linee ferroviarie ad alta velocitÀ/alta capacitÀ...8. 11. 5. 14. 13. 6. 4. 1. 2. 3. 7. 12. 9. 10....
TRANSCRIPT
![Page 1: LINEE FERROVIARIE AD ALTA VELOCITÀ/ALTA CAPACITÀ...8. 11. 5. 14. 13. 6. 4. 1. 2. 3. 7. 12. 9. 10. ITALIA “Fiorenza” Multipurpose Train Depot Milan (1987-2000) SVIZZERA Gotthard](https://reader033.vdocuments.us/reader033/viewer/2022060300/5f08288d7e708231d420a0dd/html5/thumbnails/1.jpg)
8.
11.
5.
14.
13.
6.
4.
2.1.
3.
7.
12.
9.
10.
ITALIA“Fiorenza” Multipurpose Train Depot Milan(1987-2000)
SVIZZERAGotthard Base TunnelBodio and Faido Lots(2001-2014)
FRANCIATGV Nord Aronde
(Lot 19-16)(1989-1992)
FRANCIATGV Lille and
A5 viaduct(1989-1992)
TURCHIA“Orient Express”,High-Speed Railway Halkali- Kapikule(2019-in corso)
ITALIAFlorence-Rome"Direttissima"High Speed Railway (1970-1983)
ITALIATurin-MilanHigh SpeedRailway System(2002-2009)
TURCHIAKosekoy-Gebze,Section of the Ankara-IstanbulHigh Speed Train Project(2011-2016)
ITALIANaples-Bari High Capacity Railway Line Apice-Hirpinia section(2019-in corso)
FRANCIATGV Line Rhone-Alpes
"Rhone" Viaduct"(1989-1992)
ITALIA"The Brenner Base Tunnel", "IsarcoUnderpass" and "Tulfes-Pfons" sections(2014-in corso)
ITALIATerzo Valico dei Giovi,
Milan - GenoaHigh Speed, High-Capacity
Railway Line Section(2012-in corso)
ITALIABologna-FlorenceHigh Speed Railway System(1996-2009)
ITALIAMilan-Naples High Speed Railway System “Bologna Junction” (2000-2009)
1998
2007
1999 2000 2001 2002 2003 2004 2005 2006 2008 2009 2010 2011
1981
1990
19821983198419851986198719881989
1971
1980
1972
1973
19741975
19761977
1978
1979
1970
1968
1969
1991
19921993 19
94
2012 2013 2014
2016 2017 2018 2019
2015
1997
1995 1996
10
10
88 11
1
4 11
2
7
1
7
6
3141516
12
245
5 9
9
13
13
Fine lavoriXX
Inizio lavoriXX
In corsoXX
ITALYPalermo-Catania RailwayBicocca-Catenanuovasection(2019-in corso)
15.
ITALYVerona-PaduaHigh Speed Railway(2019-in corso)
16.
PRINCIPALI PROGETTI COMPLETATI E IN CORSO
LINEE FERROVIARIE AD ALTAVELOCITÀ/ALTA CAPACITÀ