100 Climate Solutions Project Campaign ~ 2016 Renewable Energies REGIONS OF CLIMATE ACTION Summary Mandating Authority : Expected project CAPEX : Location and population Project Type : Main stakeholders Social and environmental impact Linking renewable energy with community tourism in northern protected areas of the province of Pichincha Creation of jobs; decreased energy con- sumption without affecting user comfort. A switch to clean energy will also reduce dependence on fossil fuels, which are more expensive and difficult to access in remote rural areas and are used mainly for small motorized boats and motorcycles. The project aims at providing renewable energy to three new tourism installations run by community enterprises which are located in rural poor areas of the province of Pichincha; the idea is to strengthen the concept of eco-tourism by reducing carbon emissions in protected areas. At the same time the project would contribute to guaranteeing jobs of indegenous and peasant initiatives. This is identified as an innovative pilot project in the province’s environmental policy framework. Provincial government of Pichincha 300’000 € Main stakeholders (involved in the project) Public Entities - Provincial government of Pichincha - Municipal government of Pedro Moncayo - Municipal government of Cayambe Community tourism enterprises: - Santa Mónica; Cochasquí (Pedro Moncayo) - Paquiestancia (Cayambe) Municipalities of Cayambe and Pedro Moncayo, Ecuador. 65 000 inh. Solar

Upload: others

Post on 28-Sep-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Linking renewable energy with community REGIONS OF tourism ...€¦ · Climate Solutions Project Campaign Climate Solutions Project Campaign Renewable Energies REGIONS OF CLIMATE

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Renewable Energies

REGIONS OFCLIMATE ACTION

Summary

Mandating Authority :

Expected project CAPEX :

Location and population

Project Type :

Main stakeholders

Social and environmental impact

Linking renewable energy with community tourism in northern protected areas of the province of Pichincha

Creation of jobs; decreased energy con-sumption without affecting user comfort. A switch to clean energy will also reduce dependence on fossil fuels, which are more expensive and difficult to access in remote rural areas and are used mainly for small motorized boats and motorcycles.

The project aims at providing renewable energy to three new tourism installations run by community enterprises which are located in rural poor areas of the province of Pichincha; the idea is to strengthen the concept of eco-tourism by reducing carbon emissions in protected areas. At the same time the project would contribute to guaranteeing jobs of indegenous and peasant initiatives. This is identified as an innovative pilot project in the province’s environmental policy framework.

Provincial government of Pichincha

300’000 €

Main stakeholders (involved in the project)Public Entities- Provincial government of Pichincha- Municipal government of Pedro Moncayo- Municipal government of CayambeCommunity tourism enterprises:- Santa Mónica; Cochasquí (Pedro Moncayo)- Paquiestancia (Cayambe)

Municipalities of Cayambe and Pedro Moncayo, Ecuador.65 000 inh.

Solar

Page 2: Linking renewable energy with community REGIONS OF tourism ...€¦ · Climate Solutions Project Campaign Climate Solutions Project Campaign Renewable Energies REGIONS OF CLIMATE

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Building permits signed :

STAGE 4 : Permitting / Financing / Contracts

Land concession signed :

Environmental impact study :

Grid Connection :

Power Purchase Agreement

Off-Taker :

Tenor : Price of electricity :

Identified sources of fundings

Comments

Engineering, Procurement and Construction Contractor :

Operation and Maintenance Contractor :

STAGE 5 : Engineering / Construction / Commercial Operation

STAGE 1 : Concept Development, Site identification

Site identified :

Site access :

Expected installed capacity :

Adequate road Rail access Port facilities

Project maturity ( IFC / World Bank Categories )

STAGE 3 : Feasibility Studies

STAGE 2 : Pre-Feasibility Studies

Pre-feasibility study :

Feasibility study :

Expected type of contract :

Technology :

Energy resource data

STAGE 1 : Concept Development, Site identification

STAGE 2 : Pre-Feasibility Studies

STAGE 3 : Feasibility Studies

STAGE 4 : Permitting / Financing / Contracts

STAGE 5 : Engineering/Construction/Commercial Operation

Yes

Apart from the reduction of carbon emissions in eco-tourism of protected areas, motivations for implementing the project come from the fact that in Ecuador solar energy is until now underused, despite high solar irradiation. Therefore, the project has been in-serted as a high priority within the political framework of provincial and municipal entities.

Examples:- Solar energySOLAR PANEL 250W 24V PANASONIC VB HN250AE02- Boat transportAqua watt green racing electric propulsion comparable to 20 HPgasoline energy- MotorcyclesZERO MMX ZF6.5

Yes

Yes

Yes

Contact has already been established with local enterprises RENO-VAENERGIA S.A based in Pedro Moncayo. Contact with international providers will be established if required.

RENOVAENERGIA S.A based in Pedro Moncayo

Yes

Yes

Yes

Empresa Eléctrica Regional Norte S.A. (Emelnorte)

10 Years 0,077EUR/Kwh

Not specified

0,003 Mw (for solar panels)

Data available for January 2013- January 2015

BOOT

Yes