Page 1: LIMS Strategic Implementation Plan...Goals of the Project –Develop strategic implementation plan for a levee information management system Actions » Meet with SLFPA-E staff and

LIMS Strategic Implementation PlanProject Review and Recommendations

Presented by Roger Colwell and Tim Ledet

August 2, 2012

Page 2: LIMS Strategic Implementation Plan...Goals of the Project –Develop strategic implementation plan for a levee information management system Actions » Meet with SLFPA-E staff and

Goals of the Project

– Develop strategic implementation plan for a levee information management system

● Actions

» Meet with SLFPA-E staff and levee district staff

» Analyze input from meetings and subsequent discussion

» Develop plan

» Requested a recommendations input

» Final Plan delivered on May 15th, 2012

LIMS Strategic Implementation Plan I 2

Page 3: LIMS Strategic Implementation Plan...Goals of the Project –Develop strategic implementation plan for a levee information management system Actions » Meet with SLFPA-E staff and

Current Status of Related Efforts

3

● Gathering data from Orleans Tax Assessor’s office

● NFIP GIS layers

● SLFPA-E is working with GCR on ROW/Property easements and ownership data.

Page 4: LIMS Strategic Implementation Plan...Goals of the Project –Develop strategic implementation plan for a levee information management system Actions » Meet with SLFPA-E staff and

Map Viewer

LIMS Strategic Implementation Plan I 4

Levee System Layers

Levee Watcher’s Input

Real Time Gauge Data

Inspection data/reports

Permit Tracking

Control Structure Status

ROE/ROW/Easements

Closure Alerts

NFIP flood data

Page 5: LIMS Strategic Implementation Plan...Goals of the Project –Develop strategic implementation plan for a levee information management system Actions » Meet with SLFPA-E staff and

RecommendationsWhat to do now:

– Begin implementation of LIMS

– Look to build LIMS within OLD IT infrastructure

● Secured facility

● Have some licensed software that LIMS could use

● Capable system administrator available to assist

– Begin building GIS layers of Levee System using the NLD database design standard

– Build a GIS Web Viewer

● Would be the dashboard for the additional modules

– Build the Document Management Module

● Get started on building the digital document library

LIMS Strategic Implementation Plan I 5

Page 6: LIMS Strategic Implementation Plan...Goals of the Project –Develop strategic implementation plan for a levee information management system Actions » Meet with SLFPA-E staff and

RecommendationsWhat to wait on:

– Permits Module

– Inspection Module

– Operations and Maintenance Module

LIMS Strategic Implementation Plan I 6

Page 7: LIMS Strategic Implementation Plan...Goals of the Project –Develop strategic implementation plan for a levee information management system Actions » Meet with SLFPA-E staff and

Why wait on the Permits Module

– CPRA is developing a Permit Application module with the SONRIS environment

– SLFPA-E is considered a partner with this effort

– Wait and see what functionality is built into this application

– Application goes to testing in October

LIMS Strategic Implementation Plan I 7

Page 8: LIMS Strategic Implementation Plan...Goals of the Project –Develop strategic implementation plan for a levee information management system Actions » Meet with SLFPA-E staff and

Why wait on the Inspections Module

– Recommend taking a look at the LA DOTD inspection application

– Available to all levee districts

– Application/Data hosted by DOTD

– Does require equipment purchases

LIMS Strategic Implementation Plan I 8

Page 9: LIMS Strategic Implementation Plan...Goals of the Project –Develop strategic implementation plan for a levee information management system Actions » Meet with SLFPA-E staff and

Why wait on the O&M Module

– This module could have a very broad scope

– Levee Districts have a lot of new infrastructure coming on line

– Is there consistency among the districts to build an Authority wide O&M application

LIMS Strategic Implementation Plan I 9

Page 10: LIMS Strategic Implementation Plan...Goals of the Project –Develop strategic implementation plan for a levee information management system Actions » Meet with SLFPA-E staff and

Funding Opportunities

10

● Existing Grants

– Pre-Disaster Mitigation Grant

– Hazard Mitigation Grant Program

– Buffer Zone Protection Program

● Future Grant Opportunities

– National Preparedness Grant Program

– National Levee Safety Grant

Page 11: LIMS Strategic Implementation Plan...Goals of the Project –Develop strategic implementation plan for a levee information management system Actions » Meet with SLFPA-E staff and

Questions

11

Page 12: LIMS Strategic Implementation Plan...Goals of the Project –Develop strategic implementation plan for a levee information management system Actions » Meet with SLFPA-E staff and

Document Upload

LIMS Strategic Implementation Plan I 12

– Attaching documents, drawings, As-builts, etc. to features on the map

– Link documents to more than one feature

– Search tool to retrieve/view documents

Page 13: LIMS Strategic Implementation Plan...Goals of the Project –Develop strategic implementation plan for a levee information management system Actions » Meet with SLFPA-E staff and

Levee Inspection Module

– Researching the USACE Levee Inspection System (LIS)

– Recommend to follow the LIS data model

– The inspection module would incorporate the data collected on a mobile application used to collect inspection data and photos

– The inspection module would be able to query specific inspections by type or event to view in LIMS

LIMS Strategic Implementation Plan I 13

Page 14: LIMS Strategic Implementation Plan...Goals of the Project –Develop strategic implementation plan for a levee information management system Actions » Meet with SLFPA-E staff and

Permit Tracking

– OCPR has begun an initiative to develop a permit tracking application as permits move through the system for approval

– SLFPA-E and Atkins personnel have engaged in a dialog with OCPR to understand how SLFPA-E can be a partner

– Partnership could lead to LIMS having a direct connection to pull information that SLFPA-E is interested in tracking

LIMS Strategic Implementation Plan I 14

Page 15: LIMS Strategic Implementation Plan...Goals of the Project –Develop strategic implementation plan for a levee information management system Actions » Meet with SLFPA-E staff and

Operations & Maintenance Module

– Looking at the daily routines/activities of the levee districts

– Inquiring as to what kind of information the districts would like to track/report on

– New infrastructure being turned over to maintain by levee districts

– How to help manage the information

LIMS Strategic Implementation Plan I 15

Page 16: LIMS Strategic Implementation Plan...Goals of the Project –Develop strategic implementation plan for a levee information management system Actions » Meet with SLFPA-E staff and

Contacts

16

● Roger Colwell – SLFPA-E

● Derek Boese – Atkins

– Principal in Charge

One Galleria Boulevard

Suite 1516

Metairie, LA 70001

504-841-2226

● Tim Ledet – Atkins

– Project Manager

1250 Wood Branch Park Dr

Suite 300

Houston, TX 77079

281-529-4240