1. Introductions & Project Background– General– Cherokee Heights Ravine
2. Engineering Design Items– North Knob Slope Design/Geometry– Disposal Site– Restoration-3D simulation
3. Schedule– Bidding– Construction
4. Questions/Discussion
2
Location Map
Rail R
oad
7th St W
ShepardRd
Ohi
o S
t
Water S
t
Saint Clair Ave
Bay
St
Jefferson Ave
Lexi
ngto
n P
kwy
S
Win
slow
Ave
Otto Ave
Page St W
Erie
St
Vict
oria
St S
View
St
Baker St W
King St W
Juno Ave
Sidney St W
Armstrong Ave
Man
omin
Ave
Otta
wa
Ave
George St W
Smith
Ave
Tuscarora Ave
Che
roke
e A
ve
Cha
rlton
St
Cha
tsw
orth
St S
Grace St
Watson Ave
Orle
ans
St
Bello
ws
St
Dal
y S
t
Stevens St W
Osc
eola
Ave
S
Curtice St W
Robie St W
Winona St W
One
ida
St
Arbo
r St
Annapolis St W
Toro
nto
St
Wyoming St W
Duk
e S
t
Mon
tcal
m P
l
Michigan St
Del
awar
e Av
e
Isabel St W
Winifred St W
Dodd R
d
Chi
ppew
a A
ve
Montreal Ave
Fulto
n S
t
Scheffer Ave
Juliet Ave
Alas
ka A
ve
Clif
ton
St
Lombard Ave
Stewart
Ave
Congress St W
Randolph Ave
Eleanor Ave
Ben Hill Rd
James Ave
Cliff S
t
Palace Ave
Milt
on S
t S
Delos St W
Race S
t
Elw
ay S
t
Dra
keS
t
Cherok ee H
eigh
ts B
lvd
Col
born
e S
t
Glen Ter
Pleasant Ave
Can
ton
St
Benso
n Ave
Montreal W
ay
Web
ster
St
Av
Smith e St
ryke
rAve
Albion Ave
Morton St W
Ann
St
Forster St
Wes
tern
Ave
S
Ivan Way
Buttern
ut Ave
Palmer
Pl
Bayard Ave
Bidw
ell S
t
Edgcumbe Rd
Avon
St S
Vanc
e S
t
May St
Orr
in S
t
Deu
bene
r Pl
Linwood Ave
Sem
inol
e A
ve
Ric
hmon
d S
t
Nug
ent A
ve
Was
eca
St
Monroe Ct
Adrian
St
Clay StAlice St
Sumac St
Mercer St
Col
born
e S
t
Milt
on S
t S
Pleasant Ave
Palace Ave
Watson Ave
Race S
t
Baker St W
Erie
St
Ayd Mill Rd
Was
eca
St
Vanc
e S
t
Bidw
ell S
t
Bayard Ave
Otto Ave
Shepa
rd Rd
Linwood Ave
Robie St W
James Ave
Web
ster
St
Edgc
umbe
Rd
Cherokee Ave
Cha
rlton
St
Duk
e S
t
James Ave
Eleanor Ave
Web
ster
St
Grace St
Watson Ave
Palace AveKing St W
Pleasant AveLinwood Ave
Lilydale Rd
7th St W
Fossil Ground Area
Pickerel Lake
To P
arkin
g Lo
t
FossilBed
FossilBed
FossilBed
FossilBed
Wetland
Wetland
M i
s s
i s s
i p
p i
R i
v e
r Pickerel Lake
Middle
ClayPit dFossil Be
WetlandConcrete Slab
Echo CaveBrick OvenWater Fall
StreamClay Pitt
Parking Lot
Streets
Scenic Overlook
Trails - Off Streets
Fossil Ground
Boat Launch
Key
WaterFall
BrickOven
EchoCave
ConcreteSlab
WaterFall
Bruce VentoScenic
Overlook
East ClayPit
West C
layPit
Trail Head
WaterFall
Chero
kee H
eight
Blvd
Annapolis St
LilydaleRegional Park
Crosby FarmRegional Park
CherokeeRegional Park
Harriet IslandRegional Park
Caution Lilydale fossil ground trails are on steep slopes. No water available.
FossilGroundParking
Lot
St. Paul Parks and RecreationParks and Rec GISMap Prepared By: Ger PhaNov, 2006
FossilGround
Bruce VentoScenic Overlook
Sam Morgan Regional Trail
City of Saint PaulParks and Recreation
Lilydale Regional Park
?±A@35E
35E
?±A@
Rail R
oad
*
Mississippi River
Pickerel Lake
Hwy 13
Brickyard Trail
Annapolis
North Knob
History of Site
Former location of Twin Cities Brickyards
Cherokee Regional Park
Cherokee Hts Ravine
k
k
k
k
k
k
k
k
k
k
k
!<
13
149
Annapolis St
Man
omin
Ave
Sm
ith A
ve
W Sidney St
W Curtice St
W Winona St
Otta
wa
Ave
S S
mith
Ave
W Wyoming St
S O
ttaw
a Av
e
Del
awar
e Av
e
Che
roke
e Av
e
Chi
ppew
a Av
e
Winston Ct
S D
elaw
are
Ave
Miriam St
Dod
d Rd
W Water S
t
Hiawatha Ave
Mina St
Che
roke
e Heig
hts B
lvd
S C
hero
kee
Hei
ghts
Ave
Fremont Ave
Simard St
Die
go L
a
Sutcliff Cir
Downing St
Garden La Dewerff St
W Bernard St
Chi
ppew
a Av
e
STORMWATER MODELINGBrickyard Area of
Lilydale Regional ParkSt. Paul, Minnesota
FIGURE 4-1
k Waterfall
k Seep
!< Bruce Vento Scenic Overlook
Storm Sewer Manholes
Culvert Crossing
Storm Sewer Pipes
Ravine/Stream Channel Includedin Study
Subwatershed Divides
Major Watersheds
Cherokee Heights
Cherokee Ravine
Cherokee Ravine 2
Fremont
Fremont Ravine
Fremont Ravine 2
Fremont Ravine 3
Trail
Barr
Foo
ter:
Arc
GIS
10.
3, 2
015-
01-2
9 09
:42
File
: I:\C
lient
\Sai
ntPa
ul\2
3621
151_
Lily
dale
_Reg
_Par
k\M
aps\
Repo
rts\
Repo
rt\S
torm
wat
erM
odel
Land
scap
e.m
xd U
ser:
sms
I0 300150
Feet
C: Fremont Avenue Culvert
B: Cherokee Heights Culvert
A: North Cherokee Heights Culvert
Drainage Areas
49 acres
22 acres
k
k
k
k
!?#V
k
k
k
k
!<
k
k
k
13
W Water S
t
Hiaw
atha A
ve
Che
roke
e Heig
hts B
lvd
Miriam St
Sutcliff Cir
Fremont Ave
Sim
ard S
t
Garden La
Annapolis St
Æü
RECOMMENDATIONSBrickyard Area of
Lilydale Regional ParkSt. Paul, Minnesota
FIGURE 5-1
Barr
Fo
oter
: Arc
GIS
10.
3, 2
015-
01-2
9 09
:43
File
: I:\
Clie
nt\S
aint
Paul
\236
2115
1_Li
lyda
le_R
eg_P
ark\
Map
s\Re
port
s\Re
port
\Rec
om
men
dat
ions
.mxd
Use
r: s
ms
I0 200100
Feet
West Clay Pit
Middle Clay Pit
Brickyard Access Trail - Bruce Vento Spur
Brickyard Access Trail - Bluff Section
Brickyard Trail - Connector Section
Sinkhole
East Clay Pit
Northwest Slope Failure
Cherokee Regional ParkParking/Picnic Area
North Ravine Falls
Brickyard Trail Lower Falls
East Clay PitFalls
Cherokee Heights Ravine
Brickyard Trail -Lower Section
0Brickyard Trail - Fossil/Brick OvenSection
North Ravine
Old Scarp
Brickyard Trail Culvert
2013 Slope Failure Area
North Knob
Fremont Avenue Culvert
Cherokee Heights Culvert
North Cherokee Heights Culvert
ESRI Imagery, 4/4/2012.
Fossil Site 1Fossil Site 2
Fossil Site 3
Fossil Site 4
Lower North Stream Channel
k Waterfall
k Seep
!< Bruce Vento ScenicOverlook
#V Echo Cave
!? Brick Oven
Brickyard Trail SectionBreak Points
Culvert Crossing
Railroad
Undeveloped Footpath
Paved Trail
Ravine/Stream ChannelIncluded in Study
RecommendationsCherokee HeightsProject
Inspect for Erosion
Replace Culvert
Stabilize Ravine
Stabilize Slope
Stabilize Trail
Restrict Access
Fossil Bed Proposed toRemain OpenFossil Bed Proposed toClose
Wetland
Clay Pit Wall
Study LimitsBrickyard Access Trail
Brickyard Trail
North Knob
Ravine
Ravine
P
P
Pre-construction condition (March 2015)4’ gully across path- culvert 100% blocked and washout around
Culvert Repair (April 2015)
Culvert removed, ravine channel regraded and culvert replaced.
Post Rain Event (May 8, 2015)
75% blockage after rain event. Upstream channel diverted during rain event and resulted in erosion west of culvert.
Post Rain Event (May 28, 2015)
100% blockage after additional rain events.
Sediment from North Knob area will continue to be deposited into Pickerel Lake and Mississippi River until North Knob stabilized.
Sediment caught by floating silt curtain
Sediment carried to Mississippi River via Pickerel Lake
Funding Request Summary
February 2016 - request $4.584 million to Minnesota Board of Water and Soil Resources (BWSR) - Unsuccessful.
May 2016 - resubmitted request to BWSR for Disaster Relief Funds (DRAP) for $1.905 million focusing on steep slope stability.
December 2016 - Received $925,000 in DRAP funds. Need for additional funds for restoration
- Received $164,500 Conservation Partners Legacy to enhance 61 acres of forest and prairie habitat in Cherokee Regional Park. Portion of funds will go towards bluff restoration.
- Reviewing application for restoration funds from Natural Resource Trust Fund in partnership with Ramsey Conservation District and Great River Greening. February 2018 deadline.
Meeting Agenda
1. Introductions & Project Background– General– Cherokee Heights Ravine
2. Engineering Design Items– North Knob Slope Design/Geometry– Disposal Site– Restoration-3D simulation
3. Schedule– Bidding– Construction
4. Questions/Discussion
4
Upstream Drainage Area Cherokee Heights Ravine
1
Municipal Boundary
Storm Sewer Manholes
Storm Sewer Pipes
k Waterfall
Stream/Ravine
Cherokee Heights Ravine
Cherokee Heights StudyArea
Brickyard Area Study Limits
Cherokee HeightsWatershed
Cherokee Heights RavineImprovement Alternatives Considered
1. Downstream channel stabilization• Engineered and bioengineering techniques• Selective planting and vegetation management
2. Peak flow reduction (US storage/culvert modifications)• Upstream storage & infiltration reduced bluff slope stability• Significant excavation changed park aesthetics• Loss of trees and park space
3. Downstream piped system• Riprap channel & piped system
to Mississippi River• High construction cost
6
Cherokee Heights Ravine 2018-2019 Improvements
1. Downstream channel stabilization
2. Underground stormwater treatment systems
7
Cherokee Heights Ravine Improvements Funding Sources
Project to be funded by BWSR Clean Water Fund grant award and contributing cities:
• Mendota Heights• West St. Paul• St. Paul
8
Meeting Agenda
1. Introductions & Project Background– General– Cherokee Heights Ravine
2. Engineering Design Items– North Knob Slope Design/Geometry– Disposal Site– Restoration-3D simulation
3. Schedule– Bidding– Construction
4. Questions/Discussion
9
Lilydale Park – Site Map
10
North Knob Area
Brickyard Trail
Next image
2015 Aerial Image (Post-June 2014 Failure)
11
FailedSoils and
New Stream
Channel Large2014 FailureArea
Seepage
Upper Waterfall
Lower Waterfall
Slope Failure Area & Lower North Stream Channel
12
March 30, 2017
Slope Failure Area & Lower North Stream Channel
13
Seepage
Large June 2014 slope failure from below with inset showing seepage (July 2014 site visit)
14Large slide, looking up through eroded stream channel (December 4 2017 site visit)
Slope Failure Area & Lower Stream Channel
Lower Stream Channel & Washed-out Culvert
15
North Knob Stabilization Improvement Alternatives Considered
1. Mechanical Stabilization – soil nails• Unnatural aesthetics• High cost
2. Mechanical Stabilization – piles• Constructability issues• High cost
3. Mechanical Stabilization – walls• Unnatural aesthetics• Constructability issues• High cost
4. Graded Slope Stabilization• Selected alternative due to aesthetics, cost and
constructability
16
Conceptual Slope Stabilization OptionsSoil Nails
17
Conceptual Slope Stabilization OptionsPiles
18
Conceptual Slope Stabilization OptionsWalls, Graded Slope, Soils Nails
19
Conceptual Slope Stabilization OptionsGraded Slope, Toe Protection
20
Final Grading Cross-Section
21
– Area of excavation
Soil Fill
Rock Buttress and Armored Toe of Slope
Stable Slope
Final Grading Concept
22
Grading Area
Alternate Grading Area
Waterfall Overlook
Lower Trail
Restoration - 3D Simulation
23
Existing Proposed
Restoration - Simulation
24
Restoration - Examples
25
Restoration - Examples
26
Disposal Area
27
Disposal Area
28
Work Elements
• Clearing & grubbing – slope and disposal area• Excavation & grading • Graded filter blanket for seepage conveyance• Riprap armoring at toe of slope• Erosion control & site restoration• Topsoil and vegetation
29
Grading and Earthwork Summary
• North Knob– 43,000 – 45,000 sq. ft. slope grading (2.5 hockey rinks)– 13,500 C.Y. of cut (8 ft. soil over 1 football field)– 3,300 C.Y. of filter rock and riprap toe protection
(5 ft. covering 1 hockey rink) • Disposal Site
– 50,000 sq. ft. grading (1 football field)– 10,000 cubic yards of fill (5.5 ft. over 1 football field)
30
Schedule
WSCO Meeting – February 1, 2018 Bidding – February/March 2018 Construction – Summer 2018
31
Questions/Discussion
32