1LIGO-G030695-00-W
Increasing the laser power incident on the recycling mirrors
Doug Cook and Rick SavageLIGO commissioning meeting Dec. 22, 2003
Ref. LIGO-T030288-00-W
![Page 2: LIGO-G030695-00-W 1 Increasing the laser power incident on the recycling mirrors Doug Cook and Rick Savage LIGO commissioning meeting Dec. 22, 2003 Ref](https://reader038.vdocuments.us/reader038/viewer/2022110322/56649d485503460f94a23ad4/html5/thumbnails/2.jpg)
2LIGO-G030695-00-W
LIGO I design requirementscirca 1995
6 watts of laser power incident on the recycling mirror
8.5 watts of laser power delivered to the IOO subsystem
10 watts of laser power delivered by the 126MOPA laser (Lightwave)» In a circular TEM00 mode
![Page 3: LIGO-G030695-00-W 1 Increasing the laser power incident on the recycling mirrors Doug Cook and Rick Savage LIGO commissioning meeting Dec. 22, 2003 Ref](https://reader038.vdocuments.us/reader038/viewer/2022110322/56649d485503460f94a23ad4/html5/thumbnails/3.jpg)
3LIGO-G030695-00-W
Present PSL/IOO optical layout
![Page 4: LIGO-G030695-00-W 1 Increasing the laser power incident on the recycling mirrors Doug Cook and Rick Savage LIGO commissioning meeting Dec. 22, 2003 Ref](https://reader038.vdocuments.us/reader038/viewer/2022110322/56649d485503460f94a23ad4/html5/thumbnails/4.jpg)
4LIGO-G030695-00-W
Example power budget
T 126 MOPA
T PMC
T EOMS
T MC
T FARADAY
10 Watts 85%
90 %
85 %
92 %
T =
60 %
PSL IOO
RM
8.5 Watts
6.0 Watts
Visibility = 88%
Visibility = 95 %
![Page 5: LIGO-G030695-00-W 1 Increasing the laser power incident on the recycling mirrors Doug Cook and Rick Savage LIGO commissioning meeting Dec. 22, 2003 Ref](https://reader038.vdocuments.us/reader038/viewer/2022110322/56649d485503460f94a23ad4/html5/thumbnails/5.jpg)
5LIGO-G030695-00-W
Present H1 power budget
T 126 MOPA
T PMC
T EOMS
T MC
T FARADAY
6.15 Watts
75 %
86 %
64 %
93 %
T =
38 %
PSL IOO
RM
4.61 Watts
2.36 Watts
Modematching = 87.5%
Visibility = 86 %
![Page 6: LIGO-G030695-00-W 1 Increasing the laser power incident on the recycling mirrors Doug Cook and Rick Savage LIGO commissioning meeting Dec. 22, 2003 Ref](https://reader038.vdocuments.us/reader038/viewer/2022110322/56649d485503460f94a23ad4/html5/thumbnails/6.jpg)
6LIGO-G030695-00-W
Present H2 power budget
T 126 MOPA
T PMC
T EOMS
T MC
T FARADAY
6.58 watts 85.0 %
75 %
88.5 %
82 %
PSL IOO
RM
5.59 watts
3.04 watts
Visibility = 95 %
Visibility = 97 %
T =
46 %
![Page 7: LIGO-G030695-00-W 1 Increasing the laser power incident on the recycling mirrors Doug Cook and Rick Savage LIGO commissioning meeting Dec. 22, 2003 Ref](https://reader038.vdocuments.us/reader038/viewer/2022110322/56649d485503460f94a23ad4/html5/thumbnails/7.jpg)
7LIGO-G030695-00-W
Present L1 power budget
T 126 MOPA
T PMC
T EOMS
T MC
T FARADAY
7.5 watts
73.3 %
83 %
?? %
?? %
PSL IOO
RM
5.5 watts
??? watts
Visibility = 80 % ?
Visibility = ?? %
4.56 watts
T =
?? %
![Page 8: LIGO-G030695-00-W 1 Increasing the laser power incident on the recycling mirrors Doug Cook and Rick Savage LIGO commissioning meeting Dec. 22, 2003 Ref](https://reader038.vdocuments.us/reader038/viewer/2022110322/56649d485503460f94a23ad4/html5/thumbnails/8.jpg)
8LIGO-G030695-00-W
Options for improvementoutside of the vacuum system
Increase 126MOPA power» Rebuild at Lightwave (LTW) to original specification.
– Doesn’t include NPRO
» Modify upstream PSL layout to facilitate swapping lasers– Mount phase-correcting EOM outside laser head– Add /2 plate and polarizer to set power to FSS and PMC paths– Modematch upstream of FSS/PMC splitter
Mount PMC inside a vacuum chamber» Reduce mirror losses from hundreds to ~ 50 ppm
Implement single EOM modulation scheme» Eliminate two EOMs from beam path
![Page 9: LIGO-G030695-00-W 1 Increasing the laser power incident on the recycling mirrors Doug Cook and Rick Savage LIGO commissioning meeting Dec. 22, 2003 Ref](https://reader038.vdocuments.us/reader038/viewer/2022110322/56649d485503460f94a23ad4/html5/thumbnails/9.jpg)
9LIGO-G030695-00-W
Proposed upstream PSL layout changes
![Page 10: LIGO-G030695-00-W 1 Increasing the laser power incident on the recycling mirrors Doug Cook and Rick Savage LIGO commissioning meeting Dec. 22, 2003 Ref](https://reader038.vdocuments.us/reader038/viewer/2022110322/56649d485503460f94a23ad4/html5/thumbnails/10.jpg)
10LIGO-G030695-00-W
PMC transmission vs.mirror losses
![Page 11: LIGO-G030695-00-W 1 Increasing the laser power incident on the recycling mirrors Doug Cook and Rick Savage LIGO commissioning meeting Dec. 22, 2003 Ref](https://reader038.vdocuments.us/reader038/viewer/2022110322/56649d485503460f94a23ad4/html5/thumbnails/11.jpg)
11LIGO-G030695-00-W
Expected H1 budgetwith only ‘outside’ improvements
T 126 MOPA
T PMC
T EOMS
T MC
T FARADAY
11 Watts
85 %
90 %
64 %
93 %
T =
46 %
PSL IOO
RM
9.35 Watts
5.01 Watts
Modematching = 87.5%
Visibility = 86 %
![Page 12: LIGO-G030695-00-W 1 Increasing the laser power incident on the recycling mirrors Doug Cook and Rick Savage LIGO commissioning meeting Dec. 22, 2003 Ref](https://reader038.vdocuments.us/reader038/viewer/2022110322/56649d485503460f94a23ad4/html5/thumbnails/12.jpg)
12LIGO-G030695-00-W
Expected H1 budget ifMC mirrors are also replaced
T 126 MOPA
T PMC
T EOMS
T MC
T FARADAY
11 Watts
85 %
90 %
90 %
93 %
T =
64%
PSL IOO
RM
9.35 Watts
7.04 Watts
Modematching = 87.5%
Visibility = 95 %
![Page 13: LIGO-G030695-00-W 1 Increasing the laser power incident on the recycling mirrors Doug Cook and Rick Savage LIGO commissioning meeting Dec. 22, 2003 Ref](https://reader038.vdocuments.us/reader038/viewer/2022110322/56649d485503460f94a23ad4/html5/thumbnails/13.jpg)
13LIGO-G030695-00-W
Expected H2 budgetwith only ‘outside’ improvements
T 126 MOPA
T PMC
T EOMS
T MC
T FARADAY
11 watts 85.0 %
90 %
88.5 %
82 %
T =
56 %
PSL IOO
RM
9.35 watts
6.11 watts
Visibility = 95 %
Visibility = 97 %
![Page 14: LIGO-G030695-00-W 1 Increasing the laser power incident on the recycling mirrors Doug Cook and Rick Savage LIGO commissioning meeting Dec. 22, 2003 Ref](https://reader038.vdocuments.us/reader038/viewer/2022110322/56649d485503460f94a23ad4/html5/thumbnails/14.jpg)
14LIGO-G030695-00-W
Expected H2 budget ifFaraday isolator is also replaced
T 126 MOPA
T PMC
T EOMS
T MC
T FARADAY
11 Watts
85 %
90 %
90 %
93 %
T =
64%
PSL IOO
RM
9.35 Watts
7.04 Watts
Modematching = 87.5%
Visibility = 95 %
![Page 15: LIGO-G030695-00-W 1 Increasing the laser power incident on the recycling mirrors Doug Cook and Rick Savage LIGO commissioning meeting Dec. 22, 2003 Ref](https://reader038.vdocuments.us/reader038/viewer/2022110322/56649d485503460f94a23ad4/html5/thumbnails/15.jpg)
15LIGO-G030695-00-W
Options for increasing the input laser power above the 11 W level
Rebuild the 126MOPA at LTW to 15-20 level» LTW technicians have indicated this is feasible
» May have been demonstrated in another LTW product
Replace the PA pump diodes with higher power units» LTW has identified new vendor and are starting to use them in
another product (Model 6000?). Stability issues?
Add a second amplifier head after the 126MOPA» Stanford has tested this configuration for Adv. LIGO PSL
development work
Accelerate procurement of Adv. LIGO laser from Hannover/LZH.