19-10-2017 coordination meeting
Yves Gaillard, Serge Pittet TE/EPCon behalf of TE/EPC colleagues
TE/EPC activities for YETS 2017-2018 & LS2
LINAC 2-3, PSB, PS & TT2
1. TE/EPC activities during
• Linac 2:
• Replacement of LT.BHZ20 power converter
• Linac 3:
• Upgrade of Maxidiscap converters in Linac3/LEIR transfer line
• Replacement of pulsed converters in Linac3/LEIR transfer line
• PSB
• Busbar interconnection for new reference magnet
• QSTRIP power converters
• Installation of the new power converters for PSB injection BSW magnets (stripping foil)
• PS
• POPS degraded mode N1 to be tested
• PS-MPS (motor/generator set) tests on PS magnets
• Installation of new power converters for 40/80MHz RF cavities
• L3-PSB-PS
• FGC- Ether installation
2. TE/EPC activities during
CONTENT
• Linac 2:
• Power converter consolidation on LT and LTB transfer lines
• PSB:
• LIU - Upgrade of power converters
• PS/TT2:
• LIU - Upgrade of power converters
• CONS - Upgrade of power converters
YETS 2017-2018
LS2
Replacement of LT.BHZ20 power converter + 1
spare
LINAC2
1 week testing (Feb 2018)
Machine closedWHEN:
Technical responsible:
WHERE: Bdg. 363
Christophe MUTIN ECR:
Done:
Power converters delivered and operating on test load
Temporary AC supply and water cooling until LS2
Validation of Beam Permit to L2 Control Room
To do during YETS:
Disconnect existing DC magnet cables (to bat 355)
Connect new DC magnet cables (already installed, to bat 363)
Move EIS/PAS connection to new converter (cabling already prepared)
Commissioning of the converters with FGC3 (class 63, incl. destination)
LT.BHZ20 in
b.355
(old TEKELEC)
LT.BHZ20 in
b.363
(APOLO 2p)
YETS 2017-2018
EDMS 1731301
WHEN:
Technical responsible:
WHERE:
Upgrade of Maxidiscap converters in
Linac3/LEIR transfer line
Linac3/LEIR
ECR:
Description:
10 + 3 Maxidiscap used for the pulsed quadrupole magnets (QDN,QFN) will be
upgraded to allow RegFGC3 control and connection to the WIC.
Project type:
Status:
Done:
Reg. FGC3 crate produced
To do during YETS:
Replacement old control
crate by Reg FC3.
Cabling of FGC ether and
230V sockets
WIC Connections
YETS 2017-2018
EDMS 1841822
351 / 150
LIU-Ions
Stephane JOFFE
8 first weeks of 2018
Replacement of pulsed converters in
Linac3/LEIR transfer line
Linac3/LEIR
Description:
14 + 2 Minidiscap converters will be replaced by new Mididiscap converters for the
supply of pulsed dipoles magnets (DHZ,DVT) in Linac3/LEIR transfer line to allow
RegFGC3 control and connection to the WIC.
Status:
Done:
Power converters produced
To do during YETS:
Power converters installation
Cabling of FGC ether and 230V sockets
WIC Connections
YETS 2017-2018
WHEN:
Technical responsible: Christophe MACHADO
8 first weeks of 2018WHERE:
ECR:
Project type:
EDMS 1841776
351
ACC-CONS
Status:
Done:
Power cables installed
To do during YETS:
DCCT rack moving 90° Busbar installation
Cable heads manufacturing
WHEN:
Technical responsible:
WHERE:
Busbar interconnection for new reference magnetPSB
Description:
As part of the POPSB project a new busbar will be installed in building 361 close
to the actual reference magnet.
This busbar will allow us to connect the new reference magnet which will be
installed in b245.
Arnaud BESSONNAT
361January 2018
PLAN: 10311
YETS 2017-2018
Status:
To do during YETS:
Installation of one power converter
DC cables installation
WHEN:
Technical responsible: Louis DE MALLAC
Commissioning: February 2018 WHERE: Building 361
Type: RF25kV
(25kV/8A)
QSTRIP power converters PSB
EDMS: 1537264
Description:
Installation of one post-LS2 Qstrip power
converter for loops fine tuning during MD period.
Existing infrastructure of a spare corrector will be
used (rack, Ethernet, AC,…)
CANCUN ±100A; ±30V
YETS 2017-2018
Status:
Done: Converters installed / Alcove ready
In progress: pulse transformers final mounting
To do during YETS: Transport & Install pulse
Transformers + Cabling
WHEN:
Technical responsible: Ch. COUPAT
WHERE: Bld. 361/BRF2
New Alcove Construction for PSB Injection BSW (stripping foil)
Power Converter’s Pulse Transformers PSB
ECR: PSB-K-EC-0002
For the new 160MeV beam injection from Linac4 into the PSB, a new set of slow
bumper magnets (BSW) has to be supplied by new power converters using pulse
transformers.
During second part of YETS 17/18
New Alcove
Pulse
transformers
YETS 2017-2018
POPS activities YETS 2017-2018
Time request: 3 days during Hardware test period
Technical responsible: Fulvio BOATTINI
PS
When: February 2018
1. General Maintenance
2. Test degraded mode:
DC3
DC
DC +
-
DC1
DC
DC
DC5
DC
DC +
-
DC4
DC
DC
+
DC2
DC
DC
+
DC6
DC
DC
MAGNETS
+
-
+
-
CF11
CF12
CF1
CF21
CF22
CF2
AC
CC1
DC
MV7308
AC AC
CC2
DC
MV7308
AC
18KV AC
Scc=600MVA
OF1 OF2
RF1 RF2
Not part of the
specif ication
TW2
Crwb2
TW1
Lw1
Crwb1
Lw2
MAGNETS
V_F3
V_F5
V_C1
V_F4
V_C2
V_F6
UdcF3
UdcC1
UdcF5
UdcF4
UdcC2
UdcF6
DC3
DC
DC +
-
DC1
DC
DC
DC5
DC
DC +
-
DC4
DC
DC
+
DC2
DC
DC
+
DC6
DC
DC
MAGNETS
+
-
+
-
CF11
CF12
CF1
CF21
CF22
CF2
AC
CC1
DC
MV7308
AC AC
CC2
DC
MV7308
AC
18KV AC
Scc=600MVA
OF1 OF2
RF1 RF2
Not part of the
specif ication
TW2
Crwb2
TW1
Lw1
Crwb1
Lw2
MAGNETS
V_F3
V_F5
V_C1
V_F4
V_C2
V_F6
UdcF3
UdcC1
UdcF5
UdcF4
UdcC2
UdcF6
Degraded mode N2 has
no impacts on physics
DC3
DC
DC +
-
DC1
DC
DC
DC5
DC
DC +
-
DC4
DC
DC
+
DC2
DC
DC
+
DC6
DC
DC
MAGNETS
+
-
+
-
CF11
CF12
CF1
CF21
CF22
CF2
AC
CC1
DC
MV7308
AC AC
CC2
DC
MV7308
AC
18KV AC
Scc=600MVA
OF1 OF2
RF1 RF2
Not part of the
specif ication
TW2
Crwb2
TW1
Lw1
Crwb1
Lw2
MAGNETS
V_F3
V_F5
V_C1
V_F4
V_C2
V_F6
UdcF3
UdcC1
UdcF5
UdcF4
UdcC2
UdcF6
Degraded mode N1 limits the
number of executable cycles
to half
Normal mode
YETS 2017-2018
MPS activities YETS 2017-2018
Not used in 2017 No SIEMENS Maintenance
Only standard CERN Maintenance
To do during YETS17/18:
Annual test: PS magnet pulsed with PS-MPS
Time request:
19/20 December 2017 before PS access
Technical responsible: Yves GAILLARD
PS
1 or 2 days
YETS 2017-2018
Status:
Done:
One power converter installed.
To do during YETS:
Installation of five power converters.
New supporting structure for the 6th power
converter + services + FGC3 Ethernet cable.
Five HV DC cables to be installed from bld.355 to RF cavities
+ patch panel in bld.355.
WHEN:
Technical responsible: Louis DE MALLAC
Commissioning: February 2018 WHERE: Building 355
Type: RF25kV
(25kV/8A)
Installation of new power converters for 40/80MHz RF cavitiesPS
ECR: PS-R-EC-0001EDMS1839213 for the 6th converter
In the current situation, there are five power converters
installed in building 151.
These 20 years old converters are rated to 100kW
(24kV/4A) and will be replaced by five 200kW (25kV/8A)
converters plus one spare.
YETS 2017-2018
Technical responsible:
Type: RF25kV
(25kV/8A)
FGC-Ether installationL3-PSB-PS
YETS 2017-2018
Description:
FGC-Ether is the network that connecting
the converter to a gateway allows the CCC
to control and exchange information with any
FGC3-based Converter.
J.L. GOMEZ-COSTA
Building PLAN ProjectActivities Commissioning
timeCabling Gateway
245 10311 Booster MPS Trims Required Required half day
150 LINAC 3 - LEIR Required Required half day
351 11460 / 11459 LINAC 3 - LEIR Required Required half day
355 PS-R-EC-0001 RF25Kv Required Required half day
36110290 LIU MegaDiscap Required Required half day
10297 LIU - SIRIUS BSW Required Required half day
Status:
Done: all requests have been transferred to pertaining groups
To do during YETS: all tasks can only be executed whenever the
required cables, converters, racks are in place.
WHEN:
Technical responsible:
Commissioning: April 2020 WHERE:
Type: RF25kV
(25kV/8A)
LIU – Upgrade of power convertersL2
Pre ECR:
Status:
To do during LS2:
Install new racks for the Bending, Quad and Steerer power
converters in building 363.
Install the power converters, their FGC3 controls, and controls
infrastructure (gateways, Ethernet cabling).
Connect the AC and DC cables (new AC connection required,
some new DC cables required).
Connect the interlock cables (WIC, BIS).
Commission converters with and without beam.
LS2
On the LT and LTB transfer lines, the bending converters for the LINAC4 project
will be installed, and the existing power converters not directly affected by
LINAC4 will be consolidated.
Stephane JOFFE
363
1851780
WHEN:
Technical responsible: Serge PITTET & Al.
Commissioning: April 2020 WHERE: 245, 271, 361
Test on PSB Magnet with new POPS-B: Dec.2018, Apr/May 2019
RF25kV (25kV/8A)
LIU – Upgrade of power convertersPSB
ECR: Expected April 2018
Detailed information available at
Injection:
http://te-epc-lpc.web.cern.ch/te-epc-lpc/machines/liu-booster/booster_injection.stm2GeV:
http://te-epc-lpc.web.cern.ch/te-epc-lpc/machines/liu-booster/booster_2gev.stm
Status:
Done:
Correctors power converters
To do during LS2:
Almost all remaining power converters
LS2POPS B
Bldg 245
WHEN: Commissioning: April 2020
Type: RF25kV
(25kV/8A)
LIU – Upgrade of power convertersPS/TT2
ECR: Expected April 2018
Detailed information available at
http://te-epc-lpc.web.cern.ch/te-epc-lpc/machines/ps_upgrade/documentation.stm
Status:
To do during LS2:
LS2
Project Responsible Activity Number
of PC
Where
Inj. PS Bumpers (BSW 40, 41, 43, 44) J.M. Cravero Dismantling old conv., Installation SIRIUS_F2P 4+1 365
inj. PS Bumper (BSW 42) J.M. Cravero Dismantling old conv., Installation SIRIUS F2P2S 1+1 365
inj. PS Septa (SMH 42)J.M. Cravero &
T. TodorcevicDismantling old conv., Installation MARXDISCAP 1+1 361
inj. PS Low Beta Quadrupoles J.M. Cravero Installation & commissioning MAXIDISCAP_modif 1+1 365
Vertical IPM power converter Unknown Installation & commissioning (Type TBD) 1 Unknown
TT2 transfer line power converters K. Papastergiou Dismantling old conv., Installation SIRIUS +CANCUN 39+4 269
WHEN: Commissioning: April 2020
Type: RF25kV
(25kV/8A)
CONS – Upgrade of power convertersPS/TT2
ECR: Expected April 2018
Status:
To do during LS2:
LS2
Project Responsible Activity Number
of PC
Where
PS capa. discharge with MARX T. TodorcevicDismantling old conv.,
Installation MARXDISCAP8+2 365
PS Gamma Transition
(Doublets-triplets)N. David Conv. Modification & commissioning 6 365
PS BSW26 J.-M. CraveroDismantling old conv., Installation
MAXIDISCAP_modif1 365
SMH57-61 Control Upgrade S.Pittet Upgrade the GEREG controller to a FGC3 2 356