Line 5 Straits of Mackinac Hydrostatic Pressure Test Plan Project AFE 20007132 Document Owner Enbridge Energy, Limited Partnership Version REV2 Version Date 4/25/2017 REDACTED SUBMITTAL -- PUBLIC COPY

Upload: doanxuyen

Post on 03-Feb-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • Line 5 Straits of Mackinac

    Hydrostatic Pressure Test Plan

    ProjectAFE 20007132

    DocumentOwner EnbridgeEnergy,LimitedPartnership

    Version REV2 VersionDate 4/25/2017

    REDACTED SUBMITTAL -- PUBLIC COPY

  • Page2of45

    TABLEOFCONTENTSTABLEOFCONTENTS....................................................................................................................2

    1. Terms&Definitions...............................................................................................................4

    2. ProjectSummary...................................................................................................................6

    3. TestProcedure......................................................................................................................6 General.................................................................................................................................63.1. Notifications.........................................................................................................................63.2. TestSegments......................................................................................................................73.3. PipingtobeTested...............................................................................................................73.4. TestPressureandDuration..................................................................................................83.5. TestSequence.......................................................................................................................83.6. TestIsolation........................................................................................................................83.7. ElevationProfiles................................................................................................................133.8.

    4. TestProcedureOutline........................................................................................................15 InstrumentCalibrationRequirements................................................................................154.1. TestInstrumentSetup........................................................................................................164.2. PressureMeasurements.....................................................................................................184.3. TemperatureMeasurements.............................................................................................194.4. ProcedureForStrength/LeakTesting.................................................................................194.5.

    5. ContingencyPlans...............................................................................................................21 Prevention..........................................................................................................................215.1. EmergencyResponse..........................................................................................................215.2. Leaks...................................................................................................................................215.3. TestFailures........................................................................................................................215.4. SafetyPrecautions..............................................................................................................225.5.

    6. Schedule..............................................................................................................................22 WestSegment....................................................................................................................226.1. EastSegment......................................................................................................................236.2.

    AppendixATestPressureSelection.........................................................................................251.0 Introduction........................................................................................................................25

    AppendixBNitrogenPurgePlan..............................................................................................291.0 WestStraitsHydrotestPurgePlan..................................................................................292.0 EastStraitsHydrotestPurgePlan.......................................................................................34

    AppendixCLeakDetectionPlan...............................................................................................391.0Overview................................................................................................................................391.1PreliminaryPreparations........................................................................................................391.2 LeakIdentification..............................................................................................................39

    REDACTED SUBMITTAL -- PUBLIC COPY

  • Page3of45

    1.3 LeakLocating......................................................................................................................401.4 PressureRequirements......................................................................................................411.5 Attachments.......................................................................................................................42

    AppendixDWaterAcquisitionWaterQualityStandards..........................................................44

    AppendixEMinimumOnsiteWaterTreatmentWaterQualityStandards................................45

    REDACTED SUBMITTAL -- PUBLIC COPY

  • Page4of45

    1. TERMS&DEFINITIONSCompanyTestEngineer Engineeronsiteduringthehydrostatictestthatisresponsibleforensuringthe

    hydrostatictestresultsareincompliancewithallapplicableCompanyspecifications,industrystandardsandtestplansandprocedures.

    ConstructionRelatedEquipment

    Usedaspartofconstructionoroperationsandmaintenanceactivitieswithinafacilityandontherightofway(e.g.,cranes,backhoes,vacuumtrucks,etc.).

    Contaminants Presenceofminorandunwantedconstituentair,soil,andwaterasaresultofcontactorpressureofareleasedfluid.

    ContractWorkers PersonshiredforextendedperiodsoftimeworkingunderthedirectsupervisionofCompanyemployees.

    EnvironmentalInspector

    CompanyRepresentativefortheprojecttoensurecompliancewithallCompanystandardsandspecifications,permits,andrequirednotifications.

    GeneralContractor AcontractorwhoentersintoacontractwiththeCompanyfortheconstructionoftheprojectandwhotakesfullresponsibilityforitscompletion.Thecontractormayenterintosubcontractswithothersfortheperformanceofspecificpartsorphasesoftheproject.

    Leak Pipelinereleasethatislessviolentandsuddenthanarupture,buthasamorepronouncedvolumeandflowthanaseep.

    MaximumOperatingPressure(MOP)

    Pressureorpressurerestrictionsdeterminedbythelowestvalueofthefollowingpressuretypes:statichydrotestpressuredata,flowingtestpressuredata,designpressurevaluesbasedonpipesteelgradeandwallthickness,orpressuresorpressurerestrictionsimposedbyaregulator.DeterminedbyEnbridgesOperationsandMaintenanceManual010202MaximumOperatingPressureAlgorithmforMainlinePiping.

    NormalOperatingLimit Minimumandmaximumsetpointsthatprovideforthesafeoperationofthesystemandincludesuctionpressureanddischargepressuresetpoints.

    Oil Hydrocarbonormixtureofhydrocarbonsotherthangasoranysubstancedesignatedasanoilproductbyregulations.

    OperatorQualified(OQ)

    Personnelqualificationinthenaturalgasandliquidpipelinebusinessinaccordancewith49CFR192SubpartN,49CFR195SubpartGandtheCompanyUSOQPlan.

    PLM/Operations EnbridgePipelineMaintenance(PLM)andOperationsPersonnel.

    Release Lossofcontainmentofpipelinecommodityincludingdischarge,spray,spill,leak,seepandpour.

    REDACTED SUBMITTAL -- PUBLIC COPY

  • Page5of45

    Rupture Suddenlossofcontainment(release)eventthatinvolvesimmediatecessationofoperationsand/orinvolvesextensivedamagetopipelineand/orequipment.

    SiteInspector CompanyrepresentativeorappointedrepresentativeoftheCompanyresponsiblefortheinspectionofthework(constructionormaintenanceactivities).

    SiteSupervisor Employeeresponsibleforthelocation(e.g.,PLMcoordinator/supervisor,technician,terminalsupervisor)ordesignate.

    SpecifiedMinimumYieldStrength(SMYS)

    Minimumyieldstrengthprescribedbythespecificationunderwhichthematerialispurchasedfromthemanufacturer.

    TestSupervisor CompanyrepresentativewhoensuresthehydrostatictestisexecutedinaccordancewithallCompanyspecificationsandstandards,testplansandprojectplans.

    Waterbody Areaholdingpermanentorseasonalwater,includingbutnotlimitedtodrainagechannels,ditches,sloughs,wetlands,dugouts,ponds,creeks,streams,roversorlakes.

    Worker Companyemployee,contractworkerandcontractorpersonnel.

    REDACTED SUBMITTAL -- PUBLIC COPY

  • Page6of45

    2. PROJECTSUMMARYThe Line 5 Straits of Mackinac hydrostatic pressure test (hydrotest) fulfills Enbridges requirements under Paragraph 71.b of the proposed Consent Decree in U.S. vs. Enbridge Energy, Limited Partnership, et. Al., (Civil Action No: 1:16-cv-914). The hydrotest will be performed to reduce or eliminate the potential that any axially-aligned Crack features in the Dual Pipelines could result in a leak or rupture of the dual pipelines that cross the Straits of Mackinac. The Hydrostatic Test Plan shall be in accordance with procedures and submittal timelines outlined in Paragraph 25 of the Consent Decree.

    The scope of the hydrotest applies to the 4.09mile portion of Line 5 consisting of two 20-inch diameter seamless pipelines that cross the Straits from the North Mackinac sending traps to the South Mackinac station receiving traps. The tes