U.S. Army Aviation and Missile Command, G-3 G3-0559 – DMSMS, Panel A (Nenninger) – 06/14/2006
Life Cycle Management
Gary NenningerAMCOM G-311 July 2006
Diminishing Manufacturing Sources and Material Shortages (DMSMS) Conference
G3-0559 – DMSMS, Panel A (Nenninger) – 06/14/20062
U.S. Army Aviation and Missile Command, G-3
The Situation
Problem: Average Age of Army’s Aviation and Missile Systems Continues to Increase
What’s Being Done– New Procurement– Recapitalization– Modernization Through Spares
G3-0559 – DMSMS, Panel A (Nenninger) – 06/14/20063
U.S. Army Aviation and Missile Command, G-3
UH-60 ModernizationUH-60A/LBaselineUH-60A/LBaseline
TodayToday
UH-60MBlock IUH-60MBlock I
UH-60MP3I Spiral Dev
UH-60MP3I Spiral Dev
20072007 20092009 20132013
Analog CockpitSTD Transmission700 Series Engine
Digital CockpitDual Digital Flight ControlsFully-Coupled Flt DirectorWide Chord BladesRotor Brake ProvisionsFolding Composite StabilatorImproved Durability Gearbox701D Engine
Digital CockpitDual Digital Flight ControlsFully-Coupled Flt DirectorWide Chord BladesRotor Brake ProvisionsFolding Composite StabilatorImproved Durability Gearbox701D Engine
Improved Turbine Engine Program (ITEP)Improved TransmissionFLIR/MMRLarge Fuel CellImproved ASE Composite Airframe
Improved Turbine Engine Program (ITEP)Improved TransmissionFLIR/MMRLarge Fuel CellImproved ASE Composite Airframe
Fly-by-Wire (FBW) Advanced Flight ControlsFull-Authority Digital Engine Control (FADEC)Common Cockpit -Common Avionics Architecture Sys (CAAS)
Composite Tailcone – As ReadyJTRS – As ReadyIVMS / HUMS – As ReadyCMWS / IMCD – As Ready
Fly-by-Wire (FBW) Advanced Flight ControlsFull-Authority Digital Engine Control (FADEC)Common Cockpit -Common Avionics Architecture Sys (CAAS)
Composite Tailcone – As ReadyJTRS – As ReadyIVMS / HUMS – As ReadyCMWS / IMCD – As Ready
External Lift (lbs @135km):4500Air Assault Radius(km):225
External Lift (lbs @135km):4500Air Assault Radius (km):225
External Lift (lbs @135km):9000Air Assault Radius (km):275
Performance Attributes (4K Ft/950F):
UH-60MBlock IIUH-60MBlock II
Entered Army Service 1979Entered Army Service 1979 FUTUREFORCE
FUTUREFORCE
G3-0559 – DMSMS, Panel A (Nenninger) – 06/14/20064
U.S. Army Aviation and Missile Command, G-3
RecapitalizationRebuild Selected Upgrade
Technology Insertion
Zero TimeMaintenance Standard
Upgrade Warfighting Capability
Zero TimeMaintenance Standard
Technology Insertion
Same Model -New Life New Model -
New Life
Organic Depot End Organic Depot End Item WorkloadItem Workload
• Extended service life• Reduced Operating and Support (O&S) Cost• Improved System Reliability, Safety,
Maintainability, and Efficiency• Enhanced Capability
UHUH--60A60ACHCH--47F47F
AHAH--64D64D
Two Paths
One Outcome
G3-0559 – DMSMS, Panel A (Nenninger) – 06/14/20065
U.S. Army Aviation and Missile Command, G-3
Modernization Through Spares (MTS)T700 Engine Series Example
Future ForceFuture Force701D
TodayToday
TomorrowTomorrow
Field Upgradeable Power With New DECU/FADEC & HMU
Field Upgradeable Power With New DECU/FADEC & HMU
701D (-)701D (-)701D Without Power
Upgrade – Run With C Controls
701D Without Power Upgrade – Run With C
Controls
AH-64AAH-64A-701-701 -701C-701C
AH-64DAH-64D-701-701 -701C-701C
UH-60LUH-60L
DEPOT OVERHAUL
UH-60AUH-60A
• Reduce O&S Cost up to $100M/yr• Improve Readiness Thru
Commonality and + 30% TOW• 60 – 75 Day Depot Overhaul
• Reduce O&S Cost up to $100M/yr• Improve Readiness Thru
Commonality and + 30% TOW• 60 – 75 Day Depot Overhaul
-701C-701C -700-700
701D in UH-60A Control Integration
701D in UH-60A Control Integration
• Increased Power = Increased Payload• Increased Power = Increased Payload
• Army Working Capital Fund• Army Working Capital Fund
G3-0559 – DMSMS, Panel A (Nenninger) – 06/14/20066
U.S. Army Aviation and Missile Command, G-3
Barriers to Recap & MTS
Obsolescence
Non Availability from Original Vendor
Lack of Data Rights / TDP Lack of Data Rights / TDP Inhibits Reprocurement / Inhibits Reprocurement /
CompetitionCompetition
Up Front Funding Required To Reengineer Obsolete / Unprocurable Components
G3-0559 – DMSMS, Panel A (Nenninger) – 06/14/20067
U.S. Army Aviation and Missile Command, G-3
AMCOM Enterprise & Supply Chain
Comp D
Comp E
Customers
Comp A
Comp B
Aviation MissilesDCG
LCMC
PMs PMs
Comp F Comp C
AMRDEC DLA SMDC
CCAD LEADAC IMMC
G3-0559 – DMSMS, Panel A (Nenninger) – 06/14/20068
U.S. Army Aviation and Missile Command, G-3
Supply Chain Initiative
Develop Factory-to-Foxhole ViewIdentify Network of Multi-tiered Suppliers for Selected Dynamic ComponentsIdentify Critical Vulnerabilities in Enterprise Supply ChainIdentify Opportunities for Lean and Process Improvement Efforts Within Overall AMCOM Supply ChainDevelop Recommendations for Supply Chain Improvements Focus:– Increase Throughput Throughout Supply Chain– Decrease Production Lead Time– Increase Serviceable Inventory– Reduce Backorders and Procurement Due-in’s– Increase Induction of Unserviceable Onhand– Increase Flow of Overhaul
G3-0559 – DMSMS, Panel A (Nenninger) – 06/14/20069
U.S. Army Aviation and Missile Command, G-3
All Roads Lead To Timken Latrobe
Aviation Supply Chain/WebHeightened Demand on Limited Capacity
AMCOMIMMC/CCAD
Boeing Philly Bell
SikorskyBoeing Mesa
Tier 1A
Tier 1C
Tier 1D
Tier 1E
Tier 1B
Tier 2A Tier 2B
Tier 2D Tier 2C
Metal Producers“Timken”
Air Force/NavyDLA
G3-0559 – DMSMS, Panel A (Nenninger) – 06/14/200610
U.S. Army Aviation and Missile Command, G-3
Opportunities For Improvement Exist & Are Being Pursued
Supply Chain Initial Findings
Lead Times Too Long
Better Inventory Management Needed
Labor Vulnerability at Vendor Factories
Limited Communication or Visibility of Information in Supply Chain
Sole Source Restraints/Constrained Capacity for Specialty Metals
LineLine--ofof--Balance Reviews Balance Reviews of Aviation Items of Aviation Items –– Intensive Intensive
Management RequiredManagement Required
Berry Amendment Berry Amendment Impacting Specialty Metals Impacting Specialty Metals
AvailabilityAvailability
G3-0559 – DMSMS, Panel A (Nenninger) – 06/14/200611
U.S. Army Aviation and Missile Command, G-3
Path Ahead
Intensively Manage Supply Chain
Pursue Joint Contracting Initiatives
Avoid “Boom or Bust” Procurement Cycles
Consider Bringing Single Source / Foreign Source Items In-house (Eliminate Industry Capitalization Issue – Biggest Barrier to Market Entry)