    Annexure No Description

    A Compliance to the conditions mentioned in 'Consent for Establishment'

    B Chart showing Compliance to Conditions to be compiled before the start of work

    C Chart showing Compliance to Conditions to be compiled before the start of work

  • 7/27/2019 List of Annexure

    2/4

    Annexure No Description

    D1 Drawing showing location of completed Buildings as on 09/11/2011

    D2 Drawing showing the location of buildings under construction / work in progress

    D3 Drawing showing Construction works in progress Vs compliance to Slope mapD4 Drawing showing changes made in the design to minimize / to avoid cutting & excavation

    D5 Drawing showing the location of de-centralized STP and ETP

    D6 Drawing showing the location of pumping stations

    D7 Drawing showing the location of the Soil erosion control measures adopted

    D8 Drawing showing the location of air monitoring near Crusher

    D9 Site working drawings

    D10 Drawing showing the ravine corridors and the location of bandhara

  • 7/27/2019 List of Annexure

    3/4

    Annexure No Description

    1 Sanitary & Hygienic Measure Adopted

    2 Corporate Social Responsibility Activity (CSR) carried out

    3 Interim Report by FICCI on Assessment of Energy Conservation Achievements in Completed Buildings4 List of Building Completed as on 09/11/2011

    5 Compliance report to the Conditions during Operation Phase of Completed Building as on 09/05/2012

    6 List showing the buildings under construction / work in progress at various locations

    7 Environment Parameters Monitoring Reports of M/s Horizon Services , Pune

    8 Comparative chart of Monitored Environment Parameters

    9 Photographs of Environment Monitoring Activity

    10 Various construction activity in progress Vs compliance to Hill Station Regulations

    11 Correspondences carried out by Special Planning Authority with Town & Country Planning Department, Govt. of Maharashtra

    12 Various construction activity in progress Vs FSI calculation

    13 Daily Water Balance Chart14 The list showing the details of WTPs and STPs

    15 Photographs of the provision made for the release of water from Bandharas

    16 Copy of direction received from Irrigation Department, Govt. of Maharashtra

    17 News appeared in the news paper regarding the release of water

    18 Copy of the logbook regarding the release of water from bandhara

    19 Photograph showing the release of water from the Bandhara

    20 Report on Ecological Monitoring of the water body

    21 Report on fish species selected by fisheries experts, Govt. of Maharashtra

    22 Details of ETP installed in the hospital along with the schematic and process flow chart

    23 The photographs of the ETP installed at Apollo Hospital24 Copy of the work order for the procurement of ETP along with the expenses incurred

    25 Copy of the authorization under Bio-medical waste (Management & handling) Rules 1998.

    26 Photocopy of log book detailing the bio medical waste disposed through approved agency

    27 Photographs of the filter press and bio gas generation unit

    28 Photographs of the common hazardous waste storage facility

    29 A copy of application submitted to MPCB for authorization

    30 Copy of membership form

    31 Copy of the membership certificate

    32 Soil erosion Management plan

  • 7/27/2019 List of Annexure

    4/4

    33 Soil erosion control measure executed with the expenses incurred

    34 List showing the trees transplanted along with the location of tree transplantation

    35 Letter from MPCB ambient air quality monitoring locations around the crusher area

    36 The details regarding the compliance to energy conservation37 The photographs showing installations of renewable energy

    38 Copy of Work order issued to Central Road Research Institute (CRRI)

    39 Details of on-site and off - site disaster management preparedness facilities

    40 DG sets Stack monitoring report

    41 DG sets Noise monitoring report

    42 List of total quantity of pre-mix concrete and the curing agent used at various construction sites

    43 List showing the installation of the water conservation fixtures

    44 Specifications of glass used in various buildings

    45 Specification of Shingles used for roof of the buildings

    46 Detailed compliance report of the other conditions as stipulated by MoEF / other State agencies47 The Work Order Copy of Mr. Nayan Khambati

    48 Copy of the reoprt prepared by Indipendent expert on STP's

    49 The treated sewage monitoring report

    50 The details regarding the solid waste processing facility

    51 Details regarding the green belt development in the last six month

    52 Photographs of Solar energy is used for lighting of streets

    53 Photograph of the solar panels instal led

    54 Compliance report to the environmental safeguards along with the commitment

    55 Copy of statutory approvals from Fire Dept. and other agencies as applicable.