry : M/s. Viva Winner Venture Pvt. Ltd.
S.No.296,297,298,299,300,303,390B,324, Village-Bolinj Virar (W) ,Tal - Vasai, Dist. Thane
1. Applied for Consent to Establish for- Plot area-95,430 M2 Total Construction area-284193.44
2. Application received at SRO on 27/12/2013 and at HQ on 08/02/2013 3. Water Consumption-2784 CMD Sewage generation-2227 CMD 2 STPs proposed- 1200 CMD each 4. Solid waste generation
Biodegradable- 4.79 TPD Non- Biodegradable-3.17 TPD
5. Firm has not submitted/obtained EC 6. RO has recommended the case for C to E. Consent may be granted with the condition that not to take any effective steps till EC is obtained and obtaining BG of Rs. 10 lacs for provisions of STP and MSW processing plant.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 26
CAC Item No. 25 Name and Address of the Industry: M/s. Genesis Resorts P Ltd.
TTP CTS 1238, 1240/1 to 3, Nehru Road & Ply. Grd. Junction Vile Parle (E), Mumbai-57
1. Application for consent to establish for: Total Plot area – 1799.00 M2 Total Construction Area – 4013.20 M2
2. Application received at SRO on 15/02/2013 and at HQ 01/04/2013 3. Water requirement is -130 CMD
Sewage generation is -122 CMD STP proposed; capacity not mentioned.
4. MSW generation: -125 kg/day Onsite MSW processing plant not proposed.
5. SRO reports that the firm has completed G +10 Story Building Structure and installation of STP is under process. The Project does not attract EC.
6. RO has recommended case for C to E.
7. Consent may be granted with the condition of obtaining BG of Rs. 10 lacs for
providing MSW processing plant and STP.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 27
CAC Item No. 26 Name of the Industry: M/s. Hotel Sun n Sand (Five Star),
M/s. Classic Citi Investment Pvt. Ltd., Plot No.1, Kh No. 44,
Opp. Navarashtra Press, Panjri, Wardha Road, Nagpur - 441108
1. Application for Renewal of consent for : Hotel Five Star with laundry and Swimming Pool activity (133 rooms) for:
2. Application received at SRO 21/01/2013 at HQ on 11/03/2013 3. Previous Consent valid upto 31/01/2013 for: Hotel (Five Star) with laundry
and Swimming Pool activity (133 rooms) for: Total Built Up Area – 14,219.58 M2
4. Water Consumption – Domestic - 106 CMD
Sewage generation - 100 CMD Industrial - 36 CMD Effluent Gen. 02 CMD STP Provided – details not furnished.
5. The Solid Waste generation - Details not furnished
6. RO/SRO has recommended the case for Renewal of Consent after compliance of warning notice and discrepancy letter.
7. Submitted before CAC for further decision.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 28
Review Item No. 01 Name of Industry : M/s. Watson Pharma Pvt. Ltd. Plot No. N-15, MIDC Addl.
Ambernath, Dist. Ratnagiri. Industry had applied for Amendment in consent for inclusion of additional stand
by Boiler of capacity 4.5 MT, use of Bagasse as alternate fuel, incorporation of
Hazardous waste of cat. 28.3, addition of new scrubber and for increase in CI, as per
Interim Directions issued on 22.11.2011.
The case was discussed in CAC meeting held on 19.3.2013 and it was decided to grant amendment in consent on following conditions:
1. Industry shall obtain amendment to the EC for activities which are not cover in EC dated 1.8.2007.
2. Not to operate Pilot plant/R&D till EC amendment is obtain. To ensure the compliance of same, industry shall submit the Bank Guarantee of Rs. 10 Lakhs
3. Industry shall submit Board Resolution towards increase in C.I., construction of new R & D facility storage yard and pilot plant without prior permission of the MPC Board by 15.4.2013 and also submit the Bank Guarantee of Rs. 2 Lakhs for compliance of this conditions.
After going through Minutes of Meeting of CAC dtd. 19/03/2013 the industry has made representation. The industry claims that, as per EC dtd. 1st August 2007, they have granted permission to manufacture Speciality chemicals and intermediates for 50 MTA, which is nothing but for the small volume / pilot plant products. R & D
activity is already included in EC dtd. 1.8.2007. Hence condition no. 1 & 2 above in
MOM of CAC dtd. 19.3.2013 shall be waived. The representation made by industry
with respect to point no. 1 & 2 seems to be in order. Hence we may consider the industries request. If the request made by the industry is considered by the CAC, then needs to amend the minutes of meeting accordingly.
Submitted for reconsideration of CAC.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 29
Review Item No. 02 Name of Industry : M/s. JSW Jaigad Port Ltd.,
Jaigad, Dist. Ratnagiri.
Sub:- Status report in respect of M/s. Jaigad Port Ltd. Jaigad, Dist. Ratnagiri in respect of Closure Directions issued by Board dtd. 19/10/2012. Ref:- 1) Closure Directions isued dtd. 19/10/2012.
2) Industry Request Letter dtd. 11/03/2013 3) Report submitted by RO Kolhapur vide letter dtd. 15/12/2012. 4) SRO Ratnagiri report dtd. 18/03/2013
Regional Officer Kolhapur vide their lette dtd. 19/10/2012 had issued closure directions to M/s. JSW Jaigad Port Ltd, Jaigad, Ratnagiri, for Non Compliances reorted by SRO Ratnagiri vide letter dtd. 27/04/2012.Further the industry vide their letter dtd. 11/03/2013 submitted Appeal against closure directions issued by the Board office.
Accordingly AS(T) sections has prepare and forwarded Office Note to JD (APC)
sections, for obtaining clearcut recommandations, Results, Compliance of earlier consent conditions and a copy of Closure Directions.
SRO Ratnagiri vide their letter dtd. 18/03/2013 submitted the required
information as below: 1. Latest JVS analysis results (Air & Water)
- There is no any generation of industrial effluent from the industry, hence the JVS is not collected.
- The analysis results of Ambient Air Quality Monitoring is as below
Parameters (µg/m3) Sr. No.
Date of Sampling
Location So2 Nox RSPM SPM
1 31.10.2012 Near admin Building
BDL 9.42 18.25 42.0
2 31.10.2012 At port site 4.01 11.41 46.66 74.0 3 07.11.2012 At port site 16.39 11.49 288.66 321.0
2. Compliance of earlier Consent Conditions (enclosed). 3. Copy of the Closure Direction (enclosed).
HOD’s Recommandations: The industry is having EC for coal handling only and not
the other material viz. Limestone, Bauxite, Gypsum, Iron Ore & Molasses which is
violation of EC Conditions.
Web agenda of Part-I of 1st CAC meeting of 2013-14 dtd 21.05.2013 30
-2-
-2-
We may consider the request of industry for withdrawl of closure directions by
forfeiting Bank Guarantee of Rs. 10 lakh and top up with Bank Guarantee of Rs. 20
lakh towards not to handle the material other than coal till obtaining amendment in EC.
Submitted for discussion & decision before CAC in this regard.